{
 "name": "AI Lattice",
 "description": "A sourced map of who depends on whom in the AI economy, from power plants to model labs, with the chokepoints marked.",
 "version": "0.6.0",
 "as_of": "2026-11-17",
 "status": "published",
 "publisher": {
  "name": "exmxc.ai",
  "url": "https://www.exmxc.ai",
  "founder": "Mike Ye"
 },
 "framework": {
  "name": "The Four Forces of AI Power",
  "url": "https://www.exmxc.ai/frameworks/four-forces-of-ai-power"
 },
 "companion_datasets": [
  {
   "name": "Strategic Signal",
   "url": "https://strategicsignal.ai/"
  }
 ],
 "rules": [
  "Every link between two entities cites a dated public source. Links the source implies but does not state are marked basis=inferred.",
  "Observed facts and interpretation are stored in separate fields and never mixed.",
  "Updated monthly and fully re-verified each quarter. Every version is kept; links are added, changed or retired with a date, never silently edited."
 ],
 "license": "CC BY 4.0, cite as: AI Lattice (exmxc.ai), version and date",
 "forces": [
  {
   "id": "compute",
   "name": "Compute",
   "definition": "The physical capacity to train and deploy intelligence.",
   "state_2026": "Consolidating into competing, vertically integrated camps: Nvidia's, Google's TPU camp, Amazon's Trainium camp, and China's Huawei stack.",
   "binding_constraint": "Packaging and memory, not chip design. TSMC's packaging lines and three memory makers decide how many AI chips ship."
  },
  {
   "id": "interface",
   "name": "Interface",
   "definition": "The layer that controls human interaction and belief.",
   "state_2026": "Expanding from chat windows into operating systems, coding tools and devices.",
   "binding_constraint": "Default placement. Google now powers Siri on top of its own search and Android, and ChatGPT holds the largest standalone audience."
  },
  {
   "id": "alignment",
   "name": "Alignment",
   "definition": "The governance system that decides permissible behavior.",
   "state_2026": "Now includes permission to sell. A US model was switched off worldwide for 18 days in June 2026 by a Commerce letter.",
   "binding_constraint": "Government permission. Export licensing, Pentagon procurement status and EU enforcement now decide market access for frontier models."
  },
  {
   "id": "energy",
   "name": "Energy",
   "definition": "The resource that powers the exponential.",
   "state_2026": "Moving from grid access toward owned, firm power: on-site gas, restarted nuclear plants, fuel cells.",
   "binding_constraint": "Turbines, transformers and grid connections. Chips are arriving faster than buildings can be powered."
  }
 ],
 "layers": [
  {
   "id": "energy",
   "name": "Power",
   "force": "energy",
   "order": 0,
   "description": "Electricity to run the machines: power plants, turbines, grid connections and the electrical gear between them."
  },
  {
   "id": "tools",
   "name": "Chipmaking tools",
   "force": "compute",
   "order": 1,
   "description": "The machines that make chips. A few suppliers, years of lead time."
  },
  {
   "id": "fab",
   "name": "Chip factories and packaging",
   "force": "compute",
   "order": 2,
   "description": "Foundries that print the chips, and the packaging lines that stitch chips and memory together."
  },
  {
   "id": "memory",
   "name": "Memory",
   "force": "compute",
   "order": 3,
   "description": "High-bandwidth memory (HBM) stacked beside each AI chip. Sold out in advance."
  },
  {
   "id": "chips",
   "name": "AI chips and networking",
   "force": "compute",
   "order": 4,
   "description": "The accelerators that do the math, and the switches and lasers that connect them."
  },
  {
   "id": "cloud",
   "name": "Data centers and cloud",
   "force": "compute",
   "order": 5,
   "description": "The companies that buy the chips, build the buildings and rent out the compute."
  },
  {
   "id": "models",
   "name": "Model labs",
   "force": "interface",
   "order": 6,
   "description": "The labs that train frontier models and sell access to them."
  },
  {
   "id": "interface",
   "name": "Distribution and data",
   "force": "interface",
   "order": 7,
   "description": "The screens, devices and content that put models in front of people."
  },
  {
   "id": "rules",
   "name": "Rules and permissions",
   "force": "alignment",
   "order": 8,
   "description": "The governments and regulators that decide what can be sold, to whom, and where it can be built."
  },
  {
   "id": "capital",
   "name": "Money and funders",
   "force": "capital",
   "order": 9,
   "description": "The investors, lenders and bond buyers who pay for the build-out."
  }
 ],
 "entities": [
  {
   "id": "ge-vernova",
   "name": "GE Vernova",
   "layer": "energy",
   "kind": "company",
   "ticker": "GEV",
   "role": "Largest gas turbine maker; 116 GW backlog including reservations.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/ge-vernova/"
  },
  {
   "id": "siemens-energy",
   "name": "Siemens Energy",
   "layer": "energy",
   "kind": "company",
   "ticker": "ENR",
   "role": "Gas turbines and grid equipment; 69 GW turbine backlog, lead times three years or more.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/siemens-energy/"
  },
  {
   "id": "constellation",
   "name": "Constellation Energy",
   "layer": "energy",
   "kind": "company",
   "ticker": "CEG",
   "role": "Largest US nuclear fleet operator; 20-year contracts with Microsoft, Meta and Amazon.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/constellation/"
  },
  {
   "id": "vistra",
   "name": "Vistra",
   "layer": "energy",
   "kind": "company",
   "ticker": "VST",
   "role": "Nuclear and gas generator; 20-year nuclear contracts with Meta and Amazon.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/vistra/"
  },
  {
   "id": "talen",
   "name": "Talen Energy",
   "layer": "energy",
   "kind": "company",
   "ticker": "TLN",
   "role": "Owns Susquehanna nuclear plant; 1.92 GW contract with Amazon through 2042.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/talen/"
  },
  {
   "id": "terrapower",
   "name": "TerraPower",
   "layer": "energy",
   "kind": "company",
   "ticker": null,
   "role": "Advanced reactor developer (Natrium); up to 2.8 GW option with Meta.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/terrapower/"
  },
  {
   "id": "oklo",
   "name": "Oklo",
   "layer": "energy",
   "kind": "company",
   "ticker": "OKLO",
   "role": "Small reactor developer; 1.2 GW campus plan with Meta, first phase around 2030.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/oklo/"
  },
  {
   "id": "entergy",
   "name": "Entergy",
   "layer": "energy",
   "kind": "company",
   "ticker": "ETR",
   "role": "Louisiana utility building gas plants to serve Meta's Hyperion campus.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/entergy/"
  },
  {
   "id": "bloom",
   "name": "Bloom Energy",
   "layer": "energy",
   "kind": "company",
   "ticker": "BE",
   "role": "On-site fuel cells; up to 2.8 GW agreement with Oracle.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/bloom/"
  },
  {
   "id": "eaton",
   "name": "Eaton",
   "layer": "energy",
   "kind": "company",
   "ticker": "ETN",
   "role": "Switchgear, power distribution and liquid cooling for data centers.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/eaton/"
  },
  {
   "id": "pjm",
   "name": "PJM grid",
   "layer": "energy",
   "kind": "grid",
   "ticker": null,
   "role": "Largest US grid region (13 states plus DC); 2028/29 capacity auction cleared at its price cap and still fell short.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/pjm/"
  },
  {
   "id": "ercot",
   "name": "ERCOT (Texas grid)",
   "layer": "energy",
   "kind": "grid",
   "ticker": null,
   "role": "Texas grid; about 474 GW of connection requests, roughly 90% from data centers; large-load study paused.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/ercot/"
  },
  {
   "id": "asml",
   "name": "ASML",
   "layer": "tools",
   "kind": "company",
   "ticker": "ASML",
   "role": "Sole maker of EUV lithography machines needed for leading-edge chips.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/asml/"
  },
  {
   "id": "applied-materials",
   "name": "Applied Materials",
   "layer": "tools",
   "kind": "company",
   "ticker": "AMAT",
   "role": "Deposition, etch and packaging equipment for logic and memory makers.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/applied-materials/"
  },
  {
   "id": "lam",
   "name": "Lam Research",
   "layer": "tools",
   "kind": "company",
   "ticker": "LRCX",
   "role": "Etch and deposition tools; packaging tools up more than 70% in 2026.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/lam/"
  },
  {
   "id": "tokyo-electron",
   "name": "Tokyo Electron",
   "layer": "tools",
   "kind": "company",
   "ticker": "8035",
   "role": "Etch, coating and packaging tools; China share of revenue fell to 26.8%.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/tokyo-electron/"
  },
  {
   "id": "tsmc",
   "name": "TSMC",
   "layer": "fab",
   "kind": "company",
   "ticker": "TSM",
   "role": "Makes nearly every leading AI accelerator and runs CoWoS, the dominant AI chip packaging line.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/tsmc/"
  },
  {
   "id": "samsung-foundry",
   "name": "Samsung Foundry",
   "layer": "fab",
   "kind": "company",
   "ticker": "005930",
   "role": "Second leading-edge foundry; Tesla AI5 on 2nm at Taylor, Texas.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/samsung-foundry/"
  },
  {
   "id": "intel",
   "name": "Intel",
   "layer": "fab",
   "kind": "company",
   "ticker": "INTC",
   "role": "Chipmaker and foundry; 18A in production with ASML High-NA; Nvidia owns a $5B stake.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/intel/"
  },
  {
   "id": "smic",
   "name": "SMIC",
   "layer": "fab",
   "kind": "company",
   "ticker": "0981",
   "role": "China's leading foundry; makes Huawei's Ascend chips; ran at 93.7% utilization in Q2 2026.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/smic/"
  },
  {
   "id": "amkor",
   "name": "Amkor",
   "layer": "fab",
   "kind": "company",
   "ticker": "AMKR",
   "role": "Chip packaging; building Nvidia-funded capacity in Peoria, Arizona.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/amkor/"
  },
  {
   "id": "ase",
   "name": "ASE / SPIL",
   "layer": "fab",
   "kind": "company",
   "ticker": "ASX",
   "role": "Largest outside packaging house; now taking part of TSMC's CoWoS work.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/ase/"
  },
  {
   "id": "sk-hynix",
   "name": "SK hynix",
   "layer": "memory",
   "kind": "company",
   "ticker": "000660",
   "role": "Leading HBM supplier; about 60 to 70% of Nvidia's HBM4 volume; record 80% operating margin in Q3 2026; its memory is reportedly sold out through 2029.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/sk-hynix/"
  },
  {
   "id": "samsung-memory",
   "name": "Samsung Memory",
   "layer": "memory",
   "kind": "company",
   "ticker": "005930",
   "role": "HBM4 qualified at Nvidia and AMD in 2026; expected to supply HBM4 for AMD's MI455X.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/samsung-memory/"
  },
  {
   "id": "micron",
   "name": "Micron",
   "layer": "memory",
   "kind": "company",
   "ticker": "MU",
   "role": "US memory maker; $54.2B quarter; about $100B of minimum contracted revenue through 2030.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/micron/"
  },
  {
   "id": "cxmt",
   "name": "CXMT",
   "layer": "memory",
   "kind": "company",
   "ticker": null,
   "role": "China's DRAM maker, about 10% share; sampling HBM3E to Chinese chip designers.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/cxmt/"
  },
  {
   "id": "nvidia",
   "name": "Nvidia",
   "layer": "chips",
   "kind": "company",
   "ticker": "NVDA",
   "role": "Dominant AI accelerator maker; Vera Rubin in full production; Q2 FY27 revenue $96.2B.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/nvidia/",
   "money": "Funds its own customers: $30B into OpenAI, stakes in CoreWeave, Nebius and xAI, and up to $105B of lease guarantees for OpenAI sites."
  },
  {
   "id": "amd",
   "name": "AMD",
   "layer": "chips",
   "kind": "company",
   "ticker": "AMD",
   "role": "Second GPU supplier; 6 GW deals each with OpenAI and Meta; Helios racks shipping.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/amd/"
  },
  {
   "id": "broadcom",
   "name": "Broadcom",
   "layer": "chips",
   "kind": "company",
   "ticker": "AVGO",
   "role": "Designs custom AI chips for Google, Meta, OpenAI and Anthropic; AI revenue $16.7B a quarter.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/broadcom/"
  },
  {
   "id": "marvell",
   "name": "Marvell",
   "layer": "chips",
   "kind": "company",
   "ticker": "MRVL",
   "role": "Custom chip partner across Google, AWS and Microsoft programs.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/marvell/"
  },
  {
   "id": "huawei",
   "name": "Huawei (Ascend)",
   "layer": "chips",
   "kind": "company",
   "ticker": null,
   "role": "China's main AI chip supplier; about 1.5M Ascend chips expected in 2026.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/huawei/"
  },
  {
   "id": "cerebras",
   "name": "Cerebras",
   "layer": "chips",
   "kind": "company",
   "ticker": null,
   "role": "Wafer-scale inference chips; 750 MW deal with OpenAI through 2028.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/cerebras/"
  },
  {
   "id": "lumentum",
   "name": "Lumentum",
   "layer": "chips",
   "kind": "company",
   "ticker": "LITE",
   "role": "Lasers for optical links; only volume shipper of 200G-per-lane lasers.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/lumentum/"
  },
  {
   "id": "coherent",
   "name": "Coherent",
   "layer": "chips",
   "kind": "company",
   "ticker": "COHR",
   "role": "Lasers and optical modules; took about $2B from Nvidia for priority capacity.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/coherent/"
  },
  {
   "id": "microsoft",
   "name": "Microsoft",
   "layer": "cloud",
   "kind": "company",
   "ticker": "MSFT",
   "role": "Azure passed $100B a year; owns about 27% of OpenAI; $678B contracted backlog.",
   "forces": [
    "compute",
    "interface"
   ],
   "url": "https://ailattice.ai/e/microsoft/",
   "money": "About 45% of its backlog was tied to OpenAI at end-2025; $329B of signed data-center leases not yet started; sold $25B of bonds in October 2026."
  },
  {
   "id": "amazon",
   "name": "Amazon (AWS)",
   "layer": "cloud",
   "kind": "company",
   "ticker": "AMZN",
   "role": "Largest cloud; Trainium chips; investor in both Anthropic and OpenAI.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/amazon/",
   "money": "About $220B of 2026 capex; negative $42.4B free cash flow over twelve months; invested in both Anthropic and OpenAI, which then committed $248B to AWS."
  },
  {
   "id": "google",
   "name": "Google (Alphabet)",
   "layer": "cloud",
   "kind": "company",
   "ticker": "GOOGL",
   "role": "Cloud plus its own TPU chips, used by Anthropic, Meta and Apple, and partnering with Oracle to deliver TPU systems; owns the Gemini lab (see Google DeepMind).",
   "forces": [
    "compute",
    "interface"
   ],
   "url": "https://ailattice.ai/e/google/",
   "money": "About $200B of 2026 capex; raised $85B of debt and $50B of new shares; up to $40B into Anthropic, which owes Google Cloud at least $111B."
  },
  {
   "id": "oracle",
   "name": "Oracle",
   "layer": "cloud",
   "kind": "company",
   "ticker": "ORCL",
   "role": "Builds Stargate capacity for OpenAI; $664B backlog, negative free cash flow.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/oracle/",
   "money": "Rated one notch above junk; negative free cash flow; $664B backlog (OpenAI's share not disclosed); $288B of signed leases not yet started."
  },
  {
   "id": "coreweave",
   "name": "CoreWeave",
   "layer": "cloud",
   "kind": "company",
   "ticker": "CRWV",
   "role": "Largest neocloud; $104B backlog; customers include Meta and OpenAI.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/coreweave/",
   "money": "$104B backlog concentrated in a few customers; deeply negative free cash flow; high-yield debt."
  },
  {
   "id": "nebius",
   "name": "Nebius",
   "layer": "cloud",
   "kind": "company",
   "ticker": "NBIS",
   "role": "Neocloud with multi-year contracts from Microsoft and Meta.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/nebius/"
  },
  {
   "id": "crusoe",
   "name": "Crusoe",
   "layer": "cloud",
   "kind": "company",
   "ticker": null,
   "role": "Builds and runs the Abilene, Texas Stargate campus; valued at $30B.",
   "forces": [
    "compute",
    "energy"
   ],
   "url": "https://ailattice.ai/e/crusoe/"
  },
  {
   "id": "fluidstack",
   "name": "Fluidstack",
   "layer": "cloud",
   "kind": "company",
   "ticker": null,
   "role": "Partner in Anthropic's $50B data center build-out; Google backstops its power-site leases.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/fluidstack/"
  },
  {
   "id": "alibaba-cloud",
   "name": "Alibaba Cloud",
   "layer": "cloud",
   "kind": "company",
   "ticker": "BABA",
   "role": "China's largest cloud; trains Qwen; capex up 75% in its latest quarter.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/alibaba-cloud/"
  },
  {
   "id": "google-deepmind",
   "name": "Google DeepMind (Gemini)",
   "layer": "models",
   "kind": "lab",
   "ticker": "GOOGL",
   "role": "Google's frontier model lab; Gemini 4 Argon announced Sept 30, 2026; Gemini app passed one billion users by Q3 2026; paid for from Alphabet's own cash.",
   "forces": [
    "interface",
    "compute"
   ],
   "url": "https://ailattice.ai/e/google-deepmind/"
  },
  {
   "id": "openai",
   "name": "OpenAI",
   "layer": "models",
   "kind": "lab",
   "ticker": null,
   "role": "Makes ChatGPT; closed a $122B round of committed capital in March 2026 ($110B of it announced in February); buys compute and chips from Microsoft, Oracle, Amazon, CoreWeave, AMD and Cerebras.",
   "forces": [
    "interface",
    "compute"
   ],
   "url": "https://ailattice.ai/e/openai/",
   "money": "Signed about $688B of compute with Oracle, Microsoft and Amazon against about $50 to 70B of annual revenue; backed by a $122B committed round from Amazon, Nvidia, SoftBank and others, of which $80B is documented as paid."
  },
  {
   "id": "anthropic",
   "name": "Anthropic",
   "layer": "models",
   "kind": "lab",
   "ticker": null,
   "role": "Claude models; $965B valuation at its May 2026 raise; filed its public IPO registration on Oct 26, 2026 (proposed ticker ANT); compute from Google, Amazon, Microsoft and SpaceX.",
   "forces": [
    "interface",
    "alignment"
   ],
   "url": "https://ailattice.ai/e/anthropic/",
   "money": "Compute deals tallied at $657B by Fortune ($498B non-cancellable), $265.6B of fixed commitments in its own S-1; cash-positive from operations in H1 2026 with $132B of cash; most commitments are owed to its own investors."
  },
  {
   "id": "meta",
   "name": "Meta",
   "layer": "models",
   "kind": "lab",
   "ticker": "META",
   "role": "Builds its own campuses and rents from Google, CoreWeave and Nebius; its Muse AI agent app reached No. 1 on the US App Store in September 2026.",
   "forces": [
    "interface",
    "compute",
    "energy"
   ],
   "url": "https://ailattice.ai/e/meta/",
   "money": "About $140B of 2026 capex; capex exceeded operating cash in Q3; moved $27B of Hyperion debt off its books."
  },
  {
   "id": "spacexai",
   "name": "SpaceXAI (xAI)",
   "layer": "models",
   "kind": "lab",
   "ticker": null,
   "role": "SpaceX merged with xAI in February; owns Colossus and, since August, Cursor.",
   "forces": [
    "compute",
    "interface"
   ],
   "url": "https://ailattice.ai/e/spacexai/",
   "money": "AI capex of about $16B a quarter funded by Starlink, a $75B IPO, bonds and bank loans."
  },
  {
   "id": "deepseek",
   "name": "DeepSeek",
   "layer": "models",
   "kind": "lab",
   "ticker": null,
   "role": "Chinese open-weight lab; serving on Huawei Ascend chips.",
   "forces": [
    "interface"
   ],
   "url": "https://ailattice.ai/e/deepseek/"
  },
  {
   "id": "moonshot",
   "name": "Moonshot (Kimi)",
   "layer": "models",
   "kind": "lab",
   "ticker": null,
   "role": "Chinese lab; raised $2B at $20B; Kimi is the base of Cursor's own model.",
   "forces": [
    "interface"
   ],
   "url": "https://ailattice.ai/e/moonshot/"
  },
  {
   "id": "mistral",
   "name": "Mistral",
   "layer": "models",
   "kind": "lab",
   "ticker": null,
   "role": "European lab; raised €3B at €21B to build 1 GW of European compute.",
   "forces": [
    "interface",
    "alignment"
   ],
   "url": "https://ailattice.ai/e/mistral/"
  },
  {
   "id": "apple",
   "name": "Apple",
   "layer": "interface",
   "kind": "company",
   "ticker": "AAPL",
   "role": "Siri in iOS 27 runs on a custom Google Gemini model.",
   "forces": [
    "interface"
   ],
   "url": "https://ailattice.ai/e/apple/"
  },
  {
   "id": "tesla",
   "name": "Tesla",
   "layer": "interface",
   "kind": "company",
   "ticker": "TSLA",
   "role": "Designs its own AI5 chip for cars and robots, made by Samsung and TSMC.",
   "forces": [
    "compute",
    "interface"
   ],
   "url": "https://ailattice.ai/e/tesla/"
  },
  {
   "id": "cursor",
   "name": "Cursor",
   "layer": "interface",
   "kind": "company",
   "ticker": null,
   "role": "AI coding tool; acquired by SpaceX for $60B, closed August 2026.",
   "forces": [
    "interface"
   ],
   "url": "https://ailattice.ai/e/cursor/"
  },
  {
   "id": "reddit",
   "name": "Reddit",
   "layer": "interface",
   "kind": "company",
   "ticker": "RDDT",
   "role": "Licenses its posts to Google and OpenAI for model training.",
   "forces": [
    "interface"
   ],
   "url": "https://ailattice.ai/e/reddit/"
  },
  {
   "id": "news-corp",
   "name": "News Corp",
   "layer": "interface",
   "kind": "company",
   "ticker": "NWSA",
   "role": "Licenses WSJ and New York Post archives to Meta.",
   "forces": [
    "interface"
   ],
   "url": "https://ailattice.ai/e/news-corp/"
  },
  {
   "id": "us-commerce",
   "name": "US Commerce (BIS)",
   "layer": "rules",
   "kind": "government",
   "ticker": null,
   "role": "Controls chip and model exports; required licenses for Anthropic's Fable 5 and Mythos 5 from June 12 until June 30.",
   "forces": [
    "alignment"
   ],
   "url": "https://ailattice.ai/e/us-commerce/"
  },
  {
   "id": "pentagon",
   "name": "Pentagon",
   "layer": "rules",
   "kind": "government",
   "ticker": null,
   "role": "Labeled Anthropic a supply chain risk; label upheld 2-1 on appeal Sept 25.",
   "forces": [
    "alignment"
   ],
   "url": "https://ailattice.ai/e/pentagon/"
  },
  {
   "id": "ferc",
   "name": "FERC",
   "layer": "rules",
   "kind": "government",
   "ticker": null,
   "role": "Federal power regulator; ordered six grid operators to rewrite large-load rules.",
   "forces": [
    "alignment",
    "energy"
   ],
   "url": "https://ailattice.ai/e/ferc/"
  },
  {
   "id": "new-york",
   "name": "New York State",
   "layer": "rules",
   "kind": "government",
   "ticker": null,
   "role": "First statewide moratorium on new hyperscale data centers, up to one year.",
   "forces": [
    "alignment",
    "energy"
   ],
   "url": "https://ailattice.ai/e/new-york/"
  },
  {
   "id": "eu-ai-office",
   "name": "EU AI Office",
   "layer": "rules",
   "kind": "government",
   "ticker": null,
   "role": "Enforcement against general-purpose model providers began Aug 2, 2026.",
   "forces": [
    "alignment"
   ],
   "url": "https://ailattice.ai/e/eu-ai-office/"
  },
  {
   "id": "china-gov",
   "name": "China regulators",
   "layer": "rules",
   "kind": "government",
   "ticker": null,
   "role": "Blocked Nvidia H200 imports at customs despite US approval; proposed export controls covering AI model weights in October 2026 (reported).",
   "forces": [
    "alignment"
   ],
   "url": "https://ailattice.ai/e/china-gov/"
  },
  {
   "id": "globalfoundries",
   "name": "GlobalFoundries",
   "layer": "fab",
   "kind": "company",
   "ticker": "GFS",
   "role": "US contract chipmaker; signed a $2B deal to make silicon interposers for TSMC's packaging, ramping in 2028.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/globalfoundries/"
  },
  {
   "id": "cnn",
   "name": "CNN",
   "layer": "interface",
   "kind": "company",
   "ticker": null,
   "role": "News network; among the publishers Google pays to license content for Google News AI features.",
   "forces": [
    "interface"
   ],
   "url": "https://ailattice.ai/e/cnn/"
  },
  {
   "id": "synopsys",
   "name": "Synopsys",
   "layer": "tools",
   "kind": "company",
   "ticker": "SNPS",
   "role": "Chip-design (EDA) and simulation software maker; Nvidia bought $2B of its stock in December 2025.",
   "forces": [
    "compute",
    "alignment"
   ],
   "url": "https://ailattice.ai/e/synopsys/"
  },
  {
   "id": "salesforce",
   "name": "Salesforce",
   "layer": "interface",
   "kind": "company",
   "ticker": "CRM",
   "role": "Business software (CRM, Slack, Tableau); its Agentforce platform runs Claude and OpenAI models.",
   "forces": [
    "interface",
    "alignment"
   ],
   "url": "https://ailattice.ai/e/salesforce/"
  },
  {
   "id": "servicenow",
   "name": "ServiceNow",
   "layer": "interface",
   "kind": "company",
   "ticker": "NOW",
   "role": "Enterprise workflow software; multi-year deals make OpenAI and Claude models preferred options on its AI platform.",
   "forces": [
    "interface",
    "alignment"
   ],
   "url": "https://ailattice.ai/e/servicenow/"
  },
  {
   "id": "softbank",
   "name": "SoftBank",
   "layer": "capital",
   "kind": "funder",
   "ticker": "9984.T",
   "role": "SoftBank Group. OpenAI's largest outside shareholder (about 13%) and Stargate co-owner. It pays for this mostly with borrowed money and by selling other holdings, not from operating profits.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/softbank/",
   "money": "Has put $64.6B into OpenAI, funded with bank loans, margin loans and record junk bonds."
  },
  {
   "id": "stargate",
   "name": "Stargate JV",
   "layer": "capital",
   "kind": "vehicle",
   "ticker": null,
   "role": "Stargate (OpenAI/SoftBank/Oracle/MGX joint venture). The joint venture announced in January 2025 to build US AI data centers for OpenAI. Most sites called 'Stargate' are actually leased by Oracle and financed by third parties (developers, private credit and banks), not by the venture's own equity.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/stargate/"
  },
  {
   "id": "mgx",
   "name": "MGX (Abu Dhabi)",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "Abu Dhabi state-backed AI investment company (founding partners Mubadala and G42). It writes equity checks into all three top US labs and data-center takeovers.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/mgx/"
  },
  {
   "id": "sovereign-funds",
   "name": "Sovereign wealth funds",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "Gulf and Asian sovereign wealth funds (group). State investment funds (Abu Dhabi, Saudi Arabia, Qatar, Kuwait, Singapore) that back the labs and data-center deals. MGX is listed separately.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/sovereign-funds/"
  },
  {
   "id": "blue-owl",
   "name": "Blue Owl",
   "layer": "capital",
   "kind": "funder",
   "ticker": "OWL",
   "role": "Blue Owl Capital. Private-capital firm that owns and finances AI data centers that tech companies lease. This keeps the debt off the tech companies' balance sheets.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/blue-owl/"
  },
  {
   "id": "hyperion-jv",
   "name": "Hyperion JV (Meta, Blue Owl)",
   "layer": "capital",
   "kind": "vehicle",
   "ticker": null,
   "role": "Hyperion joint venture (Meta / Blue Owl, 'Beignet Investor'). Special-purpose company, 80% Blue Owl and 20% Meta, that owns Meta's Louisiana AI campus and leases it back to Meta. The debt sits off Meta's balance sheet, but Meta guarantees its value.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/hyperion-jv/"
  },
  {
   "id": "pimco",
   "name": "PIMCO",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "Bond investor (owned by Allianz) that has anchored the largest private data-center bond deals.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/pimco/"
  },
  {
   "id": "apollo",
   "name": "Apollo",
   "layer": "capital",
   "kind": "funder",
   "ticker": "APO",
   "role": "Apollo Global Management. Private-credit lender to AI labs through chip-buying special-purpose companies (xAI, Anthropic). It also arranges loans for SoftBank.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/apollo/"
  },
  {
   "id": "diameter",
   "name": "Diameter Capital",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "Credit investor. Named with Apollo as a lender in the up to $12.5B of debt for the special-purpose company that buys Nvidia GPUs and rents them to xAI for Colossus 2 (October 2025).",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/diameter/"
  },
  {
   "id": "blackstone",
   "name": "Blackstone",
   "layer": "capital",
   "kind": "funder",
   "ticker": "BX",
   "role": "Private-equity and credit firm. It co-finances chip-backed lending to Anthropic and was in talks to fund an Oracle/OpenAI Stargate site.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/blackstone/"
  },
  {
   "id": "bond-market",
   "name": "Bond buyers",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "Public corporate bond buyers. Pension funds, insurers and asset managers buying investment-grade bonds from Big Tech, plus the buyers of data-center securitizations (bonds backed by lease payments).",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/bond-market/",
   "money": "Bought over $300B of Amazon, Alphabet, Meta and Oracle bonds since 2025; demand cooling in 2026."
  },
  {
   "id": "banks",
   "name": "Banks",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "Banks (JPMorgan, Goldman Sachs, MUFG, Mizuho, SMBC and others). Make the bridge loans, margin loans and construction loans that carry AI projects until bonds or private credit take them over.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/banks/"
  },
  {
   "id": "venture-funds",
   "name": "Venture capital funds",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "Venture capital funds (Thrive, Andreessen Horowitz, Sequoia, D. E. Shaw, Valor, Accel and others). Private equity investors in AI startups and labs. In the biggest lab rounds they are a minority next to corporate investors (Amazon, Nvidia, SoftBank).",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/venture-funds/"
  },
  {
   "id": "tencent",
   "name": "Tencent",
   "layer": "cloud",
   "kind": "company",
   "ticker": "0700.HK",
   "role": "China's second big cloud and AI spender; funds its AI build-out from operating cash and rising borrowing, and invests in Chinese labs DeepSeek and Moonshot.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/tencent/"
  },
  {
   "id": "bytedance",
   "name": "ByteDance",
   "layer": "cloud",
   "kind": "company",
   "ticker": null,
   "role": "Private owner of TikTok and Volcano Engine cloud; reportedly China's largest single AI capex spender in 2026, funded mainly from its own profits.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/bytedance/"
  },
  {
   "id": "china-big-fund",
   "name": "China Big Fund",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "China Integrated Circuit Industry Investment Fund (Big Fund) and National AI Industry Investment Fund. Chinese state chip fund (Phase III) and the AI fund it controls; state money behind domestic chipmakers and, via the AI fund, an investor in DeepSeek.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/china-big-fund/"
  },
  {
   "id": "vantage-data-centers",
   "name": "Vantage Data Centers",
   "layer": "cloud",
   "kind": "company",
   "ticker": null,
   "role": "Developer that borrowed ~$38B from banks to build two Stargate campuses (Texas, Wisconsin) leased to Oracle for OpenAI.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/vantage-data-centers/"
  },
  {
   "id": "stack-infrastructure",
   "name": "STACK Infrastructure",
   "layer": "cloud",
   "kind": "company",
   "ticker": null,
   "role": "Developer of an Oracle-affiliated Stargate data center in New Mexico financed with ~$18B of bank-led debt.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/stack-infrastructure/"
  },
  {
   "id": "related-digital",
   "name": "Related Digital",
   "layer": "cloud",
   "kind": "company",
   "ticker": null,
   "role": "Related Digital (Michigan Stargate campus). Equity sponsor (with Blackstone) of the $16.3B Saline Township, Michigan campus for Oracle/OpenAI, mostly bond-funded by Pimco.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/related-digital/"
  },
  {
   "id": "qts",
   "name": "QTS (Blackstone)",
   "layer": "cloud",
   "kind": "company",
   "ticker": null,
   "role": "QTS Data Centers (Blackstone). Blackstone-owned developer that sold a $4.6B bond in April 2026 for a Georgia data center with Microsoft as tenant.",
   "forces": [
    "compute"
   ],
   "url": "https://ailattice.ai/e/qts/"
  },
  {
   "id": "blackrock",
   "name": "BlackRock",
   "layer": "capital",
   "kind": "funder",
   "ticker": "BLK",
   "role": "Asset manager reportedly backing the ~$12B 'Sopaipilla Investor' vehicle for Meta's El Paso data center.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/blackrock/"
  },
  {
   "id": "sb-energy",
   "name": "SB Energy",
   "layer": "energy",
   "kind": "company",
   "ticker": null,
   "role": "SoftBank-backed energy and data center developer building OpenAI's 8 GW Ohio campus, with Nvidia as investor and lease guarantor.",
   "forces": [
    "energy"
   ],
   "url": "https://ailattice.ai/e/sb-energy/"
  },
  {
   "id": "stock-market",
   "name": "Public stock buyers",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "Investors buying shares in IPOs and new stock sales, such as SpaceX's June 2026 IPO and Alphabet's and Oracle's 2026 share sales.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/stock-market/"
  },
  {
   "id": "brookfield",
   "name": "Brookfield",
   "layer": "capital",
   "kind": "funder",
   "ticker": "BN",
   "role": "Infrastructure investor; up to $25B financing framework for Bloom Energy fuel-cell projects.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/brookfield/"
  },
  {
   "id": "jane-street",
   "name": "Jane Street",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "Trading firm that is both a large compute customer and an investor in neoclouds (CoreWeave, Crusoe, Fluidstack).",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/jane-street/"
  },
  {
   "id": "g42",
   "name": "G42 / MBZUAI (Abu Dhabi)",
   "layer": "capital",
   "kind": "funder",
   "ticker": null,
   "role": "Abu Dhabi AI group and university; together 86% of Cerebras' 2025 revenue.",
   "forces": [
    "capital"
   ],
   "url": "https://ailattice.ai/e/g42/"
  },
  {
   "id": "us-doe",
   "name": "US Department of Energy",
   "layer": "rules",
   "kind": "government",
   "ticker": null,
   "role": "Federal loans and cost-sharing for nuclear power that serves data centers (Crane restart, TerraPower).",
   "forces": [
    "energy",
    "alignment"
   ],
   "url": "https://ailattice.ai/e/us-doe/"
  }
 ],
 "links": [
  {
   "id": "L001",
   "from": "asml",
   "to": "tsmc",
   "kind": "tools",
   "what": "EUV lithography",
   "evidence": "Taiwan took 30% of ASML's Q2 2026 machine shipments.",
   "basis": "reported",
   "source": {
    "key": "asml_q2",
    "title": "ASML Q2 2026 results slides",
    "publisher": "Investing.com",
    "url": "https://www.investing.com/news/company-news/asml-q2-2026-slides-outlook-raised-on-ai-demand-high-na-milestone-93CH-4792166",
    "date": "2026-07-15",
    "tier": "press"
   }
  },
  {
   "id": "L002",
   "from": "asml",
   "to": "sk-hynix",
   "kind": "tools",
   "what": "EUV lithography for memory",
   "evidence": "South Korea took 43% of Q2 shipments; ASML guides memory revenue up 75%.",
   "basis": "reported",
   "source": {
    "key": "asml_q2",
    "title": "ASML Q2 2026 results slides",
    "publisher": "Investing.com",
    "url": "https://www.investing.com/news/company-news/asml-q2-2026-slides-outlook-raised-on-ai-demand-high-na-milestone-93CH-4792166",
    "date": "2026-07-15",
    "tier": "press"
   }
  },
  {
   "id": "L003",
   "from": "asml",
   "to": "samsung-memory",
   "kind": "tools",
   "what": "EUV lithography for memory",
   "evidence": "South Korea took 43% of Q2 shipments; ASML guides memory revenue up 75%.",
   "basis": "reported",
   "source": {
    "key": "asml_q2",
    "title": "ASML Q2 2026 results slides",
    "publisher": "Investing.com",
    "url": "https://www.investing.com/news/company-news/asml-q2-2026-slides-outlook-raised-on-ai-demand-high-na-milestone-93CH-4792166",
    "date": "2026-07-15",
    "tier": "press"
   }
  },
  {
   "id": "L004",
   "from": "asml",
   "to": "intel",
   "kind": "tools",
   "what": "High-NA EUV",
   "evidence": "High-NA EUV now in production use on Intel's 18A process.",
   "basis": "reported",
   "source": {
    "key": "asml_q2",
    "title": "ASML Q2 2026 results slides",
    "publisher": "Investing.com",
    "url": "https://www.investing.com/news/company-news/asml-q2-2026-slides-outlook-raised-on-ai-demand-high-na-milestone-93CH-4792166",
    "date": "2026-07-15",
    "tier": "press"
   }
  },
  {
   "id": "L005",
   "from": "asml",
   "to": "smic",
   "kind": "tools",
   "what": "Older DUV lithography",
   "evidence": "China was 14% of Q2 shipments and about 20% of sales.",
   "basis": "reported",
   "source": {
    "key": "asml_q2",
    "title": "ASML Q2 2026 results slides",
    "publisher": "Investing.com",
    "url": "https://www.investing.com/news/company-news/asml-q2-2026-slides-outlook-raised-on-ai-demand-high-na-milestone-93CH-4792166",
    "date": "2026-07-15",
    "tier": "press"
   }
  },
  {
   "id": "L006",
   "from": "applied-materials",
   "to": "tsmc",
   "kind": "tools",
   "what": "Deposition and packaging tools",
   "evidence": "Q4 FY26 revenue guide about $10.3B, driven by AI logic and memory.",
   "basis": "inferred",
   "source": {
    "key": "amat_q",
    "title": "Applied Materials Q3 FY26",
    "publisher": "BigGo Finance",
    "url": "https://finance.biggo.com/news/80dc4fdb-2a02-4112-8b43-9eab6aa47b69",
    "date": "2026-08-14",
    "tier": "secondary"
   }
  },
  {
   "id": "L007",
   "from": "lam",
   "to": "micron",
   "kind": "tools",
   "what": "Etch and deposition tools",
   "evidence": "Lam's NAND tool revenue doubled quarter on quarter; packaging revenue guided up more than 70%.",
   "basis": "inferred",
   "source": {
    "key": "lam_q",
    "title": "Lam Research quarterly results",
    "publisher": "BigGo Finance",
    "url": "https://finance.biggo.com/news/US_LRCX_2026-07-29",
    "date": "2026-07-29",
    "tier": "secondary"
   }
  },
  {
   "id": "L008",
   "from": "tokyo-electron",
   "to": "sk-hynix",
   "kind": "tools",
   "what": "Etch, coating and packaging tools",
   "evidence": "Packaging tool sales guided up 60%; China share fell to 26.8%.",
   "basis": "inferred",
   "source": {
    "key": "tel_fy",
    "title": "Tokyo Electron FY2026 results",
    "publisher": "NineScrolls",
    "url": "https://ninescrolls.com/news/tokyo-electron-posts-record-jpy-2-44-trillion-fy2026-guides-first-half-fy2027",
    "date": "2026-04-30",
    "tier": "secondary"
   }
  },
  {
   "id": "L009",
   "from": "tsmc",
   "to": "nvidia",
   "kind": "manufacturing",
   "what": "Blackwell and Rubin chips",
   "evidence": "Analysts estimate Nvidia passed Apple as TSMC's largest customer in 2026, about 22% of revenue.",
   "basis": "reported",
   "source": {
    "key": "nvda_tsmc_top",
    "title": "Nvidia replaces Apple as TSMC's biggest customer",
    "publisher": "MacRumors",
    "url": "https://www.macrumors.com/2026/01/28/nvidia-replaces-apple-as-biggest-tsmc-customer/",
    "date": "2026-01-28",
    "tier": "press"
   }
  },
  {
   "id": "L010",
   "from": "tsmc",
   "to": "nvidia",
   "kind": "packaging",
   "what": "CoWoS packaging capacity",
   "evidence": "Nvidia reportedly holds more than half of TSMC's 2026 CoWoS capacity.",
   "basis": "reported",
   "source": {
    "key": "cowos_osat",
    "title": "TSMC expands outsourcing of CoWoS front-end step to OSATs",
    "publisher": "TrendForce",
    "url": "https://www.trendforce.com/news/2026/08/05/news-tsmc-reportedly-expands-outsourcing-of-key-cowos-front-end-step-to-osats-amid-rising-nvidia-asic-demand/",
    "date": "2026-08-05",
    "tier": "press"
   }
  },
  {
   "id": "L011",
   "from": "tsmc",
   "to": "amd",
   "kind": "manufacturing",
   "what": "2nm server CPUs and MI455X",
   "evidence": "AMD Venice is the first x86 server CPU on TSMC 2nm.",
   "basis": "reported",
   "source": {
    "key": "amd_moor",
    "title": "AMD Advancing AI 2026: Helios ships",
    "publisher": "Moor Insights & Strategy",
    "url": "https://moorinsightsstrategy.com/field-notes/amd-advancing-ai-2026-helios-ships-venice-swings-and-the-software-moat-narrows/",
    "date": "2026-07-24",
    "tier": "press"
   }
  },
  {
   "id": "L012",
   "from": "tsmc",
   "to": "broadcom",
   "kind": "manufacturing",
   "what": "Custom AI chips on 3nm",
   "evidence": "Google's TPU v7 is made on TSMC 3nm; Meta's MTIA is reportedly moving to 3nm.",
   "basis": "reported",
   "source": {
    "key": "asic_tsmc",
    "title": "Custom AI ASICs examined, from Broadcom to MTIA",
    "publisher": "Tom's Hardware",
    "url": "https://www.tomshardware.com/tech-industry/semiconductors/custom-ai-asics-examined-from-broadcom-to-mtia",
    "date": "2026-05",
    "tier": "press"
   }
  },
  {
   "id": "L013",
   "from": "tsmc",
   "to": "google",
   "kind": "manufacturing",
   "what": "8th-generation TPUs on 2nm",
   "evidence": "Both 8th-gen TPU variants target late 2027 on TSMC 2nm.",
   "basis": "reported",
   "source": {
    "key": "tpu8",
    "title": "Google Ironwood and 8th-gen TPUs",
    "publisher": "The Next Web",
    "url": "https://thenextweb.com/news/google-ironwood-tpu-inference-cloud-next",
    "date": "2026-04-22",
    "tier": "press"
   }
  },
  {
   "id": "L014",
   "from": "samsung-foundry",
   "to": "tesla",
   "kind": "manufacturing",
   "what": "Tesla AI5 chip on 2nm",
   "evidence": "Tesla AI5 taped out at Samsung's Taylor, Texas fab; volume in 2H27.",
   "basis": "reported",
   "source": {
    "key": "tesla_ai5",
    "title": "Samsung Taylor fab tapes out Tesla AI5 on 2nm",
    "publisher": "Electrek",
    "url": "https://electrek.co/2026/07/13/samsung-taylor-fab-tesla-ai5-chip-2nm/",
    "date": "2026-07-13",
    "tier": "press"
   }
  },
  {
   "id": "L015",
   "from": "smic",
   "to": "huawei",
   "kind": "manufacturing",
   "what": "Ascend 950 chips",
   "evidence": "SMIC's N+3 process makes the Ascend 950 dies; Huawei plans about 1.5M AI chips in 2026.",
   "basis": "reported",
   "source": {
    "key": "huawei_960",
    "title": "Huawei pulls Ascend 960DT forward; demand outstrips capacity",
    "publisher": "Traders Agency",
    "url": "https://tradersagency.com/blog/huawei-pulls-ascend-960dt-forward-to-q1-2027-says-ai-chip-demand-outstrips-its-capacity",
    "date": "2026-09-17",
    "tier": "secondary"
   }
  },
  {
   "id": "L016",
   "from": "nvidia",
   "to": "intel",
   "kind": "capital",
   "what": "$5B equity stake",
   "evidence": "Nvidia bought $5B of Intel stock; Intel will design x86 CPUs linked to NVLink.",
   "basis": "reported",
   "source": {
    "key": "nvda_intel",
    "title": "Intel to design CPUs with Nvidia NVLink for $5B investment",
    "publisher": "Network World",
    "url": "https://www.networkworld.com/article/4059448/intel-will-design-cpus-with-nvidia-nvlink-in-return-for-5-billion-investment.html",
    "date": "2025-09",
    "tier": "press"
   }
  },
  {
   "id": "L017",
   "from": "tsmc",
   "to": "ase",
   "kind": "packaging",
   "what": "Outsourced CoWoS front-end step",
   "evidence": "TSMC reportedly outsources the chip-on-wafer step to ASE.",
   "basis": "reported",
   "source": {
    "key": "cowos_osat",
    "title": "TSMC expands outsourcing of CoWoS front-end step to OSATs",
    "publisher": "TrendForce",
    "url": "https://www.trendforce.com/news/2026/08/05/news-tsmc-reportedly-expands-outsourcing-of-key-cowos-front-end-step-to-osats-amid-rising-nvidia-asic-demand/",
    "date": "2026-08-05",
    "tier": "press"
   }
  },
  {
   "id": "L018",
   "from": "ase",
   "to": "amd",
   "kind": "packaging",
   "what": "Packaging capacity",
   "evidence": "AMD providing strategic backing to ASE and SPIL capacity.",
   "basis": "reported",
   "source": {
    "key": "cowos_osat",
    "title": "TSMC expands outsourcing of CoWoS front-end step to OSATs",
    "publisher": "TrendForce",
    "url": "https://www.trendforce.com/news/2026/08/05/news-tsmc-reportedly-expands-outsourcing-of-key-cowos-front-end-step-to-osats-amid-rising-nvidia-asic-demand/",
    "date": "2026-08-05",
    "tier": "press"
   }
  },
  {
   "id": "L019",
   "from": "amkor",
   "to": "nvidia",
   "kind": "packaging",
   "what": "US packaging capacity",
   "evidence": "About $1.5B multi-year prepayment to expand Amkor's Peoria, Arizona site.",
   "basis": "reported",
   "source": {
    "key": "amkor_az",
    "title": "Nvidia GB300 at TSMC Arizona; Amkor packaging",
    "publisher": "ExplainX",
    "url": "https://explainx.ai/blog/nvidia-gb300-tsmc-arizona-amkor-packaging-july-2026",
    "date": "2026-07-27",
    "tier": "secondary"
   }
  },
  {
   "id": "L020",
   "from": "sk-hynix",
   "to": "nvidia",
   "kind": "memory",
   "what": "HBM4 for Vera Rubin",
   "evidence": "Roughly 60 to 70% of Nvidia's HBM4 volume.",
   "basis": "reported",
   "source": {
    "key": "hbm4_suppliers",
    "title": "Vera Rubin enters full production; HBM4 suppliers named",
