94 companies, funders, grids and governments across 10 layers, joined by 182 sourced links. Pick any one to see what it buys, what it sells, and where it is exposed. Red dots mark the companies and agencies that hold the 12 chokepoints.

Data as of 2026-11-17

New: is there enough power for AI? Who has claimed the gigawatts, where the power comes from, and whether it can be switched on in time.

Who is allowed to do what in AI? Who needs permission, who grants it, and what it takes to pull it.

Who owns the front door to AI? Who owns the search box, the phone and the apps, whose model answers behind them, and who pays whom.

Does the AI money add up? Who is paying for the build-out, how much rests on a few labs, and where the money loops back.

The stack runs from the surface, where people meet AI, down to bedrock, where power is generated. Select a name to trace its links.

Chokepoints

Where a few holders control an input everyone else needs. Each entry keeps the record and our read apart: the left side is what public sources show, the right side is exmxc's judgment.

Advanced packaging (CoWoS)

ComputeBinding: limiting output now

Held by TSMC, ASE / SPIL, Amkor

What the record shows

  • Nvidia reportedly holds more than half of TSMC's 2026 CoWoS capacity. TrendForce, 2026-08-05
  • TSMC is reportedly outsourcing part of CoWoS to ASE; ASE and SPIL are adding their own lines with AMD's backing. TrendForce, 2026-08-05
  • Trade reports put CoWoS and 3nm lead times at 52 to 78 weeks and 2nm at 78 to 156 weeks as of late 2025; TSMC does not publish lead times. Silicon Analysts, 2026-06-16
  • On Oct 15 TSMC's CEO said AI demand is far above what the company can currently supply; 2026 capital spending stays at $60 to 64B. CRN Asia, 2026-10-15
  • TSMC signed a $2B deal for GlobalFoundries to make silicon interposers in New York, a CoWoS component, ramping in 2028. Manufacturing Dive, 2026-10-08

Our read

The tightest gate in the stack. Whoever holds packaging allocation decides who ships AI chips in 2027, and today that is Nvidia. Custom-chip programs from Google, Amazon and Meta compete for the remainder. TSMC outsourcing part of the process, and now buying interposers from GlobalFoundries, tells you it cannot add capacity fast enough on its own. The US supply arrives in 2028, so 2027 stays tight.

High-bandwidth memory

ComputeBinding: limiting output now

Held by SK hynix, Samsung Memory, Micron

What the record shows

  • A JPMorgan analyst who met Micron said it can meet only 50 to 67% of key customers' medium-term demand; its strategic customer agreements carry about $100B of minimum contracted revenue through 2030. Tech Times, 2026-10-01
  • SK hynix reported a 76% operating margin in Q2 2026. SK hynix, 2026-07-29
  • SK hynix reported a record 80% operating margin in Q3 2026 and says long-term contracts cover more than half of its planned 2027 and 2028 capacity; Korean press reports its DRAM and HBM are effectively sold out through 2029. TrendForce, 2026-10-28
  • Samsung's Q3 2026 profit appears to have been lifted by HBM4 sales for Nvidia's Vera Rubin platform, fully reflected from that quarter. Money Today, 2026-10-29

Our read

Three companies, with SK hynix reportedly sold out through 2029, and customers prepaying billions and signing multi-year contracts to secure supply. That is pricing power memory makers have never had. Samsung's return with HBM4 for Vera Rubin adds supply, but demand is rising faster, so it has not loosened the gate.

Leading-edge chipmaking (3nm, 2nm)

ComputeTight: scarce, not yet the limit

Held by TSMC

What the record shows

Our read

TSMC is the single point of failure for nearly every AI chip, Nvidia's and the custom ones alike. Samsung's Tesla win and Intel's 18A are real but small. A second source at scale is a 2028 story at the earliest.

EUV lithography

ComputeTight: scarce, not yet the limit

Held by ASML

What the record shows

Our read

A monopoly with a long queue. Memory makers are now its fastest-growing buyers, which links this chokepoint directly to the HBM one. ASML now says it cannot fully meet 2027 and 2028 demand, so this is the gate most likely to move from tight to binding next.

