Map / AI chips and networking
Nvidia NVDA
Dominant AI accelerator maker; Vera Rubin in full production; Q2 FY27 revenue $96.2B.
Depends on
- TSMC: Blackwell and Rubin chips. Analysts estimate Nvidia passed Apple as TSMC's largest customer in 2026, about 22% of revenue. MacRumors, 2026-01-28
- TSMC: CoWoS packaging capacity. Nvidia reportedly holds more than half of TSMC's 2026 CoWoS capacity. TrendForce, 2026-08-05
- Amkor: US packaging capacity. About $1.5B multi-year prepayment to expand Amkor's Peoria, Arizona site. ExplainX, 2026-07-27
- SK hynix: HBM4 for Vera Rubin. Roughly 60 to 70% of Nvidia's HBM4 volume. Tech Times, 2026-06-02
- Samsung Memory: HBM4 for Vera Rubin. An estimated 25 to 30% of volume. Tech Times, 2026-06-02
- Micron: HBM4 for Vera Rubin. Micron says HBM4 is shipping in volume for Vera Rubin. Tech Times, 2026-10-01
- Lumentum: Lasers for optical links. Nvidia paid about $2B each to Lumentum and Coherent for priority capacity. Tech Times, 2026-05-27
- Coherent: Lasers for optical links. Nvidia paid about $2B each to Lumentum and Coherent for priority capacity. Tech Times, 2026-05-27
- US Commerce (BIS): China export limits. H200 allowed case by case from January; Blackwell and Rubin stay banned. Interesting Engineering, 2026-01-13
- China regulators: H200 import block. Customs stopped H200 shipments despite US approval. Taipei Times, 2026-01-15
- Eaton: 800 V DC power design for Nvidia AI factories. Eaton is working with Nvidia on 800-volt direct-current power infrastructure for AI data center racks of 1 MW and beyond. Eaton (Business Wire), 2025-07-15
- Bond buyers: Nvidia's $25B bond in June 2026 (day approximate), its first in five years. Nvidia is itself a big investor in OpenAI ($30B) and xAI. Bonds, $25B. Fortune, 2026-07-17
Supplies
- Intel: $5B equity stake. Nvidia bought $5B of Intel stock; Intel will design x86 CPUs linked to NVLink. Network World, 2025-09
- CoreWeave: Vera Rubin systems. Named as a Vera Rubin ramping partner. Nvidia, 2026-08-26
- Microsoft: Vera Rubin systems. Azure named as a Vera Rubin ramping partner. Nvidia, 2026-08-26
- Oracle: Vera Rubin systems. Oracle named as a Vera Rubin ramping partner. Nvidia, 2026-08-26
- Google (Alphabet): Vera Rubin systems. Google Cloud named as a Vera Rubin ramping partner. Nvidia, 2026-08-26
- Nebius: Vera Rubin systems. Nebius named as a Vera Rubin ramping partner. Nvidia, 2026-08-26
- SpaceXAI (xAI): GPUs for Colossus. About 555,000 GPUs across Colossus 1 and 2; 2 GW planned. Introl, 2026-01
- OpenAI: $30B equity plus dedicated capacity. Part of OpenAI's $110B February round; 3 GW inference plus 2 GW training on Vera Rubin. TechCrunch, 2026-02-27
- Meta: $3B equity investment (announced, not closed). Nvidia agreed to invest $3B in Meta's stock offering as Meta expands its use of Nvidia systems. VKTR, 2026-10-26
- Synopsys: $2B equity stake. Nvidia bought $2 billion of Synopsys common stock as part of a multiyear, non-exclusive partnership announced December 1, 2025. NVIDIA, 2025-12-01
- Synopsys: CUDA-accelerated design and simulation software. The partnership moves Synopsys engineering and chip-design software onto Nvidia CUDA GPUs. NVIDIA, 2025-12-01
- SB Energy: Nvidia invested $1.5B in SB Energy, builder of OpenAI's PORTS campus in Ohio, where Nvidia will be the exclusive AI compute supplier. Equity investment, $1.5B. NVIDIA (SEC filing), 2026-08-17
- SB Energy: Cap on Nvidia's residual value guarantees for ~4.25 GW of OpenAI leases; paid only if OpenAI defaults and re-letting falls short. OpenAI must reimburse Nvidia. Lease or guarantee, up to $105B. NVIDIA (SEC filing), 2026-08-17
AI money
Q2 fiscal 2027 = quarter ended July 26, 2026 (reported Aug 26, 2026). H1 = first half of fiscal 2027 (Jan 26 to Jul 26, 2026). Q3 FY27 results not out until about Nov 18, 2026.