    "publisher": "Tech Times",
    "url": "https://www.techtimes.com/articles/317539/20260602/nvidia-vera-rubin-enters-full-production-samsung-sk-hynix-micron-named-hbm4-suppliers.htm",
    "date": "2026-06-02",
    "tier": "press"
   }
  },
  {
   "id": "L021",
   "from": "samsung-memory",
   "to": "nvidia",
   "kind": "memory",
   "what": "HBM4 for Vera Rubin",
   "evidence": "An estimated 25 to 30% of volume.",
   "basis": "reported",
   "source": {
    "key": "hbm4_suppliers",
    "title": "Vera Rubin enters full production; HBM4 suppliers named",
    "publisher": "Tech Times",
    "url": "https://www.techtimes.com/articles/317539/20260602/nvidia-vera-rubin-enters-full-production-samsung-sk-hynix-micron-named-hbm4-suppliers.htm",
    "date": "2026-06-02",
    "tier": "press"
   }
  },
  {
   "id": "L022",
   "from": "micron",
   "to": "nvidia",
   "kind": "memory",
   "what": "HBM4 for Vera Rubin",
   "evidence": "Micron says HBM4 is shipping in volume for Vera Rubin.",
   "basis": "reported",
   "source": {
    "key": "micron_q4",
    "title": "Micron posts record $54B quarter, locks $100B memory contracts",
    "publisher": "Tech Times",
    "url": "https://www.techtimes.com/articles/328376/20261001/micron-posts-record-54b-quarter-locks-hyperscalers-100b-memory-contracts.htm",
    "date": "2026-10-01",
    "tier": "press"
   }
  },
  {
   "id": "L023",
   "from": "samsung-memory",
   "to": "amd",
   "kind": "memory",
   "what": "HBM4 for MI455X",
   "evidence": "AMD secures Samsung HBM4 for the MI455X.",
   "basis": "reported",
   "source": {
    "key": "amd_samsung_hbm",
    "title": "AMD secures Samsung HBM4 for MI455X",
    "publisher": "TrendForce",
    "url": "https://www.trendforce.com/news/2026/03/19/news-amd-secures-samsung-hbm4-for-mi455x-deal-may-tie-partial-ai-chip-shift-to-samsung-foundry/",
    "date": "2026-03-19",
    "tier": "press"
   }
  },
  {
   "id": "L024",
   "from": "cxmt",
   "to": "huawei",
   "kind": "memory",
   "what": "Domestic HBM",
   "evidence": "Only about 240k of 1.5M Ascend chips use domestic HBM.",
   "basis": "reported",
   "source": {
    "key": "huawei_960",
    "title": "Huawei pulls Ascend 960DT forward; demand outstrips capacity",
    "publisher": "Traders Agency",
    "url": "https://tradersagency.com/blog/huawei-pulls-ascend-960dt-forward-to-q1-2027-says-ai-chip-demand-outstrips-its-capacity",
    "date": "2026-09-17",
    "tier": "secondary"
   }
  },
  {
   "id": "L025",
   "from": "cxmt",
   "to": "alibaba-cloud",
   "kind": "memory",
   "what": "HBM3E samples",
   "evidence": "Sampling HBM3E to Alibaba's T-Head chip unit.",
   "basis": "reported",
   "source": {
    "key": "cxmt",
    "title": "CXMT hits 10% DRAM share",
    "publisher": "Tech Times",
    "url": "https://www.techtimes.com/articles/326406/20260903/cxmt-hits-10-dram-share-samsungs-hbm-pivot-handed-china-market-vacancy.htm",
    "date": "2026-09-03",
    "tier": "press"
   }
  },
  {
   "id": "L026",
   "from": "broadcom",
   "to": "google",
   "kind": "chips",
   "what": "TPU design and supply",
   "evidence": "Design agreement for Google's TPUs runs through 2031.",
   "basis": "reported",
   "source": {
    "key": "marvell_google",
    "title": "Marvell attaches across Google's TPU stack",
    "publisher": "Futurum Group",
    "url": "https://futurumgroup.com/insights/marvell-attaches-across-googles-tpu-stack-with-a-warrant-vesting-toward-120b/",
    "date": "2026-08",
    "tier": "press"
   }
  },
  {
   "id": "L027",
   "from": "marvell",
   "to": "google",
   "kind": "chips",
   "what": "Custom chips across the TPU system",
   "evidence": "Google holds a warrant for about 7% of Marvell, vesting with custom revenue.",
   "basis": "reported",
   "source": {
    "key": "marvell_google",
    "title": "Marvell attaches across Google's TPU stack",
    "publisher": "Futurum Group",
    "url": "https://futurumgroup.com/insights/marvell-attaches-across-googles-tpu-stack-with-a-warrant-vesting-toward-120b/",
    "date": "2026-08",
    "tier": "press"
   }
  },
  {
   "id": "L028",
   "from": "marvell",
   "to": "amazon",
   "kind": "chips",
   "what": "Trainium programs",
   "evidence": "Marvell says it has signed programs at all three big US clouds.",
   "basis": "reported",
   "source": {
    "key": "marvell_google",
    "title": "Marvell attaches across Google's TPU stack",
    "publisher": "Futurum Group",
    "url": "https://futurumgroup.com/insights/marvell-attaches-across-googles-tpu-stack-with-a-warrant-vesting-toward-120b/",
    "date": "2026-08",
    "tier": "press"
   }
  },
  {
   "id": "L029",
   "from": "marvell",
   "to": "microsoft",
   "kind": "chips",
   "what": "Maia programs",
   "evidence": "Marvell says it has signed programs at all three big US clouds.",
   "basis": "reported",
   "source": {
    "key": "marvell_google",
    "title": "Marvell attaches across Google's TPU stack",
    "publisher": "Futurum Group",
    "url": "https://futurumgroup.com/insights/marvell-attaches-across-googles-tpu-stack-with-a-warrant-vesting-toward-120b/",
    "date": "2026-08",
    "tier": "press"
   }
  },
  {
   "id": "L030",
   "from": "broadcom",
   "to": "openai",
   "kind": "chips",
   "what": "Jalapeño inference chip",
   "evidence": "OpenAI's first custom inference chip, rolling into data centers by year-end.",
   "basis": "reported",
   "source": {
    "key": "jalapeno",
    "title": "OpenAI unveils Jalapeño inference chip with Broadcom",
    "publisher": "VentureBeat",
    "url": "https://venturebeat.com/infrastructure/openai-unveils-first-custom-ai-inference-chip-jalapeno-with-broadcom-and-its-development-was-sped-up-with-openais-own-models",
    "date": "2026-06-24",
    "tier": "press"
   }
  },
  {
   "id": "L031",
   "from": "broadcom",
   "to": "meta",
   "kind": "chips",
   "what": "MTIA custom chips",
   "evidence": "Meta named as a custom-chip customer on Broadcom's Q3 FY26 call.",
   "basis": "reported",
   "source": {
    "key": "avgo_q3",
    "title": "Broadcom Q3 FY2026: AI revenue $16.7B",
    "publisher": "Tech Insider",
    "url": "https://tech-insider.org/broadcom-q3-fy2026-ai-chip-revenue-16-7-billion/",
    "date": "2026-09",
    "tier": "secondary"
   }
  },
  {
   "id": "L032",
   "from": "broadcom",
   "to": "anthropic",
   "kind": "capital",
   "what": "Up to $42B of chip financing",
   "evidence": "Convertible financing against a five-year TPU lease.",
   "basis": "reported",
   "source": {
    "key": "avgo_anth_fin",
    "title": "Broadcom lines up $42B in chip financing for Anthropic",
    "publisher": "Tradingpedia",
    "url": "https://www.tradingpedia.com/2026/10/01/broadcom-lines-up-42b-in-chip-financing-for-anthropic/",
    "date": "2026-10-01",
    "tier": "secondary"
   }
  },
  {
   "id": "L033",
   "from": "amd",
   "to": "openai",
   "kind": "chips",
   "what": "MI450 / Helios racks, 6 GW",
   "evidence": "Revenue shipments start end of Q3 2026.",
   "basis": "reported",
   "source": {
    "key": "amd_moor",
    "title": "AMD Advancing AI 2026: Helios ships",
    "publisher": "Moor Insights & Strategy",
    "url": "https://moorinsightsstrategy.com/field-notes/amd-advancing-ai-2026-helios-ships-venice-swings-and-the-software-moat-narrows/",
    "date": "2026-07-24",
    "tier": "press"
   }
  },
  {
   "id": "L034",
   "from": "amd",
   "to": "meta",
   "kind": "chips",
   "what": "GPUs, up to 6 GW",
   "evidence": "Expanded partnership announced Feb 24, 2026.",
   "basis": "reported",
   "source": {
    "key": "amd_meta",
    "title": "AMD and Meta announce expanded strategic partnership",
    "publisher": "AMD",
    "url": "https://www.amd.com/en/newsroom/press-releases/2026-2-24-amd-and-meta-announce-expanded-strategic-partnersh.html",
    "date": "2026-02-24",
    "tier": "primary"
   }
  },
  {
   "id": "L035",
   "from": "cerebras",
   "to": "openai",
   "kind": "compute",
   "what": "750 MW of inference compute",
   "evidence": "More than $10B through 2028.",
   "basis": "reported",
   "source": {
    "key": "cerebras_oai",
    "title": "OpenAI signs compute deal with Cerebras",
    "publisher": "TechCrunch",
    "url": "https://techcrunch.com/2026/01/14/openai-signs-deal-reportedly-worth-10-billion-for-compute-from-cerebras/",
    "date": "2026-01-14",
    "tier": "press"
   }
  },
  {
   "id": "L036",
   "from": "nvidia",
   "to": "coreweave",
   "kind": "chips",
   "what": "Vera Rubin systems",
   "evidence": "Named as a Vera Rubin ramping partner.",
   "basis": "reported",
   "source": {
    "key": "nvda_q2fy27",
    "title": "Nvidia Q2 fiscal 2027 results",
    "publisher": "Nvidia",
    "url": "https://nvidianews.nvidia.com/news/nvidia-announces-financial-results-for-second-quarter-fiscal-2027",
    "date": "2026-08-26",
    "tier": "primary"
   }
  },
  {
   "id": "L037",
   "from": "nvidia",
   "to": "microsoft",
   "kind": "chips",
   "what": "Vera Rubin systems",
   "evidence": "Azure named as a Vera Rubin ramping partner.",
   "basis": "reported",
   "source": {
    "key": "nvda_q2fy27",
    "title": "Nvidia Q2 fiscal 2027 results",
    "publisher": "Nvidia",
    "url": "https://nvidianews.nvidia.com/news/nvidia-announces-financial-results-for-second-quarter-fiscal-2027",
    "date": "2026-08-26",
    "tier": "primary"
   }
  },
  {
   "id": "L038",
   "from": "nvidia",
   "to": "oracle",
   "kind": "chips",
   "what": "Vera Rubin systems",
   "evidence": "Oracle named as a Vera Rubin ramping partner.",
   "basis": "reported",
   "source": {
    "key": "nvda_q2fy27",
    "title": "Nvidia Q2 fiscal 2027 results",
    "publisher": "Nvidia",
    "url": "https://nvidianews.nvidia.com/news/nvidia-announces-financial-results-for-second-quarter-fiscal-2027",
    "date": "2026-08-26",
    "tier": "primary"
   }
  },
  {
   "id": "L039",
   "from": "nvidia",
   "to": "google",
   "kind": "chips",
   "what": "Vera Rubin systems",
   "evidence": "Google Cloud named as a Vera Rubin ramping partner.",
   "basis": "reported",
   "source": {
    "key": "nvda_q2fy27",
    "title": "Nvidia Q2 fiscal 2027 results",
    "publisher": "Nvidia",
    "url": "https://nvidianews.nvidia.com/news/nvidia-announces-financial-results-for-second-quarter-fiscal-2027",
    "date": "2026-08-26",
    "tier": "primary"
   }
  },
  {
   "id": "L040",
   "from": "nvidia",
   "to": "nebius",
   "kind": "chips",
   "what": "Vera Rubin systems",
   "evidence": "Nebius named as a Vera Rubin ramping partner.",
   "basis": "reported",
   "source": {
    "key": "nvda_q2fy27",
    "title": "Nvidia Q2 fiscal 2027 results",
    "publisher": "Nvidia",
    "url": "https://nvidianews.nvidia.com/news/nvidia-announces-financial-results-for-second-quarter-fiscal-2027",
    "date": "2026-08-26",
    "tier": "primary"
   }
  },
  {
   "id": "L041",
   "from": "nvidia",
   "to": "spacexai",
   "kind": "chips",
   "what": "GPUs for Colossus",
   "evidence": "About 555,000 GPUs across Colossus 1 and 2; 2 GW planned.",
   "basis": "reported",
   "source": {
    "key": "colossus",
    "title": "xAI Colossus 2 GW expansion, 555k GPUs",
    "publisher": "Introl",
    "url": "https://introl.com/blog/xai-colossus-2-gigawatt-expansion-555k-gpus-january-2026",
    "date": "2026-01",
    "tier": "secondary"
   }
  },
  {
   "id": "L042",
   "from": "nvidia",
   "to": "openai",
   "kind": "capital",
   "what": "$30B equity plus dedicated capacity",
   "evidence": "Part of OpenAI's $110B February round; 3 GW inference plus 2 GW training on Vera Rubin.",
   "basis": "reported",
   "source": {
    "key": "oai_110b",
    "title": "OpenAI raises $110B in one of the largest private rounds",
    "publisher": "TechCrunch",
    "url": "https://techcrunch.com/2026/02/27/openai-raises-110b-in-one-of-the-largest-private-funding-rounds-in-history/",
    "date": "2026-02-27",
    "tier": "press"
   }
  },
  {
   "id": "L043",
   "from": "lumentum",
   "to": "nvidia",
   "kind": "chips",
   "what": "Lasers for optical links",
   "evidence": "Nvidia paid about $2B each to Lumentum and Coherent for priority capacity.",
   "basis": "reported",
   "source": {
    "key": "lasers",
    "title": "Nvidia's $4B laser lockup pushes rivals past 2027",
    "publisher": "Tech Times",
    "url": "https://www.techtimes.com/articles/317281/20260527/ai-data-center-optical-component-shortage-nvidias-4b-laser-lockup-pushes-rivals-past-2027.htm",
    "date": "2026-05-27",
    "tier": "press"
   }
  },
  {
   "id": "L044",
   "from": "coherent",
   "to": "nvidia",
   "kind": "chips",
   "what": "Lasers for optical links",
   "evidence": "Nvidia paid about $2B each to Lumentum and Coherent for priority capacity.",
   "basis": "reported",
   "source": {
    "key": "lasers",
    "title": "Nvidia's $4B laser lockup pushes rivals past 2027",
    "publisher": "Tech Times",
    "url": "https://www.techtimes.com/articles/317281/20260527/ai-data-center-optical-component-shortage-nvidias-4b-laser-lockup-pushes-rivals-past-2027.htm",
    "date": "2026-05-27",
    "tier": "press"
   }
  },
  {
   "id": "L045",
   "from": "huawei",
   "to": "deepseek",
   "kind": "chips",
   "what": "Ascend 950DT chips (planned)",
   "evidence": "Plans at least 160,000 chips for an Inner Mongolia cluster to serve models.",
   "basis": "reported",
   "source": {
    "key": "deepseek_ascend",
    "title": "DeepSeek to use Huawei Ascend 950DT in Inner Mongolia",
    "publisher": "TechNode",
    "url": "https://technode.com/2026/09/07/deepseek-huawei-ascend-950dt-chips-inner-mongolia/",
    "date": "2026-09-07",
    "tier": "press"
   }
  },
  {
   "id": "L046",
   "from": "google",
   "to": "anthropic",
   "kind": "compute",
   "what": "5 GW of TPUs over five years",
   "evidence": "Plus 3.5 GW via Broadcom from 2027.",
   "basis": "reported",
   "source": {
    "key": "goog_anth_40",
    "title": "Google to invest up to $40B in Anthropic",
    "publisher": "TechCrunch",
    "url": "https://techcrunch.com/2026/04/24/google-to-invest-up-to-40b-in-anthropic-in-cash-and-compute/",
    "date": "2026-04-24",
    "tier": "press"
   }
  },
  {
   "id": "L047",
   "from": "google",
   "to": "anthropic",
   "kind": "capital",
   "what": "Up to $40B",
   "evidence": "$10B cash at a $350B valuation plus $30B tied to targets.",
   "basis": "reported",
   "source": {
    "key": "goog_anth_40",
    "title": "Google to invest up to $40B in Anthropic",
    "publisher": "TechCrunch",
    "url": "https://techcrunch.com/2026/04/24/google-to-invest-up-to-40b-in-anthropic-in-cash-and-compute/",
    "date": "2026-04-24",
    "tier": "press"
   }
  },
  {
   "id": "L048",
   "from": "google",
   "to": "meta",
   "kind": "compute",
   "what": "TPU rental, multibillion-dollar",
   "evidence": "Meta may buy TPUs outright from 2027.",
   "basis": "reported",
   "source": {
    "key": "meta_tpu",
    "title": "Meta signs multibillion deal to rent Google TPUs",
    "publisher": "The Decoder",
    "url": "https://the-decoder.com/meta-signs-multi-billion-dollar-deal-to-rent-googles-tpus-in-a-direct-challenge-to-nvidias-ai-chip-dominance/",
    "date": "2026-02-27",
    "tier": "press"
   }
  },
  {
   "id": "L049",
   "from": "amazon",
   "to": "anthropic",
   "kind": "compute",
   "what": "Trainium capacity, up to 5 GW",
   "evidence": "About 1 GW by end-2026; Anthropic commits $100B+ over ten years.",
   "basis": "reported",
   "source": {
    "key": "anth_aws",
    "title": "Anthropic and Amazon expand compute partnership",
    "publisher": "Anthropic",
    "url": "https://www.anthropic.com/news/anthropic-amazon-compute",
    "date": "2026-04-20",
    "tier": "primary"
   }
  },
  {
   "id": "L050",
   "from": "amazon",
   "to": "anthropic",
   "kind": "capital",
   "what": "$5B plus up to $20B",
   "evidence": "On top of the earlier $8B.",
   "basis": "reported",
   "source": {
    "key": "amzn_anth_5",
    "title": "Amazon invests additional $5B in Anthropic",
    "publisher": "Amazon",
    "url": "https://www.aboutamazon.com/news/company-news/amazon-invests-additional-5-billion-anthropic-ai",
    "date": "2026-04-20",
    "tier": "primary"
   }
  },
  {
   "id": "L051",
   "from": "amazon",
   "to": "openai",
   "kind": "capital",
   "what": "$50B investment",
   "evidence": "Part of the $122B round; the $35B that was conditional was paid by the third quarter of 2026, per Amazon's 10-Q.",
   "basis": "reported",
   "source": {
    "key": "oai_110b",
    "title": "OpenAI raises $110B in one of the largest private rounds",
    "publisher": "TechCrunch",
    "url": "https://techcrunch.com/2026/02/27/openai-raises-110b-in-one-of-the-largest-private-funding-rounds-in-history/",
    "date": "2026-02-27",
    "tier": "press"
   }
  },
  {
   "id": "L052",
   "from": "amazon",
   "to": "openai",
   "kind": "compute",
   "what": "Trainium capacity, 2 GW+",
   "evidence": "$38B deal expanded by $100B.",
   "basis": "reported",
   "source": {
    "key": "oai_110b",
    "title": "OpenAI raises $110B in one of the largest private rounds",
    "publisher": "TechCrunch",
    "url": "https://techcrunch.com/2026/02/27/openai-raises-110b-in-one-of-the-largest-private-funding-rounds-in-history/",
    "date": "2026-02-27",
    "tier": "press"
   }
  },
  {
   "id": "L053",
   "from": "microsoft",
   "to": "openai",
   "kind": "capital",
   "what": "About 27% ownership",
   "evidence": "Exclusivity ended April 27; Microsoft remains primary cloud.",
   "basis": "reported",
   "source": {
    "key": "msft_oai_reset",
    "title": "Microsoft and OpenAI gut their exclusive deal",
    "publisher": "VentureBeat",
    "url": "https://venturebeat.com/technology/microsoft-and-openai-gut-their-exclusive-deal-freeing-openai-to-sell-on-aws-and-google-cloud",
    "date": "2026-04-27",
    "tier": "press"
   }
  },
  {
   "id": "L054",
   "from": "microsoft",
   "to": "anthropic",
   "kind": "compute",
   "what": "$30B of Azure capacity",
   "evidence": "Microsoft and Nvidia committed up to $15B combined.",
   "basis": "reported",
   "source": {
    "key": "msft_nvda_anth",
    "title": "Microsoft, Nvidia and Anthropic announce strategic partnerships",
    "publisher": "Microsoft",
    "url": "https://blogs.microsoft.com/blog/2025/11/18/microsoft-nvidia-and-anthropic-announce-strategic-partnerships/",
    "date": "2025-11-18",
    "tier": "primary"
   }
  },
  {
   "id": "L055",
   "from": "oracle",
   "to": "openai",
   "kind": "compute",
   "what": "Stargate cloud capacity",
   "evidence": "Contract reported at about $300B over about five years from 2027 (outside estimate). Oracle reports a $664B contracted backlog and does not disclose customer shares.",
   "basis": "reported",
   "source": {
    "key": "orcl_q1",
    "title": "Oracle Q1 FY27: $664B backlog",
    "publisher": "ERP Today",
    "url": "https://erp.today/oracle-q1-fy27-results-664b-backlog-ai-contracts/",
    "date": "2026-09-11",
    "tier": "press"
   }
  },
  {
   "id": "L056",
   "from": "coreweave",
   "to": "meta",
   "kind": "compute",
   "what": "GPU cloud, $35B+ total",
   "evidence": "$14.2B (2025) plus $21B more (April 2026).",
   "basis": "reported",
   "source": {
    "key": "meta_cw",
    "title": "Meta and CoreWeave $21B AI cloud deal",
    "publisher": "The Next Web",
    "url": "https://thenextweb.com/news/meta-coreweave-21-billion-ai-cloud-deal",
    "date": "2026-04",
    "tier": "press"
   }
  },
  {
   "id": "L057",
   "from": "coreweave",
   "to": "openai",
   "kind": "compute",
   "what": "GPU cloud, $22.4B total",
   "evidence": "Contracts expanded through 2025.",
   "basis": "reported",
   "source": {
    "key": "cw_oai",
    "title": "CoreWeave expands agreement with OpenAI",
    "publisher": "CoreWeave",
    "url": "https://www.coreweave.com/news/coreweave-expands-agreement-with-openai-by-up-to-6-5b",
    "date": "2025-09",
    "tier": "primary"
   }
  },
  {
   "id": "L058",
   "from": "nebius",
   "to": "microsoft",
   "kind": "compute",
   "what": "GPU cloud, $17.4 to 19.4B",
   "evidence": "Five-year agreement.",
   "basis": "reported",
   "source": {
    "key": "nebius_deals",
    "title": "Nebius signs $46B in AI cloud deals",
    "publisher": "The Motley Fool",
    "url": "https://www.fool.com/investing/2026/04/02/nebius-just-signed-46-billion-in-ai-cloud-deals-wi/",
    "date": "2026-04-02",
    "tier": "press"
   }
  },
  {
   "id": "L059",
   "from": "nebius",
   "to": "meta",
   "kind": "compute",
   "what": "GPU cloud, $12B firm plus options",
   "evidence": "Up to $15B more optional.",
   "basis": "reported",
   "source": {
    "key": "nebius_meta",
    "title": "Nebius signs new AI infrastructure agreement with Meta",
    "publisher": "Nebius",
    "url": "https://nebius.com/newsroom/nebius-signs-new-ai-infrastructure-agreement-with-meta",
    "date": "2026-04",
    "tier": "primary"
   }
  },
  {
   "id": "L060",
   "from": "crusoe",
   "to": "oracle",
   "kind": "compute",
   "what": "Abilene campus build and operation",
   "evidence": "4 of 8 buildings live; expansion beyond 1.2 GW dropped.",
   "basis": "reported",
   "source": {
    "key": "stargate_sites",
    "title": "OpenAI Stargate: where the US sites stand",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
    "date": "2026-04-17",
    "tier": "press"
   }
  },
  {
   "id": "L061",
   "from": "fluidstack",
   "to": "anthropic",
   "kind": "compute",
   "what": "Data center build-out",
   "evidence": "Part of Anthropic's $50B build-out with Fluidstack.",
   "basis": "reported",
   "source": {
    "key": "anth_colossus",
    "title": "Higher limits: Anthropic and SpaceX compute agreement",
    "publisher": "Anthropic",
    "url": "https://www.anthropic.com/news/higher-limits-spacex",
    "date": "2026-05-06",
    "tier": "primary"
   }
  },
  {
   "id": "L062",
   "from": "google",
   "to": "fluidstack",
   "kind": "capital",
   "what": "Backstop on power-site leases",
   "evidence": "Google guarantees payments on about 1 GW of former crypto-mining sites.",
   "basis": "reported",
   "source": {
    "key": "fluidstack",
    "title": "A tiny startup helping Google take on Nvidia is now worth $18B",
    "publisher": "Forbes",
    "url": "https://www.forbes.com/sites/iainmartin/2026/09/03/a-tiny-startup-helping-google-take-on-nvidia-is-now-worth-18-billion/",
    "date": "2026-09-03",
    "tier": "press"
   }
  },
  {
   "id": "L063",
   "from": "spacexai",
   "to": "anthropic",
   "kind": "compute",
   "what": "All of Colossus 1",
   "evidence": "More than 300 MW and 220,000+ Nvidia GPUs.",
   "basis": "reported",
   "source": {
    "key": "anth_colossus",
    "title": "Higher limits: Anthropic and SpaceX compute agreement",
    "publisher": "Anthropic",
    "url": "https://www.anthropic.com/news/higher-limits-spacex",
    "date": "2026-05-06",
    "tier": "primary"
   }
  },
  {
   "id": "L064",
   "from": "constellation",
   "to": "microsoft",
   "kind": "power",
   "what": "Crane (Three Mile Island) restart, ~835 MW",
   "evidence": "Expected 2027.",
   "basis": "reported",
   "source": {
    "key": "ceg_meta",
    "title": "Constellation's biggest AI power deal starts June 2027",
    "publisher": "The Motley Fool",
    "url": "https://www.fool.com/investing/2026/09/08/constellation-energy-s-biggest-ai-power-deal-doesn-t-start-paying-until-june-2027/",
    "date": "2026-09-08",
    "tier": "press"
   }
  },
  {
   "id": "L065",
   "from": "constellation",
   "to": "meta",
   "kind": "power",
   "what": "Clinton plant, 1,121 MW",
   "evidence": "20 years starting June 2027.",
   "basis": "reported",
   "source": {
    "key": "ceg_meta",
    "title": "Constellation's biggest AI power deal starts June 2027",
    "publisher": "The Motley Fool",
    "url": "https://www.fool.com/investing/2026/09/08/constellation-energy-s-biggest-ai-power-deal-doesn-t-start-paying-until-june-2027/",
    "date": "2026-09-08",
    "tier": "press"
   }
  },
  {
   "id": "L066",
   "from": "constellation",
   "to": "amazon",
   "kind": "power",
   "what": "Calvert Cliffs, 690 MW",
   "evidence": "20 years plus a $3B upgrade.",
   "basis": "reported",
   "source": {
    "key": "calvert",
    "title": "Calvert Cliffs power purchase with Amazon",
    "publisher": "Maryland Matters",
    "url": "https://marylandmatters.org/2026/09/30/calvert-cliffs-power-purchase-amazon",
    "date": "2026-09-30",
    "tier": "press"
   }
  },
  {
   "id": "L067",
   "from": "vistra",
   "to": "meta",
   "kind": "power",
   "what": "2,176 MW nuclear",
   "evidence": "Perry, Davis-Besse and Beaver Valley; 2,609 MW by 2034.",
   "basis": "reported",
   "source": {
    "key": "meta_nuclear",
    "title": "Meta announces landmark agreements for new nuclear",
    "publisher": "World Nuclear News",
    "url": "https://www.world-nuclear-news.org/articles/meta-announces-landmark-agreements-for-new-nuclear",
    "date": "2026-01-09",
    "tier": "press"
   }
  },
  {
   "id": "L068",
   "from": "vistra",
   "to": "amazon",
   "kind": "power",
   "what": "Comanche Peak, 1.2 GW",
   "evidence": "20 years starting 2027.",
   "basis": "reported",
   "source": {
    "key": "vistra_amzn",
    "title": "Vistra Comanche Peak deal with Amazon",
    "publisher": "Utility Dive",
    "url": "https://www.utilitydive.com/news/vistra-texas-data-center-pause-comanche-amazon-earnings/827434/",
    "date": "2026-08",
    "tier": "press"
   }
  },
  {
   "id": "L069",
   "from": "talen",
   "to": "amazon",
   "kind": "power",
   "what": "Susquehanna, 1.92 GW",
   "evidence": "Through 2042.",
   "basis": "reported",
   "source": {
    "key": "talen_amzn",
    "title": "Talen and Amazon expand partnership",
    "publisher": "World Nuclear News",
    "url": "https://www.world-nuclear-news.org/articles/new-supply-agreement-expands-talen-amazon-partnership",
    "date": "2025-06",
    "tier": "press"
   }
  },
  {
   "id": "L070",
   "from": "terrapower",
   "to": "meta",
   "kind": "power",
   "what": "Natrium reactors, up to 2.8 GW",
   "evidence": "Two reactors plus rights to six more.",
   "basis": "reported",
   "source": {
    "key": "meta_nuclear",
    "title": "Meta announces landmark agreements for new nuclear",
    "publisher": "World Nuclear News",
    "url": "https://www.world-nuclear-news.org/articles/meta-announces-landmark-agreements-for-new-nuclear",
    "date": "2026-01-09",
    "tier": "press"
   }
  },
  {
   "id": "L071",
   "from": "oklo",
   "to": "meta",
   "kind": "power",
   "what": "1.2 GW campus, Ohio",
   "evidence": "First phase around 2030.",
   "basis": "reported",
   "source": {
    "key": "meta_nuclear",
    "title": "Meta announces landmark agreements for new nuclear",
    "publisher": "World Nuclear News",
    "url": "https://www.world-nuclear-news.org/articles/meta-announces-landmark-agreements-for-new-nuclear",
    "date": "2026-01-09",
    "tier": "press"
   }
  },
  {
   "id": "L072",
   "from": "entergy",
   "to": "meta",
   "kind": "power",
   "what": "Gas plants for Hyperion",
   "evidence": "Seven new plants, ten in total, over 7 GW.",
   "basis": "reported",
   "source": {
    "key": "hyperion_gas",
    "title": "Meta funds seven gas plants for Hyperion",
    "publisher": "WinBuzzer",
    "url": "https://winbuzzer.com/2026/03/31/meta-funds-seven-gas-plants-largest-ai-data-center-xcxwbn/",
    "date": "2026-03-31",
    "tier": "secondary"
   }
  },
  {
   "id": "L073",
   "from": "siemens-energy",
   "to": "meta",
   "kind": "power",
   "what": "Turbines for on-site gas in Ohio",
   "evidence": "Siemens Energy, Solar Turbines and Caterpillar supply Meta's off-grid Socrates South plant.",
   "basis": "reported",
   "source": {
    "key": "meta_socrates",
    "title": "Meta deploys tent data centers backed by 400MW off-grid gas",
    "publisher": "MLQ",
    "url": "https://mlq.ai/news/v2/meta-deploys-tent-based-data-centers-in-ohio-and-tennessee-backed-by-400mw-of-off-grid-gas-power/",
    "date": "2026",
    "tier": "secondary"
   }
  },
  {
   "id": "L074",
   "from": "bloom",
   "to": "oracle",
   "kind": "power",
   "what": "Fuel cells, up to 2.8 GW",
   "evidence": "On-site generation agreement.",
   "basis": "reported",
   "source": {
    "key": "bloom_orcl",
    "title": "Bloom Energy 2.8GW Oracle fuel cell deal",
    "publisher": "EnkiAI",
    "url": "https://enkiai.com/solid-oxide-fuel-cells/bloom-energy-fuel-cell-2026-2-8gw-oracle-deal/",
    "date": "2026-04",
    "tier": "secondary"
   }
  },
  {
   "id": "L075",
   "from": "talen",
   "to": "pjm",
   "kind": "power",
   "what": "Susquehanna output into the PJM grid",
   "evidence": "Amazon contract shifting to grid-delivered power in 2026.",
   "basis": "reported",
   "source": {
    "key": "talen_amzn",
    "title": "Talen and Amazon expand partnership",
    "publisher": "World Nuclear News",
    "url": "https://www.world-nuclear-news.org/articles/new-supply-agreement-expands-talen-amazon-partnership",
    "date": "2025-06",
    "tier": "press"
   }
  },
  {
   "id": "L076",
   "from": "ercot",
   "to": "crusoe",
   "kind": "power",
   "what": "Texas grid connection for Abilene",
   "evidence": "Texas delayed its first large-load study in August after a governor-ordered audit.",
   "basis": "inferred",
   "source": {
    "key": "ercot_pause",
    "title": "Texas hits pause on data center interconnections",
    "publisher": "Utility Dive",
    "url": "https://www.utilitydive.com/news/texas-hits-pause-data-center-interconnections/827046/",
    "date": "2026-08",
    "tier": "press"
   }
  },
  {
   "id": "L077",
   "from": "google-deepmind",
   "to": "apple",
   "kind": "distribution",
   "what": "Gemini model behind Siri",
   "evidence": "iOS 27 shipped a fully Gemini-based Siri; reported about $1B a year.",
   "basis": "reported",
   "source": {
    "key": "apple_gemini",
    "title": "Apple and Google Gemini Siri deal",
    "publisher": "Tech Insider",
    "url": "https://tech-insider.org/apple-google-gemini-siri-deal-1-billion-2026/",
    "date": "2026-08-15",
    "tier": "secondary"
   }
  },
  {
   "id": "L078",
   "from": "openai",
   "to": "amazon",
   "kind": "distribution",
   "what": "Models on AWS Bedrock",
   "evidence": "GPT models and Codex generally available on Bedrock after exclusivity ended.",
   "basis": "reported",
   "source": {
    "key": "bedrock_oai",
    "title": "OpenAI models on Amazon Bedrock",
    "publisher": "Amazon",
    "url": "https://www.aboutamazon.com/news/aws/bedrock-openai-models",
    "date": "2026-09-08",
    "tier": "primary"
   }
  },
  {
   "id": "L079",
   "from": "moonshot",
   "to": "cursor",
   "kind": "distribution",
   "what": "Base model for Cursor's Composer 2",
   "evidence": "Cursor confirmed Composer 2 is built on Kimi 2.5.",
   "basis": "reported",
   "source": {
    "key": "cursor_kimi",
    "title": "Cursor admits Composer 2 is based on Moonshot AI's Kimi 2.5",
    "publisher": "Dataconomy",
    "url": "https://dataconomy.com/2026/03/23/cursor-admits-composer-2-based-on-moonshot-ais-kimi-2-5/",
    "date": "2026-03-23",
    "tier": "press"
   }
  },
  {
   "id": "L080",
   "from": "spacexai",
   "to": "cursor",
   "kind": "capital",
   "what": "$60B acquisition",
   "evidence": "Announced June 16, closed August 14, 2026.",
   "basis": "reported",
   "source": {
    "key": "cursor_close",
    "title": "SpaceX closes $60B Cursor deal",
    "publisher": "AI Weekly",
    "url": "https://aiweekly.co/alerts/spacex-closes-60b-cursor-deal-folds-it-into-spacexai-unit",
    "date": "2026-08-14",
    "tier": "secondary"
   }
  },
  {
   "id": "L081",
   "from": "reddit",
   "to": "google-deepmind",
   "kind": "data",
   "what": "Training data license",
   "evidence": "Google and OpenAI are Reddit's two largest licensing buyers.",
   "basis": "reported",
   "source": {
    "key": "reddit_data",
    "title": "Reddit's data revenue: OpenAI and Google are the buyers",
    "publisher": "The Motley Fool",
    "url": "https://www.fool.com/investing/2026/08/17/reddits-data-revenue-openai-google-buyers/",
    "date": "2026-08-17",
    "tier": "press"
   }
  },
  {
   "id": "L082",
   "from": "reddit",
   "to": "openai",
   "kind": "data",
   "what": "Training data license",
   "evidence": "Google and OpenAI are Reddit's two largest licensing buyers.",
   "basis": "reported",
   "source": {
    "key": "reddit_data",
    "title": "Reddit's data revenue: OpenAI and Google are the buyers",
    "publisher": "The Motley Fool",
    "url": "https://www.fool.com/investing/2026/08/17/reddits-data-revenue-openai-google-buyers/",
    "date": "2026-08-17",
    "tier": "press"
   }
  },
  {
   "id": "L083",
   "from": "news-corp",
   "to": "meta",
   "kind": "data",
   "what": "News archive license",
   "evidence": "Up to $50M a year for at least three years.",
   "basis": "reported",
   "source": {
    "key": "pressgazette",
    "title": "News publisher AI deals and lawsuits tracker",
    "publisher": "Press Gazette",
    "url": "https://pressgazette.co.uk/platforms/news-publisher-ai-deals-lawsuits-openai-google/",
    "date": "2026-09-23",
    "tier": "press"
   }
  },
  {
   "id": "L084",
   "from": "us-commerce",
   "to": "anthropic",
   "kind": "rules",
   "what": "Export license required for Fable 5 and Mythos 5",
   "evidence": "Anthropic disabled both models for all customers June 12; controls lifted June 30, with Mythos 5 restored only for approved US organizations.",
   "basis": "reported",
   "source": {
    "key": "bis_fable",
    "title": "Commerce restricted access to Anthropic's latest models: what comes next",
    "publisher": "CSIS",
    "url": "https://www.csis.org/analysis/department-commerce-restricted-access-anthropics-latest-models-what-comes-next",
    "date": "2026-06-16",
    "tier": "press"
   }
  },
  {
   "id": "L085",
   "from": "us-commerce",
   "to": "nvidia",
   "kind": "rules",
   "what": "China export limits",
   "evidence": "H200 allowed case by case from January; Blackwell and Rubin stay banned.",
   "basis": "reported",
   "source": {
    "key": "h200_allow",
    "title": "US eases AI chip export rules for China",
    "publisher": "Interesting Engineering",
    "url": "https://interestingengineering.com/culture/us-eases-ai-chip-export-rules-china-nvidia-h200",
    "date": "2026-01-13",
    "tier": "press"
   }
  },
  {
   "id": "L086",
   "from": "pentagon",
   "to": "anthropic",
   "kind": "rules",
   "what": "Supply chain risk designation",
   "evidence": "Appeals court upheld the label 2-1 on Sept 25.",
   "basis": "reported",
   "source": {
    "key": "dod_anth",
    "title": "Appeals court declines to block Pentagon blacklisting of Anthropic",
    "publisher": "ABC News",
    "url": "https://abcnews.com/Business/anthropic-appeals-court-declines-block-pentagon-blacklisting/story?id=136755690",
    "date": "2026-09-25",
    "tier": "press"
   }
  },
  {
   "id": "L087",
   "from": "china-gov",
   "to": "nvidia",
   "kind": "rules",
   "what": "H200 import block",
   "evidence": "Customs stopped H200 shipments despite US approval.",
   "basis": "reported",
   "source": {
    "key": "h200_block",
    "title": "China customs blocks Nvidia H200",
    "publisher": "Taipei Times",
    "url": "https://www.taipeitimes.com/News/biz/archives/2026/01/15/2003850605",
    "date": "2026-01-15",
    "tier": "press"
   }
  },
  {
   "id": "L088",
   "from": "eu-ai-office",
   "to": "openai",
   "kind": "rules",
   "what": "General-purpose model enforcement",
   "evidence": "From Aug 2, 2026, fines up to 3% of worldwide turnover or €15M, whichever is higher.",
   "basis": "inferred",
   "source": {
    "key": "eu_gpai",
    "title": "GPAI enforcement has started",
    "publisher": "Praxikon",
    "url": "https://www.praxikon.com/en/posts/gpai-enforcement-has-started-powers-2026",
    "date": "2026-08",
    "tier": "secondary"
   }
  },
  {
   "id": "L089",
   "from": "eu-ai-office",
   "to": "mistral",
   "kind": "rules",
   "what": "General-purpose model enforcement",
   "evidence": "From Aug 2, 2026, fines up to 3% of worldwide turnover or €15M, whichever is higher.",
   "basis": "inferred",
   "source": {
    "key": "eu_gpai",
    "title": "GPAI enforcement has started",
    "publisher": "Praxikon",
    "url": "https://www.praxikon.com/en/posts/gpai-enforcement-has-started-powers-2026",
    "date": "2026-08",
    "tier": "secondary"
   }
  },
  {
   "id": "L090",
   "from": "ferc",
   "to": "pjm",
   "kind": "rules",
   "what": "Large-load connection rules",
   "evidence": "Ordered six grid operators to justify or rewrite their rules.",
   "basis": "reported",
   "source": {
    "key": "ferc_large_load",
    "title": "FERC acts to advance data center large-load integration",
    "publisher": "Duane Morris",
    "url": "https://www.duanemorris.com/alerts/ferc_acts_advance_data_center_large_load_integration_six_rto_regions_0626.html",
    "date": "2026-06-18",
    "tier": "press"
   }
  },
  {
   "id": "L091",
   "from": "google",
   "to": "google-deepmind",
   "kind": "compute",
   "what": "TPUs and data centers for Gemini",
   "evidence": "Google trains and serves Gemini on its own TPUs; 8th-generation TPUs target late 2027.",
   "basis": "inferred",
   "source": {
    "key": "tpu8",
    "title": "Google Ironwood and 8th-gen TPUs",
    "publisher": "The Next Web",
    "url": "https://thenextweb.com/news/google-ironwood-tpu-inference-cloud-next",
    "date": "2026-04-22",
    "tier": "press"
   }
  },
  {
   "id": "L092",
   "from": "google",
   "to": "google-deepmind",
   "kind": "capital",
   "what": "Funded from Alphabet's own cash",
   "evidence": "Gemini app at 950M monthly users and AI search mode above 1B, reported in Alphabet's Q2 2026 results.",
   "basis": "reported",
   "source": {
    "key": "goog_q2",
    "title": "Alphabet Q2 2026 earnings: CEO remarks",
    "publisher": "Google",
    "url": "https://blog.google/company-news/inside-google/message-ceo/alphabet-earnings-q2-2026/",
    "date": "2026-07-22",
    "tier": "primary"
   }
  },
  {
   "id": "L093",
   "from": "globalfoundries",
   "to": "tsmc",
   "kind": "packaging",
   "what": "Silicon interposers for CoWoS",
   "evidence": "$2B deal, initial five-year term, made in Malta, New York; production ramps in the first half of 2028.",
   "basis": "reported",
   "source": {
    "key": "gf_tsmc",
    "title": "GlobalFoundries signs $2B silicon interposer deal with TSMC",
    "publisher": "Manufacturing Dive",
    "url": "https://www.manufacturingdive.com/news/globalfoundries-tsmc-silicon-interposes-semiconductors/832537",
    "date": "2026-10-08",
    "tier": "press"
   }
  },
  {
   "id": "L094",
   "from": "google",
   "to": "apple",
   "kind": "compute",
   "what": "TPUs for training Apple's foundation models",
   "evidence": "Google's cloud chief named Apple a public reference customer scaling pretraining of its foundation models on TPUs.",
   "basis": "reported",
   "source": {
    "key": "goog_q3_call",
    "title": "Alphabet Q3 2026 earnings call transcript",
    "publisher": "Alphabet",
    "url": "https://s206.q4cdn.com/479360582/files/doc_events/2026/Oct/28/2026_Q3_Earnings_Transcript.pdf",
    "date": "2026-10-28",
    "tier": "primary"
   }
  },
  {
   "id": "L095",
   "from": "google",
   "to": "oracle",
   "kind": "chips",
   "what": "TPU systems",
   "evidence": "Google says it recently entered a partnership to deliver TPU systems with Oracle.",
   "basis": "reported",
   "source": {
    "key": "goog_q3_call",
    "title": "Alphabet Q3 2026 earnings call transcript",
    "publisher": "Alphabet",
    "url": "https://s206.q4cdn.com/479360582/files/doc_events/2026/Oct/28/2026_Q3_Earnings_Transcript.pdf",
    "date": "2026-10-28",
    "tier": "primary"
   }
  },
  {
   "id": "L096",
   "from": "nvidia",
   "to": "meta",
   "kind": "capital",
   "what": "$3B equity investment (announced, not closed)",
   "evidence": "Nvidia agreed to invest $3B in Meta's stock offering as Meta expands its use of Nvidia systems.",
   "basis": "reported",
   "source": {
    "key": "nvda_meta_3b",
    "title": "Nvidia to invest $3B in Meta as companies expand work on Muse AI agents",
    "publisher": "VKTR",
    "url": "https://www.vktr.com/ai-market/nvidia-to-invest-3b-in-meta-as-companies-expand-work-on-muse-ai-agents/",
    "date": "2026-10-26",
    "tier": "secondary"
   }
  },
  {
   "id": "L097",
   "from": "constellation",
   "to": "google",
   "kind": "power",
   "what": "890 MW from upgrades at 11 reactors, plus 2,700 MW of existing supply",
   "evidence": "20-year contract for the upgrades, first power due 2028; 15 years for the existing supply in PJM; Constellation expects to invest more than $4.3B.",
   "basis": "reported",
   "source": {
    "key": "ceg_goog",
    "title": "Google and Constellation nuclear uprate deal; DOE loan to Vistra",
    "publisher": "Power Engineering",
    "url": "https://www.power-eng.com/nuclear/google-constellation-doe-nuclear-plant-investment/",
    "date": "2026-10-07",
    "tier": "press"
   }
  },
  {
   "id": "L098",
   "from": "cnn",
   "to": "google",
   "kind": "data",
   "what": "Licensed content for Google News AI features",
   "evidence": "Google says it pays participating publications, including CNN, to license content for AI story previews and audio briefings in Google News.",
   "basis": "reported",
   "source": {
    "key": "goog_news_pay",
    "title": "Google expands paid AI pilot with news publishers",
    "publisher": "Google",
    "url": "https://blog.google/products-and-platforms/products/news/news-ai-pilot-update-publishers/",
    "date": "2026-10-15",
    "tier": "primary"
   }
  },
  {
   "id": "L170",
   "from": "nvidia",
   "to": "synopsys",
   "kind": "capital",
   "what": "$2B equity stake",
   "evidence": "Nvidia bought $2 billion of Synopsys common stock as part of a multiyear, non-exclusive partnership announced December 1, 2025.",
   "basis": "reported",
   "source": {
    "key": "nvda_snps",
    "title": "NVIDIA and Synopsys announce strategic partnership to revolutionize engineering and design",
    "publisher": "NVIDIA",
    "url": "https://nvidianews.nvidia.com/news/nvidia-and-synopsys-announce-strategic-partnership-to-revolutionize-engineering-and-design",
    "date": "2025-12-01",
    "tier": "primary"
   }
  },
  {
   "id": "L171",
   "from": "nvidia",
   "to": "synopsys",
   "kind": "chips",
   "what": "CUDA-accelerated design and simulation software",
   "evidence": "The partnership moves Synopsys engineering and chip-design software onto Nvidia CUDA GPUs.",
   "basis": "reported",
   "source": {
    "key": "nvda_snps",
    "title": "NVIDIA and Synopsys announce strategic partnership to revolutionize engineering and design",
    "publisher": "NVIDIA",
    "url": "https://nvidianews.nvidia.com/news/nvidia-and-synopsys-announce-strategic-partnership-to-revolutionize-engineering-and-design",
    "date": "2025-12-01",
    "tier": "primary"
   }
  },
  {
   "id": "L172",
   "from": "us-commerce",
   "to": "synopsys",
   "kind": "rules",
   "what": "China export license for chip-design software (imposed, then rescinded)",
   "evidence": "Commerce required a license on May 29, 2025 and rescinded the requirement on July 2, 2025.",
   "basis": "reported",
   "source": {
    "key": "snps_bis_lift",
    "title": "Synopsys issues statement on the lifting of recent U.S. export restrictions related to China",
    "publisher": "Synopsys",
    "url": "https://news.synopsys.com/2025-07-02-Synopsys-Issues-Statement-in-Connection-to-the-Lifting-of-Recent-U-S-Export-Restrictions-Related-to-China",
    "date": "2025-07-02",
    "tier": "primary"
   }
  },
  {
   "id": "L173",
   "from": "anthropic",
   "to": "salesforce",
   "kind": "distribution",
   "what": "Claude as a preferred model in Agentforce",
   "evidence": "Claude is a foundational model of the Agentforce 360 platform, served inside Salesforce's trust boundary.",
   "basis": "reported",
   "source": {
    "key": "anth_crm",
    "title": "Anthropic and Salesforce expand partnership to bring Claude to regulated industries",
    "publisher": "Anthropic",
    "url": "https://www.anthropic.com/news/salesforce-anthropic-expanded-partnership",
    "date": "2025-10-14",
    "tier": "primary"
   }
  },
  {
   "id": "L174",
   "from": "amazon",
   "to": "salesforce",
   "kind": "compute",
   "what": "Hosts Claude for Agentforce on Amazon Bedrock",
   "evidence": "Salesforce offers Anthropic's Amazon Bedrock-hosted models within Agentforce 360.",
   "basis": "reported",
   "source": {
    "key": "anth_crm",
    "title": "Anthropic and Salesforce expand partnership to bring Claude to regulated industries",
    "publisher": "Anthropic",
    "url": "https://www.anthropic.com/news/salesforce-anthropic-expanded-partnership",
    "date": "2025-10-14",
    "tier": "primary"
   }
  },
  {
   "id": "L175",
   "from": "openai",
   "to": "salesforce",
   "kind": "distribution",
   "what": "OpenAI models in Agentforce; Agentforce apps in ChatGPT",
   "evidence": "OpenAI frontier models run in Agentforce 360, and Salesforce apps are offered inside ChatGPT.",
   "basis": "reported",
   "source": {
    "key": "crm_oai",
    "title": "Salesforce and OpenAI partner across enterprise work and commerce",
    "publisher": "Salesforce",
    "url": "https://investor.salesforce.com/news/news-details/2025/Salesforce-and-OpenAI-Partner-Across-Enterprise-Work-and-Commerce/default.aspx",
    "date": "2025-10-14",
    "tier": "primary"
   }
  },
  {
   "id": "L176",
   "from": "openai",
   "to": "servicenow",
   "kind": "distribution",
   "what": "Preferred model option on the ServiceNow AI Platform",
   "evidence": "Multi-year agreement announced January 20, 2026.",
   "basis": "reported",
   "source": {
    "key": "now_oai",
    "title": "ServiceNow and OpenAI collaborate to deepen and accelerate enterprise AI outcomes",
    "publisher": "ServiceNow (Business Wire)",
    "url": "https://www.businesswire.com/news/home/20260120785434/en/ServiceNow-and-OpenAI-collaborate-to-deepen-and-accelerate-enterprise-AI-outcomes",
    "date": "2026-01-20",
    "tier": "primary"
   }
  },
  {
   "id": "L177",
   "from": "anthropic",
   "to": "servicenow",
   "kind": "distribution",