Optical lasers

ComputeBinding: limiting output now

Held by Lumentum, Coherent

What the record shows

  • Nvidia paid about $4B to lock up laser capacity, pushing rivals' lead times past 2027. Tech Times, 2026-05-27
  • Nvidia's co-packaged optics switch is in full production with a five-vendor supply chain. StorageReview, 2026-08-15
  • Lumentum's CEO said its parts are effectively sold out through early 2029. TIKR, 2026-10-09

Our read

The least-watched bottleneck. Connecting tens of thousands of chips needs lasers, and about five companies make them at scale. Nvidia locking up supply is a quiet way of making rival chip clusters harder to build, and the queue keeps lengthening: Lumentum now says it is sold out into early 2029.

Gas turbines

EnergyBinding: limiting output now

Held by GE Vernova, Siemens Energy

What the record shows

  • GE Vernova's backlog is 116 GW including slot reservations (53 GW firm orders), against output rising to about 20 GW a year. Turbomachinery Magazine, 2026-07
  • Siemens Energy quotes lead times of three years or more. Utility Dive, 2026-08
  • Mitsubishi's new orders deliver 2028 to 2030. Utility Dive, 2026-08
  • GE Vernova's gas turbines under contract or reserved rose to 122 GW in Q3 2026, with reservations now being taken for 2032 delivery and Q3 pricing more than 20% above late 2025. Utility Dive, 2026-10-29

Our read

Gas is the near-term answer to AI power, and three companies make the turbines. Their order books now run years ahead of their factories, with slots being reserved for 2032 and prices still rising. This is the clearest case of the stack shifting rent from chips to heavy equipment. Watch the pace of new reservations: it slowed in the third quarter, the first hint the queue may stop growing.

Grid connections and capacity

EnergyBinding: limiting output now

Held by PJM grid, ERCOT (Texas grid), FERC

What the record shows

  • PJM's 2028/29 auction cleared at its price cap and still came up 6,831 MW short. RTO Insider, 2026-07-15
  • About 474 GW is queued in Texas, 90% of it data centers; ERCOT delayed its first large-load study after the governor ordered an audit. Utility Dive, 2026-08
  • New York paused new hyperscale data center permits statewide for up to a year. New York State, 2026-07-14
  • FERC accepted PJM's Reliability Backstop Procurement of about 6.8 GW of new capacity but suspended it for five months, to Feb 28, 2027, subject to refund. FERC via PJM, 2026-09-29
  • On Oct 12 the Energy Department issued an emergency order letting PJM call on backup generation as a last resort, effective Oct 13 to 16. US Department of Energy, 2026-10-12

Our read

The grid is now the binding constraint on how fast AI capacity comes online. Expect more sites built with their own power plants, and more political fights over who pays.

Transformers and switchgear

EnergyTight: scarce, not yet the limit

Held by Eaton, Siemens Energy

What the record shows

  • Large power transformers average about 128 weeks to arrive; about 80% are imported. Industrial Sage, 2026
  • Eaton puts the US data center backlog at 307 GW, about 15 years of building at 2025 rates. Electrical Trends, 2026-08-26
  • GE Vernova agreed to buy high-voltage equipment maker Trench Group for $9.0B, bringing about $5B of backlog and framework agreements; closing is expected in late 2027. GE Vernova, 2026-10-28
  • Vertiv's Q3 2026 organic orders more than doubled from a year earlier. Vertiv, 2026-10-28

Our read

Unglamorous and slow to fix. Even a site with power promised cannot use it without this gear.

Firm nuclear power

EnergyTight: scarce, not yet the limit

Held by Constellation Energy, Vistra, Talen Energy

What the record shows

Our read

The existing fleet is almost fully spoken for, and new reactors arrive after 2030. The new supply that comes sooner is from upgrading existing reactors, as in Google's 890 MW deal with Constellation, and it does not come cheap. Owners of operating plants hold scarce, long-dated contracts. Nuclear is the long-term answer; gas is the answer now.

