SpaceXAI (xAI)
SpaceX merged with xAI in February; owns Colossus and, since August, Cursor.
Depends on
- Nvidia: GPUs for Colossus. About 555,000 GPUs across Colossus 1 and 2; 2 GW planned. Introl, 2026-01
- Banks: Bridge loan refinancing X and xAI high-yield debt. Loan, $20B. The Next Web, 2026-05-21
- Bond buyers: SpaceX (merged with xAI) sold $25B of bonds days after its IPO (exact date approximate). Bonds, $25B. Fortune, 2026-07-17
- MGX (Abu Dhabi): Backed xAI's $20B Series E. MGX's amount was not disclosed. Equity investment, amount not disclosed. UAE Preferred, 2026-07-02
- Apollo: Up to $12.5B of debt (Apollo, Diameter) to a special-purpose company that buys Nvidia GPUs for xAI's Colossus 2 and rents them to xAI. Loan, up to $12.5B. Free Malaysia Today (Bloomberg report), 2025-10-08
- Diameter Capital: Up to $12.5B of debt (Apollo, Diameter) to a special-purpose company that buys Nvidia GPUs for xAI's Colossus 2 and rents them to xAI. Co-lender with Apollo in this loan, up to $12.5B; its own share was not disclosed. Free Malaysia Today (Bloomberg report), 2025-10-08
- Public stock buyers: IPO proceeds, mostly to repay debt. Equity investment, $75B. AI Weekly / TradingKey, 2026-06-11
- Venture capital funds: xAI Series E (Valor, StepStone, Fidelity, QIA, MGX, Baron, Nvidia, Cisco). Equity investment, $20B. StorageNewsletter (edited xAI press release), 2026-01-12
Supplies
- Anthropic: All of Colossus 1. More than 300 MW and 220,000+ Nvidia GPUs. Anthropic, 2026-05-06
- Cursor: $60B acquisition. Announced June 16, closed August 14, 2026. AI Weekly, 2026-08-14
AI money
xAI merged into SpaceX in Feb 2026 (all-stock, xAI valued at $250B). SpaceX listed June 12, 2026. Figures: FY2025 and Q1 2026 from the S-1 (via press), Q2 2026 (reported Aug 4) and Q3 2026 (reported Oct 20) from press coverage of results. The AI segment was renamed 'SuperIntelligence' by Q3.
AI revenue
| What | Amount | Period | Detail and source |
|---|---|---|---|
| AI segment revenue | $3.2B | FY2025 | xAI plus X, consolidated back to earlier periods. AI segment operating loss $6.355B. Trending Topics, 2026-05-21 |
| AI segment revenue | $818M | Q1 2026 | AI segment loss $2.469B. Trending Topics, 2026-05-21 |
| AI segment operating loss | -$1.3B | Q2 2026 | Narrower than expected. Hargreaves Lansdown, 2026-08-05 |
| AI ('SuperIntelligence') segment revenue | $7.6B | Q3 2026 | About 52% of group revenue; up more than ninefold, driven by new cloud-services deals and the Cursor acquisition. Segment operating profit about $0.431B. No breakdown by customer; Anthropic pays SpaceX $1.25B a month for Colossus compute (per SpaceX's S-1). XTB, 2026-10-20 |
| Group annualized revenue target | $100B | December 2026 run-rate (guidance) | Q1 2027 revenue guided at $33B-$37B. Hargreaves Lansdown, 2026-10-21 |
Where the money comes from
| What | Amount | Period | Detail and source |
|---|---|---|---|
| Cash from its own business | $4.4B | FY2025 | Operating profit of the Connectivity (Starlink) segment on $11.387B revenue - the profitable business that helps fund AI. Space segment lost $0.657B; AI lost $6.355B; group operating loss $2.589B. Trending Topics, 2026-05-21 |
| Revenue | $14.6B | Q3 2026 | Group revenue; AI segment about $7.6B, Starlink about $5.2-5.3B, Space about $1.8B. Net profit $4.4B, but only $2.79B was operating profit (rest: $1.025B unexplained 'other', interest income, tax benefit). XTB, 2026-10-20 |
| Bank loans from Banks | $20B | drawn before May 2026; matures Sept 2027 | Bridge loan from Goldman Sachs, Bank of America, Citi, JPMorgan and Morgan Stanley at about 4.58%. It refinanced $17.5B of high-interest debt from X (about $12.5B from the Twitter buyout) and xAI (a $5B raise in 2025 at up to ~12%). The Next Web, 2026-05-21 |