   "what": "Claude preferred across ServiceNow workflows; default in Build Agent",
   "evidence": "Multi-year deal announced January 28, 2026; ServiceNow also rolled Claude out to its own staff.",
   "basis": "reported",
   "source": {
    "key": "now_anth",
    "title": "ServiceNow chooses Claude to power customer apps and increase internal productivity",
    "publisher": "Anthropic",
    "url": "https://www.anthropic.com/news/servicenow-anthropic-claude",
    "date": "2026-01-28",
    "tier": "primary"
   }
  },
  {
   "id": "L178",
   "from": "ge-vernova",
   "to": "crusoe",
   "kind": "power",
   "what": "29 aeroderivative gas turbines for AI data centers",
   "evidence": "GE Vernova is delivering 29 LM2500XPRESS gas turbine packages, almost 1 GW, to Crusoe AI data centers; Crusoe booked 10 units in December 2024 and 19 in June 2025. The release does not name the sites.",
   "basis": "reported",
   "source": {
    "key": "gev_crusoe",
    "title": "GE Vernova and Crusoe announce major 29-unit aeroderivative gas turbine deal to deliver power for AI data centers",
    "publisher": "GE Vernova",
    "url": "https://www.gevernova.com/news/press-releases/ge-vernova-crusoe-announce-major-29-unit-aeroderivative-gas-turbine-deliver-ai-data-centers",
    "date": "2025-07-22",
    "tier": "primary"
   }
  },
  {
   "id": "L179",
   "from": "eaton",
   "to": "nvidia",
   "kind": "power",
   "what": "800 V DC power design for Nvidia AI factories",
   "evidence": "Eaton is working with Nvidia on 800-volt direct-current power infrastructure for AI data center racks of 1 MW and beyond.",
   "basis": "reported",
   "source": {
    "key": "eaton_nvda",
    "title": "Eaton accelerates the transformation of data center infrastructure in the AI era with NVIDIA",
    "publisher": "Eaton (Business Wire)",
    "url": "https://www.businesswire.com/news/home/20250715305964/en/Eaton-Accelerates-the-Transformation-of-Data-Center-Infrastructure-in-the-AI-Era-with-NVIDIA",
    "date": "2025-07-15",
    "tier": "primary"
   }
  },
  {
   "id": "L180",
   "from": "huawei",
   "to": "bytedance",
   "kind": "chips",
   "what": "Ascend AI chips (planned)",
   "evidence": "ByteDance reportedly plans to buy more than RMB 40B (about $5.6B) of Huawei Ascend chips in 2026, up from almost none the year before.",
   "basis": "reported",
   "source": {
    "key": "bytedance_ascend",
    "title": "ByteDance reportedly plans to purchase $5.6 billion worth of Huawei's Ascend AI chips",
    "publisher": "TechNode",
    "url": "https://technode.com/2025/12/29/bytedance-reportedly-plans-to-purchase-5-6-billion-worth-of-huaweis-ascend-ai-chips/",
    "date": "2025-12-29",
    "tier": "press"
   }
  },
  {
   "id": "L099",
   "from": "banks",
   "to": "coreweave",
   "kind": "capital",
   "what": "Morgan Stanley/MUFG-led GPU-backed loan (DDTL 5.0), SOFR+4.50%",
   "evidence": "Loan, $3.1B.",
   "basis": "reported",
   "source": {
    "title": "CoreWeave Closes $3.1 Billion Loan Facility, Expanding Access to Public Markets for GPU-Backed Financing",
    "publisher": "CoreWeave via Business Wire",
    "url": "https://www.businesswire.com/news/home/20260518337916/en/CoreWeave-Closes-3.1-Billion-Loan-Facility-Expanding-Access-to-Public-Markets-for-GPU-Backed-Financing/",
    "date": "2026-05-18",
    "tier": "primary"
   },
   "flow": "F026"
  },
  {
   "id": "L100",
   "from": "banks",
   "to": "coreweave",
   "kind": "capital",
   "what": "JPMorgan/MUFG-led loan (DDTL 5.5), SOFR+5.50%",
   "evidence": "Loan, $2.6B.",
   "basis": "reported",
   "source": {
    "title": "CoreWeave Closes $2.6 Billion Loan Facility Arranged By JPMorgan And MUFG",
    "publisher": "Pulse 2.0",
    "url": "https://pulse2.com/coreweave-closes-2-6-billion-loan-facility-arranged-by-jpmorgan-and-mufg-for-ai-infrastructure/",
    "date": "2026-08-11",
    "tier": "secondary"
   },
   "flow": "F027"
  },
  {
   "id": "L101",
   "from": "banks",
   "to": "crusoe",
   "kind": "capital",
   "what": "JPMorgan-led construction loan for Abilene phase 2 (Crusoe/Blue Owl/Primary Digital $15B JV, 1.2 GW). The site is leased to Oracle and used by OpenAI.",
   "evidence": "Loan, $7.1B.",
   "basis": "reported",
   "source": {
    "title": "Newmark Facilitates $7.1 Billion Construction Loan to Develop AI Data Center",
    "publisher": "Newmark (press release via Nasdaq)",
    "url": "https://www.nasdaq.com/press-release/newmark-facilitates-71-billion-construction-loan-develop-ai-data-center-2025-05-22",
    "date": "2025-05-22",
    "tier": "primary"
   },
   "flow": "F028"
  },
  {
   "id": "L102",
   "from": "banks",
   "to": "mistral",
   "kind": "capital",
   "what": "Seven-bank loan (BNP Paribas, Credit Agricole CIB, HSBC, MUFG and three others) to buy Nvidia chips for a Paris-area data center.",
   "evidence": "Loan, $830M.",
   "basis": "reported",
   "source": {
    "title": "France's Mistral raises $830 million in debt for AI data centre build-up",
    "publisher": "Reuters via Yahoo Finance",
    "url": "https://finance.yahoo.com/sectors/technology/articles/frances-mistral-raises-830-million-060341046.html",
    "date": "2026-03-30",
    "tier": "press"
   },
   "flow": "F029"
  },
  {
   "id": "L103",
   "from": "banks",
   "to": "oracle",
   "kind": "capital",
   "what": "Oracle reportedly sought about $38B of debt for data-center projects (September 2025); lenders not named",
   "evidence": "Loan, up to $38B.",
   "basis": "reported",
   "source": {
    "title": "Blue Owl opts not to fund Oracle's $10bn Michigan data center",
    "publisher": "DatacenterDynamics (citing Financial Times)",
    "url": "https://www.datacenterdynamics.com/en/news/blue-owl-opts-not-to-fund-oracles-10bn-michigan-data-center/",
    "date": "2025-12-17",
    "tier": "press"
   },
   "flow": "F030"
  },
  {
   "id": "L104",
   "from": "banks",
   "to": "softbank",
   "kind": "capital",
   "what": "Bridge facility (facility limit $40B; JPMorgan, Goldman Sachs, Mizuho, SMBC, MUFG) to fund the 2026 OpenAI investment. Closed: the $30B drawn was fully repaid by September 15, 2026, and the $10B undrawn was canceled effective September 30, 2026.",
   "evidence": "Loan, $40B.",
   "basis": "reported",
   "source": {
    "title": "Execution of Bridge Facility Agreement Primarily for the Follow-on Investments in OpenAI",
    "publisher": "SoftBank Group",
    "url": "https://group.softbank/en/news/press/20260327",
    "date": "2026-03-27",
    "tier": "primary"
   },
   "flow": "F031"
  },
  {
   "id": "L105",
   "from": "banks",
   "to": "softbank",
   "kind": "capital",
   "what": "Margin loan secured on SoftBank's Arm Holdings shares.",
   "evidence": "Loan, $20B.",
   "basis": "reported",
   "source": {
    "title": "SoftBank's AI funding plans to face reckoning at earnings",
    "publisher": "Reuters via The Star",
    "url": "https://www.thestar.com.my/tech/tech-news/2026/08/04/softbank039s-ai-funding-plans-to-face-reckoning-at-earnings",
    "date": "2026-08-04",
    "tier": "press"
   },
   "flow": "F032"
  },
  {
   "id": "L106",
   "from": "banks",
   "to": "softbank",
   "kind": "capital",
   "what": "Margin loan secured on SoftBank's OpenAI shares, drawn in August 2026",
   "evidence": "Loan, $10B.",
   "basis": "reported",
   "source": {
    "title": "Financial Report for the Six-Month Period Ended September 30, 2026",
    "publisher": "SoftBank Group",
    "url": "https://group.softbank/media/Project/sbg/sbg/pdf/ir/financials/financial_reports/financial-report_q2fy2026_01_en.pdf",
    "date": "2026-11-10",
    "tier": "primary"
   },
   "flow": "F033"
  },
  {
   "id": "L107",
   "from": "banks",
   "to": "softbank",
   "kind": "capital",
   "what": "Syndicated loan from about 20 banks. The source says it was arranged about a week before the September 24 bond sale, so the date is approximate.",
   "evidence": "Loan, $11.9B.",
   "basis": "reported",
   "source": {
    "title": "SoftBank Pays a Steep Price for Record Bond Sale to Fund Its OpenAI Bet",
    "publisher": "European Business Magazine",
    "url": "https://europeanbusinessmagazine.com/softbank-pays-for-record-bond-sale/",
    "date": "2026-09-25",
    "tier": "secondary"
   },
   "flow": "F034"
  },
  {
   "id": "L108",
   "from": "banks",
   "to": "spacexai",
   "kind": "capital",
   "what": "Bridge loan refinancing X and xAI high-yield debt",
   "evidence": "Loan, $20B.",
   "basis": "reported",
   "source": {
    "title": "SpaceX used a $20 billion bridge loan to slash Musk's debt costs in half, IPO filing reveals",
    "publisher": "The Next Web",
    "url": "https://thenextweb.com/news/spacex-bridge-loan-musk-debt-refinancing-ipo",
    "date": "2026-05-21",
    "tier": "press"
   },
   "flow": "F035"
  },
  {
   "id": "L109",
   "from": "banks",
   "to": "stack-infrastructure",
   "kind": "capital",
   "what": "Debt (SMBC, MUFG, BNP Paribas, Goldman Sachs led; may include bonds) for an Oracle-affiliated Stargate site in New Mexico.",
   "evidence": "Loan, $18B.",
   "basis": "reported",
   "source": {
    "title": "Banks prep series of multibillion-dollar debt offerings for Oracle",
    "publisher": "Octus",
    "url": "https://octus.com/resources/articles/banks-prep-series-of-multibillion-dollar-debt-offerings-for-oracle/",
    "date": "2025-11-11",
    "tier": "press"
   },
   "flow": "F036"
  },
  {
   "id": "L110",
   "from": "banks",
   "to": "vantage-data-centers",
   "kind": "capital",
   "what": "'Jacquard' project loans (JPMorgan, MUFG lead) for Stargate campuses in Texas and Wisconsin.",
   "evidence": "Loan, $38B.",
   "basis": "reported",
   "source": {
    "title": "Three AI Megadeals Are Breaking New Ground on Wall Street (WSJ, republished)",
    "publisher": "Wall Street Journal via Tiger Brokers",
    "url": "https://www.itiger.com/hant/news/2582394141",
    "date": "2025-11-11",
    "tier": "press"
   },
   "flow": "F037"
  },
  {
   "id": "L111",
   "from": "blackrock",
   "to": "meta",
   "kind": "capital",
   "what": "Reported ~$12B of bonds via BlackRock-backed 'Sopaipilla Investor' (80% owner) for Meta's El Paso data center, backed by Meta's 20-year lease from 2028.",
   "evidence": "Bonds, up to $12B.",
   "basis": "reported",
   "source": {
    "title": "Meta's Latest AI Data Center Debt Raise Could Reportedly Cost More Than Its 2025 Record Deal (citing Financial Times)",
    "publisher": "Stocktwits",
    "url": "https://stocktwits.com/news-articles/markets/equity/meta-s-latest-ai-data-center-debt-raise-could-reportedly-cost-more-than-its-2025-record-deal/cZZYrCsR7yK",
    "date": "2026-07-24",
    "tier": "secondary"
   },
   "flow": "F038"
  },
  {
   "id": "L112",
   "from": "blackstone",
   "to": "coreweave",
   "kind": "capital",
   "what": "Anchor of 'up to' $8.5B investment-grade delayed-draw loan (DDTL 4.0), SOFR+2.25% / ~5.9% fixed, backed by a big-tech contract (reported as Meta)",
   "evidence": "Loan, up to $8.5B.",
   "basis": "reported",
   "source": {
    "title": "CoreWeave Compute Acquisition Co. VIII, LLC closes $8.5 billion delayed draw term loan facility",
    "publisher": "MarketScreener",
    "url": "https://www.marketscreener.com/news/coreweave-compute-acquisition-co-viii-llc-closes-8-5-billion-delayed-draw-term-loan-facility-ce7e51dedc81f222",
    "date": "2026-03-31",
    "tier": "secondary"
   },
   "flow": "F039"
  },
  {
   "id": "L113",
   "from": "blue-owl",
   "to": "crusoe",
   "kind": "capital",
   "what": "Blue Owl equity in the $15B Abilene JV. Its own amount was not disclosed.",
   "evidence": "Equity investment, amount not disclosed.",
   "basis": "reported",
   "source": {
    "title": "Blue Owl, Crusoe, Primary Digital enter second phase of $15B joint venture",
    "publisher": "TipRanks / TheFly",
    "url": "https://www.tipranks.com/news/the-fly/blue-owl-crusoe-primary-digital-enter-second-phase-of-15b-joint-venture",
    "date": "2025-05-21",
    "tier": "secondary"
   },
   "flow": "F040"
  },
  {
   "id": "L114",
   "from": "blue-owl",
   "to": "hyperion-jv",
   "kind": "capital",
   "what": "Blue Owl funds put in about $3B for an 80% stake; Meta keeps 20%.",
   "evidence": "Equity investment, $3B.",
   "basis": "reported",
   "source": {
    "title": "Three AI Megadeals Are Breaking New Ground on Wall Street (WSJ, republished)",
    "publisher": "Wall Street Journal via Tiger Brokers",
    "url": "https://www.itiger.com/hant/news/2582394141",
    "date": "2025-11-11",
    "tier": "press"
   },
   "flow": "F041"
  },
  {
   "id": "L115",
   "from": "blue-owl",
   "to": "hyperion-jv",
   "kind": "capital",
   "what": "Blue Owl funds' cash contribution for 80% of Meta's Hyperion data-center JV (partly funded by the Pimco-led bonds).",
   "evidence": "Equity investment, $7B.",
   "basis": "reported",
   "source": {
    "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
    "publisher": "Meta",
    "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
    "date": "2025-10-21",
    "tier": "primary"
   },
   "flow": "F042"
  },
  {
   "id": "L116",
   "from": "bond-market",
   "to": "amazon",
   "kind": "capital",
   "what": "Amazon $15B bond (November 2025, day approximate).",
   "evidence": "Bonds, $15B.",
   "basis": "reported",
   "source": {
    "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
    "publisher": "Reuters via Yahoo Finance",
    "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
    "date": "2026-02-09",
    "tier": "press"
   },
   "flow": "F043"
  },
  {
   "id": "L117",
   "from": "bond-market",
   "to": "amazon",
   "kind": "capital",
   "what": "Amazon's roughly $54B global bond sale: about $37B in dollars (about $126B of orders) plus a debut €14.5B (about $16.8B) euro deal.",
   "evidence": "Bonds, $54B.",
   "basis": "reported",
   "source": {
    "title": "Amazon Raises $54B in Record Bond Sales as Investors Place $126B Orders",
    "publisher": "Yahoo Finance / GuruFocus",
    "url": "https://finance.yahoo.com/news/amazon-raises-54b-record-bond-144705950.html",
    "date": "2026-03-13",
    "tier": "secondary"
   },
   "flow": "F044"
  },
  {
   "id": "L118",
   "from": "bond-market",
   "to": "amazon",
   "kind": "capital",
   "what": "Amazon $25B eight-part bond. Peak orders were $62B, about half its March demand.",
   "evidence": "Bonds, $25B.",
   "basis": "reported",
   "source": {
    "title": "Amazon secures $25 billion for AI buildout as bond demand cools",
    "publisher": "Investing.com",
    "url": "https://www.investing.com/news/stock-market-news/amazon-launches-eightpart-us-investment-grade-bond-offering-4779013",
    "date": "2026-07-07",
    "tier": "press"
   },
   "flow": "F045"
  },
  {
   "id": "L119",
   "from": "bond-market",
   "to": "coreweave",
   "kind": "capital",
   "what": "Convertible notes, 1.75% due 2032 (April 2026)",
   "evidence": "Bonds, $3.5B.",
   "basis": "reported",
   "source": {
    "title": "CoreWeave Prices Upsized $3.5 Billion Convertible Senior Notes Offering",
    "publisher": "CoreWeave (press release)",
    "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Prices-Upsized-3-5-Billion-Convertible-Senior-Notes-Offering/default.aspx",
    "date": "2026-04-10",
    "tier": "primary"
   },
   "flow": "F046"
  },
  {
   "id": "L120",
   "from": "bond-market",
   "to": "coreweave",
   "kind": "capital",
   "what": "High-yield unsecured notes in 2026: $1.75B + $1.0B at 9.75% (2031) and $1.25B at 9.625% (2032); excludes €2B 8.5% 2032 notes",
   "evidence": "Bonds, $4B.",
   "basis": "reported",
   "source": {
    "title": "CoreWeave Announces Pricing of $1.25 Billion of Senior Notes and €2 Billion of Senior Notes",
    "publisher": "CoreWeave (press release)",
    "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Announces-Pricing-of-1-25-Billion-of-Senior-Notes-and-2-Billion-of-Senior-Notes/default.aspx",
    "date": "2026-06-11",
    "tier": "primary"
   },
   "flow": "F047"
  },
  {
   "id": "L121",
   "from": "bond-market",
   "to": "coreweave",
   "kind": "capital",
   "what": "Convertible notes, 2.875% due 2033 (September 2026). An earlier $3.5B 1.75% convertible is listed on CoreWeave's page",
   "evidence": "Bonds, $3.7B.",
   "basis": "reported",
   "source": {
    "title": "CoreWeave Prices Upsized $3.7 Billion Convertible Senior Notes Offering",
    "publisher": "CoreWeave (press release)",
    "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Prices-Upsized-3-7-Billion-Convertible-Senior-Notes-Offering/default.aspx",
    "date": "2026-09-18",
    "tier": "primary"
   },
   "flow": "F048"
  },
  {
   "id": "L122",
   "from": "bond-market",
   "to": "google",
   "kind": "capital",
   "what": "Alphabet $17.5B US bond (November 2025, day approximate), plus a separate €6.5B euro deal the same month.",
   "evidence": "Bonds, $17.5B.",
   "basis": "reported",
   "source": {
    "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
    "publisher": "Reuters via Yahoo Finance",
    "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
    "date": "2026-02-09",
    "tier": "press"
   },
   "flow": "F049"
  },
  {
   "id": "L123",
   "from": "bond-market",
   "to": "google",
   "kind": "capital",
   "what": "Alphabet $20B seven-part US bond, followed in 2026 by sterling (including a 100-year bond), Swiss franc, euro, Canadian dollar and yen deals.",
   "evidence": "Bonds, $20B.",
   "basis": "reported",
   "source": {
    "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
    "publisher": "Reuters via Yahoo Finance",
    "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
    "date": "2026-02-09",
    "tier": "press"
   },
   "flow": "F050"
  },
  {
   "id": "L124",
   "from": "bond-market",
   "to": "hyperion-jv",
   "kind": "capital",
   "what": "The rest of the $27B Hyperion bonds bought by other investors. This is our subtraction: $27B total minus Pimco's roughly $18B.",
   "evidence": "Bonds, $9B.",
   "basis": "reported",
   "source": {
    "title": "Meta Pushes Its Largest Data Center Project Off Its Books With $27B Joint Venture",
    "publisher": "Bisnow",
    "url": "https://www.bisnow.com/national/news/data-center-capital-markets/meta-pushes-its-largest-data-center-project-off-its-books-with-27b-joint-venture-131490",
    "date": "2025-10-22",
    "tier": "press"
   },
   "flow": "F051"
  },
  {
   "id": "L125",
   "from": "bond-market",
   "to": "meta",
   "kind": "capital",
   "what": "Meta $30B bond, the largest non-acquisition high-grade bond sale ever.",
   "evidence": "Bonds, $30B.",
   "basis": "reported",
   "source": {
    "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
    "publisher": "Reuters via Yahoo Finance",
    "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
    "date": "2026-02-09",
    "tier": "press"
   },
   "flow": "F052"
  },
  {
   "id": "L126",
   "from": "bond-market",
   "to": "meta",
   "kind": "capital",
   "what": "Meta long-term debt proceeds in 2026 (consistent with the ~$25B April 2026 bond sale).",
   "evidence": "Bonds, $24.9B.",
   "basis": "reported",
   "source": {
    "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
    "publisher": "Meta Platforms via SEC EDGAR",
    "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
    "date": "2026-10-21",
    "tier": "primary"
   },
   "flow": "F053"
  },
  {
   "id": "L127",
   "from": "bond-market",
   "to": "microsoft",
   "kind": "capital",
   "what": "Microsoft sold $25.0B of notes in 10 pieces (first bond sale since 2017 per press); proceeds for general purposes including capital expenditures.",
   "evidence": "Bonds, $25B.",
   "basis": "reported",
   "source": {
    "title": "Microsoft pricing term sheet (Form FWP) for $25B notes",
    "publisher": "Microsoft via SEC EDGAR",
    "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526439794/d799291dfwp.htm",
    "date": "2026-10-29",
    "tier": "primary"
   },
   "flow": "F054"
  },
  {
   "id": "L128",
   "from": "bond-market",
   "to": "nebius",
   "kind": "capital",
   "what": "Convertible notes, 1.25% (2031) and 2.625% (2033)",
   "evidence": "Bonds, $4.3B.",
   "basis": "reported",
   "source": {
    "title": "Nebius unaudited condensed consolidated financial statements, six months ended June 30, 2026 (Form 6-K Ex. 99.2)",
    "publisher": "Nebius / SEC EDGAR",
    "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094844/nbis-20260812xex99d2.htm",
    "date": "2026-08-12",
    "tier": "primary"
   },
   "flow": "F055"
  },
  {
   "id": "L129",
   "from": "bond-market",
   "to": "nvidia",
   "kind": "capital",
   "what": "Nvidia's $25B bond in June 2026 (day approximate), its first in five years. Nvidia is itself a big investor in OpenAI ($30B) and xAI.",
   "evidence": "Bonds, $25B.",
   "basis": "reported",
   "source": {
    "title": "The AI boom's debt blitz is testing investor demand",
    "publisher": "Fortune",
    "url": "https://fortune.com/2026/07/17/ai-boom-debt-blitz-investor-demand-hyperscaler-bond-issuance/",
    "date": "2026-07-17",
    "tier": "press"
   },
   "flow": "F056"
  },
  {
   "id": "L130",
   "from": "bond-market",
   "to": "oracle",
   "kind": "capital",
   "what": "Oracle $18B investment-grade bond (September 2025, day approximate).",
   "evidence": "Bonds, $18B.",
   "basis": "reported",
   "source": {
    "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
    "publisher": "Reuters via Yahoo Finance",
    "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
    "date": "2026-02-09",
    "tier": "press"
   },
   "flow": "F057"
  },
  {
   "id": "L131",
   "from": "bond-market",
   "to": "oracle",
   "kind": "capital",
   "what": "Oracle $25B note sale (February 2026)",
   "evidence": "Bonds, $25B.",
   "basis": "reported",
   "source": {
    "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
    "publisher": "Reuters via Yahoo Finance",
    "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
    "date": "2026-02-09",
    "tier": "press"
   },
   "flow": "F058"
  },
  {
   "id": "L132",
   "from": "bond-market",
   "to": "qts",
   "kind": "capital",
   "what": "QTS debut high-grade bond for a Georgia data center with Microsoft as tenant.",
   "evidence": "Bonds, $4.6B.",
   "basis": "reported",
   "source": {
    "title": "Microsoft-Tied Data Center Bond Sale Draws $12.5 Billion Demand",
    "publisher": "Bloomberg",
    "url": "https://www.bloomberg.com/news/articles/2026-04-06/blackstone-backed-data-center-firm-qts-kicks-off-bond-sale",
    "date": "2026-04-06",
    "tier": "press"
   },
   "flow": "F059"
  },
  {
   "id": "L133",
   "from": "bond-market",
   "to": "softbank",
   "kind": "capital",
   "what": "¥1 trillion bond for Japanese retail investors, issued earlier in September 2026 (exact day not given).",
   "evidence": "Bonds, $6.3B.",
   "basis": "reported",
   "source": {
    "title": "SoftBank raises US$11.1bil in world's biggest high-yield corporate bond sale",
    "publisher": "Bloomberg/Reuters via The Star",
    "url": "https://www.thestar.com.my/business/business-news/2026/09/24/softbank-raises-us111bil-in-world039s-biggest-high-yield-corporate-bond-sale",
    "date": "2026-09-24",
    "tier": "press"
   },
   "flow": "F060"
  },
  {
   "id": "L134",
   "from": "bond-market",
   "to": "softbank",
   "kind": "capital",
   "what": "Record high-yield bond sale at 8.625% to 9.75% coupons on the dollar notes, to fund OpenAI.",
   "evidence": "Bonds, $11.1B.",
   "basis": "reported",
   "source": {
    "title": "SoftBank raises US$11.1bil in world's biggest high-yield corporate bond sale",
    "publisher": "Bloomberg/Reuters via The Star",
    "url": "https://www.thestar.com.my/business/business-news/2026/09/24/softbank-raises-us111bil-in-world039s-biggest-high-yield-corporate-bond-sale",
    "date": "2026-09-24",
    "tier": "press"
   },
   "flow": "F061"
  },
  {
   "id": "L135",
   "from": "bond-market",
   "to": "spacexai",
   "kind": "capital",
   "what": "SpaceX (merged with xAI) sold $25B of bonds days after its IPO (exact date approximate).",
   "evidence": "Bonds, $25B.",
   "basis": "reported",
   "source": {
    "title": "The AI boom's debt blitz is testing investor demand",
    "publisher": "Fortune",
    "url": "https://fortune.com/2026/07/17/ai-boom-debt-blitz-investor-demand-hyperscaler-bond-issuance/",
    "date": "2026-07-17",
    "tier": "press"
   },
   "flow": "F062"
  },
  {
   "id": "L136",
   "from": "brookfield",
   "to": "bloom",
   "kind": "capital",
   "what": "Financing framework to pay for Bloom fuel cell power projects for AI data centers (up from $5B in Oct 2025). Framework, not drawn; exact structure (loan, ownership, lease) not disclosed.",
   "evidence": "Loan, up to $25B.",
   "basis": "reported",
   "source": {
    "title": "Brookfield and Bloom Energy Expand AI Infrastructure Partnership to $25 Billion",
    "publisher": "Bloom Energy (press release)",
    "url": "https://www.bloomenergy.com/news/brookfield-and-bloom-energy-expand-ai-infrastructure-partnership/",
    "date": "2026-06-30",
    "tier": "primary"
   },
   "flow": "F064"
  },
  {
   "id": "L137",
   "from": "china-big-fund",
   "to": "deepseek",
   "kind": "capital",
   "what": "China's national AI fund (backed mainly by the Big Fund) in final talks to join DeepSeek's first round; amount not given.",
   "evidence": "Equity investment, amount not disclosed.",
   "basis": "reported",
   "source": {
    "title": "DeepSeek slated to draw $7 billion in maiden fundraising, sources say",
    "publisher": "Reuters via MarketScreener",
    "url": "https://www.marketscreener.com/news/deepseek-slated-to-draw-7-billion-in-maiden-fundraising-sources-say-ce7f5ddfd888f724",
    "date": "2026-06-03",
    "tier": "press"
   },
   "flow": "F065"
  },
  {
   "id": "L138",
   "from": "g42",
   "to": "cerebras",
   "kind": "capital",
   "what": "MBZUAI (62%) and G42 (24%), 86% of Cerebras' $0.51B 2025 revenue (amount derived); G42 is also an investor",
   "evidence": "Chip purchase, $440M.",
   "basis": "reported",
   "source": {
    "title": "Cerebras stock just hit markets",
    "publisher": "Yahoo Finance",
    "url": "https://finance.yahoo.com/markets/stocks/articles/cerebras-stock-just-hit-markets-150518599.html",
    "date": "2026-05-14",
    "tier": "press"
   },
   "flow": "F069"
  },
  {
   "id": "L139",
   "from": "hyperion-jv",
   "to": "meta",
   "kind": "capital",
   "what": "One-time distribution of about $3B to Meta for contributing the land and construction in progress (Blue Owl effectively bought 80% of the project).",
   "evidence": "Acquisition, $3B.",
   "basis": "reported",
   "source": {
    "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
    "publisher": "Meta",
    "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
    "date": "2025-10-21",
    "tier": "primary"
   },
   "flow": "F076"
  },
  {
   "id": "L140",
   "from": "jane-street",
   "to": "coreweave",
   "kind": "capital",
   "what": "Strategic equity investment in Q2 2026",
   "evidence": "Equity investment, $1B.",
   "basis": "reported",
   "source": {
    "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
    "publisher": "CoreWeave (press release)",
    "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
    "date": "2026-08-11",
    "tier": "primary"
   },
   "flow": "F077"
  },
  {
   "id": "L141",
   "from": "jane-street",
   "to": "crusoe",
   "kind": "capital",
   "what": "Reported five-year Crusoe Cloud contract",
   "evidence": "Compute contract, up to $13B.",
   "basis": "reported",
   "source": {
    "title": "Crusoe raises $3B at $30B valuation after landing $13B Jane Street deal",
    "publisher": "Tech Funding News",
    "url": "https://techfundingnews.com/crusoe-raises-3b-at-30b-valuation-after-landing-13b-jane-street-deal/",
    "date": "2026-09-04",
    "tier": "press"
   },
   "flow": "F078"
  },
  {
   "id": "L142",
   "from": "jane-street",
   "to": "fluidstack",
   "kind": "capital",
   "what": "Lead of $1.5B round at $18B valuation",
   "evidence": "Equity investment, $1.5B.",
   "basis": "reported",
   "source": {
    "title": "Fluidstack raises $1.5B led by Jane Street, valuation to $18B",
    "publisher": "Dealroom",
    "url": "https://dealroom.co/news/157101-fluidstack-raises-1-5b-led-by-jane-street-valuation-quadruples-to-18b-in/",
    "date": "2026-09-28",
    "tier": "secondary"
   },
   "flow": "F079"
  },
  {
   "id": "L143",
   "from": "meta",
   "to": "hyperion-jv",
   "kind": "capital",
   "what": "Meta leases Hyperion from the JV and guarantees investors are repaid if it leaves.",
   "evidence": "Lease or guarantee, amount not disclosed.",
   "basis": "reported",
   "source": {
    "title": "The Meta/Blue Owl deal broken down: off-balance-sheet gymnastics 24 years after Enron",
    "publisher": "IFR",
    "url": "https://www.ifre.com/opinion/2363199/the-metablue-owl-deal-broken-down-off-balance-sheet-gymnastics-24-years-after-enron",
    "date": "2026",
    "tier": "press",
    "date_inferred": true
   },
   "flow": "F085"
  },
  {
   "id": "L144",
   "from": "meta",
   "to": "hyperion-jv",
   "kind": "capital",
   "what": "Meta rents the campus and guarantees its residual value (a capped cash payment if it walks away).",
   "evidence": "Lease or guarantee, amount not disclosed.",
   "basis": "reported",
   "source": {
    "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
    "publisher": "Meta",
    "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
    "date": "2025-10-21",
    "tier": "primary"
   },
   "flow": "F086"
  },
  {
   "id": "L145",
   "from": "mgx",
   "to": "anthropic",
   "kind": "capital",
   "what": "Invested in Anthropic's $30B Series G (Feb 2026) and $65B Series H (May 2026). Amounts were not disclosed.",
   "evidence": "Equity investment, amount not disclosed.",
   "basis": "reported",
   "source": {
    "title": "Abu Dhabi's AI investment firm MGX raises $49bn for new fund",
    "publisher": "The National",
    "url": "https://www.thenationalnews.com/business/markets/2026/07/01/abu-dhabis-ai-investment-firm-mgx-raises-49bn-for-new-fund/",
    "date": "2026-07-01",
    "tier": "press"
   },
   "flow": "F094"
  },
  {
   "id": "L146",
   "from": "mgx",
   "to": "openai",
   "kind": "capital",
   "what": "Co-led OpenAI's $122B round. MGX's amount was not disclosed.",
   "evidence": "Equity investment, amount not disclosed.",
   "basis": "reported",
   "source": {
    "title": "UAE's MGX closes $49B AI fund anchored in US AI ecosystem",
    "publisher": "UAE Preferred",
    "url": "https://www.uaepreferred.com/perspectives/uaes-mgx-closes-49b-ai-fund-anchored-in-us-ai-ecosystem",
    "date": "2026-07-02",
    "tier": "secondary"
   },
   "flow": "F095"
  },
  {
   "id": "L147",
   "from": "mgx",
   "to": "spacexai",
   "kind": "capital",
   "what": "Backed xAI's $20B Series E. MGX's amount was not disclosed.",
   "evidence": "Equity investment, amount not disclosed.",
   "basis": "reported",
   "source": {
    "title": "UAE's MGX closes $49B AI fund anchored in US AI ecosystem",
    "publisher": "UAE Preferred",
    "url": "https://www.uaepreferred.com/perspectives/uaes-mgx-closes-49b-ai-fund-anchored-in-us-ai-ecosystem",
    "date": "2026-07-02",
    "tier": "secondary"
   },
   "flow": "F096"
  },
  {
   "id": "L148",
   "from": "mgx",
   "to": "stargate",
   "kind": "capital",
   "what": "Reported initial equity commitment to the Stargate JV.",
   "evidence": "Equity investment, up to $7B.",
   "basis": "reported",
   "source": {
    "title": "Stargate LLC",
    "publisher": "Wikipedia (citing The Information)",
    "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
    "date": "2025-01-23",
    "tier": "secondary"
   },
   "flow": "F097"
  },
  {
   "id": "L149",
   "from": "nvidia",
   "to": "sb-energy",
   "kind": "capital",
   "what": "Nvidia invested $1.5B in SB Energy, builder of OpenAI's PORTS campus in Ohio, where Nvidia will be the exclusive AI compute supplier.",
   "evidence": "Equity investment, $1.5B.",
   "basis": "reported",
   "source": {
    "title": "SB Energy, OpenAI and NVIDIA PORTS campus press release (8-K exhibit)",
    "publisher": "NVIDIA (SEC filing)",
    "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/sbeoainvidia-portsrelease.htm",
    "date": "2026-08-17",
    "tier": "primary"
   },
   "flow": "F118"
  },
  {
   "id": "L150",
   "from": "nvidia",
   "to": "sb-energy",
   "kind": "capital",
   "what": "Cap on Nvidia's residual value guarantees for ~4.25 GW of OpenAI leases; paid only if OpenAI defaults and re-letting falls short. OpenAI must reimburse Nvidia.",
   "evidence": "Lease or guarantee, up to $105B.",
   "basis": "reported",
   "source": {
    "title": "NVIDIA Form 8-K (residual value guaranties, PORTS campus)",
    "publisher": "NVIDIA (SEC filing)",
    "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/nvda-20260817.htm",
    "date": "2026-08-17",
    "tier": "primary"
   },
   "flow": "F119"
  },
  {
   "id": "L151",
   "from": "openai",
   "to": "stargate",
   "kind": "capital",
   "what": "Reported initial equity commitment to the Stargate JV.",
   "evidence": "Equity investment, up to $19B.",
   "basis": "reported",
   "source": {
    "title": "Stargate LLC",
    "publisher": "Wikipedia (citing The Information)",
    "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
    "date": "2025-01-23",
    "tier": "secondary"
   },
   "flow": "F131"
  },
  {
   "id": "L152",
   "from": "oracle",
   "to": "stargate",
   "kind": "capital",
   "what": "Reported initial equity commitment to the Stargate JV.",
   "evidence": "Equity investment, up to $7B.",
   "basis": "reported",
   "source": {
    "title": "Stargate LLC",
    "publisher": "Wikipedia (citing The Information)",
    "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
    "date": "2025-01-23",
    "tier": "secondary"
   },
   "flow": "F133"
  },
  {
   "id": "L153",
   "from": "oracle",
   "to": "vantage-data-centers",
   "kind": "capital",
   "what": "Oracle's 15-year lease on the Vantage campuses services the $38B loan; OpenAI is the end user.",
   "evidence": "Lease or guarantee, amount not disclosed.",
   "basis": "reported",
   "source": {
    "title": "Three AI Megadeals Are Breaking New Ground on Wall Street (WSJ, republished)",
    "publisher": "Wall Street Journal via Tiger Brokers",
    "url": "https://www.itiger.com/hant/news/2582394141",
    "date": "2025-11-11",
    "tier": "press"
   },
   "flow": "F134"
  },
  {
   "id": "L154",
   "from": "pimco",
   "to": "related-digital",
   "kind": "capital",
   "what": "Pimco bought ~$10B of the ~$14B bond tranche in the $16.3B Michigan Stargate campus financing (Bank of America structured).",
   "evidence": "Bonds, $10B.",
   "basis": "reported",
   "source": {
    "title": "Oracle needed the world's biggest bond fund to finance the world's biggest data centre",
    "publisher": "The Next Web",
    "url": "https://thenextweb.com/news/oracle-data-centre-16-billion-financing-stargate",
    "date": "2026-04-25",
    "tier": "press"
   },
   "flow": "F135"
  },
  {
   "id": "L155",
   "from": "apollo",
   "to": "anthropic",
   "kind": "capital",
   "what": "A chip-backed special-purpose company arranged by Apollo and Blackstone for Anthropic's compute (reported as $35B or $36B).",
   "evidence": "Loan, up to $35B.",
   "basis": "reported",
   "source": {
    "title": "Goldman: skjult 1,8 billion USD stor off-balance-sheet tidsbombe skaber tvivl om AI-supercyklussen",
    "publisher": "Ugebrev Investor",
    "url": "https://ugebrev.dk/formue/goldman-skjult-18-billion-usd-stor-off-balance-sheet-tidsbombe-skaber-tvivl-om-ai-supercyklussen/",
    "date": "2026-06-13",
    "tier": "press"
   },
   "flow": "F136"
  },
  {
   "id": "L181",
   "from": "blackstone",
   "to": "anthropic",
   "kind": "capital",
   "what": "A chip-backed special-purpose company arranged by Apollo and Blackstone for Anthropic's compute (reported as $35B or $36B).",
   "evidence": "Co-lender with Apollo in this loan, up to $35B; its own share was not disclosed.",
   "basis": "reported",
   "source": {
    "title": "Goldman: skjult 1,8 billion USD stor off-balance-sheet tidsbombe skaber tvivl om AI-supercyklussen",
    "publisher": "Ugebrev Investor",
    "url": "https://ugebrev.dk/formue/goldman-skjult-18-billion-usd-stor-off-balance-sheet-tidsbombe-skaber-tvivl-om-ai-supercyklussen/",
    "date": "2026-06-13",
    "tier": "press"
   },
   "flow": "F136"
  },
  {
   "id": "L156",
   "from": "apollo",
   "to": "spacexai",
   "kind": "capital",
   "what": "Up to $12.5B of debt (Apollo, Diameter) to a special-purpose company that buys Nvidia GPUs for xAI's Colossus 2 and rents them to xAI.",
   "evidence": "Loan, up to $12.5B.",
   "basis": "reported",
   "source": {
    "title": "Nvidia to invest in Musk's xAI as part of US$20bil funding",
    "publisher": "Free Malaysia Today (Bloomberg report)",
    "url": "https://www.freemalaysiatoday.com/category/business/2025/10/08/nvidia-to-invest-in-musks-xai-as-part-of-us20bil-funding",
    "date": "2025-10-08",
    "tier": "press"
   },
   "flow": "F137"
  },
  {
   "id": "L182",
   "from": "diameter",
   "to": "spacexai",
   "kind": "capital",
   "what": "Up to $12.5B of debt (Apollo, Diameter) to a special-purpose company that buys Nvidia GPUs for xAI's Colossus 2 and rents them to xAI.",
   "evidence": "Co-lender with Apollo in this loan, up to $12.5B; its own share was not disclosed.",
   "basis": "reported",
   "source": {
    "title": "Nvidia to invest in Musk's xAI as part of US$20bil funding",
    "publisher": "Free Malaysia Today (Bloomberg report)",
    "url": "https://www.freemalaysiatoday.com/category/business/2025/10/08/nvidia-to-invest-in-musks-xai-as-part-of-us20bil-funding",
    "date": "2025-10-08",
    "tier": "press"
   },
   "flow": "F137"
  },
  {
   "id": "L157",
   "from": "softbank",
   "to": "openai",
   "kind": "capital",
   "what": "SoftBank's first $30B in OpenAI (April and December 2025)",
   "evidence": "Equity investment, $30B.",
   "basis": "reported",
   "source": {
    "title": "SoftBank closes $41B OpenAI investment as Stargate buildout expands",
    "publisher": "TechInformed",
    "url": "https://techinformed.com/softbank-closes-41b-openai-investment-as-stargate-buildout-expands",
    "date": "2026-01-07",
    "tier": "press"
   },
   "flow": "F138"
  },
  {
   "id": "L158",
   "from": "softbank",
   "to": "openai",
   "kind": "capital",
   "what": "SoftBank's 2026 OpenAI investment, part of the $122B round at an $852B valuation. SoftBank reports a cumulative $64.6B for about 13%; that is $4.6B more than the two rows here, and our sources do not itemize the difference.",
   "evidence": "Equity investment, $30B.",
   "basis": "reported",
   "source": {
    "title": "SoftBank completes final phase of $30 billion investment in OpenAI",
    "publisher": "Reuters via The Star",
    "url": "https://www.thestar.com.my/tech/tech-news/2026/10/02/softbank-completes-final-phase-of-30-billion-investment-in-openai",
    "date": "2026-10-01",
    "tier": "press"
   },
   "flow": "F139"
  },
  {
   "id": "L159",
   "from": "softbank",
   "to": "stargate",
   "kind": "capital",
   "what": "Reported initial equity commitment to the Stargate JV.",
   "evidence": "Equity investment, up to $19B.",
   "basis": "reported",
   "source": {
    "title": "Stargate LLC",
    "publisher": "Wikipedia (citing The Information)",
    "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
    "date": "2025-01-23",
    "tier": "secondary"
   },
   "flow": "F140"
  },
  {
   "id": "L160",
   "from": "sovereign-funds",
   "to": "alibaba-cloud",
   "kind": "capital",
   "what": "Alibaba sold HK$80B of new shares to non-US investors; all proceeds earmarked for AI infrastructure. Buyers not named; Reuters says demand included sovereign wealth funds, so the 'from' is a partial label.",
   "evidence": "Equity investment, $10.2B.",
   "basis": "reported",
   "source": {
    "title": "Completion of placing (Form 6-K Ex. 99.1)",
    "publisher": "Alibaba Group / SEC",
    "url": "https://www.sec.gov/Archives/edgar/data/0001577552/000119312526365894/baba-ex99_1.htm",
    "date": "2026-08-26",
    "tier": "primary"
   },
   "flow": "F141"
  },
  {
   "id": "L161",
   "from": "sovereign-funds",
   "to": "crusoe",
   "kind": "capital",
   "what": "Series F at ~$30.9B valuation; co-led by Atreides, Valor and Mubadala (Abu Dhabi), with Qatar Investment Authority, Founders Fund, TPG (amount by investor not disclosed)",
   "evidence": "Equity investment, $3.9B.",
   "basis": "reported",
   "source": {
    "title": "Crusoe Completes $3.9B F-Round Funding at $30.9B Valuation (citing WSJ)",
    "publisher": "KuCoin News / MarsBit",
    "url": "https://www.kucoin.com/news/flash/crusoe-completes-3-9b-f-round-funding-at-30-9b-valuation",
    "date": "2026-09-17",
    "tier": "secondary"
   },
   "flow": "F142"
  },
  {
   "id": "L162",
   "from": "stock-market",
   "to": "spacexai",
   "kind": "capital",
   "what": "IPO proceeds, mostly to repay debt",
   "evidence": "Equity investment, $75B.",
   "basis": "reported",
   "source": {
    "title": "SpaceX prices historic $75B IPO at $1.75 trillion",
    "publisher": "AI Weekly / TradingKey",
    "url": "https://aiweekly.co/alerts/spacex-prices-historic-75b-ipo-at-175-trillion",
    "date": "2026-06-11",
    "tier": "secondary"
   },
   "flow": "F146"
  },
  {
   "id": "L163",
   "from": "tencent",
   "to": "deepseek",
   "kind": "capital",
   "what": "About RMB 10B into DeepSeek's first round (reported by Reuters from sources as 'considering'; later press reports it as done).",
   "evidence": "Equity investment, $1.5B.",
   "basis": "reported",
   "source": {
    "title": "DeepSeek slated to draw $7 billion in maiden fundraising, sources say",
    "publisher": "Reuters via MarketScreener",
    "url": "https://www.marketscreener.com/news/deepseek-slated-to-draw-7-billion-in-maiden-fundraising-sources-say-ce7f5ddfd888f724",
    "date": "2026-06-03",
    "tier": "press"
   },
   "flow": "F147"
  },
  {
   "id": "L164",
   "from": "us-doe",
   "to": "constellation",
   "kind": "capital",
   "what": "Federal loan backing the Crane nuclear restart that will supply Microsoft.",
   "evidence": "Loan, $1B.",
   "basis": "reported",
   "source": {
    "title": "Constellation 8-K Exhibit 99.1: Crane restart backed by $1 billion DOE loan",
    "publisher": "SEC EDGAR",
    "url": "https://www.sec.gov/Archives/edgar/data/1868275/000186827525000099/ceg-202511188kexh991.htm",
    "date": "2025-11-18",
    "tier": "primary"
   },
   "flow": "F150"
  },
  {
   "id": "L165",
   "from": "us-doe",
   "to": "terrapower",
   "kind": "capital",
   "what": "Up to $2B federal 50:50 cost share (Advanced Reactor Demonstration Program) for the Kemmerer, Wyoming Natrium plant. Type 'grant' proposed (not in schema list).",
   "evidence": "Government grant, up to $2B.",
   "basis": "reported",
   "source": {
    "title": "Natrium reactor and energy storage system, US - update",
    "publisher": "Engineering News",
    "url": "https://www.engineeringnews.co.za/article/natrium-reactor-and-energy-storage-system-us-update-2025-11-07",
    "date": "2025-11-07",
    "tier": "press"
   },
   "flow": "F151"
  },
  {
   "id": "L166",
   "from": "venture-funds",
   "to": "anthropic",
   "kind": "capital",
   "what": "Series G at $380B, led by GIC (sovereign) and Coatue",
   "evidence": "Equity investment, $30B.",
   "basis": "reported",
   "source": {
    "title": "Anthropic raises $30B Series G at $380B post-money valuation",
    "publisher": "Orrick",
    "url": "https://www.orrick.com/en/News/2026/02/Anthropic-Raises-30B-Series-G-at-380B-Post-Money-Valuation",
    "date": "2026-02-17",
    "tier": "secondary"
   },
   "flow": "F152"
  },
  {
   "id": "L167",
   "from": "venture-funds",
   "to": "anthropic",
   "kind": "capital",
   "what": "Series H at $965B, led by Altimeter, Dragoneer, Greenoaks, Sequoia",
   "evidence": "Equity investment, $65B.",
   "basis": "reported",
   "source": {
    "title": "Anthropic raises $65B Series H at $965B post-money valuation",
    "publisher": "Orrick",
    "url": "https://www.orrick.com/en/News/2026/05/Anthropic-Raises-65B-Series-H-at-965B-Post-Money-Valuation",
    "date": "2026-05-29",
    "tier": "secondary"
   },
   "flow": "F153"
  },
  {
   "id": "L168",
   "from": "venture-funds",
   "to": "openai",
   "kind": "capital",
   "what": "Andreessen Horowitz and D. E. Shaw (co-leads), Sequoia, Thrive and others in the $122B round. VC amounts were not disclosed. About $9B to $12B of the round is not attributed to Amazon, Nvidia or SoftBank.",
   "evidence": "Equity investment, amount not disclosed.",
   "basis": "reported",
   "source": {
    "title": "OpenAI raises $122 billion at $852 billion valuation, opens to retail investors",
    "publisher": "The Next Web",
    "url": "https://thenextweb.com/news/openai-122-billion-round-852-billion-valuation-retail-investors",
    "date": "2026-03-31",
    "tier": "press"
   },
   "flow": "F154"
  },
  {
   "id": "L169",
   "from": "venture-funds",
   "to": "spacexai",
   "kind": "capital",
   "what": "xAI Series E (Valor, StepStone, Fidelity, QIA, MGX, Baron, Nvidia, Cisco)",
   "evidence": "Equity investment, $20B.",
   "basis": "reported",
   "source": {
    "title": "xAI raises $20B Series E",
    "publisher": "StorageNewsletter (edited xAI press release)",
    "url": "https://www.storagenewsletter.com/2026/01/12/xai-raises-20b-series-e/",
    "date": "2026-01-12",
    "tier": "secondary"
   },
   "flow": "F155"
  }
 ],
 "chokepoints": [
  {
   "id": "cowos",
   "name": "Advanced packaging (CoWoS)",
   "force": "compute",
   "layer": "fab",
   "status": "binding",
   "controllers": [
    "tsmc",
    "ase",
    "amkor"
   ],
   "observed": [
    {
     "fact": "Nvidia reportedly holds more than half of TSMC's 2026 CoWoS capacity.",
     "source": {
      "key": "cowos_osat",
      "title": "TSMC expands outsourcing of CoWoS front-end step to OSATs",
      "publisher": "TrendForce",
      "url": "https://www.trendforce.com/news/2026/08/05/news-tsmc-reportedly-expands-outsourcing-of-key-cowos-front-end-step-to-osats-amid-rising-nvidia-asic-demand/",
