AI Lattice

Map / Model labs

Anthropic

Claude models; $965B valuation at its May 2026 raise; filed its public IPO registration on Oct 26, 2026 (proposed ticker ANT); compute from Google, Amazon, Microsoft and SpaceX.

InterfaceAlignment

Depends on

Supplies

AI money

Public S-1 filed 2026-10-26 (full years 2023-2025 and first half 2026, six months to June 30, 2026). Q3 2026 revenue and run-rate figures come from press reports of what Anthropic told investors. The SEC site could not be opened in this pass, so S-1 figures are taken from press coverage of the filing. Compute commitment figures differ between the confidential draft (reported by Reuters in September) and the public S-1 (reported in October); both are shown and labeled.

AI revenue

WhatAmountPeriodDetail and source
Revenue$16.3BH1 2026About 14 times H1 2025 ($1.16B). TechCrunch, 2026-10-26
Revenue$4.7BQ1 2026From documents shared with prospective investors. Bloomberg News, 2026-08-14
Revenue$11.5BQ2 2026'More than' $11.5B, preliminary; Q2 2025 was $0.787B. Adjusted operating income was positive (about $0.559B per FT, via AI Weekly). Bloomberg News, 2026-08-14
Revenue$16.8BQ3 2026What Anthropic told prospective investors (WSJ, via VKTR); up 45% from Q2. The public S-1 leaves Q3 blank. VKTR, 2026-10-21
Annualized revenue run-rate$65Bend of July 2026'Topped' $65B, per a person familiar. Was about $9B at end-2025, over $30B in April 2026, about $47B in May 2026. The S-1 defines run-rate as last-28-days usage fees x 13 plus monthly subscriptions x 12. The Star / Reuters, 2026-08-18
Revenue projection$195B2028Reported range of roughly $190B-$200B for 2028 (midpoint shown). The Star / Reuters, 2026-08-18
Business share of revenueamount not disclosed2025 (as of Nov 2025 projections)Corporate customers were about 80% of revenue, per documents seen by the WSJ. The S-1 coverage reviewed did not give a consumer vs business/API split. Fortune, 2025-11-12
Revenue$4.6BFY2025Up from $0.386B in 2024 and $0.041B in 2023 (S-1, as summarized by a secondary source). HackerNoon, 2026-10-26

Where the money comes from

WhatAmountPeriodDetail and source
Revenue$16.3BH1 2026Revenue for the six months to June 30, 2026, per the S-1; up from $1.2B in H1 2025. TechCrunch, 2026-10-26
Cash from its own business$3.9BH1 2026Cash from operations was positive in H1 2026. Capital spending was $0.482B, leaving free cash flow of about $3.45B (Fortune's figures from the S-1). H1 2025 operating cash flow was about -$1.5B (secondary source: HackerNoon). Fortune, 2026-10-27
Investment from a partner from Google (Alphabet)$10BApr 2026Google committed $10B in cash at a $350B valuation. Cyprus Mail, 2026-04-24
Investment from a partner from Google (Alphabet)up to $30BApr 2026 onwardUp to $30B more, conditional on Anthropic meeting performance targets. Total Google package is 'up to $40B'. Cyprus Mail, 2026-04-24
Investment from a partner from Amazon (AWS)$5BApr 2026Amazon's additional $5B, on top of $8B invested earlier. SiliconANGLE, 2026-04-20
Investment from a partner from Amazon (AWS)up to $20Blater, date not givenUp to $20B more at an unspecified later date (total 'up to $25B'). The S-1 names Amazon Web Services as a holder of convertible notes (per HackerNoon, secondary). SiliconANGLE, 2026-04-20
Investment from a partner from microsoft-and-nvidiaup to $15Bannounced Nov 2025Microsoft and Nvidia together committed to invest 'up to' $15B, as part of Anthropic's next funding round. The source does not give the split between them. Bloomberg News, 2025-11-18
Supplier financing from Broadcomup to $42Bfrom 2026, tied to a five-year chip leaseBroadcom agreed to lend 'up to' $42B through notes that can convert into Anthropic shares, to help pay for a $125.2B five-year lease of Google TPU computing capacity (could cover about a third). Broadcom may bring in a financing partner. Anthropic does not expect any notes to be sold before its IPO. The Star / Reuters, 2026-10-01
Investment from a partner from AMDup to $5Bnot statedAMD agreed to buy up to $5B of Anthropic stock (per Reuters' read of the confidential draft prospectus). Business Day / Reuters, 2026-09-29
New shares sold from Public stock buyersup to $100BIPO, expected mid-November 2026Fortune reports an expected raise of about $100B at a hoped-for $1.8T-$2.0T valuation. Not priced; the S-1 leaves the amount blank. Other reports put investor views closer to $1.5T. Fortune, 2026-10-27
New shares sold from GIC, Coatue and others$30BFeb 2026Series G at a $380B post-money valuation, led by GIC (Singapore sovereign fund) and Coatue. Reported to include money from Microsoft and Nvidia (not confirmed in the source opened). Orrick, 2026-02-17
New shares sold from Altimeter, Dragoneer, Greenoaks, Sequoia and others$65BMay 2026Series H at a $965B post-money valuation, led by Altimeter, Dragoneer, Greenoaks and Sequoia. The source does not split cash from other forms. Orrick, 2026-05-29
New shares sold$141Bcumulative through June 30, 2026Total raised since founding, per the S-1 as summarized by a secondary source. Includes preferred stock, convertible notes and SAFEs. HackerNoon, 2026-10-26