AI revenue
| What | Amount | Period | Detail and source |
|---|---|---|---|
| Data Center revenue | $89B | Q2 FY2027 | Up 117% from a year earlier; about 92.5% of total revenue. NVIDIA (SEC filing), 2026-08-26 |
| Total revenue guidance | $108B | Q3 FY2027 (quarter ending Oct 2026) | Plus or minus 2%; assumes no China data center compute revenue. NVIDIA (SEC filing), 2026-08-26 |
| Data Center revenue from hyperscalers | $48.7B | Q2 FY2027 | Hyperscale was about 55% of data center sales; the other $40.31B came from AI clouds, industrial and enterprise customers. Split as reported by The Next Platform. The Next Platform, 2026-08-27 |
Where the money comes from
| What | Amount | Period | Detail and source |
|---|---|---|---|
| Revenue | $96.2B | Q2 FY2027 (quarter ended Jul 26, 2026) | Total revenue, up 106% from a year earlier. NVIDIA (SEC filing), 2026-08-26 |
| Cash from its own business | $24.1B | Q2 FY2027 | Cash from operations was well below net income of $59.7B in the same quarter (see observations). NVIDIA (SEC filing), 2026-08-26 |
| Cash from its own business | $74.4B | H1 FY2027 (Jan 26 to Jul 26, 2026) | First-half cash from operations; net income for the same half was $118.0B. NVIDIA (SEC filing), 2026-08-26 |
Where it goes
| What | Amount | Period | Detail and source |
|---|---|---|---|
| Data centers and equipment | $2.7B | Q2 FY2027 | Purchases of property, equipment and intangible assets. H1 FY2027: $4.434B. NVIDIA (SEC filing), 2026-08-26 |
| Buybacks and dividends | $39B | H1 FY2027 | Share repurchases in the first half (Q2 alone: $19.732B). About $99.0B of buyback authorization remained at Jul 26, 2026. NVIDIA (SEC filing), 2026-08-26 |
| Buybacks and dividends | $6.3B | H1 FY2027 | Dividends paid in the first half (Q2 alone: $6.047B). NVIDIA (SEC filing), 2026-08-26 |
| Investing in AI companies | $31B | H1 FY2027 | Net additions to stakes in private (non-listed) companies; $13.1B of it in Q2. Balance rose from $22.3B (Jan 25, 2026) to $47.9B (Jul 26, 2026), plus $3.3B of stakes in 'infrastructure financiers'. The 10-Q excerpt read did not name the companies. NVIDIA (SEC filing), 2026-08-26 |
| Acquisitions to Groq, Inc. | $2.9B | Q2 FY2027 | Deferred payment to Groq under a non-exclusive license agreement, shown in financing cash flows. NVIDIA (SEC filing), 2026-08-26 |
| Acquisitions to Hugging Face | up to $11.9B | Expected to close H1 2027 | Agreed Sep 2, 2026 to buy Hugging Face for about $11.9B, plus up to about $1.0B of stock-based retention. Needs regulatory approval. NVIDIA (SEC filing), 2026-09-02 |
| Investing in AI companies | $18.5B | Q1 FY2027 (quarter ended Apr 26, 2026) | Purchases of private-company stakes in Q1, versus $649M the quarter before. Excludes listed-company stakes (e.g. Corning, IREN) and commitments not yet closed. TechCrunch, 2026-05-20 |
Spending it has promised
| What | Amount | Period | Detail and source |
|---|---|---|---|
| Residual value guarantees on OpenAI's leased data center campus (PORTS, Pike County, Ohio) with SB Energy (lessor) for OpenAI (tenant) | up to $105B | Leases are 20 years; capacity from 2028 | A cap, not a payment: Nvidia pays only if OpenAI defaults or goes insolvent and re-letting/sale recovers less than a guaranteed minimum value. Covers about 4.25 GW of IT load; Nvidia may (at its sole option) back another ~3.8 GW. OpenAI agreed to reimburse Nvidia for any amount it actually pays. NVIDIA (SEC filing), 2026-08-17 |