      "date": "2026-08-05",
      "tier": "press"
     }
    },
    {
     "fact": "TSMC is reportedly outsourcing part of CoWoS to ASE; ASE and SPIL are adding their own lines with AMD's backing.",
     "source": {
      "key": "cowos_osat",
      "title": "TSMC expands outsourcing of CoWoS front-end step to OSATs",
      "publisher": "TrendForce",
      "url": "https://www.trendforce.com/news/2026/08/05/news-tsmc-reportedly-expands-outsourcing-of-key-cowos-front-end-step-to-osats-amid-rising-nvidia-asic-demand/",
      "date": "2026-08-05",
      "tier": "press"
     }
    },
    {
     "fact": "Trade reports put CoWoS and 3nm lead times at 52 to 78 weeks and 2nm at 78 to 156 weeks as of late 2025; TSMC does not publish lead times.",
     "source": {
      "key": "foundry_alloc",
      "title": "Foundry allocation status 2026",
      "publisher": "Silicon Analysts",
      "url": "https://siliconanalysts.com/analysis/foundry-allocation-status-q1-2026",
      "date": "2026-06-16",
      "tier": "secondary"
     }
    },
    {
     "fact": "On Oct 15 TSMC's CEO said AI demand is far above what the company can currently supply; 2026 capital spending stays at $60 to 64B.",
     "source": {
      "key": "tsmc_q3_call",
      "title": "TSMC third-quarter revenue tops guidance as CEO says AI demand outruns supply",
      "publisher": "CRN Asia",
      "url": "https://www.crnasia.com/news/2026/components-and-peripherals/tsmc-third-quarter-revenue-tops-guidance-as-ceo-says-ai-dema",
      "date": "2026-10-15",
      "tier": "press"
     }
    },
    {
     "fact": "TSMC signed a $2B deal for GlobalFoundries to make silicon interposers in New York, a CoWoS component, ramping in 2028.",
     "source": {
      "key": "gf_tsmc",
      "title": "GlobalFoundries signs $2B silicon interposer deal with TSMC",
      "publisher": "Manufacturing Dive",
      "url": "https://www.manufacturingdive.com/news/globalfoundries-tsmc-silicon-interposes-semiconductors/832537",
      "date": "2026-10-08",
      "tier": "press"
     }
    }
   ],
   "interpretation": {
    "text": "The tightest gate in the stack. Whoever holds packaging allocation decides who ships AI chips in 2027, and today that is Nvidia. Custom-chip programs from Google, Amazon and Meta compete for the remainder. TSMC outsourcing part of the process, and now buying interposers from GlobalFoundries, tells you it cannot add capacity fast enough on its own. The US supply arrives in 2028, so 2027 stays tight.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "hbm",
   "name": "High-bandwidth memory",
   "force": "compute",
   "layer": "memory",
   "status": "binding",
   "controllers": [
    "sk-hynix",
    "samsung-memory",
    "micron"
   ],
   "observed": [
    {
     "fact": "A JPMorgan analyst who met Micron said it can meet only 50 to 67% of key customers' medium-term demand; its strategic customer agreements carry about $100B of minimum contracted revenue through 2030.",
     "source": {
      "key": "micron_q4",
      "title": "Micron posts record $54B quarter, locks $100B memory contracts",
      "publisher": "Tech Times",
      "url": "https://www.techtimes.com/articles/328376/20261001/micron-posts-record-54b-quarter-locks-hyperscalers-100b-memory-contracts.htm",
      "date": "2026-10-01",
      "tier": "press"
     }
    },
    {
     "fact": "SK hynix reported a 76% operating margin in Q2 2026.",
     "source": {
      "key": "skh_q2",
      "title": "SK hynix Q2 2026 business results",
      "publisher": "SK hynix",
      "url": "https://news.skhynix.com/en/q2-2026-business-results/",
      "date": "2026-07-29",
      "tier": "primary"
     }
    },
    {
     "fact": "SK hynix reported a record 80% operating margin in Q3 2026 and says long-term contracts cover more than half of its planned 2027 and 2028 capacity; Korean press reports its DRAM and HBM are effectively sold out through 2029.",
     "source": {
      "key": "skh_q3_tf",
      "title": "SK hynix Q3 2026: long-term contracts and sold-out capacity",
      "publisher": "TrendForce",
      "url": "https://www.trendforce.com/news/?p=65818",
      "date": "2026-10-28",
      "tier": "press"
     }
    },
    {
     "fact": "Samsung's Q3 2026 profit appears to have been lifted by HBM4 sales for Nvidia's Vera Rubin platform, fully reflected from that quarter.",
     "source": {
      "key": "samsung_q3",
      "title": "Samsung Q3 profit boosted by HBM4 sales for Vera Rubin",
      "publisher": "Money Today",
      "url": "https://www.mt.co.kr/en/industry/2026/10/29/2026102910001769944",
      "date": "2026-10-29",
      "tier": "press"
     }
    }
   ],
   "interpretation": {
    "text": "Three companies, with SK hynix reportedly sold out through 2029, and customers prepaying billions and signing multi-year contracts to secure supply. That is pricing power memory makers have never had. Samsung's return with HBM4 for Vera Rubin adds supply, but demand is rising faster, so it has not loosened the gate.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "leading-edge",
   "name": "Leading-edge chipmaking (3nm, 2nm)",
   "force": "compute",
   "layer": "fab",
   "status": "tight",
   "controllers": [
    "tsmc"
   ],
   "observed": [
    {
     "fact": "TSMC 2nm is reported booked into 2028.",
     "source": {
      "key": "foundry_alloc",
      "title": "Foundry allocation status 2026",
      "publisher": "Silicon Analysts",
      "url": "https://siliconanalysts.com/analysis/foundry-allocation-status-q1-2026",
      "date": "2026-06-16",
      "tier": "secondary"
     }
    },
    {
     "fact": "TSMC raised 2026 capital spending to as much as $64B.",
     "source": {
      "key": "tsmc_q2",
      "title": "TSMC Q2 2026 results",
      "publisher": "BigGo Finance",
      "url": "https://finance.biggo.com/news/US_TSM_2026-07-16",
      "date": "2026-07-16",
      "tier": "secondary"
     }
    },
    {
     "fact": "2nm reached 8% of TSMC's Q3 2026 wafer revenue; 3nm was 33%.",
     "source": {
      "key": "tsmc_q3",
      "title": "TSMC Q3 2026 management report and Q4 guidance (SEC 6-K)",
      "publisher": "TSMC / SEC",
      "url": "https://www.sec.gov/Archives/edgar/data/0001046179/000104617926000726/a3q26e_withguidancexfinal.htm",
      "date": "2026-10-15",
      "tier": "primary"
     }
    }
   ],
   "interpretation": {
    "text": "TSMC is the single point of failure for nearly every AI chip, Nvidia's and the custom ones alike. Samsung's Tesla win and Intel's 18A are real but small. A second source at scale is a 2028 story at the earliest.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "euv",
   "name": "EUV lithography",
   "force": "compute",
   "layer": "tools",
   "status": "tight",
   "controllers": [
    "asml"
   ],
   "observed": [
    {
     "fact": "ASML is the only maker; it targets 60+ EUV machines in 2026.",
     "source": {
      "key": "asml_euv60",
      "title": "ASML EUV shipments: 60 units in 2026",
      "publisher": "Silicon Analysts",
      "url": "https://siliconanalysts.com/analysis/asml-euv-shipments-60-units-2026-memory-demand",
      "date": "2026",
      "tier": "secondary"
     }
    },
    {
     "fact": "2026 sales guided at €43 to 45B, raised in July.",
     "source": {
      "key": "asml_q2",
      "title": "ASML Q2 2026 results slides",
      "publisher": "Investing.com",
      "url": "https://www.investing.com/news/company-news/asml-q2-2026-slides-outlook-raised-on-ai-demand-high-na-milestone-93CH-4792166",
      "date": "2026-07-15",
      "tier": "press"
     }
    },
    {
     "fact": "ASML says its planned 2027 and 2028 supply will not fully meet customer demand; it is studying raising 2028 capacity beyond the 30% increase it announced earlier.",
     "source": {
      "key": "asml_q3",
      "title": "ASML Q3 2026 financial results (SEC filing)",
      "publisher": "ASML / SEC",
      "url": "https://www.sec.gov/Archives/edgar/data/0000937966/000162828026065813/pressreleasefinancialresul.htm",
      "date": "2026-10-14",
      "tier": "primary"
     }
    }
   ],
   "interpretation": {
    "text": "A monopoly with a long queue. Memory makers are now its fastest-growing buyers, which links this chokepoint directly to the HBM one. ASML now says it cannot fully meet 2027 and 2028 demand, so this is the gate most likely to move from tight to binding next.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "lasers",
   "name": "Optical lasers",
   "force": "compute",
   "layer": "chips",
   "status": "binding",
   "controllers": [
    "lumentum",
    "coherent"
   ],
   "observed": [
    {
     "fact": "Nvidia paid about $4B to lock up laser capacity, pushing rivals' lead times past 2027.",
     "source": {
      "key": "lasers",
      "title": "Nvidia's $4B laser lockup pushes rivals past 2027",
      "publisher": "Tech Times",
      "url": "https://www.techtimes.com/articles/317281/20260527/ai-data-center-optical-component-shortage-nvidias-4b-laser-lockup-pushes-rivals-past-2027.htm",
      "date": "2026-05-27",
      "tier": "press"
     }
    },
    {
     "fact": "Nvidia's co-packaged optics switch is in full production with a five-vendor supply chain.",
     "source": {
      "key": "cpo",
      "title": "Spectrum-X Photonics enters full production",
      "publisher": "StorageReview",
      "url": "https://www.storagereview.com/news/nvidia-spectrum-x-ethernet-photonics-enters-full-production-with-4x-fewer-lasers-and-a-five-vendor-cpo-supply-chain",
      "date": "2026-08-15",
      "tier": "press"
     }
    },
    {
     "fact": "Lumentum's CEO said its parts are effectively sold out through early 2029.",
     "source": {
      "key": "lumentum_2029",
      "title": "Lumentum: AI optical components sold out through 2029",
      "publisher": "TIKR",
      "url": "https://www.tikr.com/blog/lumentum-stock-jumps-ai-optical-components-sold-out-2029",
      "date": "2026-10-09",
      "tier": "secondary"
     }
    }
   ],
   "interpretation": {
    "text": "The least-watched bottleneck. Connecting tens of thousands of chips needs lasers, and about five companies make them at scale. Nvidia locking up supply is a quiet way of making rival chip clusters harder to build, and the queue keeps lengthening: Lumentum now says it is sold out into early 2029.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "turbines",
   "name": "Gas turbines",
   "force": "energy",
   "layer": "energy",
   "status": "binding",
   "controllers": [
    "ge-vernova",
    "siemens-energy"
   ],
   "observed": [
    {
     "fact": "GE Vernova's backlog is 116 GW including slot reservations (53 GW firm orders), against output rising to about 20 GW a year.",
     "source": {
      "key": "gev_backlog",
      "title": "GE Vernova gas turbine backlog hits 116 GW",
      "publisher": "Turbomachinery Magazine",
      "url": "https://www.turbomachinerymag.com/view/ge-vernova-gas-turbine-backlog-hits-116-gw-as-power-orders-more-than-double",
      "date": "2026-07",
      "tier": "press"
     }
    },
    {
     "fact": "Siemens Energy quotes lead times of three years or more.",
     "source": {
      "key": "siemens_backlog",
      "title": "Siemens gas turbine backlog nears 70 GW",
      "publisher": "Utility Dive",
      "url": "https://www.utilitydive.com/news/siemens-gas-turbine-backlog-nears-70-gw-as-company-expands-manufacturing/827390/",
      "date": "2026-08",
      "tier": "press"
     }
    },
    {
     "fact": "Mitsubishi's new orders deliver 2028 to 2030.",
     "source": {
      "key": "mhi_backlog",
      "title": "Mitsubishi gas turbine backlog",
      "publisher": "Utility Dive",
      "url": "https://www.utilitydive.com/news/mitsubishi-gas-turbine-backlog-earnings/827761/",
      "date": "2026-08",
      "tier": "press"
     }
    },
    {
     "fact": "GE Vernova's gas turbines under contract or reserved rose to 122 GW in Q3 2026, with reservations now being taken for 2032 delivery and Q3 pricing more than 20% above late 2025.",
     "source": {
      "key": "gev_q3_ud",
      "title": "GE Vernova in $9B deal to buy high-voltage manufacturer as gas turbine orders slow",
      "publisher": "Utility Dive",
      "url": "https://www.utilitydive.com/news/ge-vernova-in-9b-deal-to-buy-high-voltage-manufacturer-as-gas-turbine-orde/873223/",
      "date": "2026-10-29",
      "tier": "press"
     }
    }
   ],
   "interpretation": {
    "text": "Gas is the near-term answer to AI power, and three companies make the turbines. Their order books now run years ahead of their factories, with slots being reserved for 2032 and prices still rising. This is the clearest case of the stack shifting rent from chips to heavy equipment. Watch the pace of new reservations: it slowed in the third quarter, the first hint the queue may stop growing.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "grid",
   "name": "Grid connections and capacity",
   "force": "energy",
   "layer": "energy",
   "status": "binding",
   "controllers": [
    "pjm",
    "ercot",
    "ferc"
   ],
   "observed": [
    {
     "fact": "PJM's 2028/29 auction cleared at its price cap and still came up 6,831 MW short.",
     "source": {
      "key": "pjm_auction",
      "title": "PJM capacity auction clears at $325 cap, short of reliability requirement",
      "publisher": "RTO Insider",
      "url": "https://www.rtoinsider.com/136577-pjm-capacity-auction-clears-325-cap-short-reliability-requirement/",
      "date": "2026-07-15",
      "tier": "press"
     }
    },
    {
     "fact": "About 474 GW is queued in Texas, 90% of it data centers; ERCOT delayed its first large-load study after the governor ordered an audit.",
     "source": {
      "key": "ercot_pause",
      "title": "Texas hits pause on data center interconnections",
      "publisher": "Utility Dive",
      "url": "https://www.utilitydive.com/news/texas-hits-pause-data-center-interconnections/827046/",
      "date": "2026-08",
      "tier": "press"
     }
    },
    {
     "fact": "New York paused new hyperscale data center permits statewide for up to a year.",
     "source": {
      "key": "ny_moratorium",
      "title": "Governor Hochul launches first statewide moratorium on new hyperscale data centers",
      "publisher": "New York State",
      "url": "https://www.governor.ny.gov/news/first-statewide-moratorium-new-hyperscale-data-centers-launched-governor-kathy-hochul",
      "date": "2026-07-14",
      "tier": "primary"
     }
    },
    {
     "fact": "FERC accepted PJM's Reliability Backstop Procurement of about 6.8 GW of new capacity but suspended it for five months, to Feb 28, 2027, subject to refund.",
     "source": {
      "key": "ferc_pjm_rrr",
      "title": "FERC order suspending PJM reliability resource procurement (ER26-3380)",
      "publisher": "FERC via PJM",
      "url": "https://www.pjm.com/pjmfiles/directory/etariff/FercOrders/9154/20260929-er26-3380-000.pdf",
      "date": "2026-09-29",
      "tier": "primary"
     }
    },
    {
     "fact": "On Oct 12 the Energy Department issued an emergency order letting PJM call on backup generation as a last resort, effective Oct 13 to 16.",
     "source": {
      "key": "doe_202c_pjm",
      "title": "DOE emergency order for PJM, October 13 to 16, 2026",
      "publisher": "US Department of Energy",
      "url": "https://www.energy.gov/node/4860603",
      "date": "2026-10-12",
      "tier": "primary"
     }
    }
   ],
   "interpretation": {
    "text": "The grid is now the binding constraint on how fast AI capacity comes online. Expect more sites built with their own power plants, and more political fights over who pays.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "electrical",
   "name": "Transformers and switchgear",
   "force": "energy",
   "layer": "energy",
   "status": "tight",
   "controllers": [
    "eaton",
    "siemens-energy"
   ],
   "observed": [
    {
     "fact": "Large power transformers average about 128 weeks to arrive; about 80% are imported.",
     "source": {
      "key": "transformers",
      "title": "Power transformer lead times and the US grid shortage",
      "publisher": "Industrial Sage",
      "url": "https://www.industrialsage.com/power-transformer-lead-times-us-grid-shortage/",
      "date": "2026",
      "tier": "secondary"
     }
    },
    {
     "fact": "Eaton puts the US data center backlog at 307 GW, about 15 years of building at 2025 rates.",
     "source": {
      "key": "eaton",
      "title": "Eaton and the data center supercycle",
      "publisher": "Electrical Trends",
      "url": "https://electricaltrends.com/2026/08/26/eaton-delivers-again-a-north-american-powerhouse-fueled-by-the-data-center-supercycle/",
      "date": "2026-08-26",
      "tier": "secondary"
     }
    },
    {
     "fact": "GE Vernova agreed to buy high-voltage equipment maker Trench Group for $9.0B, bringing about $5B of backlog and framework agreements; closing is expected in late 2027.",
     "source": {
      "key": "trench_pr",
      "title": "GE Vernova to acquire Trench Group",
      "publisher": "GE Vernova",
      "url": "https://gevernova.com/news/press-releases/ge-vernova-acquire-trench-group",
      "date": "2026-10-28",
      "tier": "primary"
     }
    },
    {
     "fact": "Vertiv's Q3 2026 organic orders more than doubled from a year earlier.",
     "source": {
      "key": "vertiv_q3",
      "title": "Vertiv third-quarter 2026 earnings release",
      "publisher": "Vertiv",
      "url": "https://s205.q4cdn.com/554782763/files/content_files/Vertiv-Third-Quarter-2026-Earnings-Release.pdf",
      "date": "2026-10-28",
      "tier": "primary"
     }
    }
   ],
   "interpretation": {
    "text": "Unglamorous and slow to fix. Even a site with power promised cannot use it without this gear.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "firm-power",
   "name": "Firm nuclear power",
   "force": "energy",
   "layer": "energy",
   "status": "tight",
   "controllers": [
    "constellation",
    "vistra",
    "talen"
   ],
   "observed": [
    {
     "fact": "Meta (Clinton, 20 years) and Microsoft (Crane restart) have signed with Constellation.",
     "source": {
      "key": "ceg_meta",
      "title": "Constellation's biggest AI power deal starts June 2027",
      "publisher": "The Motley Fool",
      "url": "https://www.fool.com/investing/2026/09/08/constellation-energy-s-biggest-ai-power-deal-doesn-t-start-paying-until-june-2027/",
      "date": "2026-09-08",
      "tier": "press"
     }
    },
    {
     "fact": "Amazon has signed for Calvert Cliffs (20 years) and, with Talen, Susquehanna through 2042.",
     "source": {
      "key": "calvert",
      "title": "Calvert Cliffs power purchase with Amazon",
      "publisher": "Maryland Matters",
      "url": "https://marylandmatters.org/2026/09/30/calvert-cliffs-power-purchase-amazon",
      "date": "2026-09-30",
      "tier": "press"
     }
    },
    {
     "fact": "Meta's new-reactor deals with Oklo and TerraPower deliver from about 2030 to 2032.",
     "source": {
      "key": "meta_nuclear",
      "title": "Meta announces landmark agreements for new nuclear",
      "publisher": "World Nuclear News",
      "url": "https://www.world-nuclear-news.org/articles/meta-announces-landmark-agreements-for-new-nuclear",
      "date": "2026-01-09",
      "tier": "press"
     }
    },
    {
     "fact": "Google signed for 890 MW of new output from upgrades at 11 Constellation reactors, first power due 2028, plus 2,700 MW of existing supply.",
     "source": {
      "key": "ceg_goog",
      "title": "Google and Constellation nuclear uprate deal; DOE loan to Vistra",
      "publisher": "Power Engineering",
      "url": "https://www.power-eng.com/nuclear/google-constellation-doe-nuclear-plant-investment/",
      "date": "2026-10-07",
      "tier": "press"
     }
    },
    {
     "fact": "The Energy Department offered Vistra a conditional loan of up to $4.2B for 433 MW of upgrades at plants whose output Meta buys.",
     "source": {
      "key": "ceg_goog",
      "title": "Google and Constellation nuclear uprate deal; DOE loan to Vistra",
      "publisher": "Power Engineering",
      "url": "https://www.power-eng.com/nuclear/google-constellation-doe-nuclear-plant-investment/",
      "date": "2026-10-07",
      "tier": "press"
     }
    }
   ],
   "interpretation": {
    "text": "The existing fleet is almost fully spoken for, and new reactors arrive after 2030. The new supply that comes sooner is from upgrading existing reactors, as in Google's 890 MW deal with Constellation, and it does not come cheap. Owners of operating plants hold scarce, long-dated contracts. Nuclear is the long-term answer; gas is the answer now.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "model-permission",
   "name": "Government permission to sell a model",
   "force": "alignment",
   "layer": "rules",
   "status": "binding",
   "controllers": [
    "us-commerce",
    "pentagon",
    "eu-ai-office"
   ],
   "observed": [
    {
     "fact": "On June 12 Commerce required export licenses for foreign access to Fable 5 and Mythos 5, and Anthropic disabled both for all customers. Controls were lifted June 30.",
     "source": {
      "key": "bis_fable",
      "title": "Commerce restricted access to Anthropic's latest models: what comes next",
      "publisher": "CSIS",
      "url": "https://www.csis.org/analysis/department-commerce-restricted-access-anthropics-latest-models-what-comes-next",
      "date": "2026-06-16",
      "tier": "press"
     }
    },
    {
     "fact": "Access was restored July 1; Mythos 5 returned only for approved US organizations.",
     "source": {
      "key": "anth_access",
      "title": "Statement on Fable and Mythos access",
      "publisher": "Anthropic",
      "url": "https://www.anthropic.com/news/fable-mythos-access",
      "date": "2026-07-01",
      "tier": "primary"
     }
    },
    {
     "fact": "The Pentagon's supply chain risk label on Anthropic was upheld on appeal.",
     "source": {
      "key": "dod_anth",
      "title": "Appeals court declines to block Pentagon blacklisting of Anthropic",
      "publisher": "ABC News",
      "url": "https://abcnews.com/Business/anthropic-appeals-court-declines-block-pentagon-blacklisting/story?id=136755690",
      "date": "2026-09-25",
      "tier": "press"
     }
    },
    {
     "fact": "EU enforcement against general-purpose model providers began Aug 2, 2026.",
     "source": {
      "key": "eu_gpai",
      "title": "GPAI enforcement has started",
      "publisher": "Praxikon",
      "url": "https://www.praxikon.com/en/posts/gpai-enforcement-has-started-powers-2026",
      "date": "2026-08",
      "tier": "secondary"
     }
    },
    {
     "fact": "The EU AI Office sent its first information requests to leading model makers, covering security, outside testing and monitoring after release.",
     "source": {
      "key": "eu_rfi",
      "title": "EU AI Act: the AI Office sends its first requests for information to leading AI developers",
      "publisher": "Reed Smith",
      "url": "https://www.reedsmith.com/our-insights/blogs/technology-law-dispatch/102o6as/eu-ai-act-the-ai-office-sends-its-first-requests-for-information-to-leading-ai/",
      "date": "2026-10-26",
      "tier": "secondary"
     }
    },
    {
     "fact": "China proposed adding 23 AI items to its export-control list, including model weights above certain performance thresholds, open for comment to Nov 15, Bloomberg reported.",
     "source": {
      "key": "china_ai_export",
      "title": "China proposes export curbs on 23 AI items, model weights included",
      "publisher": "AI Weekly",
      "url": "https://aiweekly.co/alerts/china-proposes-export-curbs-on-23-ai-items-weights-included",
      "date": "2026-10-16",
      "tier": "secondary"
     }
    }
   ],
   "interpretation": {
    "text": "New in 2026. A frontier model can now be switched off for every customer by a government letter. That makes regulatory standing a real input to a lab's revenue. The gate is widening: the EU has begun formal requests to model makers, and China has proposed its own permission rule for exporting model weights.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "default-assistant",
   "name": "The default assistant",
   "force": "interface",
   "layer": "interface",
   "status": "tight",
   "controllers": [
    "google",
    "apple",
    "openai",
    "meta"
   ],
   "observed": [
    {
     "fact": "Siri in iOS 27 runs on a custom Google Gemini model.",
     "source": {
      "key": "apple_gemini",
      "title": "Apple and Google Gemini Siri deal",
      "publisher": "Tech Insider",
      "url": "https://tech-insider.org/apple-google-gemini-siri-deal-1-billion-2026/",
      "date": "2026-08-15",
      "tier": "secondary"
     }
    },
    {
     "fact": "Gemini app at 950M monthly users; AI search mode above 1B.",
     "source": {
      "key": "goog_q2",
      "title": "Alphabet Q2 2026 earnings: CEO remarks",
      "publisher": "Google",
      "url": "https://blog.google/company-news/inside-google/message-ceo/alphabet-earnings-q2-2026/",
      "date": "2026-07-22",
      "tier": "primary"
     }
    },
    {
     "fact": "Meta's Muse agent app reached No. 1 on the US App Store ten days after its September 8 launch, promoted through house ads on Facebook, Instagram and WhatsApp.",
     "source": {
      "key": "muse_tc",
      "title": "Meta is putting its muscle behind Muse as the AI app takes off",
      "publisher": "TechCrunch",
      "url": "https://techcrunch.com/2026/09/25/meta-is-putting-its-muscle-behind-muse-as-the-ai-app-takes-off/",
      "date": "2026-09-25",
      "tier": "press"
     }
    },
    {
     "fact": "In an Oppenheimer survey of 1,500 US consumers, 8% said they would trust Meta with their passwords, versus 30% for Google.",
     "source": {
      "key": "muse_yahoo",
      "title": "Meta's AI agent Muse hit No. 1 on the App Store with fewer downloads than ChatGPT",
      "publisher": "Yahoo Tech",
      "url": "https://tech.yahoo.com/ai/article/metas-ai-agent-muse-is-chasing-chatgpts-app-store-rise--and-hit-no-1-with-fewer-downloads-152809095.html",
      "date": "2026-09-21",
      "tier": "press"
     }
    },
    {
     "fact": "Alphabet said the Gemini app passed one billion users.",
     "source": {
      "key": "goog_q3_call",
      "title": "Alphabet Q3 2026 earnings call transcript",
      "publisher": "Alphabet",
      "url": "https://s206.q4cdn.com/479360582/files/doc_events/2026/Oct/28/2026_Q3_Earnings_Transcript.pdf",
      "date": "2026-10-28",
      "tier": "primary"
     }
    },
    {
     "fact": "Meta said more than 10 million people in the US and Canada have set up Muse accounts.",
     "source": {
      "key": "meta_muse_10m",
      "title": "Meta Q3 revenue tops estimates; Zuckerberg says Muse accounts top 10 million",
      "publisher": "KSAT (AP)",
      "url": "https://www.ksat.com/business/2026/10/21/meta-q3-revenue-tops-estimates-and-zuckerberg-says-muse-accounts-have-topped-10-million/",
      "date": "2026-10-21",
      "tier": "press"
     }
    }
   ],
   "interpretation": {
    "text": "There are now three routes to being the assistant people use. Google owns the defaults: search, Android and Siri at once, and Gemini has passed a billion users. OpenAI owns the largest standalone audience but no device. Meta showed the third route, using its own apps to push Muse past 10 million accounts without needing Apple or Google. The next contest is trust, not reach: an agent that books and buys needs your accounts, and on that measure Meta starts well behind Google.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  },
  {
   "id": "china-stack",
   "name": "China's domestic chip supply",
   "force": "compute",
   "layer": "chips",
   "status": "binding",
   "controllers": [
    "smic",
    "huawei",
    "cxmt"
   ],
   "observed": [
    {
     "fact": "SMIC ran at 93.7% utilization in Q2 2026.",
     "source": {
      "key": "smic_q2",
      "title": "SMIC Q2 2026 revenue surpasses $3B",
      "publisher": "AnySilicon",
      "url": "https://anysilicon.com/news/smic-q2-2026-revenue-surpasses-3-billion-as-ai-demand-tightens-foundry-capacity/",
      "date": "2026-08-15",
      "tier": "secondary"
     }
    },
    {
     "fact": "Only about 240k of 1.5M Ascend chips use domestic HBM.",
     "source": {
      "key": "huawei_960",
      "title": "Huawei pulls Ascend 960DT forward; demand outstrips capacity",
      "publisher": "Traders Agency",
      "url": "https://tradersagency.com/blog/huawei-pulls-ascend-960dt-forward-to-q1-2027-says-ai-chip-demand-outstrips-its-capacity",
      "date": "2026-09-17",
      "tier": "secondary"
     }
    },
    {
     "fact": "China blocked Nvidia H200 imports even after the US allowed them.",
     "source": {
      "key": "h200_block",
      "title": "China customs blocks Nvidia H200",
      "publisher": "Taipei Times",
      "url": "https://www.taipeitimes.com/News/biz/archives/2026/01/15/2003850605",
      "date": "2026-01-15",
      "tier": "press"
     }
    },
    {
     "fact": "CXMT's HBM3E yield is reported at 20 to 30%, against about 70% at SK hynix.",
     "source": {
      "key": "cxmt_hbm3e",
      "title": "China's CXMT pushes ahead with HBM3E despite 20% yield",
      "publisher": "Seoul Economic Daily",
      "url": "https://en.sedaily.com/international/2026/10/28/chinas-cxmt-pushes-ahead-with-hbm3e-despite-20-percent-yield",
      "date": "2026-10-28",
      "tier": "press"
     }
    },
    {
     "fact": "Cambricon's Q3 revenue of 3.53B yuan fell well short of the 6.26B expected; Bloomberg said it struggled to make enough chips.",
     "source": {
      "key": "cambricon_q3",
      "title": "Cambricon Q3 sales miss on chip supply",
      "publisher": "The Next Web",
      "url": "https://thenextweb.com/news/cambricon-q3-sales-miss-chip-supply",
      "date": "2026-10-23",
      "tier": "press"
     }
    },
    {
     "fact": "China was 35% of Lam Research's September-quarter revenue, its largest region.",
     "source": {
      "key": "lam_q1fy27",
      "title": "Lam Research September-quarter 2026 results (SEC exhibit)",
      "publisher": "Lam Research / SEC",
      "url": "https://www.sec.gov/Archives/edgar/data/0000707549/000070754926000052/lrcx_exhibitx991xq1x2027.htm",
      "date": "2026-10-21",
      "tier": "primary"
     }
    }
   ],
   "interpretation": {
    "text": "China chose self-reliance over Nvidia, and the price is a hard ceiling on its compute. Memory, not chip design, is the weak link: CXMT's HBM yields run at less than half of SK hynix's, and Chinese chip designers are missing sales for lack of supply. China is buying chipmaking tools fast to close the gap.",
    "author": "exmxc.ai",
    "type": "interpretation"
   }
  }
 ],
 "changes_2026": [
  {
   "date": "2026-01-09",
   "event": "Meta signs about 6.6 GW of nuclear deals with Vistra, TerraPower and Oklo.",
   "source": {
    "key": "meta_nuclear",
    "title": "Meta announces landmark agreements for new nuclear",
    "publisher": "World Nuclear News",
    "url": "https://www.world-nuclear-news.org/articles/meta-announces-landmark-agreements-for-new-nuclear",
    "date": "2026-01-09",
    "tier": "press"
   }
  },
  {
   "date": "2026-01-15",
   "event": "China's customs blocks Nvidia H200 imports two days after the US allowed them.",
   "source": {
    "key": "h200_block",
    "title": "China customs blocks Nvidia H200",
    "publisher": "Taipei Times",
    "url": "https://www.taipeitimes.com/News/biz/archives/2026/01/15/2003850605",
    "date": "2026-01-15",
    "tier": "press"
   }
  },
  {
   "date": "2026-02-27",
   "event": "OpenAI raises $110B from Amazon, Nvidia and SoftBank.",
   "source": {
    "key": "oai_110b",
    "title": "OpenAI raises $110B in one of the largest private rounds",
    "publisher": "TechCrunch",
    "url": "https://techcrunch.com/2026/02/27/openai-raises-110b-in-one-of-the-largest-private-funding-rounds-in-history/",
    "date": "2026-02-27",
    "tier": "press"
   }
  },
  {
   "date": "2026-02-27",
   "event": "Meta agrees to rent Google's TPUs, the first big outside buyer after Anthropic.",
   "source": {
    "key": "meta_tpu",
    "title": "Meta signs multibillion deal to rent Google TPUs",
    "publisher": "The Decoder",
    "url": "https://the-decoder.com/meta-signs-multi-billion-dollar-deal-to-rent-googles-tpus-in-a-direct-challenge-to-nvidias-ai-chip-dominance/",
    "date": "2026-02-27",
    "tier": "press"
   }
  },
  {
   "date": "2026-03-06",
   "event": "Oracle and OpenAI drop the Abilene Stargate expansion.",
   "source": {
    "key": "abilene_drop",
    "title": "Oracle/OpenAI drop Abilene expansion; Meta in talks for Crusoe capacity",
    "publisher": "DatacenterDynamics",
    "url": "https://www.datacenterdynamics.com/en/news/oracleopenai-drop-plans-to-expand-flagship-abilene-stargate-site-meta-in-talks-to-pick-up-crusoe-capacity-with-nvidias-help/",
    "date": "2026-03-06",
    "tier": "press"
   }
  },
  {
   "date": "2026-04-07",
   "event": "Anthropic, Google and Broadcom sign a 3.5 GW TPU deal starting 2027.",
   "source": {
    "key": "anth_goog_avgo",
    "title": "Anthropic, Google and Broadcom announce 3.5GW TPU deal",
    "publisher": "Silicon Republic",
    "url": "https://www.siliconrepublic.com/machines/anthropic-google-broadcom-announce-3-5gw-tpu-deal",
    "date": "2026-04-07",
    "tier": "press"
   }
  },
  {
   "date": "2026-04-20",
   "event": "Amazon and Anthropic expand to up to 5 GW of Trainium.",
   "source": {
    "key": "anth_aws",
    "title": "Anthropic and Amazon expand compute partnership",
    "publisher": "Anthropic",
    "url": "https://www.anthropic.com/news/anthropic-amazon-compute",
    "date": "2026-04-20",
    "tier": "primary"
   }
  },
  {
   "date": "2026-04-27",
   "event": "Microsoft and OpenAI end exclusivity; OpenAI models reach AWS.",
   "source": {
    "key": "msft_oai_reset",
    "title": "Microsoft and OpenAI gut their exclusive deal",
    "publisher": "VentureBeat",
    "url": "https://venturebeat.com/technology/microsoft-and-openai-gut-their-exclusive-deal-freeing-openai-to-sell-on-aws-and-google-cloud",
    "date": "2026-04-27",
    "tier": "press"
   }
  },
  {
   "date": "2026-05-06",
   "event": "Anthropic rents all of SpaceX's Colossus 1 data center.",
   "source": {
    "key": "anth_colossus",
    "title": "Higher limits: Anthropic and SpaceX compute agreement",
    "publisher": "Anthropic",
    "url": "https://www.anthropic.com/news/higher-limits-spacex",
    "date": "2026-05-06",
    "tier": "primary"
   }
  },
  {
   "date": "2026-06-02",
   "event": "Nvidia's Vera Rubin enters full production with three HBM4 suppliers.",
   "source": {
    "key": "hbm4_suppliers",
    "title": "Vera Rubin enters full production; HBM4 suppliers named",
    "publisher": "Tech Times",
    "url": "https://www.techtimes.com/articles/317539/20260602/nvidia-vera-rubin-enters-full-production-samsung-sk-hynix-micron-named-hbm4-suppliers.htm",
    "date": "2026-06-02",
    "tier": "press"
   }
  },
  {
   "date": "2026-06-12",
   "event": "Commerce requires licenses for Anthropic's Fable 5 and Mythos 5; Anthropic disables both for all customers until controls lift June 30.",
   "source": {
    "key": "bis_fable",
    "title": "Commerce restricted access to Anthropic's latest models: what comes next",
    "publisher": "CSIS",
    "url": "https://www.csis.org/analysis/department-commerce-restricted-access-anthropics-latest-models-what-comes-next",
    "date": "2026-06-16",
    "tier": "press"
   }
  },
  {
   "date": "2026-06-18",
   "event": "FERC orders six grid operators to rewrite large-load connection rules.",
   "source": {
    "key": "ferc_large_load",
    "title": "FERC acts to advance data center large-load integration",
    "publisher": "Duane Morris",
    "url": "https://www.duanemorris.com/alerts/ferc_acts_advance_data_center_large_load_integration_six_rto_regions_0626.html",
    "date": "2026-06-18",
    "tier": "press"
   }
  },
  {
   "date": "2026-07-14",
   "event": "New York imposes the first statewide hyperscale data center moratorium.",
   "source": {
    "key": "ny_moratorium",
    "title": "Governor Hochul launches first statewide moratorium on new hyperscale data centers",
    "publisher": "New York State",
    "url": "https://www.governor.ny.gov/news/first-statewide-moratorium-new-hyperscale-data-centers-launched-governor-kathy-hochul",
    "date": "2026-07-14",
    "tier": "primary"
   }
  },
  {
   "date": "2026-07-15",
   "event": "PJM capacity auction clears at its cap and still falls short.",
   "source": {
    "key": "pjm_auction",
    "title": "PJM capacity auction clears at $325 cap, short of reliability requirement",
    "publisher": "RTO Insider",
    "url": "https://www.rtoinsider.com/136577-pjm-capacity-auction-clears-325-cap-short-reliability-requirement/",
    "date": "2026-07-15",
    "tier": "press"
   }
  },
  {
   "date": "2026-08-02",
   "event": "EU begins enforcing rules on general-purpose AI models.",
   "source": {
    "key": "eu_gpai",
    "title": "GPAI enforcement has started",
    "publisher": "Praxikon",
    "url": "https://www.praxikon.com/en/posts/gpai-enforcement-has-started-powers-2026",
    "date": "2026-08",
    "tier": "secondary"
   }
  },
  {
   "date": "2026-08-05",
   "event": "TSMC reportedly outsources part of CoWoS packaging to ASE.",
   "source": {
    "key": "cowos_osat",
    "title": "TSMC expands outsourcing of CoWoS front-end step to OSATs",
    "publisher": "TrendForce",
    "url": "https://www.trendforce.com/news/2026/08/05/news-tsmc-reportedly-expands-outsourcing-of-key-cowos-front-end-step-to-osats-amid-rising-nvidia-asic-demand/",
    "date": "2026-08-05",
    "tier": "press"
   }
  },
  {
   "date": "2026-08-14",
   "event": "SpaceX closes its $60B purchase of Cursor.",
   "source": {
    "key": "cursor_spacex",
    "title": "SpaceX to acquire Cursor in $60B deal",
    "publisher": "DevOps.com",
    "url": "https://devops.com/spacex-to-acquire-ai-coding-leader-cursor-in-60-billion-blockbuster-deal/",
    "date": "2026-06-16",
    "tier": "press"
   }
  },
  {
   "date": "2026-08-26",
   "event": "Salesforce and Anthropic announce Claudeforce: Salesforce data and workflows inside Claude, and Claude deeper in Agentforce and Slack.",
   "source": {
    "key": "crm_claudeforce",
    "title": "Salesforce and Anthropic announce Claudeforce",
    "publisher": "Salesforce",
    "url": "https://www.salesforce.com/news/press-releases/2026/08/27/salesforce-and-anthropic-announce-claudeforce/",
    "date": "2026-08-26",
    "tier": "primary"
   }
  },
  {
   "date": "2026-09-08",
   "event": "Meta launches Muse, an AI agent app; it reaches No. 1 on the US App Store ten days later.",
   "source": {
    "key": "muse_tc",
    "title": "Meta is putting its muscle behind Muse as the AI app takes off",
    "publisher": "TechCrunch",
    "url": "https://techcrunch.com/2026/09/25/meta-is-putting-its-muscle-behind-muse-as-the-ai-app-takes-off/",
    "date": "2026-09-25",
    "tier": "press"
   }
  },
  {
   "date": "2026-09-11",
   "event": "Oracle reports a $664B backlog with negative free cash flow.",
   "source": {
    "key": "orcl_q1",
    "title": "Oracle Q1 FY27: $664B backlog",
    "publisher": "ERP Today",
    "url": "https://erp.today/oracle-q1-fy27-results-664b-backlog-ai-contracts/",
    "date": "2026-09-11",
    "tier": "press"
   }
  },
  {
   "date": "2026-09-25",
   "event": "Appeals court upholds the Pentagon's supply chain risk label on Anthropic.",
   "source": {
    "key": "dod_anth",
    "title": "Appeals court declines to block Pentagon blacklisting of Anthropic",
    "publisher": "ABC News",
    "url": "https://abcnews.com/Business/anthropic-appeals-court-declines-block-pentagon-blacklisting/story?id=136755690",
    "date": "2026-09-25",
    "tier": "press"
   }
  },
  {
   "date": "2026-09-30",
   "event": "Google announces Gemini 4 Argon, its largest model, first to cybersecurity partners and a voluntary US government review.",
   "source": {
    "key": "gemini4",
    "title": "Google announces Gemini 4 flagship AI model after months of delays",
    "publisher": "Reuters via Khaleej Times",
    "url": "https://www.khaleejtimes.com/business/google-announces-gemini-4-flagship-ai-model-after-months-of-delays-2",
    "date": "2026-10-01",
    "tier": "press"
   }
  },
  {
   "date": "2026-10-01",
   "event": "Micron signs $100B of multi-year memory commitments; says it can meet only half to two-thirds of demand.",
   "source": {
    "key": "micron_q4",
    "title": "Micron posts record $54B quarter, locks $100B memory contracts",
    "publisher": "Tech Times",
    "url": "https://www.techtimes.com/articles/328376/20261001/micron-posts-record-54b-quarter-locks-hyperscalers-100b-memory-contracts.htm",
    "date": "2026-10-01",
    "tier": "press"
   }
  },
  {
   "date": "2026-10-06",
   "event": "Google signs for 890 MW of new nuclear output from upgrades at 11 Constellation reactors, plus 2,700 MW of existing supply.",
   "source": {
    "key": "ceg_goog",
    "title": "Google and Constellation nuclear uprate deal; DOE loan to Vistra",
    "publisher": "Power Engineering",
    "url": "https://www.power-eng.com/nuclear/google-constellation-doe-nuclear-plant-investment/",
    "date": "2026-10-07",
    "tier": "press"
   }
  },
  {
   "date": "2026-10-08",
   "event": "USA Today Co. sues OpenAI for more than $250M over training on its journalism.",
   "source": {
    "key": "usat_oai",
    "title": "USA Today sues OpenAI for over $250 million",
    "publisher": "Forbes",
    "url": "https://www.forbes.com/sites/fionariley/2026/10/08/usa-today-sues-openai-for-over-250-million-alleging-willful-copyright-infringement/",
    "date": "2026-10-08",
    "tier": "press"
   }
  },
  {
   "date": "2026-10-14",
   "event": "ASML says its 2027 and 2028 supply will not fully meet demand.",
   "source": {
    "key": "asml_q3",
    "title": "ASML Q3 2026 financial results (SEC filing)",
    "publisher": "ASML / SEC",
    "url": "https://www.sec.gov/Archives/edgar/data/0000937966/000162828026065813/pressreleasefinancialresul.htm",
    "date": "2026-10-14",
    "tier": "primary"
   }
  },
  {
   "date": "2026-10-15",
   "event": "TSMC's CEO says AI demand is far above what it can supply.",
   "source": {
    "key": "tsmc_q3_call",
    "title": "TSMC third-quarter revenue tops guidance as CEO says AI demand outruns supply",
    "publisher": "CRN Asia",
    "url": "https://www.crnasia.com/news/2026/components-and-peripherals/tsmc-third-quarter-revenue-tops-guidance-as-ceo-says-ai-dema",
    "date": "2026-10-15",
    "tier": "press"
   }
  },
  {
   "date": "2026-10-15",
   "event": "Google expands paying news publishers, including CNN, for content used in Google News AI features.",
   "source": {
    "key": "goog_news_pay",
    "title": "Google expands paid AI pilot with news publishers",
    "publisher": "Google",
    "url": "https://blog.google/products-and-platforms/products/news/news-ai-pilot-update-publishers/",
    "date": "2026-10-15",
    "tier": "primary"
   }
  },
  {
   "date": "2026-10-16",
   "event": "China proposes export controls covering AI model weights, Bloomberg reports.",
   "source": {
    "key": "china_ai_export",
    "title": "China proposes export curbs on 23 AI items, model weights included",
    "publisher": "AI Weekly",
    "url": "https://aiweekly.co/alerts/china-proposes-export-curbs-on-23-ai-items-weights-included",
    "date": "2026-10-16",
    "tier": "secondary"
   }
  },
  {
   "date": "2026-10-26",
   "event": "Anthropic files its public IPO registration (S-1), proposed Nasdaq ticker ANT.",
   "source": {
    "key": "anth_s1",
    "title": "Anthropic PBC registration statement (Form S-1)",
    "publisher": "Anthropic / SEC",
    "url": "https://www.sec.gov/Archives/edgar/data/0002130357/000162828026067168/anthropicpbc-sx1.htm",
    "date": "2026-10-26",
    "tier": "primary"
   }
  },
  {
   "date": "2026-10-28",
   "event": "SK hynix posts a record 80% operating margin; Korean press reports its memory is sold out through 2029.",
   "source": {
    "key": "skh_q3",
    "title": "SK hynix logs record Q3 operating profit",
    "publisher": "The Korea Times",
    "url": "https://www.koreatimes.co.kr/business/companies/20261028/sk-hynix-logs-record-q3-operating-profit-of-628-bil",
    "date": "2026-10-28",
    "tier": "press"
   }
  },
  {
   "date": "2026-10-28",
   "event": "GE Vernova reports 122 GW of turbines under contract or reserved, and agrees to buy Trench Group for $9B.",
   "source": {
    "key": "gev_q3_ud",
    "title": "GE Vernova in $9B deal to buy high-voltage manufacturer as gas turbine orders slow",
    "publisher": "Utility Dive",
    "url": "https://www.utilitydive.com/news/ge-vernova-in-9b-deal-to-buy-high-voltage-manufacturer-as-gas-turbine-orde/873223/",
    "date": "2026-10-29",
    "tier": "press"
   }
  },
  {
   "date": "2026-10-28",
   "event": "Alphabet says the Gemini app passed one billion users and names Apple as a TPU customer.",
   "source": {
    "key": "goog_q3_call",
    "title": "Alphabet Q3 2026 earnings call transcript",
    "publisher": "Alphabet",
    "url": "https://s206.q4cdn.com/479360582/files/doc_events/2026/Oct/28/2026_Q3_Earnings_Transcript.pdf",
    "date": "2026-10-28",
    "tier": "primary"
   }
  },
  {
   "date": "2026-10-30",
   "event": "OpenAI cuts its funding round to about $20B at a $1.25T valuation, from $30B at $1.4T, as investors pull back.",
   "source": {
    "key": "oai_cut",
    "title": "OpenAI slashes funding target by $10 billion amid tech rout, FT reports",
    "publisher": "Reuters via KFGO",
    "url": "https://kfgo.com/2026/10/30/openai-cuts-funding-target-by-10-billion-ft-reports/",
    "date": "2026-10-30",
    "tier": "press"
   }
  }
 ],
 "retired_entities": [
  {
   "id": "private-credit",
   "redirect": "https://ailattice.ai/money/",
   "note": "2026-11-17 (v0.5.9): its two loans are now credited to the lenders the sources name; no connections left."