Where it goes

WhatAmountPeriodDetail and source
Renting compute$8.9BH1 2026Compute and infrastructure operating expense, up about 300% from H1 2025 ($2.3B). Anthropic books compute as an operating expense, not cost of revenue. The Stack, 2026-10-26
Data centers and equipment$482MH1 2026Anthropic owns little hardware itself; it mostly rents. Fortune, 2026-10-27
Data centers and equipment to Fluidstackup to $50Bannounced Nov 2025; sites coming online through 2026Announced $50B investment in custom data centers in Texas and New York, built with Fluidstack. An announced plan; contract terms not disclosed. Yahoo Finance / TechCrunch, 2025-11-12
Renting compute$7.3BFY2025Compute and infrastructure spending in 2025, about three times 2024. Sovereign Magazine, 2026-09

Spending it has promised

WhatAmountPeriodDetail and source
Total compute and infrastructure commitments (public S-1) with multiple-about-eight-or-nine-contractsup to $657Bmostly through 2030, remainder 2031-2045Fortune's tally from the public S-1: $657B total, of which $498B (76%) cannot be cancelled. Fortune estimates the non-cancellable part at roughly $70B a year if most contracts run seven years or less. Fortune, 2026-10-27
Non-cancellable portion of compute commitments (public S-1) with multiple$498Bmostly through 2030-2033Payable regardless of how much computing Anthropic actually uses. Fortune, 2026-10-27
Total cloud and data center commitments (confidential draft) with Google, Amazon, Microsoft, Broadcom, SpaceXAI, AMDup to $518Babout a decade'At least' $518B in the draft seen by Reuters; about 80% non-cancellable. Superseded by the public S-1 total above, which added deals signed after June. Business Day / Reuters, 2026-09-29
Google Cloud capacity with Google (Alphabet)$111BApr 2026 - Jul 2033'At least' $111.1B, payable regardless of usage; Anthropic pays any shortfall. The public S-1 reports at least about $114.5B, April 2026 to July 2033. Business Day / Reuters, 2026-09-29
AWS capacity with Amazon (AWS)$110BMay 2026 - Apr 2036Terms similar to Google's (payable regardless of usage). Announced in April 2026 as 'over $100B over the next decade' for up to 5 GW, including Trainium chips. Business Day / Reuters, 2026-09-29
Microsoft Azure capacity with Microsoft$31.4BNov 2026 - May 2033Cancellable only if Microsoft breaches and fails to fix it. Started as a $30B Azure commitment in Nov 2025. The public S-1 reports at least $44.9B, November 2026 to May 2033, so it was enlarged. Business Day / Reuters, 2026-09-29
Equipment lease obligations for Broadcom-built Google TPU systems with Broadcom$161Bno end date givenExcludes interest; neither side can cancel except on default. Includes the $125.2B five-year TPU lease that Broadcom's up-to-$42B convertible loan helps finance. The Stack, 2026-10-26
AMD compute with AMDup to $20Bnot statedExpected to 'exceed' $20B; cancellation terms not reported. Business Day / Reuters, 2026-09-29
Nscale and Lambda GPU rentals with Nscale, Lambdaup to $86Bthrough 2033-2034'Up to' $86B combined, per a draft S-1 viewed by the WSJ (via VKTR). The same report says deals worth up to $150B more were still being negotiated. VKTR, 2026-10-21
SpaceXAI compute (Colossus 1 and 2, Nvidia GPUs) with SpaceXAI (xAI)up to $120Bthrough 2029'Up to' $120.5B maximum contract value in the public S-1 (via analyst posts; secondary). Non-cancellable periods end Jan and Mar 2027; after that either side can exit on 90 days' notice. The draft said up to $84.5B; SpaceX's own S-1 described $1.25B a month through May 2029 (about $45B). Basenor, 2026-10-26