| Land, power and shell guarantees for AI cloud partners' data center leases with Unnamed AI cloud partners | up to $3.5B | Declines over 5 to 7 years | Notional amount at Jul 26, 2026. Partners put $712M in escrow to partly cover Nvidia's exposure. NVIDIA (SEC filing), 2026-08-26 |
| Buy CoreWeave's unsold cloud capacity with CoreWeave | $6.3B | Through Apr 13, 2032 | Initial value of the order. Nvidia must buy any capacity CoreWeave cannot sell to its own customers. CoreWeave (SEC filing), 2025-09-15 |
| Warrants to buy listed-company stock with Not named | $4.8B | 3 to 5 years | Notional value of warrants held at Jul 26, 2026 (none at Jan 25, 2026); fair value $824M. NVIDIA (SEC filing), 2026-08-26 |
| Compute financing platforms with Apollo, BlackRock, Blackstone, Brookfield, Goldman Sachs and KKR with apollo-blackstone-brookfield-and-others | up to $500B | Not stated | Release says the platforms 'could mobilize over $500B in third-party capital', subject to definitive agreements. This is outside money, not Nvidia's. NVIDIA (SEC filing), 2026-08-26 |
| Supply and capacity purchase commitments with Suppliers (mainly memory makers; not named) | $279B | Mostly fiscal 2027 to 2029 (about $92B rest of FY27, $87B FY28, $88B FY29) | Up from $119B a quarter earlier and $45.8B a year earlier. Company said the jump was 'primarily related to the procurement of memory'. Year split per TIKR. The Motley Fool via Nasdaq.com, 2026-08-27 |
| Multi-year cloud service agreements (Nvidia renting compute from clouds) with Unnamed cloud partners | $29B | Multi-year | Reported by a secondary summary of the 10-Q; the same summary elsewhere cites $36B, unreconciled. sec-api.io, 2026 |
| Equity investment commitments not yet funded with Not named | $25B | Not stated | From secondary summaries of the Q2 FY2027 10-Q; could not read this note in the filing directly. Hudson Labs, 2026 |
Who it depends on for revenue
- Q2 FY2027: one direct customer was 16% of total revenue. H1 FY2027: three direct customers were 16%, 15% and 13% (all Compute & Networking). A year earlier (Q2 FY2026) two direct customers were 23% and 16%. Some indirect customers (buying through those direct customers) are also 10%+ each, amounts not given. Hudson Labs, 2026
- Fiscal 2026 (year to Jan 25, 2026): one direct customer was 22% of revenue and another 14%. sec-api.io, 2026
- At Jul 26, 2026, five direct customers held 22%, 14%, 13%, 11% and 10% of accounts receivable (70% combined), up from three customers at 25%, 18%, 13% in January 2026. NVIDIA (SEC filing), 2026-08-26
- Hyperscalers were about 55% of Q2 FY2027 data center revenue ($48.71B of $89.0B). The Next Platform, 2026-08-27
Money flows with other companies
| Money from | Money to | Type | Amount | What, and source |
|---|---|---|---|---|