  },
  {
   "id": "mitsubishi-power",
   "redirect": "https://ailattice.ai/#cp-turbines",
   "note": "2026-11-17 (v0.5.9): no sourced link, money flow, power record, permission or door on the map; still named in the gas turbine chokepoint's facts."
  }
 ],
 "money": {
  "finance": {
   "ge-vernova": {
    "period_note": "Q3 2026 (quarter to Sep 30, 2026) and first nine months of 2026, from the Oct 28, 2026 earnings release and Q3 2026 10-Q.",
    "sources": [
     {
      "type": "customer_prepayment",
      "amount_usd_b": 45.669,
      "firm": true,
      "period": "balance at Sep 30, 2026",
      "from": "utilities, power developers and other customers (not named)",
      "note": "Contract liabilities and deferred income (current) were $45.669B at Sep 30, 2026, up from $25.774B at Dec 31, 2025 -- about $19.9B more customer cash received ahead of delivery in nine months. The 10-Q describes this as 'cash received from customers under ordinary commercial payment terms in advance of delivery of equipment orders or servicing.' The filing excerpt read does not split out slot reservation deposits or name data center customers. Source date is the quarter end; filing date not separately confirmed.",
      "source": {
       "title": "GE Vernova Inc. Form 10-Q for quarter ended Sep 30, 2026",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001996810/000199681026000163/gev3q2026form10-q.pdf",
       "date": "2026-09-30",
       "tier": "primary"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 16.737,
      "firm": true,
      "period": "first nine months of 2026",
      "from": null,
      "note": "Cash from operating activities; Q3 2026 alone was $6.057B. Free cash flow was $15.307B for nine months; full-year 2026 free cash flow guidance raised to $16-17B. Much of this cash is customer down payments (see contract liabilities line).",
      "source": {
       "title": "GE Vernova Reports Third Quarter 2026 Financial Results (8-K Ex. 99.1)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001996810/000199681026000162/gevpressrelease3q26.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 0.647,
      "firm": true,
      "period": "Q3 2026",
      "to": null,
      "note": "Gross property additions in Q3 2026. Company has committed $6B of capex over 2025-2028 (including $1B at Prolec GE in 2026-2028) -- small relative to cash generated.",
      "source": {
       "title": "GE Vernova Reports Third Quarter 2026 Financial Results (8-K Ex. 99.1)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001996810/000199681026000162/gevpressrelease3q26.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 5.7,
      "firm": true,
      "period": "first nine months of 2026",
      "to": "shareholders",
      "note": "Capital returned to shareholders in nine months; Q3 buybacks were $1.6B. Buyback authorization raised to $20B from $10B in October 2026 ($10.1B remaining).",
      "source": {
       "title": "GE Vernova Reports Third Quarter 2026 Financial Results (8-K Ex. 99.1)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001996810/000199681026000162/gevpressrelease3q26.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     }
    ],
    "revenue": [],
    "commitments": [
     {
      "what": "Total backlog (orders not yet delivered)",
      "amount_usd_b": 197.0,
      "firm": true,
      "horizon": "multi-year",
      "counterparty": "utilities, developers, data center customers (not named)",
      "note": "Up $20B in the quarter; Q3 2026 orders were $29.3B (+96% organically). Gas Power equipment backlog plus slot reservation agreements rose from 116 to 122 GW (target at least 130 GW by end-2026). Within that, firm equipment backlog rose 53 to 64 GW while slot reservations fell 63 to 58 GW -- reservations are converting to firm orders. No dollar value given for slot reservations; release mentions 'data center customers' but names no hyperscaler.",
      "source": {
       "title": "GE Vernova Reports Third Quarter 2026 Financial Results (8-K Ex. 99.1)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001996810/000199681026000162/gevpressrelease3q26.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "GE Vernova's build-out is largely paid for by its customers in advance: customer advance cash on the balance sheet rose about $19.9B in nine months of 2026, while its own capex is about $0.6B a quarter.",
     "The company is returning more cash to shareholders ($5.7B in nine months) than it is spending on factories."
    ]
   },
   "siemens-energy": {
    "period_note": "Fiscal Q3 2026 (quarter to Jun 30, 2026); fiscal Q4 results not out as of Oct 30, 2026. Euro figures converted at the source's own implied rate (about $1.155 per euro, Aug 2026).",
    "sources": [],
    "uses": [],
    "revenue": [],
    "commitments": [
     {
      "what": "Total order backlog",
      "amount_usd_b": 187.0,
      "firm": true,
      "horizon": "multi-year",
      "counterparty": "various",
      "note": "Record EUR 162B (about $187B per the article). Quarterly orders a record EUR 17.9B (about $20.7B). Gas Services orders a record EUR 9.967B (about $11.5B), up 61.9%, book-to-bill 2.65, segment backlog EUR 73B (about $84B). Release credits U.S. demand including large data-center-related orders, but does not quantify the data center share. No reservation fees or down payments disclosed in the article.",
      "source": {
       "title": "Siemens Energy posts record backlog, joining GE Vernova and Baker Hughes in a record quarter for gas turbines",
       "publisher": "Turbomachinery Magazine",
       "url": "https://www.turbomachinerymag.com/view/siemens-energy-posts-record-backlog-joining-ge-vernova-and-baker-hughes-in-a-record-quarter-for-gas-turbines",
       "date": "2026-08-06",
       "tier": "press"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "Siemens Energy's gas turbine orders are running at more than 2.5 times what it ships each quarter, so backlog keeps building."
    ]
   },
   "mitsubishi-power": {
    "period_note": "MHI fiscal Q1 (Apr-Jun 2026), reported Aug 4-6, 2026.",
    "sources": [],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": null,
      "firm": true,
      "period": "ongoing",
      "to": null,
      "note": "Plans to double gas turbine production capacity versus 2024; no dollar figure given in the source. Still evaluating whether more capacity is needed.",
      "source": {
       "title": "Mitsubishi gas turbine backlog earnings",
       "publisher": "Utility Dive",
       "url": "https://www.utilitydive.com/news/mitsubishi-gas-turbine-backlog-earnings/827761/",
       "date": "2026-08-13",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [
     {
      "what": "Large gas turbine backlog",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "deliveries 2028-2030 for new orders",
      "counterparty": "U.S. and Japanese utilities and developers",
      "note": "Backlog 35 GW, up from 23 GW a year earlier. 10 large turbine orders in the quarter (4 U.S., 6 Japan). No dollar backlog, data center share, or reservation fees disclosed. CFO said MHI is 'being selective in the projects we contract.'",
      "source": {
       "title": "Mitsubishi gas turbine backlog earnings",
       "publisher": "Utility Dive",
       "url": "https://www.utilitydive.com/news/mitsubishi-gas-turbine-backlog-earnings/827761/",
       "date": "2026-08-13",
       "tier": "press"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "Mitsubishi says it will not immediately double order intake even as demand stays strong -- it is rationing slots rather than expanding as fast as demand."
    ]
   },
   "constellation": {
    "period_note": "Deal terms from 2025-2026 announcements; Q2 2026 contracting stats. Q3 2026 results not yet released as of Oct 30, 2026.",
    "sources": [
     {
      "type": "government",
      "amount_usd_b": 1.0,
      "firm": true,
      "period": "announced Nov 18, 2025",
      "from": "us-doe",
      "note": "U.S. Department of Energy loan backing the restart of the Crane Clean Energy Center (former Three Mile Island Unit 1), whose output goes to Microsoft. A loan, not a grant. Total restart cost not given in the release.",
      "source": {
       "title": "Constellation 8-K Exhibit 99.1: Crane restart backed by $1 billion DOE loan",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/1868275/000186827525000099/ceg-202511188kexh991.htm",
       "date": "2025-11-18",
       "tier": "primary"
      }
     }
    ],
    "uses": [],
    "revenue": [],
    "commitments": [
     {
      "what": "20-year PPA with Meta for Clinton nuclear plant output",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "June 2027-2047",
      "counterparty": "meta",
      "note": "1,121 MW for 20 years starting June 2027, plus a 30 MW uprate. Price and total value not disclosed.",
      "source": {
       "title": "Constellation and Meta 20-year Clinton nuclear agreement",
       "publisher": "Business Wire (Constellation press release)",
       "url": "https://www.businesswire.com/news/home/20250603781894/en",
       "date": "2025-06-03",
       "tier": "primary"
      }
     },
     {
      "what": "Long-term power contracts signed in Q2 2026",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "average 18.5 years",
      "counterparty": "various incl. Walmart (176 MW)",
      "note": "920 MW of long-term PPAs signed in Q2 2026; dollar values not disclosed. Microsoft 20-year PPA for Crane restart also in place (value not disclosed).",
      "source": {
       "title": "Constellation signed 920 megawatts of new power deals, including a Walmart PPA",
       "publisher": "The Motley Fool",
       "url": "https://www.fool.com/investing/2026/08/07/constellation-signed-920-megawatts-of-new-power-deals-including-a-walmart-ppa-heres-what-it-means-for-ceg-stock/",
       "date": "2026-08-07",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "Constellation's two largest hyperscaler deals (Microsoft at Crane, Meta at Clinton) have no disclosed dollar value; the public only knows megawatts and 20-year terms.",
     "The Microsoft-linked restart is partly financed by a $1B federal loan."
    ]
   },
   "vistra": {
    "period_note": "First half 2026 (six months to Jun 30, 2026) from the Q2 2026 earnings release; Q3 2026 not yet released as of Oct 30, 2026.",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 2.222,
      "firm": true,
      "period": "six months to Jun 30, 2026",
      "from": null,
      "note": "Up from $1.171B a year earlier.",
      "source": {
       "title": "Vistra Q2 2026 earnings release (8-K)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001692819/000169281926000017/vistra-20260630xearningsre.htm",
       "date": "2026-08-07",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 6.422,
      "firm": true,
      "period": "six months to Jun 30, 2026",
      "from": "bond-market",
      "note": "Gross debt issued; $3.859B repaid or repurchased in the same period, so net new debt about $2.6B. Release does not split bonds versus loans.",
      "source": {
       "title": "Vistra Q2 2026 earnings release (8-K)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001692819/000169281926000017/vistra-20260630xearningsre.htm",
       "date": "2026-08-07",
       "tier": "primary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 1.572,
      "firm": true,
      "period": "six months to Jun 30, 2026",
      "to": null,
      "note": "Includes nuclear fuel and long-term service agreement prepayments; growth vs maintenance not split.",
      "source": {
       "title": "Vistra Q2 2026 earnings release (8-K)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001692819/000169281926000017/vistra-20260630xearningsre.htm",
       "date": "2026-08-07",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 0.709,
      "firm": true,
      "period": "six months to Jun 30, 2026",
      "to": "shareholders",
      "note": "Share repurchases; about $6.5B bought back since Nov 2021.",
      "source": {
       "title": "Vistra Q2 2026 earnings release (8-K)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001692819/000169281926000017/vistra-20260630xearningsre.htm",
       "date": "2026-08-07",
       "tier": "primary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 1.0,
      "firm": false,
      "period": "announced Aug 7, 2026",
      "to": "Helix Digital Infrastructure",
      "note": "'Initial commitment from Vistra of up to $1.0 billion' to Helix, a data center platform formed with KKR, KIA and NVIDIA; Vistra is preferred power provider. Up-to amount.",
      "source": {
       "title": "Vistra Q2 2026 earnings release (8-K)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001692819/000169281926000017/vistra-20260630xearningsre.htm",
       "date": "2026-08-07",
       "tier": "primary"
      }
     }
    ],
    "revenue": [],
    "commitments": [
     {
      "what": "20-year PPA with Amazon from Comanche Peak nuclear plant",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "2027-2047",
      "counterparty": "amazon",
      "note": "1.2 GW to an Amazon data center (Amazon building a $5B project nearby); deliveries begin 2027. Dollar value not disclosed. Executives said the Texas data center pause does not affect it.",
      "source": {
       "title": "Vistra Texas data center pause, Comanche Peak, Amazon (earnings call coverage)",
       "publisher": "Utility Dive",
       "url": "https://www.utilitydive.com/news/vistra-texas-data-center-pause-comanche-amazon-earnings/827434/",
       "date": "2026-08-10",
       "tier": "press"
      }
     },
     {
      "what": "Meta-supported nuclear uprates plus PPAs",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "early 2030s",
      "counterparty": "meta",
      "note": "About 433 MW of uprates at Perry, Davis-Besse and Beaver Valley, supported by Meta (announced Jan 9, 2026). Vistra's Q2 release mentions signed PPAs with Meta. No dollar values disclosed.",
      "source": {
       "title": "Meta strikes deals with Vistra, Oklo, TerraPower",
       "publisher": "American Nuclear Society (Nuclear News)",
       "url": "https://www.ans.org/news/article-7666/meta-strikes-deals-with-vistra-oklo-terrapower/",
       "date": "2026-01-12",
       "tier": "press"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "Vistra is now putting its own money (up to $1B) into a data center platform alongside NVIDIA and KKR -- the power seller is also becoming an investor in its customers.",
     "Vistra supported a pause on new Texas data center hookups while the ERCOT queue (about 474 GW, mostly large loads) is audited, signalling it views much of the queue as speculative."
    ]
   },
   "talen": {
    "period_note": "Amazon PPA from June 2025; financing from Q2 2026 10-Q (six months to Jun 30, 2026). Source date for 10-Q is the period end; filing date not separately checked.",
    "sources": [
     {
      "type": "loans",
      "amount_usd_b": 4.0,
      "firm": true,
      "period": "six months to Jun 30, 2026",
      "from": "banks-bond-market",
      "note": "Gross debt issued ($1.215B repaid). Split between term loans and notes not read. Total debt about $9.57B at Jun 30, 2026, up from about $6.81B at Dec 31, 2025.",
      "source": {
       "title": "Talen Energy Corp Form 10-Q, quarter ended Jun 30, 2026",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001622536/000162253626000066/tln-20260630.htm",
       "date": "2026-06-30",
       "tier": "primary"
      }
     },
     {
      "type": "revenue",
      "amount_usd_b": 18.0,
      "firm": true,
      "period": "contract life through 2042",
      "from": "amazon",
      "note": "Talen 'expects about $18 billion in revenue over the life of the contract at its full quantity' -- company estimate, depends on full ramp to 1,920 MW by 2032.",
      "source": {
       "title": "Talen, Amazon expand Susquehanna nuclear deal to 1.9 GW",
       "publisher": "Utility Dive",
       "url": "https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-center-t/750440/",
       "date": "2025-06-11",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "acquisitions",
      "amount_usd_b": 3.495,
      "firm": true,
      "period": "six months to Jun 30, 2026",
      "to": "Cornerstone (gas plants)",
      "note": "$2.568B cash paid (net) plus about $0.927B in Talen shares issued in a business combination in Q2 2026, which likely relates to this deal (10-Q note not fully read).",
      "source": {
       "title": "Talen Energy Corp Form 10-Q, quarter ended Jun 30, 2026",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001622536/000162253626000066/tln-20260630.htm",
       "date": "2026-06-30",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 0.298,
      "firm": true,
      "period": "six months to Jun 30, 2026",
      "to": "shareholders",
      "note": "Share repurchases.",
      "source": {
       "title": "Talen Energy Corp Form 10-Q, quarter ended Jun 30, 2026",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001622536/000162253626000066/tln-20260630.htm",
       "date": "2026-06-30",
       "tier": "primary"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [
     {
      "fact": "Amazon PPA: 1,920 MW from Susquehanna through 2042 (ramping 840-1,200 MW in 2029 to 1,680-1,920 MW in 2032); one customer takes a large share of a ~2.5 GW plant. PPL Electric handles delivery; who pays for the transmission upgrades is not stated.",
      "source": {
       "title": "Talen, Amazon expand Susquehanna nuclear deal to 1.9 GW",
       "publisher": "Utility Dive",
       "url": "https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-center-t/750440/",
       "date": "2025-06-11",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Talen's Amazon contract is one of the few hyperscaler power deals with a disclosed dollar value (~$18B lifetime revenue, a company estimate).",
     "Talen financed its 2026 gas plant buying with about $4B of new debt and stock, lifting debt about 40% in six months."
    ]
   },
   "entergy": {
    "period_note": "Capital plan as of Q1 2026 update (April 2026). Q3 2026 results due Nov 2, 2026, not yet out.",
    "sources": [
     {
      "type": "customer_prepayment",
      "amount_usd_b": null,
      "firm": true,
      "period": "life of Meta Louisiana agreement",
      "from": "meta",
      "note": "CEO: 'The cost of the proposed facilities will be covered by payments from Meta, whether from their tariff or other contributions.' Covers seven new gas units (5.2+ GW), transmission and batteries. Meta also committed about $2B of customer benefits (including $140M over 20 years for efficiency and $60M to bill assistance). Total Meta payment amount not disclosed.",
      "source": {
       "title": "New generation adds $12B to Entergy capital plan",
       "publisher": "Utility Dive",
       "url": "https://www.utilitydive.com/news/new-generation-adds-12b-entergy-capital-plan/818790/",
       "date": "2026-04-30",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 57.0,
      "firm": false,
      "period": "2026-2029 plan",
      "to": null,
      "note": "Plan raised from $43B (Feb 2026) to $57B. $27B new generation, $9B transmission, $8B distribution, $7B renewables/storage. The Meta Louisiana deal alone calls for $15B of capital investment. How the plan is financed (debt vs new shares vs rate base) is not stated in the source. A plan, not a firm commitment.",
      "source": {
       "title": "New generation adds $12B to Entergy capital plan",
       "publisher": "Utility Dive",
       "url": "https://www.utilitydive.com/news/new-generation-adds-12b-entergy-capital-plan/818790/",
       "date": "2026-04-30",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [
     {
      "fact": "About $15B of Entergy's $57B 2026-2029 plan is tied to a single customer, Meta (Louisiana / Hyperion data center); Entergy also cites a further 7-12 GW pipeline of potential data center customers.",
      "source": {
       "title": "New generation adds $12B to Entergy capital plan",
       "publisher": "Utility Dive",
       "url": "https://www.utilitydive.com/news/new-generation-adds-12b-entergy-capital-plan/818790/",
       "date": "2026-04-30",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Entergy says Meta, not retail customers, pays for the new plants serving Meta -- an example of the hyperscaler-pays model."
    ]
   },
   "bloom": {
    "period_note": "Q3 2026 (quarter to Sep 30, 2026), reported Oct 22, 2026; Brookfield framework as of Jun 30, 2026.",
    "sources": [
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 25.0,
      "firm": false,
      "period": "framework announced Jun 30, 2026",
      "from": "brookfield",
      "note": "Brookfield 'increases its framework to finance power projects for AI infrastructure' from $5B (Oct 2025, described then as 'up to $5 billion') to $25B. A financing framework, not drawn money; structure (who owns the fuel cells, how power is sold) not disclosed. Lets customers get power without paying upfront.",
      "source": {
       "title": "Brookfield and Bloom Energy Expand AI Infrastructure Partnership to $25 Billion",
       "publisher": "Bloom Energy (press release)",
       "url": "https://www.bloomenergy.com/news/brookfield-and-bloom-energy-expand-ai-infrastructure-partnership/",
       "date": "2026-06-30",
       "tier": "primary"
      }
     },
     {
      "type": "revenue",
      "amount_usd_b": 1.236,
      "firm": true,
      "period": "Q3 2026",
      "from": null,
      "note": "Revenue up 138% year over year. Operating cash flow was negative $0.027B in the quarter. Cash $2.487B; recourse debt $2.473B. FY2026 revenue guidance raised to $4.4-4.6B. Release names no customers.",
      "source": {
       "title": "Bloom Energy Q3 2026 financial results (8-K Ex. 99.1)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001664703/000162828026066890/ex991_q326financialresults.htm",
       "date": "2026-10-22",
       "tier": "primary"
      }
     }
    ],
    "uses": [],
    "revenue": [],
    "commitments": [
     {
      "what": "Oracle fuel cell agreement",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "not disclosed",
      "counterparty": "oracle",
      "note": "Up to 2.8 GW; 1.2 GW described as contracted and deploying; up to 2.45 GW could go to Project Jupiter (New Mexico). Article stresses neither the Oracle nor the Brookfield figure is booked revenue. Secondary source; no primary confirmation found.",
      "source": {
       "title": "Bloom Energy gains as Oracle's 2.8 GW deal and $25 billion Brookfield pact set a high bar",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/bloom-energy-gains-as-oracles-2-8-gw-deal-and-25-billion-brookfield-pact-set-a-high-bar",
       "date": "2026-10-22",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "Bloom's growth depends on third-party money: Brookfield's $25B financing framework is about 5-6 times Bloom's own 2026 revenue guidance.",
     "Despite revenue more than doubling, Bloom's operating cash flow was slightly negative in Q3 2026."
    ]
   },
   "eaton": {
    "period_note": "Full-year 2025 audited figures; Q2 2026 segment trends. Q3 2026 results not yet out as of Oct 30, 2026.",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 4.472,
      "firm": true,
      "period": "FY2025",
      "from": null,
      "note": "On revenue of $27.448B. Backlog about $19.8B at Dec 31, 2025. Filing credits 'momentum in the data center and utility end markets' without quantifying the data center share.",
      "source": {
       "title": "Eaton Corp plc 8-K Exhibit 99 (FY2025 financial statements)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001551182/000155118226000034/etn-20261016_d2.htm",
       "date": "2026-10-16",
       "tier": "primary"
      }
     }
    ],
    "uses": [
     {
      "type": "acquisitions",
      "amount_usd_b": 9.5,
      "firm": true,
      "period": "agreed Nov 2, 2025; closing expected Q2 2026",
      "to": "Boyd Thermal",
      "note": "Data center liquid cooling business. Also bought Fibrebond ($1.43B, Apr 2025) and Ultra PCS ($1.53B, Jan 2026). Closing status of Boyd not confirmed in source read.",
      "source": {
       "title": "Eaton Corp plc 8-K Exhibit 99 (FY2025 financial statements)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001551182/000155118226000034/etn-20261016_d2.htm",
       "date": "2026-10-16",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 0.919,
      "firm": true,
      "period": "FY2025",
      "to": null,
      "note": "Property, plant and equipment spending.",
      "source": {
       "title": "Eaton Corp plc 8-K Exhibit 99 (FY2025 financial statements)",
       "publisher": "SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001551182/000155118226000034/etn-20261016_d2.htm",
       "date": "2026-10-16",
       "tier": "primary"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "Eaton is funding its data center push from its own cash flow and acquisitions (about $12.5B of deals since 2025), not outside financing tied to AI customers.",
     "Q2 2026: Electrical Americas orders up 41% and Electrical Global backlog up 103% year over year (secondary source, pulse2.com, Aug 2, 2026)."
    ]
   },
   "oklo": {
    "period_note": "First half 2026 (to Jun 30, 2026); Meta deal Jan 2026.",
    "sources": [
     {
      "type": "equity_raised",
      "amount_usd_b": 1.9,
      "firm": true,
      "period": "first half 2026",
      "from": "public-stock-market-at-the-market-sales",
      "note": "Raised $1.9B selling shares at market; ended June 2026 with $3.0B cash and securities. Diluted share count up about 26% year over year. New $1B at-the-market program filed Sep 11, 2026.",
      "source": {
       "title": "OKLO Stock: Here's why investors need to look at its 26% share count jump",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/oklo-stock-heres-why-investors-need-to-look-at-its-26-share-count-jump",
       "date": "2026-09-29",
       "tier": "secondary"
      }
     },
     {
      "type": "customer_prepayment",
      "amount_usd_b": null,
      "firm": true,
      "period": "agreement announced Jan 2026",
      "from": "meta",
      "note": "Described as 'a first-of-its-kind transaction' letting Meta prepay for power, giving Oklo early funds to secure nuclear fuel for a 1.2 GW campus in Pike County, Ohio (online as early as 2030). Prepayment amount not disclosed.",
      "source": {
       "title": "Oklo, Meta announce agreement in support of 1.2 GW nuclear energy development in southern Ohio",
       "publisher": "Orrick (deal counsel news)",
       "url": "https://www.orrick.com/en/News/2026/01/Oklo-Meta-Announce-Agreement-in-Support-of-1-2-GW-Nuclear-Energy-Development-in-Southern-Ohio",
       "date": "2026-01-13",
       "tier": "secondary"
      }
     }
    ],
    "uses": [],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "Oklo, with no operating reactor yet, is funded mainly by selling new shares to public investors; Meta's prepayment is the only hyperscaler money and its size is undisclosed."
    ]
   },
   "terrapower": {
    "period_note": "Private company; June 2025 raise, DOE program terms, Jan 2026 Meta deal.",
    "sources": [
     {
      "type": "government",
      "amount_usd_b": 2.0,
      "firm": false,
      "period": "Kemmerer, Wyoming Natrium demonstration, completion expected 2030",
      "from": "us-doe",
      "note": "DOE Advanced Reactor Demonstration Program 'authorises a 50:50 cost share and authorises up to $2-billion for the project'; TerraPower and partners match dollar for dollar. Up-to amount; how much has been paid out not found.",
      "source": {
       "title": "Natrium reactor and energy storage system, US - update",
       "publisher": "Engineering News",
       "url": "https://www.engineeringnews.co.za/article/natrium-reactor-and-energy-storage-system-us-update-2025-11-07",
       "date": "2025-11-07",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 0.65,
      "firm": true,
      "period": "June 2025",
      "from": "Bill Gates, HD Hyundai, NVentures (NVIDIA), existing investors",
      "note": "Brings total raised to about $1.4B per Crunchbase data. NVIDIA's share not disclosed.",
      "source": {
       "title": "TerraPower raises $650M with NVIDIA and Gates backing",
       "publisher": "Crunchbase News",
       "url": "https://news.crunchbase.com/venture/nuclear-terrapower-raise-nvda-gates/",
       "date": "2025-06-18",
       "tier": "press"
      }
     },
     {
      "type": "customer_prepayment",
      "amount_usd_b": null,
      "firm": true,
      "period": "announced Jan 9, 2026",
      "from": "meta",
      "note": "Meta 'will provide funding to support the development of two new Natrium units' and gets rights to energy from up to six more (8 units = 2.8 GW) by 2035. Amount and form of funding not disclosed; no sites named.",
      "source": {
       "title": "Meta strikes deals with Vistra, Oklo, TerraPower",
       "publisher": "American Nuclear Society (Nuclear News)",
       "url": "https://www.ans.org/news/article-7666/meta-strikes-deals-with-vistra-oklo-terrapower/",
       "date": "2026-01-12",
       "tier": "press"
      }
     }
    ],
    "uses": [],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "TerraPower's first plant is half-funded by the federal government (up to $2B); AI money arrives via NVIDIA's venture arm and Meta's development funding, both of undisclosed size."
    ]
   },
   "softbank": {
    "period_note": "OpenAI investments April 2025 to October 1, 2026. Balance-sheet figures (LTV, net debt) as of June 30, 2026 (Q1 of its fiscal year ending March 2027); SoftBank reported LTV of 15.9% at September 30 on November 10, 2026. Yen converted at 162.39 per dollar, the rate SoftBank used on its June 30, 2026 data page.",
    "sources": [
     {
      "type": "asset_sales",
      "amount_usd_b": 5.83,
      "firm": true,
      "period": "October 2025",
      "from": "public market buyers of Nvidia shares",
      "note": "SoftBank sold its entire Nvidia stake (32.1 million shares) to help fund OpenAI.",
      "source": {
       "title": "SoftBank sells its entire stake in Nvidia for US$5.83 billion to fund 'all in' bet on ChatGPT maker OpenAI",
       "publisher": "The Nightly (CNBC report)",
       "url": "https://thenightly.com.au/business/softbank-sells-its-entire-stake-in-nvidia-for-us583-billion-to-fund-all-in-bet-on-chatgpt-maker-openai-c-20651132",
       "date": "2025-11-12",
       "tier": "press"
      }
     },
     {
      "type": "asset_sales",
      "amount_usd_b": 9.17,
      "firm": true,
      "period": "June to October 2025",
      "from": "public market buyers of T-Mobile US shares",
      "note": "Partial sale of the T-Mobile US stake, per CNBC in November 2025. It includes a roughly $4.8B block sale on June 17, 2025 (Bloomberg). A later report (The Next Web, April 2026) put total T-Mobile sales from June to December 2025 at $12.73B.",
      "source": {
       "title": "SoftBank sells its entire stake in Nvidia for US$5.83 billion to fund 'all in' bet on ChatGPT maker OpenAI",
       "publisher": "The Nightly (CNBC report)",
       "url": "https://thenightly.com.au/business/softbank-sells-its-entire-stake-in-nvidia-for-us583-billion-to-fund-all-in-bet-on-chatgpt-maker-openai-c-20651132",
       "date": "2025-11-12",
       "tier": "press"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 40.0,
      "firm": true,
      "period": "Signed March 27, 2026; closed September 30, 2026",
      "from": "banks",
      "note": "Facility limit, not the amount borrowed. A 12-month bridge facility (a short-term loan meant to be repaid with later financing) from JPMorgan, Goldman Sachs, Mizuho, SMBC and MUFG, for the $30B 2026 OpenAI investment plus general purposes. $30B was drawn and fully repaid by September 15, 2026; the $10B undrawn was canceled effective September 30, 2026.",
      "source": {
       "title": "Execution of Bridge Facility Agreement Primarily for the Follow-on Investments in OpenAI",
       "publisher": "SoftBank Group",
       "url": "https://group.softbank/en/news/press/20260327",
       "date": "2026-03-27",
       "tier": "primary"
      },
      "sources_more": [
       {
        "title": "Financial Report for the Six-Month Period Ended September 30, 2026",
        "publisher": "SoftBank Group",
        "url": "https://group.softbank/media/Project/sbg/sbg/pdf/ir/financials/financial_reports/financial-report_q2fy2026_01_en.pdf",
        "date": "2026-11-10",
        "tier": "primary"
       }
      ]
     },
     {
      "type": "loans",
      "amount_usd_b": 10.0,
      "firm": true,
      "period": "Drawn August 2026, two-year term",
      "from": "banks",
      "note": "A margin loan (a loan secured by shares, which the lender can sell if their value falls) backed by SoftBank's OpenAI shares. The banks were reportedly Goldman Sachs, JPMorgan, Mizuho and SMBC, with Apollo also arranging. Pricing during talks was reported at about SOFR + 4.25 percentage points (about 7.9%). An earlier attempt in June stalled after the target was cut to about $6B.",
      "source": {
       "title": "Financial Report for the Six-Month Period Ended September 30, 2026",
       "publisher": "SoftBank Group",
       "url": "https://group.softbank/media/Project/sbg/sbg/pdf/ir/financials/financial_reports/financial-report_q2fy2026_01_en.pdf",
       "date": "2026-11-10",
       "tier": "primary"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 20.0,
      "firm": true,
      "period": "Outstanding as of August 2026",
      "from": "banks",
      "note": "Margin loan on SoftBank's Arm Holdings stake. SoftBank's own June 30, 2026 data page deducts ¥3.22T (about $19.8B) from the Arm holding for this borrowing. European Business Magazine (September 2026) says the facility limit was raised to $25B.",
      "source": {
       "title": "SoftBank's AI funding plans to face reckoning at earnings",
       "publisher": "Reuters via The Star",
       "url": "https://www.thestar.com.my/tech/tech-news/2026/08/04/softbank039s-ai-funding-plans-to-face-reckoning-at-earnings",
       "date": "2026-08-04",
       "tier": "press"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 11.1,
      "firm": true,
      "period": "September 2026",
      "from": "bond-market",
      "note": "The largest high-yield (junk-rated) corporate bond sale on record: $10B in dollar notes at coupons of 8.625% to 9.75%, plus two €500M euro notes. Proceeds were for the OpenAI investment. A 2021 SoftBank deal paid 2.125% to 5.25%. SoftBank had issued $14.6B of high-yield bonds in 2026 to that point, this deal included.",
      "source": {
       "title": "SoftBank raises US$11.1bil in world's biggest high-yield corporate bond sale",
       "publisher": "Bloomberg/Reuters via The Star",
       "url": "https://www.thestar.com.my/business/business-news/2026/09/24/softbank-raises-us111bil-in-world039s-biggest-high-yield-corporate-bond-sale",
       "date": "2026-09-24",
       "tier": "press"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 6.3,
      "firm": true,
      "period": "September 2026",
      "from": "bond-market",
      "note": "A ¥1 trillion bond sold to Japanese retail investors (about $6.3B, per the article's conversion).",
      "source": {
       "title": "SoftBank raises US$11.1bil in world's biggest high-yield corporate bond sale",
       "publisher": "Bloomberg/Reuters via The Star",
       "url": "https://www.thestar.com.my/business/business-news/2026/09/24/softbank-raises-us111bil-in-world039s-biggest-high-yield-corporate-bond-sale",
       "date": "2026-09-24",
       "tier": "press"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 11.87,
      "firm": true,
      "period": "September 2026, two-year term",
      "from": "banks",
      "note": "A syndicated loan from about 20 banks, arranged about a week before the September bond sale.",
      "source": {
       "title": "SoftBank Pays a Steep Price for Record Bond Sale to Fund Its OpenAI Bet",
       "publisher": "European Business Magazine",
       "url": "https://europeanbusinessmagazine.com/softbank-pays-for-record-bond-sale/",
       "date": "2026-09-25",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 30.0,
      "firm": true,
      "period": "April to December 2025",
      "to": "openai",
      "note": "$7.5B closed in April 2025 and $22.5B on December 26, 2025. Third-party co-investors syndicated through SoftBank added $11B, for a $41B round in total.",
      "source": {
       "title": "SoftBank closes $41B OpenAI investment as Stargate buildout expands",
       "publisher": "TechInformed",
       "url": "https://techinformed.com/softbank-closes-41b-openai-investment-as-stargate-buildout-expands",
       "date": "2026-01-07",
       "tier": "press"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 30.0,
      "firm": true,
      "period": "2026, final tranche closed October 1, 2026",
      "to": "openai",
      "note": "Three $10B tranches through Vision Fund 2, part of OpenAI's $122B round at an $852B valuation. Cumulative SoftBank investment in OpenAI is $64.6B, for about a 13% stake.",
      "source": {
       "title": "SoftBank completes final phase of $30 billion investment in OpenAI",
       "publisher": "Reuters via The Star",
       "url": "https://www.thestar.com.my/tech/tech-news/2026/10/02/softbank-completes-final-phase-of-30-billion-investment-in-openai",
       "date": "2026-10-01",
       "tier": "press"
      }
     },
     {
      "type": "acquisitions",
      "amount_usd_b": 5.4,
      "firm": true,
      "period": "Second half of 2026",
      "to": "ABB robotics business",
      "note": "Payment SoftBank must fund in the second half of 2026.",
      "source": {
       "title": "SoftBank books lower Q1 profit, gain on Intel stake",
       "publisher": "Reuters via The Star",
       "url": "https://www.thestar.com.my/business/business-news/2026/08/06/softbank-books-lower-q1-profit-gain-on-intel-stake",
       "date": "2026-08-06",
       "tier": "press"
      }
     },
     {
      "type": "acquisitions",
      "amount_usd_b": 3.1,
      "firm": true,
      "period": "Second half of 2026",
      "to": "DigitalBridge",
      "note": "DigitalBridge is a digital-infrastructure investment firm (data centers, towers).",
      "source": {
       "title": "SoftBank books lower Q1 profit, gain on Intel stake",
       "publisher": "Reuters via The Star",
       "url": "https://www.thestar.com.my/business/business-news/2026/08/06/softbank-books-lower-q1-profit-gain-on-intel-stake",
       "date": "2026-08-06",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [
     {
      "what": "Total payment obligations due in the second half of 2026 (OpenAI, ABB robotics, DigitalBridge and others)",
      "amount_usd_b": 30.0,
      "firm": true,
      "horizon": "July to December 2026",
      "counterparty": "openai-and-others",
      "note": "Reuters' figure. It includes the $20B of OpenAI tranches that were still unpaid in August 2026.",
      "source": {
       "title": "SoftBank's AI funding plans to face reckoning at earnings",
       "publisher": "Reuters via The Star",
       "url": "https://www.thestar.com.my/tech/tech-news/2026/08/04/softbank039s-ai-funding-plans-to-face-reckoning-at-earnings",
       "date": "2026-08-04",
       "tier": "press"
      }
     },
     {
      "what": "Equity in the Stargate data-center joint venture",
      "amount_usd_b": 19.0,
      "firm": false,
      "horizon": "Initial commitment, announced January 2025",
      "counterparty": "stargate",
      "note": "Reported by The Information. Not confirmed in SoftBank filings that we read.",
      "source": {
       "title": "Stargate LLC",
       "publisher": "Wikipedia (citing The Information, Jan 23, 2025)",
       "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
       "date": "2025-01-23",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [
     {
      "fact": "CreditSights estimates Arm and OpenAI make up about three-quarters of SoftBank's group asset value.",
      "source": {
       "title": "SoftBank raises US$11.1bil in world's biggest high-yield corporate bond sale",
       "publisher": "Bloomberg/Reuters via The Star",
       "url": "https://www.thestar.com.my/business/business-news/2026/09/24/softbank-raises-us111bil-in-world039s-biggest-high-yield-corporate-bond-sale",
       "date": "2026-09-24",
       "tier": "press"
      }
     },
     {
      "fact": "S&P estimates OpenAI is about 30% of SoftBank's investment assets.",
      "source": {
       "title": "SoftBank Pays a Steep Price for Record Bond Sale to Fund Its OpenAI Bet",
       "publisher": "European Business Magazine",
       "url": "https://europeanbusinessmagazine.com/softbank-pays-for-record-bond-sale/",
       "date": "2026-09-25",
       "tier": "secondary"
      }
     }
    ],
    "observations": [
     "SoftBank's own loan-to-value ratio (net debt divided by the value of its holdings) was 13.0% on June 30, 2026. Its self-imposed ceiling is 25%. Net debt after asset-backed adjustments was ¥10.81T (about $66.6B), and consolidated net interest-bearing debt was ¥22.29T (about $137B). Source: SoftBank Group NAV/LTV page, https://group.softbank/en/news/ir/20260806_1 (primary).",
     "S&P's version of the same ratio, which counts margin loans, was about 33% at end-March 2026, against SoftBank's own 17% (Reuters, Aug 4, 2026). The gap comes down to how the margin loans are treated.",
     "Most of SoftBank's OpenAI money comes from borrowing and asset sales rather than operating income. Since 2025, $30B came from a $40B bridge facility (since repaid and closed), $10B from a loan backed by the OpenAI shares themselves (drawn August 2026), about $20B from the Arm-backed margin loan, $17.4B from 2026 bonds, $11.87B from a syndicated loan, and about $15B from selling Nvidia and T-Mobile shares. Bloomberg Intelligence counted more than $70B of SoftBank AI investment funded by debt and asset sales since 2025 (Yahoo/GuruFocus, March 6, 2026).",
     "SoftBank's borrowing costs rose. Five-year credit default swaps (the cost of insuring its debt against default) went above 4 percentage points a year in September 2026, from about 2.8 in June (The Star, Sept 24, 2026). S&P rates SoftBank BB+ (below investment grade).",
     "SoftBank booked no gain on OpenAI in April to June 2026. Its total investment gain on OpenAI so far is $45B, unrealized (not cashed in) (Reuters, Aug 6, 2026). The expected cash from OpenAI and SB Energy IPOs has been delayed (The Star, Sept 24, 2026).",
     "Circular element: the $10B loan secured on OpenAI shares paid for more OpenAI shares, so the same asset both secures the debt and is what the debt buys."