Government permission to sell a model

AlignmentBinding: limiting output now

Held by US Commerce (BIS), Pentagon, EU AI Office

What the record shows

  • On June 12 Commerce required export licenses for foreign access to Fable 5 and Mythos 5, and Anthropic disabled both for all customers. Controls were lifted June 30. CSIS, 2026-06-16
  • Access was restored July 1; Mythos 5 returned only for approved US organizations. Anthropic, 2026-07-01
  • The Pentagon's supply chain risk label on Anthropic was upheld on appeal. ABC News, 2026-09-25
  • EU enforcement against general-purpose model providers began Aug 2, 2026. Praxikon, 2026-08
  • The EU AI Office sent its first information requests to leading model makers, covering security, outside testing and monitoring after release. Reed Smith, 2026-10-26
  • China proposed adding 23 AI items to its export-control list, including model weights above certain performance thresholds, open for comment to Nov 15, Bloomberg reported. AI Weekly, 2026-10-16

Our read

New in 2026. A frontier model can now be switched off for every customer by a government letter. That makes regulatory standing a real input to a lab's revenue. The gate is widening: the EU has begun formal requests to model makers, and China has proposed its own permission rule for exporting model weights.

The default assistant

InterfaceTight: scarce, not yet the limit

Held by Google (Alphabet), Apple, OpenAI, Meta

What the record shows

  • Siri in iOS 27 runs on a custom Google Gemini model. Tech Insider, 2026-08-15
  • Gemini app at 950M monthly users; AI search mode above 1B. Google, 2026-07-22
  • Meta's Muse agent app reached No. 1 on the US App Store ten days after its September 8 launch, promoted through house ads on Facebook, Instagram and WhatsApp. TechCrunch, 2026-09-25
  • In an Oppenheimer survey of 1,500 US consumers, 8% said they would trust Meta with their passwords, versus 30% for Google. Yahoo Tech, 2026-09-21
  • Alphabet said the Gemini app passed one billion users. Alphabet, 2026-10-28
  • Meta said more than 10 million people in the US and Canada have set up Muse accounts. KSAT (AP), 2026-10-21

Our read

There are now three routes to being the assistant people use. Google owns the defaults: search, Android and Siri at once, and Gemini has passed a billion users. OpenAI owns the largest standalone audience but no device. Meta showed the third route, using its own apps to push Muse past 10 million accounts without needing Apple or Google. The next contest is trust, not reach: an agent that books and buys needs your accounts, and on that measure Meta starts well behind Google.

China's domestic chip supply

ComputeBinding: limiting output now

Held by SMIC, Huawei (Ascend), CXMT

What the record shows

Our read

China chose self-reliance over Nvidia, and the price is a hard ceiling on its compute. Memory, not chip design, is the weak link: CXMT's HBM yields run at less than half of SK hynix's, and Chinese chip designers are missing sales for lack of supply. China is buying chipmaking tools fast to close the gap.

The Four Forces

Every layer of the map sits under one of the Four Forces of AI Power: Compute, Interface, Alignment and Energy. Strength in one does not remove dependence on another.

Interface

The layer that controls human interaction and belief.

Where it stands

Expanding from chat windows into operating systems, coding tools and devices.

What binds it now

Default placement. Google now powers Siri on top of its own search and Android, and ChatGPT holds the largest standalone audience.

Chokepoints

Alignment

The governance system that decides permissible behavior.

Where it stands

Now includes permission to sell. A US model was switched off worldwide for 18 days in June 2026 by a Commerce letter.

What binds it now

Government permission. Export licensing, Pentagon procurement status and EU enforcement now decide market access for frontier models.