| Bank loans | $9B | as of S-1 (Mar 31, 2026) | 'Other financings', including obligations tied to AI infrastructure recorded as failed sale-leasebacks (assets sold and leased back but still counted as borrowing). A $5B revolving credit line was undrawn. The Next Web, 2026-05-21 |
| Off-balance-sheet vehicle from private-credit-nvidia | up to $20B | announced Oct 2025 | xAI's roughly $20B Colossus 2 raise: $7-8B equity and up to $12B debt, routed through a special-purpose company that buys Nvidia GPUs and leases them to xAI. Nvidia to put in up to $2B of the equity. Lender names (reported elsewhere as Apollo, Valor and others) are not confirmed in the source opened. Tom's Hardware, 2025-10-08 |
| New shares sold from Public stock buyers | $75B | IPO priced June 11, 2026 | About $75B at $135/share, $1.75T valuation, about 4% float. Over three-quarters earmarked for repaying debt; under $18B left for growth projects. AI Weekly / TradingKey, 2026-06-11 |
| New shares sold from venture-funds, sovereign-funds, nvidia, Cisco | $20B | Jan 2026 (xAI Series E, pre-merger) | Upsized from a $15B target. Investors: Valor, StepStone, Fidelity, Qatar Investment Authority, MGX, Baron; Nvidia and Cisco as strategic investors. Valuation not stated. StorageNewsletter (edited xAI press release), 2026-01-12 |
Where it goes
| What | Amount | Period | Detail and source |
|---|---|---|---|
| Data centers and equipment | $7.7B | Q1 2026 | AI capex alone - more than Space and Connectivity combined; about 76% of group capex. Trending Topics, 2026-05-21 |
| Data centers and equipment | $18.4B | Q2 2026 | Group capex; about $15.8-16B went to the AI buildout. Hargreaves Lansdown, 2026-08-05 |
| Data centers and equipment | up to $37.5B | Q4 2026 guidance | Guided $35B-$40B (midpoint shown). SpaceX expects about 3 GW of data center capacity at end-2026 and to add about 10 GW in 2027, citing roughly $30B-$50B of capex per GW. Hargreaves Lansdown, 2026-10-21 |
| Acquisitions to Cursor | $60B | closed Aug 14, 2026 | All-stock: Cursor shares converted into about 389.3 million SpaceX Class A shares. No cash paid. VKTR, 2026-08-14 |
| Acquisitions to SpaceXAI (xAI) | $250B | Feb 2026 | All-stock merger valuing xAI at $250B and SpaceX at $1T. No cash paid. Bloomberg News, 2026-02-03 |
| Data centers and equipment | $19.6B | Q3 2026 | Group capex, above quarterly revenue; $16.4B (about 84%) went to AI. Free cash outflow was $10.0B in the quarter. investingLive, 2026-10-20 |
Spending it has promised
| What | Amount | Period | Detail and source |
|---|---|---|---|
| Anthropic compute contract (SpaceX is the seller) with Anthropic | up to $45B | May 2026 - May 2029 | $1.25B a month for Colossus 1 and 2 capacity (over 220,000 Nvidia GPUs, 300+ MW); either side may cancel on 90 days' notice. Anthropic's S-1 puts the maximum value at up to $120.5B. HotHardware, 2026-05-21 |
Who it depends on for revenue
- AI took about 84% of Q3 2026 capex while contributing about 52% of revenue and under 10% of profit (XTB estimate). XTB, 2026-10-20
Money flows with other companies
| Money from | Money to | Type | Amount | What, and source |
|---|---|---|---|---|
| Anthropic | SpaceXAI (xAI) | Compute contract | up to $120B | Colossus compute, 'up to'; cancellable on 90 days' notice after early 2027 through 2029 Basenor, 2026-10-26 |
| Public stock buyers | SpaceXAI (xAI) | Equity investment | $75B | IPO proceeds, mostly to repay debt 2026 AI Weekly / TradingKey, 2026-06-11 |
| SpaceXAI (xAI) | Cursor | Acquisition | $60B | All-stock purchase of Cursor closed VKTR, 2026-08-14 |