    ]
   },
   "stargate": {
    "period_note": "January 2025 to March 2026. We found no 2026 audited figures for the venture itself. Headline plans from Jan and Sept 2025; capital actually put in by each partner was not found.",
    "sources": [
     {
      "type": "vendor_financing",
      "amount_usd_b": 250.0,
      "firm": false,
      "period": "talks reported July 2026",
      "from": "nvidia",
      "note": "Superseded by Nvidia's signed guarantees capped at $105B on SB Energy's PORTS-Pike campus (August 17, 2026), which appears to be the same project. Nvidia reportedly in talks to guarantee about $250B of financing for a 10 GW Ohio campus (SoftBank energy unit develops, OpenAI leases); first 800 MW expected 2028. Up to $350B of chip purchases discussed separately. The source does not call the Ohio site 'Stargate'.",
      "source": {
       "title": "Nvidia in talks to backstop $250bn of OpenAI's data-centre financing (citing WSJ)",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/nvidia-openai-250bn-data-centre-financing-guarantee",
       "date": "2026-07-27",
       "tier": "press"
      },
      "superseded": true
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 19.0,
      "firm": false,
      "period": "Initial commitment, Jan 2025",
      "from": "softbank",
      "note": "Reported. SoftBank and OpenAI were each to own 40%.",
      "source": {
       "title": "Stargate LLC",
       "publisher": "Wikipedia (citing The Information, Jan 23, 2025)",
       "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
       "date": "2025-01-23",
       "tier": "secondary"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 7.0,
      "firm": false,
      "period": "Initial commitment, Jan 2025",
      "from": "oracle",
      "note": "Reported.",
      "source": {
       "title": "Stargate LLC",
       "publisher": "Wikipedia (citing The Information, Jan 23, 2025)",
       "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
       "date": "2025-01-23",
       "tier": "secondary"
      }
     }
    ],
    "uses": [],
    "revenue": [],
    "commitments": [
     {
      "what": "Headline US AI infrastructure investment",
      "amount_usd_b": 500.0,
      "firm": false,
      "horizon": "$100B initially, up to $500B over four years (by 2029), 10 GW",
      "counterparty": "openai",
      "note": "A target, not committed capital. By September 2025 OpenAI cited nearly 7 GW planned and over $400B of investment over three years. This total includes Oracle-leased sites financed by others.",
      "source": {
       "title": "SoftBank closes $41B OpenAI investment as Stargate buildout expands",
       "publisher": "TechInformed",
       "url": "https://techinformed.com/softbank-closes-41b-openai-investment-as-stargate-buildout-expands",
       "date": "2026-01-07",
       "tier": "press"
      }
     },
     {
      "what": "Announced Stargate investment",
      "amount_usd_b": 500.0,
      "firm": false,
      "horizon": "4 years from Jan 2025",
      "counterparty": "OpenAI, SoftBank, Oracle, MGX",
      "note": "Headline target; $100B said to deploy immediately. By Sept 2025 described as nearly 7 GW planned and over $400B over three years (secondary source).",
      "source": {
       "title": "OpenAI's $600B compute reset",
       "publisher": "Fintool",
       "url": "https://fintool.com/news/openai-600b-compute-reset",
       "date": "2026-02",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [
     {
      "fact": "OpenAI is the only named tenant of Stargate capacity.",
      "source": {
       "title": "OpenAI's $600B compute reset",
       "publisher": "Fintool",
       "url": "https://fintool.com/news/openai-600b-compute-reset",
       "date": "2026-02",
       "tier": "secondary"
      }
     }
    ],
    "observations": [
     "In July 2025 the WSJ reported the project had been scaled back after disagreements between SoftBank and OpenAI, with the near-term aim cut to a single Ohio data center (TipRanks citing WSJ, https://www.tipranks.com/news/openai-softbank-pull-back-on-500b-stargate-project). In August 2025 Bloomberg reported no funds had yet been raised toward the $500B budget (via Wikipedia).",
     "Oracle and OpenAI dropped plans to expand the Abilene, Texas campus from about 1.2 GW to about 2 GW after funding talks broke down (Bloomberg via Mezha, https://mezha.ua/en/news/stargate-openai-oracle-cancel-309242/). In March 2026, Microsoft agreed to rent a roughly 700 MW Crusoe site next door that Oracle and OpenAI had walked away from (Reuters, March 24, 2026, https://finance.yahoo.com/sectors/technology/articles/microsoft-rent-texas-data-center-161533953.html).",
     "Blue Owl declined to finance Oracle's roughly $10B, 1 GW Stargate site in Saline Township, Michigan, after lenders demanded stricter terms (FT, December 2025, via DatacenterDynamics). Blackstone was reported in talks to replace it, with no deal signed at the time.",
     "Circular element: OpenAI is both a 40% owner of Stargate and its main tenant. SoftBank's 2025 OpenAI investment was partly expected to fund OpenAI's own Stargate equity (Bisnow, Feb 10, 2025).",
     "The $500B is a target, not a funded pool; who pays for which site (Oracle leases, SoftBank energy units, project debt) is spread across partners."
    ]
   },
   "mgx": {
    "period_note": "2024 to July 2026",
    "sources": [
     {
      "type": "equity_raised",
      "amount_usd_b": 49.0,
      "firm": true,
      "period": "Final close July 1, 2026",
      "from": "sovereign-funds",
      "note": "MGX Fund I closed above its $45B target. Investors were described as Gulf, North American, Asian and European institutions and private investors. No individual amounts were disclosed. MGX targets more than $100B of assets and about $10B a year of deployment.",
      "source": {
       "title": "Abu Dhabi's AI investment firm MGX raises $49bn for new fund",
       "publisher": "The National",
       "url": "https://www.thenationalnews.com/business/markets/2026/07/01/abu-dhabis-ai-investment-firm-mgx-raises-49bn-for-new-fund/",
       "date": "2026-07-01",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "acquisitions",
      "amount_usd_b": 40.0,
      "firm": true,
      "period": "Agreed October 2025",
      "to": "Aligned Data Centers",
      "note": "Deal value for the whole consortium: the AI Infrastructure Partnership (BlackRock's GIP, MGX, Microsoft, Nvidia). MGX's own share was not disclosed.",
      "source": {
       "title": "Abu Dhabi's AI investment firm MGX raises $49bn for new fund",
       "publisher": "The National",
       "url": "https://www.thenationalnews.com/business/markets/2026/07/01/abu-dhabis-ai-investment-firm-mgx-raises-49bn-for-new-fund/",
       "date": "2026-07-01",
       "tier": "press"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": null,
      "firm": true,
      "period": "March 2026",
      "to": "openai",
      "note": "Co-led OpenAI's $122B round. MGX's own amount was not disclosed.",
      "source": {
       "title": "UAE's MGX closes $49B AI fund anchored in US AI ecosystem",
       "publisher": "UAE Preferred",
       "url": "https://www.uaepreferred.com/perspectives/uaes-mgx-closes-49b-ai-fund-anchored-in-us-ai-ecosystem",
       "date": "2026-07-02",
       "tier": "secondary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": null,
      "firm": true,
      "period": "February 2026 (Series G, $30B round) and May 2026 (Series H, $65B round)",
      "to": "anthropic",
      "note": "MGX invested in both rounds. Its own amounts were not disclosed. The National confirms the Series H participation.",
      "source": {
       "title": "UAE's MGX closes $49B AI fund anchored in US AI ecosystem",
       "publisher": "UAE Preferred",
       "url": "https://www.uaepreferred.com/perspectives/uaes-mgx-closes-49b-ai-fund-anchored-in-us-ai-ecosystem",
       "date": "2026-07-02",
       "tier": "secondary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": null,
      "firm": true,
      "period": "January 2026 (xAI Series E, $20B round)",
      "to": "spacexai",
      "note": "MGX backed the round. Its own amount was not disclosed.",
      "source": {
       "title": "UAE's MGX closes $49B AI fund anchored in US AI ecosystem",
       "publisher": "UAE Preferred",
       "url": "https://www.uaepreferred.com/perspectives/uaes-mgx-closes-49b-ai-fund-anchored-in-us-ai-ecosystem",
       "date": "2026-07-02",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [],
    "commitments": [
     {
      "what": "Equity in Stargate",
      "amount_usd_b": 7.0,
      "firm": false,
      "horizon": "Initial, Jan 2025",
      "counterparty": "stargate",
      "note": "Reported by The Information.",
      "source": {
       "title": "Stargate LLC",
       "publisher": "Wikipedia (citing The Information, Jan 23, 2025)",
       "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
       "date": "2025-01-23",
       "tier": "secondary"
      }
     },
     {
      "what": "AI Infrastructure Partnership (with BlackRock, Microsoft, Nvidia) equity target",
      "amount_usd_b": 30.0,
      "firm": false,
      "horizon": "Target. Up to $100B including debt",
      "counterparty": "blackrock-microsoft-nvidia",
      "note": "A target, not committed capital. Analysts question whether these headline figures are committed or aspirational.",
      "source": {
       "title": "Abu Dhabi's MGX targets $100B AI fund with $10B annual deployments",
       "publisher": "Techleap Finder (citing aicerts.ai)",
       "url": "https://finder.techleap.nl/news/feed/abu-dhabi-s-mgx-targets-100b-ai-fund-with-10b-annual-deployments",
       "date": "2026-02-01",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "MGX holds stakes in OpenAI, Anthropic and xAI at the same time, so one state-backed investor is exposed to all three top US labs.",
     "MGX said it plans to invest up to 80% of its portfolio in US projects (UAE Preferred, July 2026)."
    ]
   },
   "sovereign-funds": {
    "period_note": "Only Abu Dhabi items could be sourced. See gaps.",
    "sources": [],
    "uses": [],
    "revenue": [],
    "commitments": [
     {
      "what": "UAE pledge to invest in the United States (all sectors, not AI-only)",
      "amount_usd_b": 1400.0,
      "firm": false,
      "horizon": "Multi-year pledge",
      "counterparty": "United States",
      "note": "A political pledge, not committed AI capital.",
      "source": {
       "title": "MGX catapults Abu Dhabi to centre of global AI evolution",
       "publisher": "AGBI",
       "url": "https://www.agbi.com/opinion/ai/2026/07/mgx-catapults-abu-dhabi-to-centre-of-global-ai-evolution/",
       "date": "2026-07-01",
       "tier": "press"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "We could not open sources giving amounts for PIF/Humain, QIA, GIC, Temasek or the Kuwait Investment Authority in 2025 to 2026 AI rounds or data-center deals. See gaps."
    ]
   },
   "blue-owl": {
    "period_note": "2024 to September 2026",
    "sources": [],
    "uses": [
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 7.0,
      "firm": true,
      "period": "October 2025",
      "to": "hyperion-jv",
      "note": "Meta says Blue Owl-managed funds made a cash contribution of about $7B for 80% of the Hyperion (Louisiana) data-center joint venture, partly funded by bonds sold to Pimco and others. CRE Daily (citing Bloomberg) describes the deal as about $2.5B of equity plus debt, so reports split the $27B differently.",
      "source": {
       "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
       "publisher": "Meta",
       "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
       "date": "2025-10-21",
       "tier": "primary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": null,
      "firm": true,
      "period": "2024 to 2026",
      "to": "crusoe",
      "note": "Co-sponsor (with Crusoe and Primary Digital Infrastructure) of the $15B joint venture building the 1.2 GW Abilene, Texas campus leased to Oracle for OpenAI. Blue Owl's own equity amount was not disclosed. The three firms committed $3.4B for the first two buildings in October 2024.",
      "source": {
       "title": "Newmark Facilitates $7.1 Billion Construction Loan to Develop AI Data Center",
       "publisher": "Newmark (press release via Nasdaq)",
       "url": "https://www.nasdaq.com/press-release/newmark-facilitates-71-billion-construction-loan-develop-ai-data-center-2025-05-22",
       "date": "2025-05-22",
       "tier": "primary"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "Blue Owl backed most of Oracle's largest US data-center builds using a buy-and-lease-back structure (Blue Owl owns the site and Oracle rents it). In December 2025 it declined to fund Oracle's roughly $10B, 1 GW Michigan site after lenders sought stricter lease and debt terms (FT via Yahoo/Blockspace, Dec 17, 2025, https://finance.yahoo.com/news/funding-stalls-oracle-8217-michigan-155238542.html).",
     "Reported in a secondary source, not confirmed: a $20B data-center partnership with Chirisa (Pennsylvania and Virginia), and a suspension of redemptions at Blue Owl Capital Corp II, one of its lending funds (AI2Work, Sept 3, 2026, https://ai2.work/blog/private-credit-bankrolls-the-ai-buildout-as-cover-ratios-thin)."
    ]
   },
   "hyperion-jv": {
    "period_note": "Set up October 2025. Campus built through about 2030.",
    "sources": [
     {
      "type": "equity_raised",
      "amount_usd_b": 7.0,
      "firm": true,
      "period": "October 2025",
      "from": "blue-owl",
      "note": "Meta's description of Blue Owl's cash contribution, which overlaps with the bond money. See the Blue Owl entry.",
      "source": {
       "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
       "publisher": "Meta",
       "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
       "date": "2025-10-21",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 27.0,
      "firm": true,
      "period": "October 2025",
      "from": "bond-market",
      "note": "Investment-grade bonds backed by the project, sold privately with Morgan Stanley as sole bookrunner. S&P rates them A+. Pimco took about $18B. IFR and other trade sources put the size at $27.3B, maturing in 2049.",
      "source": {
       "title": "Meta Pushes Its Largest Data Center Project Off Its Books With $27B Joint Venture",
       "publisher": "Bisnow",
       "url": "https://www.bisnow.com/national/news/data-center-capital-markets/meta-pushes-its-largest-data-center-project-off-its-books-with-27b-joint-venture-131490",
       "date": "2025-10-22",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "other",
      "amount_usd_b": 3.0,
      "firm": true,
      "period": "October 2025",
      "to": "meta",
      "note": "A one-time cash distribution of about $3B to Meta, which contributed the land and construction in progress.",
      "source": {
       "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
       "publisher": "Meta",
       "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
       "date": "2025-10-21",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": null,
      "firm": true,
      "period": "2025 to about 2030",
      "to": "Hyperion campus, Richland Parish, Louisiana",
      "note": "Initially 2 GW, potentially more than 5 GW. The exact capex funded by the JV was not separately disclosed.",
      "source": {
       "title": "Meta Pushes Its Largest Data Center Project Off Its Books With $27B Joint Venture",
       "publisher": "Bisnow",
       "url": "https://www.bisnow.com/national/news/data-center-capital-markets/meta-pushes-its-largest-data-center-project-off-its-books-with-27b-joint-venture-131490",
       "date": "2025-10-22",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [
     {
      "what": "Meta residual value guarantee: if Meta does not renew or ends the lease, it makes a capped cash payment to the JV",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "First 16 years of operations",
      "counterparty": "meta",
      "note": "Meta's leases have a four-year initial term with options to extend.",
      "source": {
       "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
       "publisher": "Meta",
       "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
       "date": "2025-10-21",
       "tier": "primary"
      }
     }
    ],
    "concentration": [
     {
      "fact": "There is a single tenant (Meta). Bondholders depend on Meta's rent and Meta's value guarantee.",
      "source": {
       "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
       "publisher": "Meta",
       "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
       "date": "2025-10-21",
       "tier": "primary"
      }
     }
    ],
    "observations": [
     "Pimco bought about $18B of the bonds and had about $2B of paper profit soon after, with the bonds trading above 110 cents on the dollar (CRE Daily citing Bloomberg, Oct 23, 2025, https://www.credaily.com/?p=211081).",
     "Circular element: the debt is off Meta's balance sheet, but the only tenant is Meta and Meta guarantees the asset's value. Economically, the risk stays with Meta."
    ]
   },
   "pimco": {
    "period_note": "October 2025 to 2026",
    "sources": [],
    "uses": [
     {
      "type": "other",
      "amount_usd_b": 18.0,
      "firm": true,
      "period": "October 2025",
      "to": "hyperion-jv",
      "note": "Bought about $18B of the Hyperion bonds and later sold over $1B in the secondary market.",
      "source": {
       "title": "AI Infrastructure Drives $2B Pimco Profit In Meta Debt Deal",
       "publisher": "CRE Daily (citing Bloomberg)",
       "url": "https://www.credaily.com/?p=211081",
       "date": "2025-10-23",
       "tier": "secondary"
      }
     },
     {
      "type": "other",
      "amount_usd_b": 16.0,
      "firm": false,
      "period": "2026 (date not given)",
      "to": "oracle",
      "note": "Reportedly anchored a $16B Oracle financing after banks pulled back. This is from a secondary blog only and is unconfirmed.",
      "source": {
       "title": "Private Credit Bankrolls the AI Buildout as Cover Ratios Thin",
       "publisher": "AI2Work",
       "url": "https://ai2.work/blog/private-credit-bankrolls-the-ai-buildout-as-cover-ratios-thin",
       "date": "2026-09-03",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": []
   },
   "apollo": {
    "period_note": "October 2025 to 2026",
    "sources": [],
    "uses": [
     {
      "type": "other",
      "amount_usd_b": null,
      "firm": false,
      "period": "October 2025",
      "to": "spacexai",
      "note": "Debt participant, alongside Diameter Capital, in up to $12.5B of debt for a special-purpose company that buys Nvidia GPUs for xAI's Colossus 2 and rents them to xAI for five years. Apollo's own share was not disclosed.",
      "source": {
       "title": "Nvidia to invest in Musk's xAI as part of US$20bil funding",
       "publisher": "Free Malaysia Today (Bloomberg report)",
       "url": "https://www.freemalaysiatoday.com/category/business/2025/10/08/nvidia-to-invest-in-musks-xai-as-part-of-us20bil-funding",
       "date": "2025-10-08",
       "tier": "press"
      }
     },
     {
      "type": "other",
      "amount_usd_b": 35.0,
      "firm": false,
      "period": "2026 (staged, reported)",
      "to": "anthropic",
      "note": "Apollo and Blackstone reportedly arranged a chip-backed special-purpose company for Anthropic of about $35B ($36B in a quoted Goldman summary), with Broadcom backstopping it. A separate secondary source says about $15B of the debt was expected to be available by early 2027. The split between Apollo and Blackstone was not given.",
      "source": {
       "title": "Goldman: skjult 1,8 billion USD stor off-balance-sheet tidsbombe skaber tvivl om AI-supercyklussen",
       "publisher": "Ugebrev Investor",
       "url": "https://ugebrev.dk/formue/goldman-skjult-18-billion-usd-stor-off-balance-sheet-tidsbombe-skaber-tvivl-om-ai-supercyklussen/",
       "date": "2026-06-13",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "Apollo's data showed demand for hyperscaler bonds falling from nearly 5x the amount offered in February 2026 to under 2x in July 2026 (Reuters, July 29, 2026).",
     "A secondary source lists Apollo Global Funding among the arrangers of SoftBank's $10B OpenAI-share-backed loan (AI2Work, August 2026)."
    ]
   },
   "blackstone": {
    "period_note": "December 2025 to 2026",
    "sources": [],
    "uses": [
     {
      "type": "other",
      "amount_usd_b": null,
      "firm": false,
      "period": "2026 (reported)",
      "to": "anthropic",
      "note": "Co-arranger with Apollo of the roughly $35B chip-backed special-purpose company for Anthropic (see the Apollo entry). Blackstone's own share was not disclosed.",
      "source": {
       "title": "Goldman: skjult 1,8 billion USD stor off-balance-sheet tidsbombe skaber tvivl om AI-supercyklussen",
       "publisher": "Ugebrev Investor",
       "url": "https://ugebrev.dk/formue/goldman-skjult-18-billion-usd-stor-off-balance-sheet-tidsbombe-skaber-tvivl-om-ai-supercyklussen/",
       "date": "2026-06-13",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "In December 2025, Blackstone was reported in talks to replace Blue Owl as financial partner on Oracle's roughly $10B Michigan Stargate site. No deal was signed at the time (DatacenterDynamics citing FT, https://www.datacenterdynamics.com/en/news/blue-owl-opts-not-to-fund-oracles-10bn-michigan-data-center/).",
     "We found no source for Blackstone's QTS data-center financing amounts. See gaps."
    ]
   },
   "bond-market": {
    "period_note": "Calendar 2025 and 2026 to date (latest tallies run to July to October 2026). Tallies differ by source because of which companies, currencies and dates they count.",
    "sources": [],
    "uses": [
     {
      "type": "other",
      "amount_usd_b": 93.3,
      "firm": true,
      "period": "Calendar 2025",
      "to": "google-amazon-meta-microsoft-oracle",
      "note": "Vanguard/Bloomberg tally of bond issuance by the five hyperscalers, up from $20.1B in 2024. Other counts: BofA $121B (US bonds, five companies), and Reuters/LSEG about $108B (four companies, excluding Microsoft). IESE gives $109B.",
      "source": {
       "title": "By the Numbers: How AI-Related Debt is Changing the Bond Market",
       "publisher": "Chief Investment Officer (Vanguard calculations on Bloomberg data)",
       "url": "https://www.ai-cio.com/?p=106712",
       "date": "2026-09-24",
       "tier": "press"
      }
     },
     {
      "type": "other",
      "amount_usd_b": 132.0,
      "firm": true,
      "period": "2026 through July 31",
      "to": "google-amazon-meta-microsoft-oracle",
      "note": "Vanguard/Bloomberg tally. That is 11% of US investment-grade bond supply, against 2% in 2024. Reuters/LSEG counted about $194B for Amazon, Alphabet, Meta and Oracle through July 7 (likely all currencies). Aviva counted about $170B through June 26, with over one-third in non-dollar currencies. Goldman counted about $200B by about October 2026.",
      "source": {
       "title": "By the Numbers: How AI-Related Debt is Changing the Bond Market",
       "publisher": "Chief Investment Officer (Vanguard calculations on Bloomberg data)",
       "url": "https://www.ai-cio.com/?p=106712",
       "date": "2026-09-24",
       "tier": "press"
      }
     },
     {
      "type": "other",
      "amount_usd_b": 61.0,
      "firm": true,
      "period": "2026 year to date (as of July 2026)",
      "to": "data-center owners (ABS/CMBS)",
      "note": "Barclays figure for data-center asset-backed securities and commercial mortgage-backed securities (bonds backed by data-center leases or mortgages). The SFA text calls it 'outstanding issuance', so it may be a stock (total outstanding) rather than 2026 issuance. In March 2026, Diamond Hill gave $40.5B ABS and $18.0B CMBS outstanding. Aviva says secured data-center project bonds were 'approaching $100B' since Meta's October 2025 deal.",
      "source": {
       "title": "SFA Research Corner: How Data Center ABS and CMBS Fit in a Broader Financing Ecosystem",
       "publisher": "Structured Finance Association",
       "url": "https://structuredfinance.org/wp-content/uploads/2026/07/SFA-Research-Corner_How-Data-Center-ABS-and-CMBS-Fit-in-a-Broader-Financing-Ecosystem.pdf",
       "date": "2026-07-23",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [
     {
      "fact": "Four borrowers dominate: Amazon, Alphabet, Meta and Oracle issued over $300B of bonds from the start of 2025 to mid-July 2026 (Bloomberg calculation). Microsoft issued none in either year, per Aviva's 2026 table.",
      "source": {
       "title": "The AI boom's debt blitz is testing investor demand",
       "publisher": "Fortune",
       "url": "https://fortune.com/2026/07/17/ai-boom-debt-blitz-investor-demand-hyperscaler-bond-issuance/",
       "date": "2026-07-17",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Big individual deals: Oracle $18B (Sept 2025) and $25B (Feb 2026). Meta $30B (Oct 2025, about $125B of orders) and $25B (Apr 30, 2026, $96B of orders). Alphabet $17.5B (Nov 2025) and $20B (Feb 9, 2026), and was close to $60B of new debt since November by May 2026. Amazon $15B (Nov 2025), about $54B (Mar 2026: $37B in dollars plus €14.5B), and $25B (Jul 2026). Sources: Reuters (Feb 9, 2026), Bloomberg (Apr 30, 2026), Yahoo/GuruFocus (Mar 13, 2026), Investing.com (Jul 7, 2026), Bloomberg (May 14, 2026).",
     "Non-tech AI borrowers also tapped bonds in June 2026: SpaceX (merged with xAI) sold $25B of bonds days after its IPO, and Nvidia sold $25B, its first bond sale in five years (Fortune, Jul 17, 2026).",
     "Demand is cooling, and these signals are reported, not forecast. Bond orders fell from nearly 5x the amount offered (Feb 2026) to under 2x (Jul 2026). 78 of 91 hyperscaler bonds issued in 2026 traded at higher yields on July 28 than at issue. The extra yield new deals must offer rose to a median 12 basis points (0.12 percentage points) from 2.25 in 2025 (Reuters, Jul 29, 2026). Meta's longer bonds trade like BBB-rated debt despite its AA- rating (Aviva, Jul 9, 2026). S&P cut Oracle to one notch above junk in July 2026 (The Next Web, Jul 10, 2026).",
     "Big Tech is also raising equity, not just debt. Alphabet ran an $85B share sale (Bloomberg via AI Weekly, June 2026; Aviva describes it as an $84.75B at-the-market programme about half used). Oracle issued a $5B mandatory convertible preferred and guided to a $20B at-the-market programme for 2026 (Aviva, Jul 9, 2026)."
    ]
   },
   "banks": {
    "period_note": "2025 to October 2026",
    "sources": [],
    "uses": [
     {
      "type": "other",
      "amount_usd_b": 7.1,
      "firm": true,
      "period": "May 2025",
      "to": "crusoe",
      "note": "JPMorgan-led construction loan for phase 2 of the 1.2 GW Abilene, Texas campus (Crusoe/Blue Owl/Primary Digital JV), leased to Oracle for OpenAI.",
      "source": {
       "title": "Newmark Facilitates $7.1 Billion Construction Loan to Develop AI Data Center",
       "publisher": "Newmark (press release via Nasdaq)",
       "url": "https://www.nasdaq.com/press-release/newmark-facilitates-71-billion-construction-loan-develop-ai-data-center-2025-05-22",
       "date": "2025-05-22",
       "tier": "primary"
      }
     },
     {
      "type": "other",
      "amount_usd_b": 38.0,
      "firm": false,
      "period": "Sought September 2025",
      "to": "oracle",
      "note": "Oracle 'sought a debt package of about $38bn' for data centers. The lenders and the final closing were not confirmed in the source we read.",
      "source": {
       "title": "Blue Owl opts not to fund Oracle's $10bn Michigan data center",
       "publisher": "DatacenterDynamics (citing Financial Times)",
       "url": "https://www.datacenterdynamics.com/en/news/blue-owl-opts-not-to-fund-oracles-10bn-michigan-data-center/",
       "date": "2025-12-17",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "SoftBank alone has drawn on banks for $30B of a $40B bridge facility (since repaid and closed), a $10B OpenAI-share margin loan, about $20B of Arm-share margin loans, and an $11.87B syndicated loan (see SoftBank).",
     "Reported in a secondary source: the Chicago Fed (Feb 2026) found large banks' committed lending to AI-adjacent industries is about 25% of their core (tier 1) capital, against 9% actually drawn. A Federal Reserve Board study found up to a quarter of bank loans to non-bank lenders now go to private credit firms, up from about 1% in 2013 (AI2Work, Sept 3, 2026).",
     "The Bank of England warned on Dec 2, 2025 that the debt-financed AI boom could unravel given 'materially stretched' valuations, that a correction would spill into debt markets, and that credit default swaps of debt-reliant AI investors show early warning signs (Bloomberg, https://www.bloomberg.com/news/articles/2025-12-02/bank-of-england-warns-debt-fueled-spending-boom-could-unravel)."
    ]
   },
   "venture-funds": {
    "period_note": "2026 to date. We could not open PitchBook or Crunchbase 2025 full-year tallies. See gaps.",
    "sources": [],
    "uses": [
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": null,
      "firm": true,
      "period": "March 2026",
      "to": "openai",
      "note": "Andreessen Horowitz and D. E. Shaw Ventures co-led OpenAI's $122B round with SoftBank. Sequoia and Thrive also invested, and retail investors put in $3B via banks. VC amounts were not disclosed. Amazon (up to $50B), Nvidia ($30B) and SoftBank ($30B) supplied up to $110B of the $122B.",
      "source": {
       "title": "OpenAI raises $122 billion at $852 billion valuation, opens to retail investors",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/openai-122-billion-round-852-billion-valuation-retail-investors",
       "date": "2026-03-31",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [
     {
      "fact": "In 2026 the top three labs raised at least $237B in four rounds: OpenAI $122B (Mar), Anthropic $30B Series G (Feb) and $65B Series H (May), and xAI $20B Series E (Jan). That is our sum of reported round sizes. Global venture investment in Q1 2026 alone was reported at $297B, 2.5x the prior quarter (source not named by the publisher). Much of the labs' money came from corporates, not VC funds.",
      "source": {
       "title": "UAE's MGX closes $49B AI fund anchored in US AI ecosystem",
       "publisher": "UAE Preferred",
       "url": "https://www.uaepreferred.com/perspectives/uaes-mgx-closes-49b-ai-fund-anchored-in-us-ai-ecosystem",
       "date": "2026-07-02",
       "tier": "secondary"
      }
     }
    ],
    "observations": [
     "The Q1 2026 venture total of $297B is from The Next Web (Apr 15, 2026), which does not name its data provider (https://thenextweb.com/news/accel-5-billion-fund-ai-anthropic-cursor-venture-capital).",
     "Circular element in the biggest 'venture' round: about 90% of OpenAI's $122B came from Amazon, Nvidia and SoftBank. Amazon and Nvidia are also suppliers OpenAI pays for cloud capacity and chips."
    ]
   },
   "alibaba-cloud": {
    "period_note": "Latest reported quarter is April-June 2026 (reported 2026-08-20). The September 2026 quarter was not out as of 2026-10-30. Yuan converted at RMB 6.7851 = US$1, the rate Alibaba itself uses (Federal Reserve H.10, 2026-06-30). Hong Kong dollar figures use Reuters' own conversion. NOT RESEARCHED, the session's web-search budget ran out before Alibaba could be sourced. No figures included.",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 3.382,
      "firm": true,
      "period": "Q2 2026 (April-June)",
      "from": null,
      "note": "Cash from operations RMB 22.9B, up 11% from a year earlier. Far below the quarter's capex of RMB 67.7B.",
      "source": {
       "title": "Alibaba Group Announces June Quarter 2026 Results (Form 6-K Ex. 99.1)",
       "publisher": "Alibaba Group / SEC",
       "url": "https://www.sec.gov/Archives/edgar/data/0001577552/000110465926099220/tm2623667d1_ex99-1.htm",
       "date": "2026-08-20",
       "tier": "primary"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 10.2,
      "firm": true,
      "period": "Completed 2026-08-26",
      "from": "sovereign-funds",
      "note": "Sold 710 million new Hong Kong shares at HK$112.70 for HK$80B (Reuters converts to about US$10.2B). Alibaba says 100% of net proceeds go to AI: about 60% (HK$47.9B) to expand global computing infrastructure, about 40% (HK$31.9B) to hyperscale AI data centers and cloud upgrades. Buyers are not named by Alibaba; Reuters' sources said demand included sovereign wealth funds (unnamed). Reuters called it the largest primary follow-on share sale ever by a Hong Kong-listed company.",
      "source": {
       "title": "Completion of placing (Form 6-K Ex. 99.1)",
       "publisher": "Alibaba Group / SEC",
       "url": "https://www.sec.gov/Archives/edgar/data/0001577552/000119312526365894/baba-ex99_1.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 1.622,
      "firm": true,
      "period": "Q2 2026 (April-June)",
      "from": "banks",
      "note": "Net new bank borrowings of RMB 11.0B in the quarter. No new bond or convertible was issued in the quarter.",
      "source": {
       "title": "Alibaba Group Announces June Quarter 2026 Results (Form 6-K Ex. 99.1)",
       "publisher": "Alibaba Group / SEC",
       "url": "https://www.sec.gov/Archives/edgar/data/0001577552/000110465926099220/tm2623667d1_ex99-1.htm",
       "date": "2026-08-20",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 3.2,
      "firm": true,
      "period": "September 2025",
      "from": "bond-market",
      "note": "Zero-coupon convertible bonds (bonds that pay no interest and can be swapped for shares). DCD also reports a US$1.53B bond raise in July 2025.",
      "source": {
       "title": "Alibaba considers increasing AI data center capex spend to $69bn over three years - report",
       "publisher": "DatacenterDynamics",
       "url": "https://www.datacenterdynamics.com/en/news/alibaba-considers-increasing-ai-data-center-capex-spend-to-69bn-over-three-years-report/",
       "date": "2026-01-29",
       "tier": "press"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 1.53,
      "firm": true,
      "period": "July 2025",
      "from": "bond-market",
      "note": "Bond raise reported by DCD; page is undated, the 480B-yuan report it covers circulated around 2026-01-29.",
      "source": {
       "title": "Alibaba considers increasing AI data center capex spend to $69bn over three years - report",
       "publisher": "DatacenterDynamics",
       "url": "https://www.datacenterdynamics.com/en/news/alibaba-considers-increasing-ai-data-center-capex-spend-to-69bn-over-three-years-report/",
       "date": "2026-01-29",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 9.975,
      "firm": true,
      "period": "Q2 2026 (April-June)",
      "to": null,
      "note": "Capex RMB 67.7B, up 75% from RMB 38.7B a year earlier. Alibaba cites purchase timing, more CPU computing capacity for expected AI agent demand, and higher chip component prices.",
      "source": {
       "title": "Alibaba Group Announces June Quarter 2026 Results (Form 6-K Ex. 99.1)",
       "publisher": "Alibaba Group / SEC",
       "url": "https://www.sec.gov/Archives/edgar/data/0001577552/000110465926099220/tm2623667d1_ex99-1.htm",
       "date": "2026-08-20",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 0.162,
      "firm": true,
      "period": "Q2 2026 (April-June)",
      "to": null,
      "note": "Share buybacks shrank to US$162M in the quarter, as cash was pointed at AI.",
      "source": {
       "title": "Alibaba Group Announces June Quarter 2026 Results (Form 6-K Ex. 99.1)",
       "publisher": "Alibaba Group / SEC",
       "url": "https://www.sec.gov/Archives/edgar/data/0001577552/000110465926099220/tm2623667d1_ex99-1.htm",
       "date": "2026-08-20",
       "tier": "primary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": null,
      "firm": true,
      "period": "existing stake",
      "to": "moonshot",
      "note": "Alibaba is an existing investor in Moonshot AI and also sells it cloud computing. Amount not disclosed.",
      "source": {
       "title": "China's Moonshot AI raises $2B at $20B valuation as demand for open source AI skyrockets",
       "publisher": "TechCrunch",
       "url": "https://techcrunch.com/2026/05/07/chinas-moonshot-ai-raises-2b-at-20b-valuation-as-demand-for-open-source-ai-skyrockets",
       "date": "2026-05-07",
       "tier": "press"
      }
     }
    ],
    "revenue": [
     {
      "metric": "AI Cloud and Compute Services segment revenue",
      "amount_usd_b": 7.139,
      "period": "Q2 2026 (April-June)",
      "note": "RMB 48.4B, up 45%; revenue from outside customers also up 45%. New segment combining the old Cloud Intelligence Group with T-Head, Alibaba's in-house chip unit.",
      "source": {
       "title": "Alibaba Group Announces June Quarter 2026 Results (Form 6-K Ex. 99.1)",
       "publisher": "Alibaba Group / SEC",
       "url": "https://www.sec.gov/Archives/edgar/data/0001577552/000110465926099220/tm2623667d1_ex99-1.htm",
       "date": "2026-08-20",
       "tier": "primary"
      }
     },
     {
      "metric": "AI-related product revenue",
      "amount_usd_b": 1.824,
      "period": "Q2 2026 (April-June)",
      "note": "RMB 12.4B; triple-digit growth for the 12th quarter in a row (exact rate not given).",
      "source": {
       "title": "Alibaba Group Announces June Quarter 2026 Results (Form 6-K Ex. 99.1)",
       "publisher": "Alibaba Group / SEC",
       "url": "https://www.sec.gov/Archives/edgar/data/0001577552/000110465926099220/tm2623667d1_ex99-1.htm",
       "date": "2026-08-20",
       "tier": "primary"
      }
     },
     {
      "metric": "AI model-as-a-service annual recurring revenue (selling access to its models, mainly Qwen)",
      "amount_usd_b": 2.36,
      "period": "run-rate as of Aug 2026",
      "note": "Reuters: passed RMB 16B in annual recurring revenue. Converted at 6.7851.",
      "source": {
       "title": "Alibaba's quarterly revenue up 9%, misses adjusted profit due to heavy AI spend",
       "publisher": "Reuters via BNN Bloomberg",
       "url": "https://www.bnnbloomberg.ca/business/company-news/2026/08/20/alibabas-quarterly-revenue-up-9-misses-adjusted-profit-due-to-heavy-ai-spend/",
       "date": "2026-08-20",
       "tier": "press"
      }
     }
    ],
    "commitments": [
     {
      "what": "Three-year AI and cloud infrastructure investment plan",
      "amount_usd_b": 53.0,
      "firm": true,
      "horizon": "three years from February 2025",
      "counterparty": null,
      "note": "Over RMB 380B, announced February 2025 (Bloomberg's conversion ~US$53B). In September 2025 CEO Eddie Wu said it would be raised, without a new figure. Reuters (Aug 2026) says Alibaba had already spent nearly half; Reuters' Aug 20 story describes the plan as covering 2026-29, which conflicts with other sources dating it from Feb 2025.",
      "source": {
       "title": "Alibaba Shares Soar After Hiking AI Budget Past $50 Billion",
       "publisher": "Bloomberg",
       "url": "https://www.bloomberg.com/news/articles/2025-09-24/alibaba-to-raise-spending-on-ai-above-50-billion-plan",
       "date": "2025-09-24",
       "tier": "press"
      }
     },
     {
      "what": "Reported increase of the three-year plan to RMB 480B",
      "amount_usd_b": 69.05,
      "firm": false,
      "horizon": "three years through February 2028",
      "counterparty": null,
      "note": "Reportedly under consideration, per Chinese outlet LatePost citing one insider. Not confirmed by Alibaba. Up to RMB 480B vs RMB 380B before.",
      "source": {
       "title": "Alibaba considers increasing AI data center capex spend to $69bn over three years - report",
       "publisher": "DatacenterDynamics",
       "url": "https://www.datacenterdynamics.com/en/news/alibaba-considers-increasing-ai-data-center-capex-spend-to-69bn-over-three-years-report/",
       "date": "2026-01-29",
       "tier": "press"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "Free cash flow was negative RMB 44.7B (about -US$6.6B) in Q2 2026, versus negative RMB 18.8B a year earlier; Alibaba blames cloud infrastructure spending.",
     "Cash and liquid investments fell from RMB 520.8B (Mar 31, 2026) to RMB 474.5B (about US$69.9B) at June 30, 2026, a drop of about RMB 46B in one quarter.",
     "Net profit fell 75% year on year in Q2 2026 (Reuters). CEO Eddie Wu said AI capex should pay back within about three years at current gross margins; Reuters later reported the target payback cut to 2.5 years.",
     "Funding pattern: operating cash covered about a third of Q2 capex; the rest came from cash on hand, bank loans, and then a US$10.2B share sale in August, on top of US$4.7B of bonds and convertibles in 2025. Alibaba is now issuing new shares to fund AI, not just spending profits.",
     "Qwen3.8-Max launched August 2026 with open weights (2.4 trillion parameters); Alibaba says 250 million users have made an AI-driven purchase through the Qwen app."
    ]
   },
   "mistral": {
    "period_note": "Funding rounds Sept 2025 and Sept 2026, debt March 2026, revenue statements Jan-Sept 2026. Euros converted at about US$1.17 per euro, the rate implied by AFP's own conversion on 2026-02-11 (EUR 1.2B = US$1.4B); not an official reference rate. Not verified in this pass (web search limit reached).",
    "sources": [
     {
      "type": "equity_raised",
      "amount_usd_b": 3.51,
      "firm": true,
      "period": "Series D, 2026-09-08",
      "from": "Samsung Electronics (lead); Scaleup Europe Fund (EQT); PSG Equity; Nvidia",
      "note": "EUR 3B at more than EUR 21B post-money valuation. Led by Samsung Electronics; co-led by the EU-backed Scaleup Europe Fund (managed by EQT) and PSG Equity. Euronews says existing investor Nvidia also added to its stake. Per-investor amounts not disclosed. Called the largest equity round ever by a European tech company.",
      "source": {
       "title": "Orrick Advises Mistral in its EUR 3B Series D Funding Round at EUR 21B Post-Money Valuation",
       "publisher": "Orrick (Mistral's law firm)",
       "url": "https://www.orrick.com/en/News/2026/09/Orrick-Advises-Mistral-in-its-3B-Series-D-at-21B-Post-Money-Valuation",
       "date": "2026-09-08",
       "tier": "primary"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 1.99,
      "firm": true,
      "period": "Series C, September 2025",
      "from": "asml",
      "note": "EUR 1.7B at EUR 11.7B valuation. ASML put in EUR 1.3B (about US$1.5B) for about 11%, becoming the largest shareholder.",
      "source": {
       "title": "ASML confirms EUR 1.3 billion investment in French AI firm",
       "publisher": "DutchNews.nl",
       "url": "https://www.dutchnews.nl/2025/09/asml-confirms-e1-3-billion-investment-in-french-ai-firm",
       "date": "2025-09-09",
       "tier": "press"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 0.83,
      "firm": true,
      "period": "2026-03-30",
      "from": "banks",
      "note": "First debt raise: US$830M from seven banks incl. BNP Paribas, Credit Agricole CIB, HSBC and MUFG, to buy 13,800 Nvidia chips for a data center at Bruyeres-le-Chatel near Paris.",
      "source": {
       "title": "France's Mistral raises $830 million in debt for AI data centre build-up",
       "publisher": "Reuters via Yahoo Finance",
       "url": "https://finance.yahoo.com/sectors/technology/articles/frances-mistral-raises-830-million-060341046.html",
       "date": "2026-03-30",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "chip_purchases",
      "amount_usd_b": 0.83,
      "firm": true,
      "period": "2026",
      "to": "nvidia",
      "note": "13,800 Nvidia chips funded by the March 2026 debt; exact chip spend not disclosed, the loan size is the best available proxy.",
      "source": {
       "title": "France's Mistral raises $830 million in debt for AI data centre build-up",
       "publisher": "Reuters via Yahoo Finance",
       "url": "https://finance.yahoo.com/sectors/technology/articles/frances-mistral-raises-830-million-060341046.html",
       "date": "2026-03-30",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 1.4,
      "firm": true,
      "period": "announced 2026-02-11, no timeline given",
      "to": null,
      "note": "EUR 1.2B for data centers in Sweden, its first outside France (AFP's conversion US$1.4B). Mistral's own statement; cost-sharing with partners not stated.",
      "source": {
       "title": "French AI firm Mistral invests $1.2b in first overseas data centres in Sweden",
       "publisher": "AFP via Malay Mail",
       "url": "https://www.malaymail.com/news/money/2026/02/11/french-ai-firm-mistral-invests-12b-in-first-overseas-data-centres-in-sweden-amid-us-competition/208899",
       "date": "2026-02-11",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 4.68,
      "firm": false,
      "period": "multi-year, end date not stated",
      "to": null,
      "note": "Euronews: Mistral is 'already spending' EUR 4B on data centers in France and Europe (one site near Paris running, one under construction in Sweden). Includes the Sweden EUR 1.2B; no breakdown or timeline.",
      "source": {
       "title": "Mistral AI raises record EUR 3 billion in Samsung-led funding round",
       "publisher": "Euronews",
       "url": "https://www.euronews.com/2026/09/08/mistral-ai-raises-record-3-billion-in-samsung-led-funding-round",
       "date": "2026-09-08",
       "tier": "press"
      }
     },
     {
      "type": "chip_purchases",
      "amount_usd_b": 1.17,
      "firm": false,
      "period": "2026 (CEO estimate, Jan 2026)",
      "to": null,
      "note": "CEO Arthur Mensch said Mistral would 'likely' spend about the same as its revenue (about EUR 1B) on AI chips and related infrastructure in 2026.",
      "source": {
       "title": "French AI firm Mistral expects Ksh.150 billion in 2026 revenue",
       "publisher": "AFP via Citizen Digital",
       "url": "https://citizen.digital/article/french-ai-firm-mistral-expects-ksh150-billion-in-2026-revenue-n376203",
       "date": "2026-01-23",
       "tier": "press"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Annual recurring revenue",
      "amount_usd_b": 0.4,
      "period": "February 2026",
      "note": "Passed US$400M, up from about US$20M a year earlier; target US$1B ARR by end-2026.",
      "source": {
       "title": "Mistral secures $830M from seven banks to build its own AI data centre",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/mistral-ai-830m-debt-data-centre-paris",
       "date": "2026-03-30",
       "tier": "press"
      }
     },
     {
      "metric": "2026 revenue target",
      "amount_usd_b": 1.17,
      "period": "FY2026 target",
      "note": "CEO: revenue 'should cross a billion [euros] by the end of the year.' A target, not a result. In Sept 2026 Mistral still projected passing 'a billion in annual recurring revenue' by end-2026 (currency not stated).",
      "source": {
       "title": "French AI firm Mistral expects Ksh.150 billion in 2026 revenue",
       "publisher": "AFP via Citizen Digital",
       "url": "https://citizen.digital/article/french-ai-firm-mistral-expects-ksh150-billion-in-2026-revenue-n376203",
       "date": "2026-01-23",
       "tier": "press"
      }
     }
    ],
    "commitments": [
     {
      "what": "Partner in 1.4 GW AI campus near Paris (joint venture led by MGX and Bpifrance, with Nvidia)",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "construction from H2 2026, operations by 2028",
      "counterparty": "mgx; Bpifrance; nvidia",
      "note": "Announced 2025-05-19. Capacity 'expected to ultimately' reach 1.4 GW. No investment amount and no Mistral stake disclosed.",
      "source": {
       "title": "MGX partners with Bpifrance, Mistral AI and NVIDIA to build Europe's largest AI campus in France",
       "publisher": "Abu Dhabi Media Office",
       "url": "https://www.mediaoffice.abudhabi/en/technology/mgx-partners-with-bpifrance-mistral-ai-and-nvidia-to-build-europes-largest-ai-campus-in-france/",
       "date": "2025-05-19",
       "tier": "primary"
      }
     },
     {
      "what": "Target of 200 MW of own compute capacity across Europe",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "by end-2027",
      "counterparty": null,
      "note": "Stated goal, not a contract.",
      "source": {
       "title": "France's Mistral raises $830 million in debt for AI data centre build-up",
       "publisher": "Reuters via Yahoo Finance",
       "url": "https://finance.yahoo.com/sectors/technology/articles/frances-mistral-raises-830-million-060341046.html",
       "date": "2026-03-30",
       "tier": "press"
      }
     }
    ],
    "concentration": [
     {
      "fact": "ASML held about 11% after Sept 2025, its largest shareholder at that time; post-Series D stakes not disclosed.",
      "source": {
       "title": "ASML confirms EUR 1.3 billion investment in French AI firm",
       "publisher": "DutchNews.nl",
       "url": "https://www.dutchnews.nl/2025/09/asml-confirms-e1-3-billion-investment-in-french-ai-firm",
       "date": "2025-09-09",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Total money in over 12 months: about US$5.5B equity (Sept 2025 + Sept 2026) plus US$0.83B debt, against stated data-center spending of EUR 4B (about US$4.7B) and 2026 revenue targeted at about EUR 1B.",
     "Euronews: most of the Series D goes to data centers and computing rather than software; Mistral plans to rent spare capacity to others.",
     "Mistral has relied on rented cloud capacity from Microsoft Azure, Google Cloud and CoreWeave (The Next Web, 2026-03-30); Euronews says Microsoft has agreed to fund capacity from its European network. Amounts not disclosed.",
     "Its biggest backers are chip-chain companies (ASML, Samsung, Nvidia), not cloud giants, unlike the US frontier labs.",
     "AI Lattice's existing source list records a €3B raise (TechCrunch, 2026-09-08). Could not reopen it in this pass, so no figure is entered."