Who it depends on for revenue

Money flows with other companies

Money fromMoney toTypeAmountWhat, and source
AnthropicBroadcomLease or guarantee$161BEquipment lease obligations for Broadcom-built Google TPU systems, excluding interest no end date given The Stack, 2026-10-26
AnthropicSpaceXAI (xAI)Compute contractup to $120BColossus compute, 'up to'; cancellable on 90 days' notice after early 2027 through 2029 Basenor, 2026-10-26
AnthropicGoogle (Alphabet)Compute contract$111BGoogle Cloud capacity, payable regardless of use (public S-1: at least about $114.5B) Apr 2026 - Jul 2033 Business Day / Reuters, 2026-09-29
AnthropicAmazon (AWS)Compute contract$110BAWS capacity incl. Trainium, payable regardless of use May 2026 - Apr 2036 Business Day / Reuters, 2026-09-29
Venture capital fundsAnthropicEquity investment$65BSeries H at $965B, led by Altimeter, Dragoneer, Greenoaks, Sequoia 2026 Orrick, 2026-05-29
AnthropicFluidstackCompute contractup to $50BCustom data centers in Texas and New York (announced plan) through 2026 Yahoo Finance / TechCrunch, 2025-11-12
BroadcomAnthropicSupplier financingup to $42BLoop Convertible loan, 'up to', to help pay for leased TPU systems Broadcom lends money that is used to lease chips Broadcom helps build. tied to five-year TPU lease The Star / Reuters, 2026-10-01
Apollo with BlackstoneAnthropicLoanup to $35BA chip-backed special-purpose company arranged by Apollo and Blackstone for Anthropic's compute (reported as $35B or $36B). Staged. About $15B reportedly available by early 2027 Ugebrev Investor, 2026-06-13
AnthropicMicrosoftCompute contract$31.4BAzure capacity (public S-1: at least $44.9B) Nov 2026 - May 2033 Business Day / Reuters, 2026-09-29
Google (Alphabet)AnthropicEquity investmentup to $30BLoop Further Google investment if Anthropic hits performance targets Google invests; Anthropic commits to spend on Google Cloud and TPUs. conditional Cyprus Mail, 2026-04-24
Venture capital fundsAnthropicEquity investment$30BSeries G at $380B, led by GIC (sovereign) and Coatue 2026 Orrick, 2026-02-17
Amazon (AWS)AnthropicEquity investmentup to $20BLoop Further Amazon investment, 'up to' Anthropic committed $110B to AWS through 2036. later, unspecified SiliconANGLE, 2026-04-20
AnthropicAMDCompute contractup to $20BAMD compute, expected to exceed $20B not stated Business Day / Reuters, 2026-09-29
Google (Alphabet)AnthropicEquity investment$10BLoop Google cash investment at a $350B valuation Anthropic owes Google at least about $114.5B for cloud capacity, payable regardless of use (public S-1). 2026 Cyprus Mail, 2026-04-24
NvidiaAnthropicEquity investmentup to $10BLoop Nvidia committed to invest up to $10B in Anthropic Anthropic committed to up to 1 GW of Nvidia Grace Blackwell and Vera Rubin compute in the same deal. not stated NVIDIA blog, 2025-11-18
Amazon (AWS)AnthropicEquity investment$8BLoop Amazon's first $8B in Anthropic (two $4B tranches, 2023 and 2024), as recapped when the April 2026 investment was announced Amazon invests in the lab; the lab commits to spend on AWS. 2023 to 2024 SiliconANGLE, 2026-04-20
Amazon (AWS)AnthropicEquity investment$5BLoop Amazon's additional investment (after $8B earlier) Anthropic committed $110B to AWS through 2036. 2026 SiliconANGLE, 2026-04-20
AMDAnthropicEquity investmentup to $5BLoop AMD to buy up to $5B of Anthropic stock Anthropic expects to spend over $20B on AMD compute. not stated Business Day / Reuters, 2026-09-29
MicrosoftAnthropicEquity investmentup to $5BLoop Microsoft committed to invest up to $5B. Anthropic committed to buy $30B of Azure compute from Microsoft in the same deal. not stated NVIDIA blog, 2025-11-18
MGX (Abu Dhabi)AnthropicEquity investmentamount not disclosedInvested in Anthropic's $30B Series G (Feb 2026) and $65B Series H (May 2026). Amounts were not disclosed. 2026-05-29 The National, 2026-07-01
AnthropicBroadcomChip purchaseamount not disclosedCustom TPU chips; Anthropic to be Broadcom's largest custom-chip customer in 2027-28. No dollar value disclosed. about 1 GW 2026, 5 GW 2027, 10 GW 2028 The Next Platform, 2026-09-10

