AI Lattice

Map / Data centers and cloud

Crusoe

Builds and runs the Abilene, Texas Stargate campus; valued at $30B.

ComputeEnergy

Depends on

Supplies

AI money

Private company, no audited financials published. Figures are funding rounds and loans reported Jan 2025 – Sep 2026.

Where the money comes from

WhatAmountPeriodDetail and source
Bank loans from Banks$7.1BMay 2025JPMorgan-led construction loan to the Blue Owl / Crusoe / Primary Digital joint venture for phase two of the 1.2 GW Abilene, Texas campus (part of a $15B JV). Abilene is the first Stargate site built for OpenAI and Oracle. Newmark via Nasdaq, 2025-05-22
New shares sold from Sovereign wealth funds$3BSep 2026Bloomberg: 'over $3B' at roughly $30B valuation; Mubadala Capital (Abu Dhabi) participated. Same round as above, do not add. Bloomberg via Bloomberg Government, 2026-09-03
New shares sold from Nvidia$1.4BOct 2025 (Series E)About $10B valuation; investors included Nvidia, Fidelity, Founders Fund, Valor and Mubadala. Nvidia's amount not disclosed. Tech Funding News, 2026-09-04
Revenue from Jane Streetup to $13B5-year contract, signed 2026Reported $13B five-year contract for Jane Street to use GPUs and AI infrastructure via Crusoe Cloud (Bloomberg, as cited). Contract value over time, not revenue to date. Tech Funding News, 2026-09-04
New shares sold from Venture capital funds$3.9BSep 2026 (Series F)Reported $3.9B Series F at about $30.9B post-money valuation, co-led by Atreides, Valor Equity Partners and Mubadala; Founders Fund, TPG and Qatar Investment Authority participated (secondary source citing WSJ). Bloomberg earlier reported 'over $3B at about $30B'. KuCoin News / MarsBit, 2026-09-17
Bank loans from Banksup to $509MSep 2026Goldman Sachs delayed-draw term loan; price talk SOFR+4.75–5.00% (secondary source citing Octus). AM Compute, 2026-10

Where it goes

WhatAmountPeriodDetail and source
Data centers and equipmentamount not disclosed2025–2026Capex not disclosed. Abilene JV is described as a $15B project. Newmark via Nasdaq, 2025-05-22

Who it depends on for revenue

Money flows with other companies

Money fromMoney toTypeAmountWhat, and source
Jane StreetCrusoeCompute contractup to $13BReported five-year Crusoe Cloud contract 5 years Tech Funding News, 2026-09-04
BanksCrusoeLoan$7.1BJPMorgan-led construction loan for Abilene phase 2 (Crusoe/Blue Owl/Primary Digital $15B JV, 1.2 GW). The site is leased to Oracle and used by OpenAI. Construction loan Newmark (press release via Nasdaq), 2025-05-22
Sovereign wealth fundsCrusoeEquity investment$3.9BSeries F at ~$30.9B valuation; co-led by Atreides, Valor and Mubadala (Abu Dhabi), with Qatar Investment Authority, Founders Fund, TPG (amount by investor not disclosed) 2026-09-17 KuCoin News / MarsBit, 2026-09-17
Blue OwlCrusoeEquity investmentamount not disclosedBlue Owl equity in the $15B Abilene JV. Its own amount was not disclosed. 2025-05-21 TipRanks / TheFly, 2025-05-21

Amounts in US dollars. "Up to" amounts are maximums or depend on conditions. See Does it add up? for the full picture.

AI power

Sites

Site and buyerPlannedStatusWhere its power comes from, and source
Stargate AbileneOpenAI with Crusoe, Abilene, Texas1.2 GWfacility (running figure is IT load)0.82 GW running Being built State policy risk all 8 buildings about Nov 2026Grid plus an on-site gas plant. Oracle confirmed about 0.62 GW of IT load running in September; Epoch estimates all eight buildings, about 0.82 GW, by November. Oracle and OpenAI dropped a planned expansion toward 2.1 GW in March 2026. Epoch AI, 2026-10-28
Crusoe Abilene expansionMicrosoft with Crusoe, Abilene, Texas0.9 GWbasis unknown (two buildings of 336 MW computing load each)Being built State policy risk first building mid-2027A 900 MW on-site power plant plus batteries. The capacity OpenAI and Oracle gave up next door went to Microsoft. Crusoe, 2026-03-27 Tom's Hardware, 2026-03

Planned gigawatts are not all measured the same way: 0 sites report computing (IT) load, 1 report total site power, and 1 do not say. Total site power runs roughly 20 to 50 percent above computing load, so sums across sites are approximate.

Power supply deals

Project and typePowerStatusDetail and source
Engine No. 1 and Chevron gas for CrusoeGas plant built for the campus, for Crusoeup to 4.5 GWOption or up to A 2025 framework for up to 4.5 GW using GE Vernova turbines; sites never published. Data Center Frontier, 2025-03-24
ProEnergy gas turbines for CrusoeGas turbines on site, for Crusoe0.65 GWAnnounced Thirteen 50 MW units; site not named. Power Engineering, 2026-04-16

Power in gigawatts. Deals sized in gigawatts overlap with sites and are never added to them. See Is there enough power for AI? for the full picture.

Data as of 2026-11-17. Cite as: Ye, Mike. "Crusoe" (crusoe). AI Lattice, dataset v0.6.0. https://ailattice.ai/e/crusoe/. How to cite.