| Nvidia | SB Energy | Lease or guarantee | up to $105B | Loop Cap on Nvidia's residual value guarantees for ~4.25 GW of OpenAI leases; paid only if OpenAI defaults and re-letting falls short. OpenAI must reimburse Nvidia. The guarantee makes it possible to finance a campus whose tenant (OpenAI) is also an Nvidia investee and whose chips will be Nvidia's. 20-year leases from 2028 NVIDIA (SEC filing), 2026-08-17 |
| Nvidia | OpenAI | Equity investment | $30B | Loop Nvidia's $30B in OpenAI's $110B round at a $730B pre-money valuation (round closed Mar 31, 2026 at $122B committed, $852B post-money). Funding schedule not disclosed. OpenAI committed in the same announcement to 3 GW of inference capacity and 2 GW of training on Nvidia Vera Rubin systems, so much of the money is expected to come back to Nvidia as chip purchases. one-time (funding round) OpenAI, 2026-02-27 |
| Bond buyers | Nvidia | Bonds | $25B | Nvidia's $25B bond in June 2026 (day approximate), its first in five years. Nvidia is itself a big investor in OpenAI ($30B) and xAI. 2026-06-15 Fortune, 2026-07-17 |
| Nvidia | Hugging Face | Acquisition | up to $11.9B | Agreement to acquire Hugging Face for about $11.9B, pending regulatory approval. close expected H1 2027 NVIDIA (SEC filing), 2026-09-02 |
| Nvidia | Anthropic | Equity investment | up to $10B | Loop Nvidia committed to invest up to $10B in Anthropic Anthropic committed to up to 1 GW of Nvidia Grace Blackwell and Vera Rubin compute in the same deal. not stated NVIDIA blog, 2025-11-18 |
| Nvidia | CoreWeave | Compute contract | $6.3B | Loop Nvidia capacity order plus obligation to buy any unsold CoreWeave capacity through Apr 13, 2032 Nvidia is backstopping demand for capacity built with its own GPUs, which CoreWeave finances partly with Nvidia's equity. 2025–2032 CoreWeave / SEC EDGAR, 2025-09-15 |
| Nvidia | Intel | Equity investment | $5B | Nvidia bought 214,776,632 newly issued Intel shares for about $5B. 2025-12-26 Seeking Alpha, 2025-12-29 |
| Nvidia | Groq, Inc. | Acquisition | $2.9B | Deferred payment under Nvidia's non-exclusive license agreement with Groq, paid in Q2 FY2027. 2026-07-26 NVIDIA (SEC filing), 2026-08-26 |
| Nvidia | Coherent | Equity investment | $2B | Nvidia bought 7,788,161 Coherent shares at $256.80 for $2B cash; access to five extra product families for co-packaged optics. 2026-03-02 Coherent (SEC filing), 2026-03-02 |
| Nvidia | CoreWeave | Equity investment | $2B | Loop Nvidia bought $2B of CoreWeave Class A stock at $87.20 per share and pledged to use its 'financial strength' to help CoreWeave get land, power and shells for 5+ GW by 2030. CoreWeave is a major buyer of Nvidia GPUs; Nvidia is also its shareholder and its backstop customer. 2026-01-26 NVIDIA Newsroom, 2026-01-26 |
| Nvidia | Lumentum | Equity investment | $2B | Nvidia investing $2B (instrument not stated) plus a non-exclusive 'multi-billion' commitment to buy Lumentum laser parts. multi-year Lumentum (SEC filing), 2026-03-02 |
| Nvidia | Nebius | Equity investment | $2B | Loop Nvidia buys pre-funded warrants for 21.07M Nebius shares Nebius' capex ($5.7B in Q2 2026) goes mainly to GPUs, i.e., largely back to Nvidia. 2026-03-12 The Next Web, 2026-03-12 |
| Nvidia | SpaceXAI (xAI) | Equity investment | up to $2B | Loop Nvidia reportedly investing up to $2B of equity in xAI's Colossus 2 financing; the debt side buys Nvidia GPUs and leases them to xAI The vehicle uses the money to buy Nvidia GPUs. 2025-2026 Tom's Hardware, 2025-10-08 |