Amounts in US dollars. "Up to" amounts are maximums or depend on conditions. See Does it add up? for the full picture.

AI power

Sites

Site and buyerPlannedStatusWhere its power comes from, and source
Project Rainier, New CarlisleAnthropic with Amazon (AWS), New Carlisle, Indiana1.9 GWIT load1 GW running Being built full about early 2028Not stated. The largest AI site running today. Amazon owns the chips; Anthropic uses them. Sources do not say whether it counts toward Amazon's up-to-5 GW deal with Anthropic. Epoch AI, 2026-10-19
Colossus 1Anthropic with SpaceXAI (xAI), Memphis, Tennessee0.34 GWIT loadRunning Grid plus gas turbines. Built by xAI; Anthropic now rents its computing. Epoch AI, 2026-06-16
Nscale Monarch (Anthropic's share)Anthropic, West Virginia0.46 GWbasis unknownAnnounced 2027About 2 GW of on-site gas engines planned. About 460 MW for Anthropic, about $45B over six years (Bloomberg); first phase late 2027. The campus targets 2 GW initially; Microsoft's non-binding 1.35 GW letter was reportedly dropped. The Energy Mag (citing Bloomberg), 2026-08-26 Aker ASA (via Borskollen), 2026-05-08 Power Engineering, 2026-04-16
Hut 8 River BendAnthropic with Fluidstack, West Feliciana Parish, Louisiana0.24 GWIT loadAnnounced Not stated. 15-year lease with Fluidstack; Anthropic is the reported end user. The Energy Mag, 2026-09-01

Planned gigawatts are not all measured the same way: 3 sites report computing (IT) load, 0 report total site power, and 1 do not say. Total site power runs roughly 20 to 50 percent above computing load, so sums across sites are approximate.

Chip and cloud deals sized in gigawatts

Buyer and sellerSizeStatusWhat, and source
Anthropicfrom Amazon (AWS)up to 5 GWAnnounced 2026Up to 5 GW of Trainium; about 1 GW by end-2026. Anthropic, 2026-04-20
Anthropicfrom Google (Alphabet)up to 5 GWAnnounced 20273.5 GW of Google TPUs through Broadcom from 2027 is reported; one person said it could reach close to 5 GW. Yahoo Finance (Bloomberg), 2026-04-07
Anthropicfrom Google (Alphabet)1 GWBeing built 2026The first Google TPU deal (October 2025), coming online in 2026. TechRepublic, 2025-11-13
Anthropicfrom Microsoftup to 1 GWAnnounced About 1 GW on Nvidia systems in Azure. Dealroom (summarising The Information), 2026-09-06
Anthropicfrom AMDup to 2 GWAnnounced 2027Up to 2 GW; the first 1 GW deploys from the first half of 2027. AMD will invest up to $5B in Anthropic. AMD, 2026-07-22

Power in gigawatts. Deals sized in gigawatts overlap with sites and are never added to them. See Is there enough power for AI? for the full picture.

Data as of 2026-11-17. Cite as: Ye, Mike. "Anthropic" (anthropic). AI Lattice, dataset v0.6.0. https://ailattice.ai/e/anthropic/. How to cite.