    ]
   },
   "moonshot": {
    "period_note": "Rounds late 2025 to May 2026; revenue as of April 2026; a further round in talks June 2026. Not verified in this pass (web search limit reached).",
    "sources": [
     {
      "type": "equity_raised",
      "amount_usd_b": 2.0,
      "firm": true,
      "period": "May 2026",
      "from": "Meituan (Long-Z Investments, lead); Tsinghua Capital; China Mobile; CPE Yuanfeng",
      "note": "'About' US$2B at a US$20B valuation, per a post by financial adviser Huafeng Capital; Meituan's venture arm Long-Z confirmed it led. Per-investor amounts not disclosed. Huafeng says Moonshot raised US$3.9B in total over the prior six months.",
      "source": {
       "title": "China's Moonshot AI raises $2B at $20B valuation as demand for open source AI skyrockets",
       "publisher": "TechCrunch",
       "url": "https://techcrunch.com/2026/05/07/chinas-moonshot-ai-raises-2b-at-20b-valuation-as-demand-for-open-source-ai-skyrockets",
       "date": "2026-05-07",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 0.7,
      "firm": true,
      "period": "early 2026",
      "from": "not-named",
      "note": "US$700M raise that took valuation to US$10B (Bloomberg, as cited by TechCrunch). Valued at US$4.3B at end-2025.",
      "source": {
       "title": "China's Moonshot AI raises $2B at $20B valuation as demand for open source AI skyrockets",
       "publisher": "TechCrunch",
       "url": "https://techcrunch.com/2026/05/07/chinas-moonshot-ai-raises-2b-at-20b-valuation-as-demand-for-open-source-ai-skyrockets",
       "date": "2026-05-07",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 2.0,
      "firm": false,
      "period": "in talks, June 2026",
      "from": "not-named",
      "note": "Bloomberg: early talks to raise up to US$2B at about US$30B valuation, its third round in about half a year. Not confirmed closed.",
      "source": {
       "title": "Moonshot AI eyes US$2b funding round for US$30b valuation: Bloomberg",
       "publisher": "The Standard (HK), citing Bloomberg",
       "url": "https://www.thestandard.com.hk/innovation/article/334053/Moonshot-AI-eyes-US2b-funding-round-for-US30b-valuation-Bloomberg",
       "date": "2026-06-08",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "compute_contracts",
      "amount_usd_b": null,
      "firm": true,
      "period": "ongoing",
      "to": "alibaba-cloud",
      "note": "Reuters describes Alibaba as both an investor in and cloud supplier to Moonshot. No amount disclosed.",
      "source": {
       "title": "Alibaba's quarterly revenue up 9%, misses adjusted profit due to heavy AI spend",
       "publisher": "Reuters via BNN Bloomberg",
       "url": "https://www.bnnbloomberg.ca/business/company-news/2026/08/20/alibabas-quarterly-revenue-up-9-misses-adjusted-profit-due-to-heavy-ai-spend/",
       "date": "2026-08-20",
       "tier": "press"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Annual recurring revenue",
      "amount_usd_b": 0.2,
      "period": "April 2026",
      "note": "Topped US$200M, from paid subscriptions and API use, per the financial adviser's post (not company-reported).",
      "source": {
       "title": "China's Moonshot AI raises $2B at $20B valuation as demand for open source AI skyrockets",
       "publisher": "TechCrunch",
       "url": "https://techcrunch.com/2026/05/07/chinas-moonshot-ai-raises-2b-at-20b-valuation-as-demand-for-open-source-ai-skyrockets",
       "date": "2026-05-07",
       "tier": "press"
      }
     }
    ],
    "commitments": [],
    "concentration": [
     {
      "fact": "Existing backers include Alibaba and Tencent (plus HongShan, ZhenFund, IDG Capital, 5Y Capital), so China's two largest cloud/AI spenders are both shareholders.",
      "source": {
       "title": "China's Moonshot AI raises $2B at $20B valuation as demand for open source AI skyrockets",
       "publisher": "TechCrunch",
       "url": "https://techcrunch.com/2026/05/07/chinas-moonshot-ai-raises-2b-at-20b-valuation-as-demand-for-open-source-ai-skyrockets",
       "date": "2026-05-07",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Valuation went from about US$4.3B (end-2025) to US$20B (May 2026), with talks at US$30B in June: roughly 100x revenue run-rate at the May price.",
     "State-linked money is in the cap table: China Mobile (state-owned carrier) and Tsinghua Capital (university-linked).",
     "AI Lattice's existing source list records a $2B raise at a $20B valuation (TechCrunch, 2026-05-07). Could not reopen it in this pass, so no figure is entered."
    ]
   },
   "deepseek": {
    "period_note": "Self-funded by founder's hedge fund High-Flyer until June 2026; first outside round June 2026; second round in progress Oct 2026. Yuan converted using Reuters' own conversion (RMB 50B = US$7.4B, i.e. about 6.76 per dollar, June 2026). Not verified in this pass (web search limit reached).",
    "sources": [
     {
      "type": "equity_raised",
      "amount_usd_b": 7.4,
      "firm": true,
      "period": "first outside round, June 2026",
      "from": "Liang Wenfeng (founder); tencent; CATL; china-big-fund (via national AI fund); NetEase; JD.com",
      "note": "About RMB 50B at RMB 350-400B (US$52-59B) post-money valuation. Reuters (June 3) reported it as slated to close within weeks, from unnamed sources; later press (TNW, Oct 2026) describes it as raised. Founder Liang Wenfeng put in about RMB 20B of his own money, the largest single cheque, so roughly 40% is insider money. Tencent about RMB 10B, CATL about RMB 5B; China's national AI fund, NetEase and JD.com amounts not given. DeepSeek has not disclosed the round.",
      "source": {
       "title": "DeepSeek slated to draw $7 billion in maiden fundraising, sources say",
       "publisher": "Reuters via MarketScreener",
       "url": "https://www.marketscreener.com/news/deepseek-slated-to-draw-7-billion-in-maiden-fundraising-sources-say-ce7f5ddfd888f724",
       "date": "2026-06-03",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 12.0,
      "firm": false,
      "period": "second round, nearing close Oct 2026",
      "from": "tencent; CATL; others not named",
      "note": "Bloomberg: nearing at least RMB 80B (about US$12B), possibly close to RMB 100B; Tencent and CATL among the largest backers. Not announced or closed as of 2026-10-06. Reuters separately reported in Sept that DeepSeek hired CITIC Securities to prepare a possible Shanghai STAR Market listing.",
      "source": {
       "title": "DeepSeek reportedly nears $12bn funding round backed by Tencent and CATL",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/deepseek-12bn-funding-round-tencent-catl",
       "date": "2026-10-06",
       "tier": "press"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": null,
      "firm": true,
      "period": "2023 to mid-2026",
      "from": "High-Flyer (founder's quant hedge fund)",
      "note": "High-Flyer supplied DeepSeek's seed capital and computing resources; no outside money until June 2026. Amounts never disclosed. Source is secondary, relying on Bloomberg and Reuters.",
      "source": {
       "title": "DeepSeek froze funding round in July, now nearing $12 billion",
       "publisher": "Let's Data Science",
       "url": "https://letsdatascience.com/blog/deepseek-froze-funding-round-july-now-nearing-12-billion",
       "date": "2026-10-07",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "chip_purchases",
      "amount_usd_b": null,
      "firm": false,
      "period": "planned, timing depends on Huawei supply",
      "to": "huawei",
      "note": "Bloomberg: plans to install at least 160,000 Huawei Ascend 950DT accelerators in a data center under construction in Inner Mongolia, mainly to run (not train) its models. Cost not disclosed.",
      "source": {
       "title": "DeepSeek Plans Big Huawei AI Chip Order to Power New Data Center",
       "publisher": "Bloomberg",
       "url": "https://news.bgov.com/artificial-intelligence/deepseek-plans-big-huawei-ai-chip-order-to-power-new-data-center",
       "date": "2026-09-04",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "No revenue figure has been reported for DeepSeek.",
     "Investors other than the founder mostly hold stakes through a partnership Liang controls, with no voting rights or board seats (secondary source citing Reuters).",
     "A filing by luggage maker Anhui Korrun showed a fund it backs paid RMB 2.9B for an indirect 0.8265% stake, implying about RMB 351B (about US$52B) valuation (Reuters, via Silicon UK).",
     "Founder put in ~RMB 20B of the first ~RMB 50B round: much of the 'outside' raise is the owner's own money.",
     "No revenue, funding or spending figures found. Funded by its owner, the hedge fund High-Flyer; AI Lattice's existing sources note it plans to use Huawei Ascend chips (TechNode, 2026-09-07; not reopened here)."
    ]
   },
   "tencent": {
    "period_note": "Q2 2026 (April-June), reported 2026-08-12. Yuan converted at 6.7851 per dollar (Federal Reserve H.10, 2026-06-30, the rate Alibaba and Baidu use).",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 7.77,
      "firm": true,
      "period": "Q2 2026",
      "from": null,
      "note": "Cash from operations RMB 52.7B.",
      "source": {
       "title": "Tencent Announces 2026 Second Quarter Results",
       "publisher": "Tencent",
       "url": "https://www.tencent.com/wp-content/uploads/2026/08/Tencent-Announces-2026-Second-Quarter-Results.pdf",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 9.62,
      "firm": true,
      "period": "H1 2026 (Dec 31, 2025 to Jun 30, 2026)",
      "from": "banks-bond-market",
      "note": "Borrowings and notes payable rose from about RMB 387.7B to RMB 453.0B (+RMB 65.3B). Breakdown between loans and bonds not given in the release.",
      "source": {
       "title": "Tencent Announces 2026 Second Quarter Results",
       "publisher": "Tencent",
       "url": "https://www.tencent.com/wp-content/uploads/2026/08/Tencent-Announces-2026-Second-Quarter-Results.pdf",
       "date": "2026-08-12",
       "tier": "primary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 7.78,
      "firm": true,
      "period": "Q2 2026",
      "to": null,
      "note": "Capex RMB 52.8B, up 176% year on year. Free cash flow was negative RMB 13.8B; excluding prepayments for compute purchases it would have been RMB 37.6B, so roughly RMB 51B went to compute prepayments.",
      "source": {
       "title": "Tencent Announces 2026 Second Quarter Results",
       "publisher": "Tencent",
       "url": "https://www.tencent.com/wp-content/uploads/2026/08/Tencent-Announces-2026-Second-Quarter-Results.pdf",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 2.16,
      "firm": true,
      "period": "Q2 2026",
      "to": null,
      "note": "Bought back about 37.4M shares for about HK$16.9B (converted at about 7.83 HK$ per US$; approximate).",
      "source": {
       "title": "Tencent Announces 2026 Second Quarter Results",
       "publisher": "Tencent",
       "url": "https://www.tencent.com/wp-content/uploads/2026/08/Tencent-Announces-2026-Second-Quarter-Results.pdf",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 1.48,
      "firm": true,
      "period": "June 2026",
      "to": "deepseek",
      "note": "About RMB 10B in DeepSeek's first round (Reuters, sources; Tencent declined to comment). Also reported among the largest backers of the second round (amount not given). Also an existing Moonshot investor.",
      "source": {
       "title": "DeepSeek slated to draw $7 billion in maiden fundraising, sources say",
       "publisher": "Reuters via MarketScreener",
       "url": "https://www.marketscreener.com/news/deepseek-slated-to-draw-7-billion-in-maiden-fundraising-sources-say-ce7f5ddfd888f724",
       "date": "2026-06-03",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "Net cash fell to RMB 58.2B at June 30, 2026, down 22% year on year, even as total cash rose to RMB 511.2B; borrowing is funding part of the AI build.",
     "Management (call, Aug 12) described the heavy spending as concentrated in 2026-27 and said losses on new AI products rose from about RMB 8.8B in Q1 to about RMB 10.5B in Q2 (Inven Global, 2026-08-13: https://www.invenglobal.com/articles/24772/tencent-we-will-prioritize-ai-infrastructure-in-capital-allocation)."
    ]
   },
   "bytedance": {
    "period_note": "2026 capex plans as reported by press (company is private and does not publish figures). Figures are reports from unnamed sources and conflict.",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 50.0,
      "firm": false,
      "period": "2025 profit",
      "from": null,
      "note": "Bloomberg: ByteDance will pay for much of its 2026 spending from roughly US$50B of profit earned in 2025. Unaudited, from people familiar.",
      "source": {
       "title": "ByteDance Weighs Capex of as Much as $70 Billion in AI Push",
       "publisher": "Bloomberg",
       "url": "https://news.bloomberglaw.com/capital-markets/bytedance-weighs-capex-of-as-much-as-70-billion-in-ai-push",
       "date": "2026-05-27",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 70.0,
      "firm": false,
      "period": "2026 (under discussion)",
      "to": null,
      "note": "Bloomberg: discussing capex of 'as much as' US$70B in 2026, more than double 2025. Upper bound, not a commitment.",
      "source": {
       "title": "ByteDance Weighs Capex of as Much as $70 Billion in AI Push",
       "publisher": "Bloomberg",
       "url": "https://news.bloomberglaw.com/capital-markets/bytedance-weighs-capex-of-as-much-as-70-billion-in-ai-push",
       "date": "2026-05-27",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 30.0,
      "firm": false,
      "period": "2026 (plan as of May 2026)",
      "to": null,
      "note": "SCMP: 2026 capex raised to 'more than' RMB 200B (US$30B), up at least 25% from a preliminary RMB 160B plan (FT/Reuters, Dec 2025), partly due to higher memory chip prices; bigger share to domestic AI chips. Two unnamed sources. SCMP page undated; image path indicates 2026-05-08.",
      "source": {
       "title": "ByteDance raises 2026 capex by at least 25% amid AI boom, rising memory costs, sources say",
       "publisher": "South China Morning Post",
       "url": "https://scmp.com/tech/article/3352906/bytedance-raises-2026-capex-least-25-amid-ai-boom-rising-memory-costs-sources-say",
       "date": "2026-05-08",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "Reported 2026 capex ranges from about US$30B (SCMP, early May) to as much as US$70B (Bloomberg, late May); the gap may reflect different definitions (China-only AI capex vs total global capex). Neither is confirmed by ByteDance."
    ]
   },
   "china-big-fund": {
    "period_note": "Fund sizes are registered capital (money pledged, paid in over time), not money spent.",
    "sources": [
     {
      "type": "government",
      "amount_usd_b": 47.5,
      "firm": true,
      "period": "Big Fund Phase III, registered May 24, 2024",
      "from": "china-gov",
      "note": "Registered capital RMB 344B (Reuters' rate 7.2449). Ministry of Finance largest holder (17%, RMB 60B), China Development Bank Capital 10.5%, five big state banks about 6% each. Earlier phases: RMB 138.7B (2014) and RMB 204B (2019).",
      "source": {
       "title": "China sets up third fund with $47.5 bn to boost semiconductor industry",
       "publisher": "Reuters via Investing.com",
       "url": "https://investing.com/news/stock-market-news/china-sets-up-475-billion-state-fund-to-boost-semiconductor-industry-3457524",
       "date": "2024-05-27",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 8.2,
      "firm": true,
      "period": "fund approved 2025-01-17",
      "to": "National AI Industry Investment Fund",
      "note": "RMB 60.06B registered capital, controlled by Big Fund III with a Shanghai state asset manager; makes early-stage AI equity investments (SCMP conversion ~US$8.2B).",
      "source": {
       "title": "60b yuan AI giant up and running",
       "publisher": "The Standard (Hong Kong)",
       "url": "https://www.thestandard.com.hk/market/article/69564/60b-yuan-AI-giant-up-and-running",
       "date": "2025-01-21",
       "tier": "press"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": null,
      "firm": true,
      "period": "June 2026",
      "to": "deepseek",
      "note": "Reuters: China's national AI fund (main backer: the Big Fund) was in final talks to join DeepSeek's first round; amount not given.",
      "source": {
       "title": "DeepSeek slated to draw $7 billion in maiden fundraising, sources say",
       "publisher": "Reuters via MarketScreener",
       "url": "https://www.marketscreener.com/news/deepseek-slated-to-draw-7-billion-in-maiden-fundraising-sources-say-ce7f5ddfd888f724",
       "date": "2026-06-03",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": [
     "Past Big Fund investments include SMIC, Hua Hong, and Yangtze Memory (Reuters, 2024)."
    ]
   },
   "microsoft": {
    "period_note": "Latest quarter = fiscal Q1 2027 (July–Sept 2026, reported 2026-10-28). Microsoft's own Q1 FY27 earnings release and 10-Q on SEC could not be opened (repeated site errors) and microsoft.com is blocked here, so quarter cash-flow figures come from secondary write-ups and are marked. Debt, bond and prospectus figures are primary (SEC filings dated Oct 29, 2026). Latest quarter = fiscal Q1 2027 (July–Sept 2026, reported 2026-10-28). Full year = fiscal 2026 (July 2025–June 2026). Microsoft's own Q1 FY27 press release and 10-Q could not be opened (blocked); Q1 FY27 figures come from secondary write-ups of that release and are marked as such. Trailing-12-month cash flow not computed because the July–Sept 2025 base was not opened.",
    "sources": [
     {
      "type": "bonds",
      "amount_usd_b": 25.0,
      "firm": true,
      "period": "priced 2026-10-29, settles 2026-11-04",
      "from": "bond-market",
      "note": "CONFIRMED by Microsoft's own pricing term sheet: $25.0B in 10 pieces ($2.0B floating rate, $23.0B fixed). Maturities 2028 to 2066; fixed coupons from 4.85% (2028) to 6.35% (2066). Proceeds are for 'general corporate purposes, which may include... capital expenditures' (424B2). Press reports call it Microsoft's first bond sale since 2017.",
      "source": {
       "title": "Microsoft pricing term sheet (Form FWP) for $25B notes",
       "publisher": "Microsoft via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526439794/d799291dfwp.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     },
     {
      "type": "revenue",
      "amount_usd_b": 24.1,
      "firm": true,
      "period": "FY2026 (Jul 2025–Jun 2026)",
      "from": "openai",
      "note": "Revenue from commercial arrangements with OpenAI, including revenue-sharing payments. No Q1 FY27 figure found.",
      "source": {
       "title": "Microsoft 8-K exhibit 99.1, fiscal 2026 financial statements",
       "publisher": "Microsoft via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 182.935,
      "firm": true,
      "period": "FY2026 (Jul 2025–Jun 2026)",
      "from": null,
      "note": "Net cash from operations.",
      "source": {
       "title": "Microsoft Form 8-K Exhibit 99.1 (fiscal 2026 annual report items recast for new segments)",
       "publisher": "Microsoft via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "revenue",
      "amount_usd_b": 24.1,
      "firm": true,
      "period": "FY2026",
      "from": "openai",
      "note": "Revenue from commercial arrangements with OpenAI, including revenue-sharing payments. Microsoft also had $6.0B of receivables from OpenAI at June 30, 2026.",
      "source": {
       "title": "Microsoft Form 8-K Exhibit 99.1 (fiscal 2026 annual report items recast for new segments)",
       "publisher": "Microsoft via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 4.6,
      "firm": true,
      "period": "April 2026",
      "from": "bond-market",
      "note": "Not Microsoft's own debt: Blackstone-backed QTS sold a $4.6B debut high-grade bond (about $12.5B peak demand) for a Fayetteville, Georgia data center where Microsoft has signed on as tenant. Microsoft's lease payments service the debt.",
      "source": {
       "title": "Microsoft-Tied Data Center Bond Sale Draws $12.5 Billion Demand",
       "publisher": "Bloomberg",
       "url": "https://www.bloomberg.com/news/articles/2026-04-06/blackstone-backed-data-center-firm-qts-kicks-off-bond-sale",
       "date": "2026-04-06",
       "tier": "press"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 58.0,
      "firm": true,
      "period": "Q1 FY2027 (Jul–Sep 2026)",
      "from": null,
      "note": "Derived, not read from Microsoft's own statement: free cash flow $18.63B plus cash spent on property and equipment $39.37B (Microsoft defines free cash flow as operating cash flow minus cash spent on property and equipment). Both inputs come from secondary write-ups of the earnings release. Treat as approximate.",
      "source": {
       "title": "Microsoft earnings: Cloud growth overshadows CAPEX & FCF questions",
       "publisher": "XTB",
       "url": "https://www.xtb.com/en/market-analysis/microsoft-results-cloud-growth-overshadows-capex-questions",
       "date": "2026-10-28",
       "tier": "secondary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 25.0,
      "firm": false,
      "period": "announced ~2026-10-29",
      "from": "bond-market",
      "note": "Reportedly seeking at least $25B in a 10-part US bond sale, its first since 2017 (24/7 Wall St citing posts on X; a Reuters-syndicated page lists a Bloomberg headline 'Microsoft to raise US$25 billion in US bond sale'). Not confirmed from a filing or full press article; one post said 'up to $25 billion'.",
      "source": {
       "title": "Azure grew 48% in fiscal Q1 2027 as capex doubled to $39 billion",
       "publisher": "24/7 Wall St.",
       "url": "https://247wallst.com/cards/microsoft-q1-2027-earnings-msft-01m6223bcjxyqzvby9cw8yzzqb",
       "date": "2026-10-28",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 115.948,
      "firm": true,
      "period": "FY2026",
      "to": null,
      "note": "Additions to property and equipment (cash). Excludes assets acquired under finance leases.",
      "source": {
       "title": "Microsoft Form 8-K Exhibit 99.1 (fiscal 2026 annual report items recast for new segments)",
       "publisher": "Microsoft via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 48.716,
      "firm": true,
      "period": "FY2026",
      "to": null,
      "note": "$22.271B share repurchases plus $26.445B dividends (cash flow statement).",
      "source": {
       "title": "Microsoft Form 8-K Exhibit 99.1 (fiscal 2026 annual report items recast for new segments)",
       "publisher": "Microsoft via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 11.9,
      "firm": true,
      "period": "cumulative to June 30, 2026",
      "to": "openai",
      "note": "Funded part of a $13.0B total commitment to OpenAI; $1.1B not yet funded at June 30, 2026.",
      "source": {
       "title": "Microsoft Form 8-K Exhibit 99.1 (fiscal 2026 annual report items recast for new segments)",
       "publisher": "Microsoft via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": null,
      "firm": true,
      "period": "Q1 FY2027 (Jul–Sep 2026)",
      "to": null,
      "note": "NOT FOUND: Microsoft's headline 'capital expenditures including finance leases' for this quarter, and the finance-lease part on its own. In July 2026 Microsoft guided this quarter to 'more than $50 billion' on that wider measure (Reuters reported $50B vs analysts' $56.0B). If that guide was met, finance leases added would be roughly $10B+ on top of the $39.37B cash figure, but that is an inference, not a reported number.",
      "source": {
       "title": "Microsoft cloud forecast beats estimates driven by AI revenue (Reuters)",
       "publisher": "Reuters via The Standard (HK)",
       "url": "https://www.thestandard.com.hk/innovation/article/338641/Microsoft-cloud-forecast-beats-estimates-driven-by-AI-revenue-surpasses-US100-bln",
       "date": "2026-07-30",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 175.0,
      "firm": false,
      "period": "calendar 2026 guidance (reported basis, incl. finance leases)",
      "to": null,
      "note": "About $175B, down from about $190B in April 2026. Microsoft says the ~$15B drop is only the accounting change (see observations), not a cut in planned building: 'Outside of this useful life impact, our calendar year 2026 CapEx investment expectations remain unchanged' (CFO Amy Hood, July 29, 2026). Reaffirmed in October per secondary reports.",
      "source": {
       "title": "Microsoft holds line on AI spending plans",
       "publisher": "CFO Dive",
       "url": "https://www.cfodive.com/news/microsoft-holds-line-ai-spending-plans/826648/",
       "date": "2026-07-30",
       "tier": "press"
      }
     },
     {
      "type": "leases",
      "amount_usd_b": 329.1,
      "firm": false,
      "period": "signed as of June 30, 2026; start FY2027–FY2033",
      "to": null,
      "note": "Data-center leases signed but not yet started, terms 1–20 years; some depend on contract conditions being met. The Sept 30, 2026 figure is in the 10-Q, which could not be opened. These are not in capex until each lease starts, and leases now classed as operating will never appear in capex.",
      "source": {
       "title": "Microsoft cloud forecast beats estimates driven by AI revenue (Reuters)",
       "publisher": "Reuters via The Standard (HK)",
       "url": "https://www.thestandard.com.hk/innovation/article/338641/Microsoft-cloud-forecast-beats-estimates-driven-by-AI-revenue-surpasses-US100-bln",
       "date": "2026-07-30",
       "tier": "press"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 5.0,
      "firm": false,
      "period": "announced Nov 2025",
      "to": "anthropic",
      "note": "Microsoft agreed to invest up to $5B in Anthropic (Nvidia up to $10B) alongside Anthropic's $30B Azure commitment. 'Up to' amount; funded amount not found.",
      "source": {
       "title": "Microsoft investors sweat cloud giant's OpenAI exposure",
       "publisher": "The Register",
       "url": "https://www.theregister.com/2026/01/29/microsoft_earnings_q2_2026/",
       "date": "2026-01-29",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 39.37,
      "firm": true,
      "period": "Q1 FY2027 (Jul–Sep 2026)",
      "to": null,
      "note": "Cash spent on property and equipment, up 103% from a year earlier (about $19.4B in Jul–Sep 2025). This EXCLUDES data centers taken on through finance leases. Secondary write-ups of the earnings release; Microsoft's own statement could not be opened.",
      "source": {
       "title": "Microsoft earnings: Cloud growth overshadows CAPEX & FCF questions",
       "publisher": "XTB",
       "url": "https://www.xtb.com/en/market-analysis/microsoft-results-cloud-growth-overshadows-capex-questions",
       "date": "2026-10-28",
       "tier": "secondary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 41.0,
      "firm": true,
      "period": "Q4 FY2026 (Apr–Jun 2026)",
      "to": null,
      "note": "Shown for the definition: $41.0B 'capital expenditures including finance leases' = $35.8B cash spent on property and equipment + $5.6B of finance leases (mainly large data-center sites).",
      "source": {
       "title": "Microsoft Keeps AI Infrastructure Plan as Reported 2026 Capex Falls to $175 Billion",
       "publisher": "Let's Data Science",
       "url": "https://letsdatascience.com/news/microsoft-keeps-ai-infrastructure-plan-as-reported-2026-cape-1ce1ad02",
       "date": "2026-07-29",
       "tier": "secondary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 10.2,
      "firm": true,
      "period": "Q1 FY2027",
      "to": null,
      "note": "Dividends plus buybacks combined; split not given (secondary).",
      "source": {
       "title": "Azure grew 48% in fiscal Q1 2027 as capex doubled to $39 billion",
       "publisher": "24/7 Wall St.",
       "url": "https://247wallst.com/cards/microsoft-q1-2027-earnings-msft-01m6223bcjxyqzvby9cw8yzzqb",
       "date": "2026-10-29",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Microsoft Cloud revenue",
      "amount_usd_b": 214.4,
      "period": "FY2026",
      "note": "Up 27%; Azure revenue up 40% for the year.",
      "source": {
       "title": "Microsoft Form 8-K Exhibit 99.1 (fiscal 2026 annual report items recast for new segments)",
       "publisher": "Microsoft via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "metric": "Azure revenue growth",
      "amount_usd_b": 33.17,
      "period": "Q1 FY2027",
      "note": "Azure revenue about $33.17B, up 48% (XTB). Microsoft Cloud revenue $63.9B, up 30% (AI Weekly).",
      "source": {
       "title": "Microsoft earnings: Cloud growth overshadows CAPEX & FCF questions",
       "publisher": "XTB",
       "url": "https://www.xtb.com/en/market-analysis/microsoft-results-cloud-growth-overshadows-capex-questions",
       "date": "2026-10-28",
       "tier": "secondary"
      }
     },
     {
      "metric": "Azure and other cloud services growth",
      "amount_usd_b": null,
      "period": "Q1 FY2027",
      "note": "Azure grew 48% year on year (guided ~45% in constant currency). XTB puts Azure revenue at $33.17B; Microsoft does not normally report Azure dollars, so treat that figure with care.",
      "source": {
       "title": "Microsoft results: cloud growth overshadows capex questions",
       "publisher": "XTB",
       "url": "https://www.xtb.com/en/market-analysis/microsoft-results-cloud-growth-overshadows-capex-questions",
       "date": "2026-10-28",
       "tier": "secondary"
      }
     },
     {
      "metric": "Revenue from OpenAI arrangements",
      "amount_usd_b": 10.0,
      "period": "Q1 FY2027",
      "note": "About 11% of the quarter's $92.3B revenue, per a write-up citing TechCrunch's reading of the 10-Q. Receivables from OpenAI rose to $7.2B at Sept 30 from $6.0B at June 30.",
      "source": {
       "title": "Microsoft recorded $10 billion in revenue from OpenAI (citing TechCrunch on Microsoft's 10-Q)",
       "publisher": "Winzheng",
       "url": "https://www.winzheng.com/en/article/microsoft-openai-10-billion-revenue",
       "date": "2026-10-29",
       "tier": "secondary"
      }
     },
     {
      "metric": "AI business annual run rate",
      "amount_usd_b": 37.0,
      "period": "as of March 2026 quarter",
      "note": "Up 123% year on year, per Om Malik coverage cited by Let's Data Science; a run rate is the latest period annualized, not booked annual revenue.",
      "source": {
       "title": "Microsoft Discloses OpenAI Stakes and Gains (citing Microsoft 10-Q for March 2026 quarter)",
       "publisher": "Let's Data Science",
       "url": "https://www.letsdatascience.com/news/microsoft-discloses-openai-stakes-and-gains-f5d59916",
       "date": "2026-05-01",
       "tier": "secondary"
      }
     }
    ],
    "commitments": [
     {
      "what": "Undrawn OpenAI funding commitment",
      "amount_usd_b": 1.1,
      "firm": true,
      "horizon": "as of June 30, 2026",
      "counterparty": "openai",
      "note": "$13.0B committed, $11.9B funded.",
      "source": {
       "title": "Microsoft 8-K exhibit 99.1, fiscal 2026 financial statements",
       "publisher": "Microsoft via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "what": "Remaining OpenAI funding commitment",
      "amount_usd_b": 1.1,
      "firm": true,
      "horizon": "as of June 30, 2026",
      "counterparty": "openai",
      "note": "$13.0B committed minus $11.9B funded.",
      "source": {
       "title": "Microsoft Form 8-K Exhibit 99.1 (fiscal 2026 annual report items recast for new segments)",
       "publisher": "Microsoft via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "what": "OpenAI incremental Azure purchase commitment",
      "amount_usd_b": 250.0,
      "firm": true,
      "horizon": "multi-year (from Oct 2025 deal)",
      "counterparty": "openai",
      "note": "Part of the Oct 2025 recapitalization deal; Microsoft gave up its right of first refusal on OpenAI compute in return.",
      "source": {
       "title": "Microsoft investors sweat cloud giant's OpenAI exposure",
       "publisher": "The Register",
       "url": "https://www.theregister.com/2026/01/29/microsoft_earnings_q2_2026/",
       "date": "2026-01-29",
       "tier": "press"
      }
     },
     {
      "what": "Anthropic Azure compute commitment",
      "amount_usd_b": 30.0,
      "firm": true,
      "horizon": "multi-year (from Nov 2025 deal)",
      "counterparty": "anthropic",
      "note": "Plus support for up to 1 gigawatt of compute.",
      "source": {
       "title": "Microsoft investors sweat cloud giant's OpenAI exposure",
       "publisher": "The Register",
       "url": "https://www.theregister.com/2026/01/29/microsoft_earnings_q2_2026/",
       "date": "2026-01-29",
       "tier": "press"
      }
     },
     {
      "what": "Commercial remaining performance obligation (contracted backlog)",
      "amount_usd_b": 677.0,
      "firm": true,
      "horizon": "multi-year",
      "counterparty": "many customers; OpenAI largest",
      "note": "At Sept 30, 2026, up 73% from a year earlier; was $678B at June 30, 2026 (flat quarter on quarter). Secondary write-up of the release.",
      "source": {
       "title": "Azure grew 48% in fiscal Q1 2027 as capex doubled to $39 billion",
       "publisher": "24/7 Wall St.",
       "url": "https://247wallst.com/cards/microsoft-q1-2027-earnings-msft-01m6223bcjxyqzvby9cw8yzzqb",
       "date": "2026-10-29",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [
     {
      "fact": "Latest company-stated OpenAI share of backlog: about 45% of the $625B commercial backlog at Dec 31, 2025. No newer company figure found for Sept 30, 2026.",
      "source": {
       "title": "Microsoft earnings Q2 FY2026 (OpenAI 45% of backlog)",
       "publisher": "The Register",
       "url": "https://www.theregister.com/2026/01/29/microsoft_earnings_q2_2026/",
       "date": "2026-01-29",
       "tier": "press"
      }
     },
     {
      "fact": "CFO Amy Hood said backlog grew 25% year on year at June 30, 2026 when OpenAI is excluded (vs 84% total). From that, Benzinga estimates OpenAI at about 32% (~$218B) of the $678B, an outside estimate, not a Microsoft disclosure.",
      "source": {
       "title": "Microsoft's Backlog Just Hit $678B, Almost a Third Traces to a Single Customer",
       "publisher": "Benzinga via Webull",
       "url": "https://www.webull.com/news/15317720163771392",
       "date": "2026-07-30",
       "tier": "secondary"
      }
     },
     {
      "fact": "OpenAI revenue ($24.1B) was about 7% of Microsoft's FY2026 revenue ($331.8B).",
      "source": {
       "title": "Microsoft's Biggest AI Customer Is Also Its Biggest Risk",
       "publisher": "Nasdaq (Motley Fool)",
       "url": "https://www.nasdaq.com/articles/microsofts-biggest-ai-customer-also-its-biggest-risk",
       "date": "2026-09-22",
       "tier": "secondary"
      }
     },
     {
      "fact": "About 45% of Microsoft's $625B commercial backlog at Dec 31, 2025 was attributable to OpenAI; CFO called the remaining ~55% broad-based. A newer OpenAI share was not found.",
      "source": {
       "title": "Microsoft investors sweat cloud giant's OpenAI exposure",
       "publisher": "The Register",
       "url": "https://www.theregister.com/2026/01/29/microsoft_earnings_q2_2026/",
       "date": "2026-01-29",
       "tier": "press"
      }
     },
     {
      "fact": "Of the ~$50B rise in backlog in the April–June 2026 quarter, about $50B came from companies outside the leading US AI model makers (Reuters).",
      "source": {
       "title": "Microsoft sees strong cash flow, lower capex (Reuters)",
       "publisher": "Reuters via The Star",
       "url": "https://www.thestar.com.my/business/business-news/2026/07/31/microsoft-sees-strong-cash-flow-lower-capex",
       "date": "2026-07-31",
       "tier": "press"
      }
     },
     {
      "fact": "OpenAI-related revenue was about 11% of Microsoft revenue in July–Sept 2026 (secondary).",
      "source": {
       "title": "Microsoft recorded $10 billion in revenue from OpenAI (citing TechCrunch on Microsoft's 10-Q)",
       "publisher": "Winzheng",
       "url": "https://www.winzheng.com/en/article/microsoft-openai-10-billion-revenue",
       "date": "2026-10-29",
       "tier": "secondary"
      }
     }
    ],
    "observations": [
     "Microsoft confirmed a $25.0B, 10-part bond sale priced Oct 29, 2026 (settling Nov 4). Total debt was $35.5B at Sept 30, 2026 (prospectus capitalization table), so this lifts debt to roughly $60.5B (simple sum; before any repayments).",
     "The July 2026 accounting change, in plain words: Microsoft now assumes its data-center buildings last 25 years, not 15. Under US lease rules, a lease that covers most of an asset's life counts as a 'finance lease' (treated like buying the building, so it shows up in Microsoft's headline capex). With a longer assumed life, the same 15- or 20-year lease covers a smaller share of it, so more new data-center leases become 'operating leases', treated like rent. Rent never shows up as capex; it is paid out of operating cash flow instead. Result: reported capex falls (Microsoft put it at about $15B for calendar 2026: ~$190B to ~$175B) while the actual building plan is unchanged, and future operating cash flow is lower than it would otherwise be because the rent runs through it. Depreciation also falls, which Microsoft called a 'minimal' profit benefit in FY2027.",
     "Fiscal Q1 2027 free cash flow was $18.63B, 51% of net income versus 92% a year earlier (XTB). Cash capex ($39.37B) roughly doubled while revenue grew 19%.",
     "Even before the bond, Microsoft's operating cash (~$58B) still covered its cash capex (~$39B) this quarter, unlike Amazon and Meta, but the measure that includes finance leases, and the $329B of signed future leases, are not covered by that comparison.",
     "Microsoft owned about 27% of OpenAI after the Oct 2025 recapitalization (stake then valued ~$135B), ~25% at June 30, 2026 (filing) and ~24% at Sept 30, 2026 (secondary), diluted by OpenAI's later fundraising.",
     "Microsoft booked a $10B pre-tax gain on OpenAI in the Oct–Dec 2025 quarter from the recapitalization, after a $3.1B net-income hit from OpenAI losses in July–Sept 2025; fiscal 2026 net gains on OpenAI were $6.5B (adding $5.0B to net income).",
     "Total debt was only $40.3B at June 30, 2026, so Microsoft has funded the build-out mostly from operating cash; the reported ~$25B bond sale in Oct 2026 would be its first since 2017.",
     "Free cash flow is shrinking relative to profit: $18.63B in Q1 FY27, covering 51% of net income versus 92% a year earlier (XTB); Q4 FY26 free cash flow $19.6B was down 23% year on year (Reuters).",
     "Signed-but-not-started data center leases ($329.1B at June 30, 2026) are far larger than Microsoft's on-balance-sheet debt and are not counted in reported capex until the leases start.",
     "OpenAI is both an investee and Microsoft's biggest backlog customer: Microsoft's equity money and revenue share flow to OpenAI, and OpenAI's Azure purchases flow back as Microsoft revenue."
    ]
   },
   "apple": {
    "period_note": "Apple's fiscal Q4 2026 (quarter ended Sept 26, 2026) is NOT out yet: Apple reports on Nov 2, 2026. Latest data = nine months to June 27, 2026 (fiscal Q1–Q3 2026). Not researched: the shared web-search budget ran out before Apple could be covered, and its results page could not be opened.",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 116.996,
      "firm": true,
      "period": "9 months to June 27, 2026",
      "from": null,
      "note": "Up from $81.754B a year earlier. June 2026 quarter alone: $34.4B (CFO on call, secondary transcript).",
      "source": {
       "title": "Apple 8-K exhibit 99.1, Q3 fiscal 2026 results (quarter ended June 27, 2026)",
       "publisher": "Apple via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000320193/000032019326000018/a8-kex991q3202606272026.htm",
       "date": "2026-07-30",
       "tier": "primary"
      }
     },
     {
      "type": "revenue",
      "amount_usd_b": 20.0,
      "firm": false,
      "period": "2022 (estimate)",
      "from": "google",
      "note": "Not AI money but relevant to who pays whom: Google paid Apple an estimated $20B in 2022 to be Safari's default search engine (estimate from antitrust court documents; 'could be higher' in later years). A Sept 2025 ruling let these payments continue but limited deals to one year.",
      "source": {
       "title": "Apple dodged a $20 billion hit, thanks to Google antitrust ruling",
       "publisher": "Yahoo Finance",
       "url": "https://finance.yahoo.com/news/apple-dodged-a-20-billion-hit-thanks-to-google-antitrust-ruling-163056806.html",
       "date": "2025-09-03",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 6.799,
      "firm": true,
      "period": "9 months to June 27, 2026",
      "to": null,
      "note": "Total cash spent on property, plant and equipment, DOWN from $9.473B a year earlier. Apple does not split out AI capex.",
      "source": {
       "title": "Apple 8-K exhibit 99.1, Q3 fiscal 2026 results (quarter ended June 27, 2026)",
       "publisher": "Apple via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000320193/000032019326000018/a8-kex991q3202606272026.htm",
       "date": "2026-07-30",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 73.872,
      "firm": true,
      "period": "9 months to June 27, 2026",
      "to": null,
      "note": "$62.094B share buybacks + $11.778B dividends. Apple also repaid $8.146B of term debt and $5.911B (net) of commercial paper; no new term debt issued.",
      "source": {
       "title": "Apple 8-K exhibit 99.1, Q3 fiscal 2026 results (quarter ended June 27, 2026)",
       "publisher": "Apple via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0000320193/000032019326000018/a8-kex991q3202606272026.htm",
       "date": "2026-07-30",
       "tier": "primary"
      }
     },
     {
      "type": "compute_contracts",
      "amount_usd_b": 1.0,
      "firm": false,
      "period": "per year (reported)",
      "to": "google",
      "note": "Bloomberg (Nov 2025) reported Apple would pay 'roughly $1 billion annually' for a custom 1.2-trillion-parameter Gemini model; the companies were then 'finalizing' the deal. The Jan 12, 2026 joint statement confirmed a 'multi-year collaboration' with Gemini underpinning Apple's next models, running on Apple devices and Apple's own Private Cloud Compute, but disclosed no money terms.",
      "source": {
       "title": "Apple will reportedly pay Google $1 billion a year for Gemini-powered Siri (citing Bloomberg)",
       "publisher": "9to5Mac",
       "url": "https://9to5mac.com/2025/11/05/google-gemini-1-billion-deal-apple-siri/",
       "date": "2025-11-05",
       "tier": "press"
      }
     },
     {
      "type": "acquisitions",
      "amount_usd_b": 2.0,
      "firm": false,
      "period": "Jan 2026",
      "to": "Q.ai (Israel)",
      "note": "Apple bought Israeli AI audio/imaging startup Q.ai; price 'estimated to be worth $2 billion' per the Financial Times; not disclosed by Apple.",
      "source": {
       "title": "Apple buys Israeli startup Q.ai",
       "publisher": "Globes",
       "url": "https://en.globes.co.il/en/article-1001533520",
       "date": "2026-01-29",
       "tier": "press"
      }
     },
     {
      "type": "r_and_d",
      "amount_usd_b": 19.1,
      "firm": true,
      "period": "June 2026 quarter (total operating expenses)",
      "to": null,
      "note": "Operating expenses $19.1B, up 23%, 'driven by investments in R&D'. Tim Cook: Apple is 'spending more in AI... quite a bit more', with AI costs also in cost of sales. No AI-only figure given.",
      "source": {
       "title": "Apple (AAPL) Q3 2026 Earnings Call Transcript",
       "publisher": "Webull",
       "url": "https://www.webull.com/news/15364638775387136",
       "date": "2026-07-30",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [],
    "commitments": [
     {
      "what": "US investment pledge (manufacturing, suppliers, data centers, AI servers, R&D)",
      "amount_usd_b": 600.0,
      "firm": false,
      "horizon": "4 years from Aug 2025",
      "counterparty": "US suppliers and Apple's own sites",
      "note": "A pledge, not a contract: raised from $500B (Feb 2025) by a 'new $100 billion commitment'. Includes a 250,000 sq ft Houston AI-server factory and data-center expansion in North Carolina (on top of >$5B already invested in Catawba County), Iowa, Oregon and Nevada. No breakdown of how much is AI or data centers.",
      "source": {
       "title": "Apple increases U.S. commitment to $600 billion, announces ambitious program",
       "publisher": "Apple Newsroom",
       "url": "https://apple.com/newsroom/2025/08/apple-increases-us-commitment-to-600-billion-usd-announces-ambitious-program",
       "date": "2025-08-06",
       "tier": "primary"
      }
     },
     {
      "what": "Houston AI servers for Private Cloud Compute",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "shipping since Oct 2025",
      "counterparty": "Apple data centers",
      "note": "COO Sabih Khan: 'We are thrilled to be shipping American-made advanced servers from our Houston facility... these servers will be installed in our data centers' (part of the $600B pledge). No dollar figure.",
      "source": {
       "title": "Apple Starts Shipping its Made-in-America AI Servers, Beating 2026 Target",
       "publisher": "MacTrast",
       "url": "https://www.mactrast.com/2025/10/apple-starts-shipping-its-made-in-america-ai-servers-beating-2026-target/amp/",
       "date": "2025-10-24",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "Apple is the outlier among Big Tech: capex fell about 28% ($9.5B to $6.8B) in the nine months to June 2026, even though in Aug 2025 its CEO and CFO said capex would grow 'substantially' for AI servers and data centers.",
     "Apple spent about 11 times more on buybacks and dividends ($73.9B) than on capex ($6.8B) over those nine months, and was paying down debt rather than borrowing.",
     "Apple rents frontier AI rather than building it: it reportedly pays Google about $1B a year for Gemini, while Google pays Apple an estimated $20B a year (2022 figure) for search placement, so net money flows from Google to Apple.",
     "Cash and marketable securities were about $147B against about $84B of total debt at June 27, 2026."