| Bond buyers | SpaceXAI (xAI) | Bonds | $25B | SpaceX (merged with xAI) sold $25B of bonds days after its IPO (exact date approximate). 2026-06-23 Fortune, 2026-07-17 |
| Banks | SpaceXAI (xAI) | Loan | $20B | Bridge loan refinancing X and xAI high-yield debt matures Sept 2027 The Next Web, 2026-05-21 |
| Venture capital funds | SpaceXAI (xAI) | Equity investment | $20B | xAI Series E (Valor, StepStone, Fidelity, QIA, MGX, Baron, Nvidia, Cisco) 2026 StorageNewsletter (edited xAI press release), 2026-01-12 |
| Apollo with Diameter Capital | SpaceXAI (xAI) | Loan | up to $12.5B | Up to $12.5B of debt (Apollo, Diameter) to a special-purpose company that buys Nvidia GPUs for xAI's Colossus 2 and rents them to xAI. Five-year chip rental Free Malaysia Today (Bloomberg report), 2025-10-08 |
| Nvidia | SpaceXAI (xAI) | Equity investment | up to $2B | Loop Nvidia reportedly investing up to $2B of equity in xAI's Colossus 2 financing; the debt side buys Nvidia GPUs and leases them to xAI The vehicle uses the money to buy Nvidia GPUs. 2025-2026 Tom's Hardware, 2025-10-08 |
| Tesla | SpaceXAI (xAI) | Equity investment | $2B | Tesla invested $2B in xAI's Series E; now held as SpaceX shares after the merger. closed in 2026 (cash paid $2.002B in 9 months to Sep 2026) TechCrunch, 2026-01-28 |
| SpaceXAI (xAI) | Tesla | Prepayment | up to $588M | Tesla billed SpaceX $588M for Megapacks not yet delivered; unpaid at quarter end (per Tesla 10-Q as reported by Electrek). billed, unpaid at Sept 30, 2026 Electrek, 2026-10-22 |
| SpaceXAI (xAI) | Tesla | Chip purchase | $303M | xAI bought $303M of Tesla products and services, of which $269M was Megapack batteries for its data centers (per SpaceX IPO filing). Type is 'equipment purchase' (closest allowed type). Jan 1 – Apr 30, 2026 Drive Tesla Canada, 2026-06-04 |
| MGX (Abu Dhabi) | SpaceXAI (xAI) | Equity investment | amount not disclosed | Backed xAI's $20B Series E. MGX's amount was not disclosed. 2026-01-05 UAE Preferred, 2026-07-02 |
Amounts in US dollars. "Up to" amounts are maximums or depend on conditions. See Does it add up? for the full picture.
AI power
Sites
| Site and buyer | Planned | Status | Where its power comes from, and source |
|---|---|---|---|
| Colossus 1Anthropic with SpaceXAI (xAI), Memphis, Tennessee | 0.34 GWIT load | Grid plus gas turbines. Built by xAI; Anthropic now rents its computing. Epoch AI, 2026-06-16 | |
| Colossus 2SpaceXAI (xAI), Memphis, Tennessee and Southaven, Mississippi | 1.5 GWIT load | Being built full about early 2027 | On-site gas: 69 temporary turbines being replaced by a permanent 1.2 GW plant by July 2027, plus batteries. Also used by Anthropic and Cursor. Epoch AI, 2026-07-30 |
Planned gigawatts are not all measured the same way: 2 sites report computing (IT) load, 0 report total site power, and 0 do not say. Total site power runs roughly 20 to 50 percent above computing load, so sums across sites are approximate.
Power supply deals
| Project and type | Power | Status | Detail and source |
|---|---|---|---|
| Permanent gas plant beside Colossus 2, Southaven, MississippiGas plant built for the campus, for SpaceXAI (xAI) | 1.2 GW | Being built | 41 turbines, permitted March 2026, being built. Replaces the 69 temporary turbines, which must go by July 2027. Gizmodo, 2026-08-01 |
Power in gigawatts. Deals sized in gigawatts overlap with sites and are never added to them. See Is there enough power for AI? for the full picture.
Data as of 2026-11-17. Cite as: Ye, Mike. "SpaceXAI (xAI)" (spacexai). AI Lattice, dataset v0.6.0. https://ailattice.ai/e/spacexai/. How to cite.