Chokepoints

What moved in 2026

  1. Meta signs about 6.6 GW of nuclear deals with Vistra, TerraPower and Oklo. World Nuclear News, 2026-01-09
  2. China's customs blocks Nvidia H200 imports two days after the US allowed them. Taipei Times, 2026-01-15
  3. OpenAI raises $110B from Amazon, Nvidia and SoftBank. TechCrunch, 2026-02-27
  4. Meta agrees to rent Google's TPUs, the first big outside buyer after Anthropic. The Decoder, 2026-02-27
  5. Oracle and OpenAI drop the Abilene Stargate expansion. DatacenterDynamics, 2026-03-06
  6. Anthropic, Google and Broadcom sign a 3.5 GW TPU deal starting 2027. Silicon Republic, 2026-04-07
  7. Amazon and Anthropic expand to up to 5 GW of Trainium. Anthropic, 2026-04-20
  8. Microsoft and OpenAI end exclusivity; OpenAI models reach AWS. VentureBeat, 2026-04-27
  9. Anthropic rents all of SpaceX's Colossus 1 data center. Anthropic, 2026-05-06
  10. Nvidia's Vera Rubin enters full production with three HBM4 suppliers. Tech Times, 2026-06-02
  11. Commerce requires licenses for Anthropic's Fable 5 and Mythos 5; Anthropic disables both for all customers until controls lift June 30. CSIS, 2026-06-16
  12. FERC orders six grid operators to rewrite large-load connection rules. Duane Morris, 2026-06-18
  13. New York imposes the first statewide hyperscale data center moratorium. New York State, 2026-07-14
  14. PJM capacity auction clears at its cap and still falls short. RTO Insider, 2026-07-15
  15. EU begins enforcing rules on general-purpose AI models. Praxikon, 2026-08
  16. TSMC reportedly outsources part of CoWoS packaging to ASE. TrendForce, 2026-08-05
  17. SpaceX closes its $60B purchase of Cursor. DevOps.com, 2026-06-16
  18. Salesforce and Anthropic announce Claudeforce: Salesforce data and workflows inside Claude, and Claude deeper in Agentforce and Slack. Salesforce, 2026-08-26
  19. Meta launches Muse, an AI agent app; it reaches No. 1 on the US App Store ten days later. TechCrunch, 2026-09-25
  20. Oracle reports a $664B backlog with negative free cash flow. ERP Today, 2026-09-11
  21. Appeals court upholds the Pentagon's supply chain risk label on Anthropic. ABC News, 2026-09-25
  22. Google announces Gemini 4 Argon, its largest model, first to cybersecurity partners and a voluntary US government review. Reuters via Khaleej Times, 2026-10-01
  23. Micron signs $100B of multi-year memory commitments; says it can meet only half to two-thirds of demand. Tech Times, 2026-10-01
  24. Google signs for 890 MW of new nuclear output from upgrades at 11 Constellation reactors, plus 2,700 MW of existing supply. Power Engineering, 2026-10-07
  25. USA Today Co. sues OpenAI for more than $250M over training on its journalism. Forbes, 2026-10-08
  26. ASML says its 2027 and 2028 supply will not fully meet demand. ASML / SEC, 2026-10-14
  27. TSMC's CEO says AI demand is far above what it can supply. CRN Asia, 2026-10-15
  28. Google expands paying news publishers, including CNN, for content used in Google News AI features. Google, 2026-10-15
  29. China proposes export controls covering AI model weights, Bloomberg reports. AI Weekly, 2026-10-16
  30. Anthropic files its public IPO registration (S-1), proposed Nasdaq ticker ANT. Anthropic / SEC, 2026-10-26
  31. SK hynix posts a record 80% operating margin; Korean press reports its memory is sold out through 2029. The Korea Times, 2026-10-28
  32. GE Vernova reports 122 GW of turbines under contract or reserved, and agrees to buy Trench Group for $9B. Utility Dive, 2026-10-29
  33. Alphabet says the Gemini app passed one billion users and names Apple as a TPU customer. Alphabet, 2026-10-28
  34. OpenAI cuts its funding round to about $20B at a $1.25T valuation, from $30B at $1.4T, as investors pull back. Reuters via KFGO, 2026-10-30

How the map is built

Evidence first

A link appears only when a dated public source says one party supplies another with chips, memory, power, compute, capital, distribution, data or permission. Each link carries its source and how strong that source is. Where the source supports the fact but does not name both parties, the link is marked Our inference; there are 7 of these.

Primary source 47 links from company, regulator or court records. Press report 100 links from news and trade press. Secondary source 35 links from aggregators, to be upgraded to primary sources.

Record and judgment stay apart

Facts and interpretation live in separate fields in the data and separate columns on the page. You can take the record and ignore our read.

Versions are kept

The map is updated monthly and fully re-verified each quarter. Every version is saved, and links are added, changed or retired with a date, so you can see how the lattice shifts over time.

Use it

The full dataset is free under CC BY 4.0, built for people and for AI agents alike.

Full rules are on the methodology page; citation formats are on how to cite.

Deals and filings that change the map are tracked at Strategic Signal. Company-level scoring lives at exmxc.ai.