| Nvidia | Amkor | Prepayment | $1.5B | $1.5B multi-year packaging agreement for Arizona capacity, including a prepayment of undisclosed size. multi-year Amkor Technology, 2026-07-23 |
| Nvidia | SB Energy | Equity investment | $1.5B | Loop Nvidia invested $1.5B in SB Energy, builder of OpenAI's PORTS campus in Ohio, where Nvidia will be the exclusive AI compute supplier. Nvidia funds and guarantees the landlord of an OpenAI campus that will be filled with Nvidia systems. 2026-08-17 NVIDIA (SEC filing), 2026-08-17 |
| Nvidia | Amkor | Prepayment | $1.3B | $1.3B South Korea agreement with prepayments; Amkor's Nvidia agreements now total $3B. multi-year Amkor Technology, 2026-10-21 |
| Nvidia | King Yuan Electronics (KYEC) | Prepayment | $1.1B | $1.1B capacity reservation advance for new US chip-testing plants. Nvidia also gave IBIDEN a 'multibillion-dollar' advance (amount undisclosed). production from Apr 2027 TIKR, 2026 |
| CoreWeave | Nvidia | Chip purchase | amount not disclosed | CoreWeave GPU purchases (all GPUs are Nvidia); exact dollar amount not disclosed, the bulk of $35–39B 2026 capex 2026 Fintool, 2026-01-26 |
| Mistral | Nvidia | Chip purchase | amount not disclosed | 13,800 Nvidia chips for the Bruyeres-le-Chatel data center; price not disclosed (funded by the US$0.83B loan). 2026 Reuters via Yahoo Finance, 2026-03-30 |
| Nvidia | Mistral | Equity investment | amount not disclosed | Existing investor Nvidia added to its Mistral stake in the Series D; amount not disclosed. one-time Euronews, 2026-09-08 |
| Nvidia | TerraPower | Equity investment | amount not disclosed | NVentures (NVIDIA's venture arm) took part in TerraPower's $650M round; NVIDIA's share undisclosed. 2025-06-18 Crunchbase News, 2025-06-18 |
Amounts in US dollars. "Up to" amounts are maximums or depend on conditions. See Does it add up? for the full picture.
AI power
Sites
| Site and buyer | Planned | Status | Where its power comes from, and source |
|---|---|---|---|
| Hut 8 Beacon PointNvidia, Texas | 0.7 GWbasis unknown | Announced State policy risk 2027 | Not stated. Two 352 MW leases to one tenant, reported by the WSJ and FT to be Nvidia; Lambda reportedly installs the chips and sells about 350 MW to Anthropic. The Energy Mag, 2026-09-01 |
Planned gigawatts are not all measured the same way: 0 sites report computing (IT) load, 0 report total site power, and 1 do not say. Total site power runs roughly 20 to 50 percent above computing load, so sums across sites are approximate.
Chip and cloud deals sized in gigawatts
| Buyer and seller | Size | Status | What, and source |
|---|---|---|---|
| OpenAIfrom Nvidia | up to 10 GW | Option or up to 2026 | Letter of intent only. Reports in February 2026 said Nvidia's roughly $30B investment in OpenAI replaced it; others say the two are separate. Not counted in our totals. DatacenterDynamics, 2026-02 |
Power in gigawatts. Deals sized in gigawatts overlap with sites and are never added to them. See Is there enough power for AI? for the full picture.
Data as of 2026-11-17. Cite as: Ye, Mike. "Nvidia" (nvidia). AI Lattice, dataset v0.6.0. https://ailattice.ai/e/nvidia/. How to cite.