    ]
   },
   "tesla": {
    "period_note": "Latest quarter = Q3 2026 (July–Sept 2026, reported 2026-10-21; 10-Q filed ~2026-10-22). Nine-month figures = Jan–Sept 2026. Not researched: the shared web-search budget ran out before Tesla could be covered.",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 14.897,
      "firm": true,
      "period": "9 months to Sep 2026",
      "from": null,
      "note": "Up from $10.934B a year earlier. Q3 2026 alone: $6.26B (Electrek).",
      "source": {
       "title": "Tesla Form 10-Q for quarter ended September 30, 2026",
       "publisher": "Tesla via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001318605/000162828026066775/tsla-20260930.htm",
       "date": "2026-10-22",
       "tier": "primary"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 5.834,
      "firm": true,
      "period": "9 months to Sep 2026",
      "from": null,
      "note": "Proceeds from debt issuances (vs $4.232B a year earlier). Total debt and finance leases $9.523B at Sept 30, 2026. CFO said Tesla has 'secured capacity to borrow up to $30 billion' to support capex growth (an 'up to' facility; amount drawn not stated).",
      "source": {
       "title": "Tesla Form 10-Q for quarter ended September 30, 2026",
       "publisher": "Tesla via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001318605/000162828026066775/tsla-20260930.htm",
       "date": "2026-10-22",
       "tier": "primary"
      }
     },
     {
      "type": "revenue",
      "amount_usd_b": 0.573,
      "firm": true,
      "period": "calendar 2025",
      "from": "spacexai",
      "note": "Tesla sales to Musk companies: $430.1M to xAI (mostly Megapack batteries) + $143.3M to SpaceX, per Tesla's amended annual filing as reported by Bloomberg.",
      "source": {
       "title": "Tesla Got $573 Million from SpaceX and xAI in 2025",
       "publisher": "CleanTechnica",
       "url": "https://cleantechnica.com/2026/05/01/tesla-got-573-million-from-spacex-and-xai-in-2025/",
       "date": "2026-05-01",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 13.014,
      "firm": true,
      "period": "9 months to Sep 2026",
      "to": null,
      "note": "Purchases of property and equipment excluding finance leases, net of sales, more than double the $6.134B a year earlier. Q3 2026 alone $4.73B (vs $2.25B). Tesla does not split out AI compute dollars; the 10-Q says 2026 spending is 'driven by our SI initiatives, including investments in compute infrastructure and data centers' (per Electrek). 'SI' is Tesla's label for its AI/autonomy work.",
      "source": {
       "title": "Tesla Form 10-Q for quarter ended September 30, 2026",
       "publisher": "Tesla via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001318605/000162828026066775/tsla-20260930.htm",
       "date": "2026-10-22",
       "tier": "primary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 2.002,
      "firm": true,
      "period": "9 months to Sep 2026",
      "to": "spacexai",
      "note": "Cash flow line 'Purchase of SpaceX equity investment'. This is the $2B Tesla agreed in Jan 2026 to put into xAI's $20B Series E; xAI then merged into SpaceX (Feb 2026), so Tesla holds SpaceX shares, carried at fair value. Unrealized gain $0.863B over nine months, but a $0.142B markdown in Q3.",
      "source": {
       "title": "Tesla Form 10-Q for quarter ended September 30, 2026",
       "publisher": "Tesla via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001318605/000162828026066775/tsla-20260930.htm",
       "date": "2026-10-22",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 20.0,
      "firm": false,
      "period": "FY2026 guidance",
      "to": null,
      "note": "'In excess of $20 billion' (10-Q) / 'approximately $20 billion' (CFO), cut from 'more than $25 billion' guided since April. Implies about $7B in Q4. CFO: capex 'would continue to expand' in coming years.",
      "source": {
       "title": "Tesla cuts 2026 capex guidance; Q3 cash flow",
       "publisher": "Electrek",
       "url": "https://electrek.co/2026/10/22/tesla-cuts-2026-capex-guidance-q3-cash-flow/?extended-comments=1",
       "date": "2026-10-22",
       "tier": "press"
      }
     },
     {
      "type": "chip_purchases",
      "amount_usd_b": 16.54,
      "firm": true,
      "period": "July 24, 2025 – Dec 31, 2033",
      "to": "samsung-foundry",
      "note": "Samsung disclosed a 22.76 trillion won ($16.54B) chip manufacturing and supply contract with an unnamed 'global tech company'; Musk confirmed it is Tesla. Correction to the brief: Musk said this contract is for the AI6 chip at Samsung's Texas fab, not AI5. AI5 is to be made by both TSMC and Samsung in the US.",
      "source": {
       "title": "Samsung foundry wins $16.5 bil. chip order from Tesla",
       "publisher": "The Korea Times",
       "url": "https://www.koreatimes.co.kr/business/tech-science/20250728/samsung-foundry-wins-165-bil-chip-order-from-tesla",
       "date": "2025-07-28",
       "tier": "press"
      }
     }
    ],
    "revenue": [],
    "commitments": [
     {
      "what": "AI5 chip production",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "not given",
      "counterparty": "tsmc-samsung-foundry",
      "note": "Musk (Oct 2025): AI5 'will be produced in the United States at facilities run by... Samsung and... TSMC'; surplus chips to go to Tesla data centers; Nvidia still used for training. No dollar value found for the TSMC part.",
      "source": {
       "title": "Tesla Says Newest AI Chip Will Be Made in US by Samsung and TSMC",
       "publisher": "TaiwanPlus",
       "url": "https://www.taiwanplus.com/news/world-news/americas/251023009/tesla-says-newest-ai-chip-will-be-made-in-us-by-samsung-and-tsmc",
       "date": "2025-10-23",
       "tier": "press"
      }
     },
     {
      "what": "AI training compute build-out (Cortex 1 and 2, Texas)",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "by end of 2026",
      "counterparty": null,
      "note": "Over 225 MW in production (Cortex 1 >105 MW, Cortex 2 >120 MW, plus 40 MW elsewhere); target 400 MW by year end. No dollar cost disclosed.",
      "source": {
       "title": "Tesla Plans 400 MW of AI Training Compute, From Over 225 MW",
       "publisher": "FourWeekMBA",
       "url": "https://fourweekmba.com/ai-tesla-plans-400-mw-of-ai-training-compute-from-over-225-mw/",
       "date": "2026-10-21",
       "tier": "secondary"
      }
     },
     {
      "what": "Terafab / Austin chip fab",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "equipment commissioning from 2027; 'tens of billions' by 2028",
      "counterparty": "spacexai-cost-split-undecided",
      "note": "Musk: 'certainly in the tens of billions' and 'north of $100 billion long term'; split with SpaceX not yet decided. CFO: Tesla's share becomes 'noticeable in the tens of billions in 28'; most equipment for the first research fab already ordered.",
      "source": {
       "title": "Transcript: Tesla (TSLA) Q3 2026 earnings call",
       "publisher": "The Singju Post",
       "url": "https://singjupost.com/transcript-tesla-tsla-q3-2026-earnings-call/",
       "date": "2026-10-21",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "Tesla's AI build is still funded from its own cash: nine-month operating cash $14.9B vs capex $13.0B, leaving ~$1.9B free cash flow; Q3 free cash flow $1.53B. Cash and short-term investments $45.4B vs $9.5B debt.",
     "Tesla cut 2026 capex guidance from >$25B to ~$20B, but signals much larger spending from 2027–2028 for Terafab and robotaxi fleet, backed by up to $30B of new borrowing capacity.",
     "Money circulates between Musk companies: Tesla put $2.0B into xAI (now SpaceX) despite a shareholder vote that failed once abstentions were counted, while xAI/SpaceX bought about $1B of Tesla products since 2024 (mostly Megapacks), and Tesla billed SpaceX $588M for undelivered Megapacks still unpaid at Sept 30, 2026."
    ]
   },
   "amazon": {
    "period_note": "Latest quarter = Q3 2026 (July–Sept 2026, reported 2026-10-29). TTM = 12 months to Sept 30, 2026 as reported by Amazon. The 10-Q could not be opened, so lease commitments and Anthropic carrying value are missing.",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 168.3,
      "firm": true,
      "period": "TTM to Sep 2026",
      "from": null,
      "note": "Up 29% from $130.7B a year earlier. Q3 2026 alone: $42.422B.",
      "source": {
       "title": "Amazon.com Announces Third Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000038/amzn-20260930xex991.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 130.027,
      "firm": true,
      "period": "TTM to Sep 2026",
      "from": "bond-market",
      "note": "Proceeds from long-term debt; $48.102B of it in Q3 2026 alone. Long-term debt rose to $173.1B at Sept 30, 2026 from $65.6B at Dec 31, 2025. Exact bond dates/sizes not opened.",
      "source": {
       "title": "Amazon.com Announces Third Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000038/amzn-20260930xex991.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     },
     {
      "type": "asset_sales",
      "amount_usd_b": null,
      "firm": true,
      "period": "Q2 2026",
      "from": "anthropic",
      "note": "Not cash: Amazon booked $53.4B of pre-tax non-operating income in Q2 2026 'primarily from our investments in Anthropic' (a paper revaluation, not a sale). It also booked $9.5B of Anthropic gains in Q3 2025. Amount left null because no cash was received.",
      "source": {
       "title": "Amazon.com Announces Second Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000024/amzn-20260630xex991.htm",
       "date": "2026-06-30",
       "tier": "primary",
       "date_inferred": true
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 77.259,
      "firm": true,
      "period": "Q3 2026",
      "to": null,
      "note": "Gross purchases of property and equipment ($75.9B net of proceeds and incentives). Nine months 2026 gross: $175.7B. Amazon says the increase 'primarily reflects investments in artificial intelligence.'",
      "source": {
       "title": "Amazon.com Announces Third Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000038/amzn-20260930xex991.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 210.657,
      "firm": true,
      "period": "TTM to Sep 2026",
      "to": null,
      "note": "Purchases of property and equipment net of proceeds, up 82%.",
      "source": {
       "title": "Amazon.com Announces Third Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000038/amzn-20260930xex991.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 220.0,
      "firm": false,
      "period": "FY2026 guidance",
      "to": null,
      "note": "'Approximately $220B' of 2026 cash capex (raised from ~$200B in July 2026, which Amazon tied partly to higher memory prices).",
      "source": {
       "title": "Amazon.com Announces Third Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000038/amzn-20260930xex991.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     },
     {
      "type": "leases",
      "amount_usd_b": 1.681,
      "firm": true,
      "period": "TTM to Sep 2026",
      "to": null,
      "note": "Principal repayments of finance leases (plus $0.333B of financing obligations). Leases signed but not yet started were not found in a source we could open.",
      "source": {
       "title": "Amazon.com Announces Third Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000038/amzn-20260930xex991.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 0.0,
      "firm": true,
      "period": "Q3 2026",
      "to": null,
      "note": "No share repurchases; Amazon pays no dividend.",
      "source": {
       "title": "Amazon.com Announces Third Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000038/amzn-20260930xex991.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "AWS segment sales",
      "amount_usd_b": 45.984,
      "period": "Q3 2026",
      "note": "Up 39% year on year; AWS operating income $17.773B.",
      "source": {
       "title": "Amazon.com Announces Third Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000038/amzn-20260930xex991.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     },
     {
      "metric": "AWS sales",
      "amount_usd_b": 42.2,
      "period": "Q2 2026",
      "note": "Up 37%, fastest since 2021.",
      "source": {
       "title": "Amazon capital spending (Q2 2026 results)",
       "publisher": "Silicon UK",
       "url": "https://www.silicon.co.uk/ai-2/amazon-capital-spending-630955/amp",
       "date": "2026",
       "tier": "press",
       "date_inferred": true
      }
     }
    ],
    "commitments": [
     {
      "what": "Anthropic and OpenAI compute commitments",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "multi-year",
      "counterparty": "anthropic-openai",
      "note": "Amazon says both labs are 'making multi-year, multi-gigawatt commitments' tied to Trainium chips. Dollar amounts not given.",
      "source": {
       "title": "Amazon.com Announces Second Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000024/amzn-20260630xex991.htm",
       "date": "2026-06-30",
       "tier": "primary",
       "date_inferred": true
      }
     },
     {
      "what": "AWS backlog",
      "amount_usd_b": 495.0,
      "firm": true,
      "horizon": "multi-year",
      "counterparty": "many incl. Anthropic, OpenAI",
      "note": "As of the June 2026 quarter; Sept 30 figure not found.",
      "source": {
       "title": "Amazon capital spending (Q2 2026 results)",
       "publisher": "Silicon UK",
       "url": "https://www.silicon.co.uk/ai-2/amazon-capital-spending-630955/amp",
       "date": "2026",
       "tier": "press",
       "date_inferred": true
      }
     }
    ],
    "concentration": [
     {
      "fact": "Amazon names Anthropic and OpenAI as making multi-year, multi-gigawatt AWS commitments, but discloses no customer share of backlog.",
      "source": {
       "title": "Amazon.com Announces Second Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000024/amzn-20260630xex991.htm",
       "date": "2026-06-30",
       "tier": "primary",
       "date_inferred": true
      }
     },
     {
      "fact": "Q3 2026: new AWS agreements signed with Meta, NVIDIA, OpenAI, Salesforce, Oracle, Qualcomm, Verizon, ADP and others.",
      "source": {
       "title": "Amazon.com Announces Third Quarter Results (Form 8-K Exhibit 99.1)",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001018724/000101872426000038/amzn-20260930xex991.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     }
    ],
    "observations": [
     "Free cash flow was an outflow of $42.4B for the 12 months to Sept 2026 (was -$7.6B to June 2026); capex ($210.7B) exceeded operating cash flow ($168.3B).",
     "The gap is being filled with debt: $130.0B of long-term debt raised in 12 months; interest expense rose to $1.691B in Q3 2026 from $0.538B a year earlier.",
     "Q2 2026 net income of $62.6B was inflated by $53.4B of mostly Anthropic-related paper gains; Amazon's investment in Anthropic is being marked up while Anthropic spends on AWS.",
     "Q4 2026 guidance: sales $240–247B, operating income $28.5–33.5B."
    ]
   },
   "google": {
    "period_note": "Latest quarter = Q3 2026 (July–Sept 2026, reported 2026-10-28). TTM = 12 months to Sept 30, 2026 as reported in the release. The 10-Q (backlog, leases, Anthropic stake) could not be opened.",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 179.551,
      "firm": true,
      "period": "TTM to Sep 2026",
      "from": null,
      "note": "Q3 2026 alone: $42.290B.",
      "source": {
       "title": "Alphabet Announces Third Quarter 2026 Results (earnings release PDF)",
       "publisher": "Alphabet Investor Relations",
       "url": "https://s206.q4cdn.com/479360582/files/doc_financials/2026/q3/2026q3-alphabet-earnings-release.pdf",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 85.222,
      "firm": true,
      "period": "9 months to Sep 2026",
      "from": "bond-market",
      "note": "Proceeds from issuance of debt, net of costs ($28.996B in Q3); repayments $8.879B over nine months. Long-term debt $125.1B at Sept 30, 2026. Individual deal dates/currencies not opened.",
      "source": {
       "title": "Alphabet Announces Third Quarter 2026 Results (earnings release PDF)",
       "publisher": "Alphabet Investor Relations",
       "url": "https://s206.q4cdn.com/479360582/files/doc_financials/2026/q3/2026q3-alphabet-earnings-release.pdf",
       "date": "2026-10-28",
       "tier": "primary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 51.355,
      "firm": true,
      "period": "Q3 2026",
      "to": null,
      "note": "Purchases of property and equipment.",
      "source": {
       "title": "Alphabet Announces Third Quarter 2026 Results (earnings release PDF)",
       "publisher": "Alphabet Investor Relations",
       "url": "https://s206.q4cdn.com/479360582/files/doc_financials/2026/q3/2026q3-alphabet-earnings-release.pdf",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 159.804,
      "firm": true,
      "period": "TTM to Sep 2026",
      "to": null,
      "note": "",
      "source": {
       "title": "Alphabet Announces Third Quarter 2026 Results (earnings release PDF)",
       "publisher": "Alphabet Investor Relations",
       "url": "https://s206.q4cdn.com/479360582/files/doc_financials/2026/q3/2026q3-alphabet-earnings-release.pdf",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 2.936,
      "firm": true,
      "period": "Q3 2026",
      "to": null,
      "note": "Dividends only; share repurchases were $0 in Q3 2026.",
      "source": {
       "title": "Alphabet Announces Third Quarter 2026 Results (earnings release PDF)",
       "publisher": "Alphabet Investor Relations",
       "url": "https://s206.q4cdn.com/479360582/files/doc_financials/2026/q3/2026q3-alphabet-earnings-release.pdf",
       "date": "2026-10-28",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 205.0,
      "firm": false,
      "period": "FY2026 guidance",
      "to": null,
      "note": "Range $195–205B (raised in July 2026 from $180–190B). Upper end shown.",
      "source": {
       "title": "AI infrastructure demand pushes Alphabet's 2026 capex guidance to US$205 billion",
       "publisher": "W.Media",
       "url": "https://w.media/ai-infrastructure-demand-pushes-alphabets-2026-capex-guidance-to-us-205-billion/",
       "date": "2026-07-23",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": null,
      "firm": false,
      "period": "FY2027",
      "to": null,
      "note": "Alphabet 'expects CapEx to increase significantly again in 2027' (July 2026 call). An Oct 2026 secondary write-up says Alphabet signaled 2027 capex will top $300B; we could not confirm the exact wording, so amount left null.",
      "source": {
       "title": "Alphabet Q2 2026 earnings call addendum",
       "publisher": "Converge Digest",
       "url": "https://convergedigest.com/?p=113826",
       "date": "2026-07-22",
       "tier": "press"
      }
     },
     {
      "type": "compute_contracts",
      "amount_usd_b": null,
      "firm": true,
      "period": "Q3 2026",
      "to": null,
      "note": "Alphabet said it would rent more third-party compute capacity in Q3 2026 as a 'temporary bridge'; amount not disclosed.",
      "source": {
       "title": "Alphabet Q2 2026 earnings call addendum",
       "publisher": "Converge Digest",
       "url": "https://convergedigest.com/?p=113826",
       "date": "2026-07-22",
       "tier": "press"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Google Cloud revenue",
      "amount_usd_b": 30.709,
      "period": "Q3 2026",
      "note": "Operating income $11.121B. Growth reported as 103% year on year by AI Weekly; Q2 2026 Cloud revenue was $24.8B (+82%).",
      "source": {
       "title": "Alphabet Announces Third Quarter 2026 Results (earnings release PDF)",
       "publisher": "Alphabet Investor Relations",
       "url": "https://s206.q4cdn.com/479360582/files/doc_financials/2026/q3/2026q3-alphabet-earnings-release.pdf",
       "date": "2026-10-28",
       "tier": "primary"
      }
     }
    ],
    "commitments": [
     {
      "what": "Google Cloud backlog",
      "amount_usd_b": 560.8,
      "firm": true,
      "horizon": "just over 55% within 24 months",
      "counterparty": "many (Anthropic share not disclosed)",
      "note": "At September 30, 2026, up from $513.9B at June 30. Includes $16.8B with Crux AI, a joint venture Alphabet accounts for as a related party.",
      "source": {
       "title": "Alphabet Form 10-Q, quarter ended September 30, 2026",
       "publisher": "Alphabet via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001652044/000165204426000084/goog-20260930.htm",
       "date": "2026-10-29",
       "tier": "primary"
      }
     }
    ],
    "concentration": [
     {
      "fact": "Most revenue from current TPU system agreements (customer-installed TPU systems, first recognized in Q2 2026) is expected to arrive in 2027. Customer names and Anthropic's share of backlog not disclosed in sources we opened.",
      "source": {
       "title": "Alphabet Q2 2026 earnings call addendum",
       "publisher": "Converge Digest",
       "url": "https://convergedigest.com/?p=113826",
       "date": "2026-07-22",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Unlike Amazon and Meta, Alphabet still had positive free cash flow over 12 months ($19.7B TTM) but it was negative in Q3 2026 (-$9.1B), the first quarter where capex exceeded operating cash flow in our data.",
     "Alphabet stopped buybacks in Q3 2026 ($0) and raised $85.2B of debt in nine months while holding $265.1B of cash and marketable securities.",
     "Q3 2026 included an $8.664B loss on equity securities (vs a $10.7B gain a year earlier), cutting EPS by $0.55; the release does not name the holdings."
    ]
   },
   "meta": {
    "period_note": "Latest quarter = Q3 2026 (July–Sept 2026, reported 2026-10-21). Nine months = Jan–Sept 2026. TTM not computed (Q4 2025 base not opened).",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 32.786,
      "firm": true,
      "period": "Q3 2026",
      "from": null,
      "note": "Nine months 2026: $96.873B.",
      "source": {
       "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
       "publisher": "Meta Platforms via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
       "date": "2026-10-21",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 24.91,
      "firm": true,
      "period": "9 months to Sep 2026",
      "from": "bond-market",
      "note": "Net proceeds from long-term debt. Matches the ~$20–25B, up-to-six-part bond sale Bloomberg reported Meta was preparing on 2026-04-30. Long-term debt rose to $80.9B at Sept 30, 2026 from $58.7B at Dec 31, 2025. Meta also sold $30B of bonds in late 2025.",
      "source": {
       "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
       "publisher": "Meta Platforms via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
       "date": "2026-10-21",
       "tier": "primary"
      }
     },
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 27.3,
      "firm": true,
      "period": "Oct 2025",
      "from": "blue-owl",
      "note": "Hyperion (Louisiana) joint venture: 80% owned by Blue Owl funds, 20% by Meta; the JV (Beignet Investor) sold ~$27.3B of bonds due 2049 at 6.58% (Pimco bought $18B); Blue Owl put in about $3B of equity. Debt sits off Meta's balance sheet; Meta leases the campus in 4-year blocks and gives a residual value guarantee (pays investors if it walks away).",
      "source": {
       "title": "Three AI Megadeals Are Breaking New Ground on Wall Street (WSJ, republished)",
       "publisher": "Wall Street Journal via Tiger Brokers",
       "url": "https://www.itiger.com/hant/news/2582394141",
       "date": "2025-11-11",
       "tier": "press"
      }
     },
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 12.0,
      "firm": false,
      "period": "reported July 2026",
      "from": "blackrock",
      "note": "El Paso, Texas data center: a BlackRock-backed vehicle ('Sopaipilla Investor', 80%; Meta 20%) was reportedly preparing ~$12B of bonds due 2048, backed by Meta's 20-year lease from 2028; investors wanted yields above 7%. 'Reportedly'; closing not confirmed.",
      "source": {
       "title": "Meta's Latest AI Data Center Debt Raise Could Reportedly Cost More Than Its 2025 Record Deal (citing Financial Times)",
       "publisher": "Stocktwits",
       "url": "https://stocktwits.com/news-articles/markets/equity/meta-s-latest-ai-data-center-debt-raise-could-reportedly-cost-more-than-its-2025-record-deal/cZZYrCsR7yK",
       "date": "2026-07-24",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 34.91,
      "firm": true,
      "period": "Q3 2026",
      "to": null,
      "note": "Includes $0.964B of finance-lease principal. Nine months 2026: $85.82B.",
      "source": {
       "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
       "publisher": "Meta Platforms via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
       "date": "2026-10-21",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 145.0,
      "firm": false,
      "period": "FY2026 guidance",
      "to": null,
      "note": "Range $135–145B including finance-lease principal (narrowed from $130–145B). Upper end shown. Implies $49–59B in Q4 2026.",
      "source": {
       "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
       "publisher": "Meta Platforms via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
       "date": "2026-10-21",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": null,
      "firm": false,
      "period": "FY2027",
      "to": null,
      "note": "Meta expects to keep investing aggressively in 2027; budget still being set; no number given.",
      "source": {
       "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
       "publisher": "Meta Platforms via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
       "date": "2026-10-21",
       "tier": "primary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 2.544,
      "firm": true,
      "period": "9 months to Sep 2026",
      "to": null,
      "note": "Payments for non-marketable equity investments ($0.874B in Q3). Non-marketable equity holdings total $32.6B at Sept 30, 2026; investees not named in the release.",
      "source": {
       "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
       "publisher": "Meta Platforms via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
       "date": "2026-10-21",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 4.06,
      "firm": true,
      "period": "9 months to Sep 2026",
      "to": null,
      "note": "Dividends only ($1.361B in Q3); no share repurchases in 2026 (Q3 2025 buybacks were $3.3B).",
      "source": {
       "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
       "publisher": "Meta Platforms via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
       "date": "2026-10-21",
       "tier": "primary"
      }
     },
     {
      "type": "other",
      "amount_usd_b": 9.9,
      "firm": true,
      "period": "2026",
      "to": null,
      "note": "Legal charge tied to an agreement with US state attorneys general; included in 2026 expense guidance of $175–179B.",
      "source": {
       "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
       "publisher": "Meta Platforms via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
       "date": "2026-10-21",
       "tier": "primary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Total revenue (ad business that funds AI spend)",
      "amount_usd_b": 64.601,
      "period": "Q3 2026",
      "note": "Up 26%. Meta does not report separate AI revenue.",
      "source": {
       "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
       "publisher": "Meta Platforms via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
       "date": "2026-10-21",
       "tier": "primary"
      }
     }
    ],
    "commitments": [
     {
      "what": "Hyperion lease and residual value guarantee",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "~16-year guarantee; leases up to ~20 years",
      "counterparty": "blue-owl",
      "note": "Meta must make investors whole if it does not renew; guarantee size not given in sources opened.",
      "source": {
       "title": "The Meta/Blue Owl deal broken down: off-balance-sheet gymnastics 24 years after Enron",
       "publisher": "IFR",
       "url": "https://www.ifre.com/opinion/2363199/the-metablue-owl-deal-broken-down-off-balance-sheet-gymnastics-24-years-after-enron",
       "date": "2026",
       "tier": "press",
       "date_inferred": true
      }
     }
    ],
    "concentration": [],
    "observations": [
     "Q3 2026 capex ($34.91B) exceeded operating cash flow ($32.79B): free cash flow was -$2.12B versus +$10.6B a year earlier.",
     "Meta stopped buybacks in 2026 and added ~$22B of on-balance-sheet debt in nine months, on top of ~$27B (Hyperion) and a reported ~$12B (El Paso) of off-balance-sheet project debt.",
     "S&P rated the Hyperion bonds A+ (one notch below Meta's AA-) because the deal depends on Meta's lease and guarantee; the El Paso deal reportedly priced ~0.4 points wider than Hyperion.",
     "Net debt including lease liabilities was $29.6B at Q3 2026 (Hargreaves Lansdown); cash and marketable securities $82.45B."
    ]
   },
   "oracle": {
    "period_note": "Latest quarter = fiscal Q1 2027 (June–Aug 2026, reported ~2026-09-10). Full year = fiscal 2026 (June 2025–May 2026). Oracle's next quarter (Sept–Nov 2026) is not yet reported.",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 23.103,
      "firm": true,
      "period": "Q1 FY2027 (Jun–Aug 2026)",
      "from": null,
      "note": "Record, but inflated by customer prepayments (ERP Today).",
      "source": {
       "title": "Oracle Corp Form 10-Q for quarter ended August 31, 2026",
       "publisher": "Oracle via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001341439/000119312526389274/orcl-20260831.htm",
       "date": "2026-08-31",
       "tier": "primary",
       "date_inferred": true
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 19.909,
      "firm": true,
      "period": "Q1 FY2027 (Jun–Aug 2026)",
      "from": null,
      "note": "141M shares sold under the $20B at-the-market program, now fully used.",
      "source": {
       "title": "Oracle Corp Form 10-Q for quarter ended August 31, 2026",
       "publisher": "Oracle via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001341439/000119312526389274/orcl-20260831.htm",
       "date": "2026-08-31",
       "tier": "primary",
       "date_inferred": true
      }
     },
     {
      "type": "customer_prepayment",
      "amount_usd_b": null,
      "firm": true,
      "period": "Q1 FY2027",
      "from": null,
      "note": "Oracle says the 'vast majority' of $30B+ of new AI contracts use customer prepayments, customer-supplied hardware or similar structures that 'will not require incremental capital from Oracle'. Amount not disclosed.",
      "source": {
       "title": "Oracle's $664 Billion Backlog Comes With a New Financing Model",
       "publisher": "ERP Today",
       "url": "https://erp.today/oracle-q1-fy27-results-664b-backlog-ai-contracts/",
       "date": "2026-09-11",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 5.0,
      "firm": true,
      "period": "Feb 2026",
      "from": null,
      "note": "Mandatory convertible preferred stock (converts to common shares).",
      "source": {
       "title": "US$50bn funding blitz shows Oracle's market access and its vulnerability",
       "publisher": "IFR",
       "url": "https://www.ifre.com/bonds/2381048/us50bn-funding-blitz-shows-oracles-market-access-and-its-vulnerability",
       "date": "2026-02-07",
       "tier": "press"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 25.0,
      "firm": true,
      "period": "Feb 2026",
      "from": "bond-market",
      "note": "Senior bonds; >$125B of orders, described as the largest corporate bond order book ever. Part of a $45–50B 2026 plan split roughly half debt, half equity.",
      "source": {
       "title": "US$50bn funding blitz shows Oracle's market access and its vulnerability",
       "publisher": "IFR",
       "url": "https://www.ifre.com/bonds/2381048/us50bn-funding-blitz-shows-oracles-market-access-and-its-vulnerability",
       "date": "2026-02-07",
       "tier": "press"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 18.0,
      "firm": true,
      "period": "Sep 2025",
      "from": "bond-market",
      "note": "Six-tranche bond sale referenced by IFR.",
      "source": {
       "title": "US$50bn funding blitz shows Oracle's market access and its vulnerability",
       "publisher": "IFR",
       "url": "https://www.ifre.com/bonds/2381048/us50bn-funding-blitz-shows-oracles-market-access-and-its-vulnerability",
       "date": "2026-02-07",
       "tier": "press"
      }
     },
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 38.0,
      "firm": true,
      "period": "Nov 2025",
      "from": "banks",
      "note": "'Jacquard' bank loans (~$23B + ~$15B, 5-year, ~6.4%) to Vantage Data Centers for two Stargate campuses in Texas and Wisconsin; Oracle has a 15-year lease; JPMorgan and MUFG lead 30+ lenders. Debt is on the developer, not Oracle.",
      "source": {
       "title": "Three AI Megadeals Are Breaking New Ground on Wall Street (WSJ, republished)",
       "publisher": "Wall Street Journal via Tiger Brokers",
       "url": "https://www.itiger.com/hant/news/2582394141",
       "date": "2025-11-11",
       "tier": "press"
      }
     },
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 18.0,
      "firm": true,
      "period": "Nov 2025",
      "from": "banks",
      "note": "Debt (loans plus likely bonds) for an Oracle-affiliated New Mexico data center developed by STACK Infrastructure; led by SMBC, MUFG, BNP Paribas, Goldman Sachs. Described as 'would include bonds' at the time.",
      "source": {
       "title": "Banks prep series of multibillion-dollar debt offerings for Oracle",
       "publisher": "Octus",
       "url": "https://octus.com/resources/articles/banks-prep-series-of-multibillion-dollar-debt-offerings-for-oracle/",
       "date": "2025-11-11",
       "tier": "press"
      }
     },
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 16.3,
      "firm": true,
      "period": "Apr 2026",
      "from": "pimco",
      "note": "Saline Township, Michigan Stargate campus: ~$14B bonds (Pimco bought ~$10B) plus ~$2B equity from Related Digital and Blackstone; secured on the campus, not Oracle's balance sheet; US banks stepped back.",
      "source": {
       "title": "Oracle needed the world's biggest bond fund to finance the world's biggest data centre",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/oracle-data-centre-16-billion-financing-stargate",
       "date": "2026-04-25",
       "tier": "press"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 32.0,
      "firm": true,
      "period": "FY2026",
      "from": null,
      "note": "Up 54% (Motley Fool).",
      "source": {
       "title": "Oracle Just Hit a Fresh 52-Week Low and Had Its Credit Cut Toward Junk",
       "publisher": "The Motley Fool",
       "url": "https://www.fool.com/investing/2026/07/19/oracle-just-hit-a-fresh-52-week-low-and-had-its-cr/",
       "date": "2026-07-19",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 28.499,
      "firm": true,
      "period": "Q1 FY2027",
      "to": null,
      "note": "",
      "source": {
       "title": "Oracle Corp Form 10-Q for quarter ended August 31, 2026",
       "publisher": "Oracle via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001341439/000119312526389274/orcl-20260831.htm",
       "date": "2026-08-31",
       "tier": "primary",
       "date_inferred": true
      }
     },
     {
      "type": "leases",
      "amount_usd_b": 288.0,
      "firm": true,
      "period": "signed as of Aug 31, 2026; start Q2 FY2027–FY2029",
      "to": null,
      "note": "Leases not yet started, 'substantially all related to data center arrangements', terms 15–19 years. These are the payments that service partner debt (Vantage, STACK, Related).",
      "source": {
       "title": "Oracle Corp Form 10-Q for quarter ended August 31, 2026",
       "publisher": "Oracle via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001341439/000119312526389274/orcl-20260831.htm",
       "date": "2026-08-31",
       "tier": "primary",
       "date_inferred": true
      }
     },
     {
      "type": "chip_purchases",
      "amount_usd_b": 34.15,
      "firm": true,
      "period": "multi-year",
      "to": null,
      "note": "Unconditional purchase obligations, mainly cloud hardware components and data-center power; $5.449B due in rest of FY2027.",
      "source": {
       "title": "Oracle Corp Form 10-Q for quarter ended August 31, 2026",
       "publisher": "Oracle via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001341439/000119312526389274/orcl-20260831.htm",
       "date": "2026-08-31",
       "tier": "primary",
       "date_inferred": true
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 95.0,
      "firm": false,
      "period": "FY2027 guidance",
      "to": null,
      "note": "Range $90–95B, unchanged. Upper end shown.",
      "source": {
       "title": "Oracle's $664 Billion Backlog Comes With a New Financing Model",
       "publisher": "ERP Today",
       "url": "https://erp.today/oracle-q1-fy27-results-664b-backlog-ai-contracts/",
       "date": "2026-09-11",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 55.66,
      "firm": true,
      "period": "FY2026",
      "to": null,
      "note": "Up ~162%.",
      "source": {
       "title": "Oracle Just Hit a Fresh 52-Week Low and Had Its Credit Cut Toward Junk",
       "publisher": "The Motley Fool",
       "url": "https://www.fool.com/investing/2026/07/19/oracle-just-hit-a-fresh-52-week-low-and-had-its-cr/",
       "date": "2026-07-19",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Oracle Cloud Infrastructure (OCI) revenue",
      "amount_usd_b": 7.4,
      "period": "Q1 FY2027",
      "note": "Up 121%; total cloud revenue $11.6B (+62%); total revenue $19.3B (+30%).",
      "source": {
       "title": "Oracle's $664 Billion Backlog Comes With a New Financing Model",
       "publisher": "ERP Today",
       "url": "https://erp.today/oracle-q1-fy27-results-664b-backlog-ai-contracts/",
       "date": "2026-09-11",
       "tier": "press"
      }
     }
    ],
    "commitments": [
     {
      "what": "Remaining performance obligations (backlog)",
      "amount_usd_b": 664.0,
      "firm": true,
      "horizon": "~13% in 12 months, 37% in months 13–36, 34% in months 37–60, rest later",
      "counterparty": "openai-and-others",
      "note": "At Aug 31, 2026; up $209B in a year. Customers named in Feb 2026: AMD, Meta, NVIDIA, OpenAI, TikTok, xAI.",
      "source": {
       "title": "Oracle Corp Form 10-Q for quarter ended August 31, 2026",
       "publisher": "Oracle via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001341439/000119312526389274/orcl-20260831.htm",
       "date": "2026-08-31",
       "tier": "primary",
       "date_inferred": true
      }
     }
    ],
    "concentration": [
     {
      "fact": "Roughly half of the $664B backlog is tied to OpenAI (implied ~$330B); the non-OpenAI part more than doubled in a year.",
      "source": {
       "title": "Oracle's $664 Billion Backlog Comes With a New Financing Model",
       "publisher": "ERP Today",
       "url": "https://erp.today/oracle-q1-fy27-results-664b-backlog-ai-contracts/",
       "date": "2026-09-11",
       "tier": "press"
      }
     },
     {
      "fact": "OpenAI is the end user of the Vantage Texas/Wisconsin campuses under a ~$300B purchase agreement with Oracle (WSJ, Nov 2025).",
      "source": {
       "title": "Three AI Megadeals Are Breaking New Ground on Wall Street (WSJ, republished)",
       "publisher": "Wall Street Journal via Tiger Brokers",
       "url": "https://www.itiger.com/hant/news/2582394141",
       "date": "2025-11-11",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Free cash flow: about -$23.7B in FY2026 and -$5.4B in Q1 FY2027 (vs -$0.36B a year earlier); Oracle would not say when it turns positive. S&P projects a ~$42B deficit in FY2027.",
     "Total borrowings $125.3B at Aug 31, 2026; quarterly interest expense $1.4B, up 55%.",
     "S&P cut Oracle to BBB- (one notch above junk) on 2026-07-09 citing mounting debt and sharply negative cash flow; Moody's outlook negative.",
     "Oracle 5-year credit default swaps (the price of insuring its debt) hit ~203 basis points on 2026-07-20, the highest since records began in 2008 (ICE data via Thairath); a secondary source puts it at 215 on 2026-07-27, up from 144 at the start of 2026.",
     "Developers and their lenders have reported financings for four Oracle/OpenAI Stargate sites (Texas $22.75B loan closed, Wisconsin $14.75B facility, New Mexico about $18B of loans, Michigan about $16B of bonds and equity). These are of different kinds and dates, are not Oracle debt, and are repaid from Oracle's leases ($288B signed, not started), so Oracle's real obligations exceed its $125B of reported debt.",
     "Chain of dependence: lenders fund developers -> Oracle leases sites -> OpenAI pays Oracle; Oracle does not disclose OpenAI's share of its backlog; OpenAI's contract is reported at about $300B (outside estimate)."
    ]
   },
   "anthropic": {
    "period_note": "Public S-1 filed 2026-10-26 (full years 2023-2025 and first half 2026, six months to June 30, 2026). Q3 2026 revenue and run-rate figures come from press reports of what Anthropic told investors. The SEC site could not be opened in this pass, so S-1 figures are taken from press coverage of the filing. Compute commitment figures differ between the confidential draft (reported by Reuters in September) and the public S-1 (reported in October); both are shown and labeled.",
    "sources": [
     {
      "type": "revenue",
      "amount_usd_b": 16.3,
      "firm": true,
      "period": "H1 2026",
      "from": null,
      "note": "Revenue for the six months to June 30, 2026, per the S-1; up from $1.2B in H1 2025.",
      "source": {
       "title": "Anthropic officially files for its public debut",
       "publisher": "TechCrunch",
       "url": "https://techcrunch.com/2026/10/26/anthropic-officially-files-for-its-public-debut/",
       "date": "2026-10-26",
       "tier": "press"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 3.93,
      "firm": true,
      "period": "H1 2026",
      "from": null,
      "note": "Cash from operations was positive in H1 2026. Capital spending was $0.482B, leaving free cash flow of about $3.45B (Fortune's figures from the S-1). H1 2025 operating cash flow was about -$1.5B (secondary source: HackerNoon).",
      "source": {
       "title": "Anthropic S-1 IPO filing: financials and profits",
       "publisher": "Fortune",
       "url": "https://fortune.com/2026/10/27/anthropic-s1-ipo-filing-financials-profits/",
       "date": "2026-10-27",
       "tier": "press"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 10.0,
      "firm": true,
      "period": "Apr 2026",
      "from": "google",
      "note": "Google committed $10B in cash at a $350B valuation.",
      "source": {
       "title": "Google plans to invest up to $40 billion in Anthropic (Bloomberg via Reuters)",
       "publisher": "Cyprus Mail",
       "url": "https://www.cyprus-mail.com/2026/04/24/google-plans-to-invest-up-to-40-billion-in-anthropic",
       "date": "2026-04-24",
       "tier": "press"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 30.0,
      "firm": false,
      "period": "Apr 2026 onward",
      "from": "google",
      "note": "Up to $30B more, conditional on Anthropic meeting performance targets. Total Google package is 'up to $40B'.",
      "source": {
       "title": "Google plans to invest up to $40 billion in Anthropic (Bloomberg via Reuters)",
       "publisher": "Cyprus Mail",
       "url": "https://www.cyprus-mail.com/2026/04/24/google-plans-to-invest-up-to-40-billion-in-anthropic",
       "date": "2026-04-24",
       "tier": "press"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 5.0,
      "firm": true,
      "period": "Apr 2026",
      "from": "amazon",
      "note": "Amazon's additional $5B, on top of $8B invested earlier.",
      "source": {
       "title": "Amazon to invest $25B in Anthropic as part of expanded cloud partnership",
       "publisher": "SiliconANGLE",
       "url": "https://siliconangle.com/2026/04/20/amazon-invest-25b-anthropic-part-expanded-cloud-partnership/",
       "date": "2026-04-20",
       "tier": "press"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 20.0,
      "firm": false,
      "period": "later, date not given",
      "from": "amazon",
      "note": "Up to $20B more at an unspecified later date (total 'up to $25B'). The S-1 names Amazon Web Services as a holder of convertible notes (per HackerNoon, secondary).",
      "source": {
       "title": "Amazon to invest $25B in Anthropic as part of expanded cloud partnership",
       "publisher": "SiliconANGLE",
       "url": "https://siliconangle.com/2026/04/20/amazon-invest-25b-anthropic-part-expanded-cloud-partnership/",
       "date": "2026-04-20",
       "tier": "press"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 15.0,
      "firm": false,
      "period": "announced Nov 2025",
      "from": "microsoft-and-nvidia",
      "note": "Microsoft and Nvidia together committed to invest 'up to' $15B, as part of Anthropic's next funding round. The source does not give the split between them.",
      "source": {
       "title": "Microsoft, Nvidia to invest up to $15 billion in Anthropic",
       "publisher": "Bloomberg News",
       "url": "https://news.bloomberglaw.com/tech-and-telecom-law/microsoft-nvidia-to-invest-as-much-as-15-billion-in-anthropic",
       "date": "2025-11-18",
       "tier": "press"
      }
     },
     {
      "type": "vendor_financing",
      "amount_usd_b": 42.0,
      "firm": false,
      "period": "from 2026, tied to a five-year chip lease",
      "from": "broadcom",
      "note": "Broadcom agreed to lend 'up to' $42B through notes that can convert into Anthropic shares, to help pay for a $125.2B five-year lease of Google TPU computing capacity (could cover about a third). Broadcom may bring in a financing partner. Anthropic does not expect any notes to be sold before its IPO.",
      "source": {
       "title": "Exclusive: Broadcom to lend Anthropic up to $42 billion to lease its chips, filing says (Reuters)",
       "publisher": "The Star / Reuters",
       "url": "https://www.thestar.com.my/tech/tech-news/2026/10/01/exclusive-broadcom-to-lend-anthropic-up-to-42-billion-to-lease-its-chips-filing-says",
       "date": "2026-10-01",
       "tier": "press"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 5.0,
      "firm": false,
      "period": "not stated",
      "from": "amd",
      "note": "AMD agreed to buy up to $5B of Anthropic stock (per Reuters' read of the confidential draft prospectus).",
      "source": {
       "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
       "publisher": "Business Day / Reuters",
       "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
       "date": "2026-09-29",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 100.0,
      "firm": false,
      "period": "IPO, expected mid-November 2026",
      "from": "stock-market",
      "note": "Fortune reports an expected raise of about $100B at a hoped-for $1.8T-$2.0T valuation. Not priced; the S-1 leaves the amount blank. Other reports put investor views closer to $1.5T.",
      "source": {
       "title": "Anthropic S-1 IPO filing: financials and profits",
       "publisher": "Fortune",
       "url": "https://fortune.com/2026/10/27/anthropic-s1-ipo-filing-financials-profits/",
       "date": "2026-10-27",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 30.0,
      "firm": true,
      "period": "Feb 2026",
      "from": "GIC, Coatue and others",
      "note": "Series G at a $380B post-money valuation, led by GIC (Singapore sovereign fund) and Coatue. Reported to include money from Microsoft and Nvidia (not confirmed in the source opened).",
      "source": {
       "title": "Anthropic raises $30B Series G at $380B post-money valuation",
       "publisher": "Orrick",
       "url": "https://www.orrick.com/en/News/2026/02/Anthropic-Raises-30B-Series-G-at-380B-Post-Money-Valuation",
       "date": "2026-02-17",
       "tier": "secondary"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 65.0,
      "firm": true,
      "period": "May 2026",
      "from": "Altimeter, Dragoneer, Greenoaks, Sequoia and others",
      "note": "Series H at a $965B post-money valuation, led by Altimeter, Dragoneer, Greenoaks and Sequoia. The source does not split cash from other forms.",
      "source": {
       "title": "Anthropic raises $65B Series H at $965B post-money valuation",
       "publisher": "Orrick",
       "url": "https://www.orrick.com/en/News/2026/05/Anthropic-Raises-65B-Series-H-at-965B-Post-Money-Valuation",
       "date": "2026-05-29",
       "tier": "secondary"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 141.1,
      "firm": true,
      "period": "cumulative through June 30, 2026",
      "from": null,
      "note": "Total raised since founding, per the S-1 as summarized by a secondary source. Includes preferred stock, convertible notes and SAFEs.",
      "source": {
       "title": "Anthropic's S-1 shows $16.3B in half-year revenue, a 900% NRR and an $80.7B loss that mostly isn't",
       "publisher": "HackerNoon",
       "url": "https://hackernoon.com/anthropics-s-1-shows-$163b-in-half-year-revenue-a-900percent-nrr-and-an-$807b-loss-that-mostly-isnt",
       "date": "2026-10-26",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "compute_contracts",
      "amount_usd_b": 8.9,
      "firm": true,
      "period": "H1 2026",
      "to": null,
      "note": "Compute and infrastructure operating expense, up about 300% from H1 2025 ($2.3B). Anthropic books compute as an operating expense, not cost of revenue.",
      "source": {
       "title": "Anthropic S-1 shows it is at the hyperscalers' mercy",
       "publisher": "The Stack",
       "url": "https://www.thestack.technology/anthropic-s-1-shows-it-is-at-the-hyperscalers-mercy/",
       "date": "2026-10-26",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 0.482,
      "firm": true,
      "period": "H1 2026",
      "to": null,
      "note": "Anthropic owns little hardware itself; it mostly rents.",
      "source": {
       "title": "Anthropic S-1 IPO filing: financials and profits",
       "publisher": "Fortune",
       "url": "https://fortune.com/2026/10/27/anthropic-s1-ipo-filing-financials-profits/",
       "date": "2026-10-27",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 50.0,
      "firm": false,
      "period": "announced Nov 2025; sites coming online through 2026",
      "to": "fluidstack",
      "note": "Announced $50B investment in custom data centers in Texas and New York, built with Fluidstack. An announced plan; contract terms not disclosed.",
      "source": {
       "title": "Anthropic announces $50 billion data center plan (TechCrunch)",
       "publisher": "Yahoo Finance / TechCrunch",
       "url": "https://finance.yahoo.com/news/anthropic-announces-50-billion-data-155247322.html",
       "date": "2025-11-12",
       "tier": "press"
      }
     },
     {
      "type": "compute_contracts",
      "amount_usd_b": 7.33,
      "firm": true,
      "period": "FY2025",
      "to": null,
      "note": "Compute and infrastructure spending in 2025, about three times 2024.",
      "source": {
       "title": "Anthropic IPO: $518 billion compute commitments",
       "publisher": "Sovereign Magazine",
       "url": "https://www.sovereignmagazine.com/article/anthropic-ipo-518-billion-compute-commitments",
       "date": "2026-09",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Revenue",
      "amount_usd_b": 16.3,
      "period": "H1 2026",
      "note": "About 14 times H1 2025 ($1.16B).",
      "source": {
       "title": "Anthropic officially files for its public debut",
       "publisher": "TechCrunch",
       "url": "https://techcrunch.com/2026/10/26/anthropic-officially-files-for-its-public-debut/",
       "date": "2026-10-26",
       "tier": "press"
      }
     },
     {
      "metric": "Revenue",
      "amount_usd_b": 4.73,
      "period": "Q1 2026",
      "note": "From documents shared with prospective investors.",
      "source": {
       "title": "Anthropic revenue surges to over $11.5 billion in second quarter",
       "publisher": "Bloomberg News",
       "url": "https://news.bgov.com/artificial-intelligence/anthropic-revenue-surges-to-over-11-5-billion-in-second-quarter",
       "date": "2026-08-14",
       "tier": "press"
      }
     },
     {
      "metric": "Revenue",
      "amount_usd_b": 11.5,
      "period": "Q2 2026",
      "note": "'More than' $11.5B, preliminary; Q2 2025 was $0.787B. Adjusted operating income was positive (about $0.559B per FT, via AI Weekly).",
      "source": {
       "title": "Anthropic revenue surges to over $11.5 billion in second quarter",
       "publisher": "Bloomberg News",
       "url": "https://news.bgov.com/artificial-intelligence/anthropic-revenue-surges-to-over-11-5-billion-in-second-quarter",
       "date": "2026-08-14",
       "tier": "press"
      }
     },
     {
      "metric": "Revenue",
      "amount_usd_b": 16.8,
      "period": "Q3 2026",
      "note": "What Anthropic told prospective investors (WSJ, via VKTR); up 45% from Q2. The public S-1 leaves Q3 blank.",
      "source": {
       "title": "Anthropic's S-1 shows $16.3B in revenue and a compute squeeze from its own partners",
       "publisher": "VKTR",
       "url": "https://www.vktr.com/ai-market/anthropics-s1-shows-163b-in-revenue-and-compute-squeeze/",
       "date": "2026-10-21",
       "tier": "press"
      }
     },
     {
      "metric": "Annualized revenue run-rate",
      "amount_usd_b": 65.0,
      "period": "end of July 2026",
      "note": "'Topped' $65B, per a person familiar. Was about $9B at end-2025, over $30B in April 2026, about $47B in May 2026. The S-1 defines run-rate as last-28-days usage fees x 13 plus monthly subscriptions x 12.",
      "source": {
       "title": "Anthropic revenue run rate tops $65 billion, source says (Reuters)",
       "publisher": "The Star / Reuters",
       "url": "https://www.thestar.com.my/tech/tech-news/2026/08/18/anthropic-revenue-run-rate-tops-65-billion-source-says",
       "date": "2026-08-18",
       "tier": "press"
      }
     },
     {
      "metric": "Revenue projection",
      "amount_usd_b": 195.0,
      "period": "2028",
      "note": "Reported range of roughly $190B-$200B for 2028 (midpoint shown).",
      "source": {
       "title": "Anthropic revenue run rate tops $65 billion, source says (Reuters)",
       "publisher": "The Star / Reuters",
       "url": "https://www.thestar.com.my/tech/tech-news/2026/08/18/anthropic-revenue-run-rate-tops-65-billion-source-says",
       "date": "2026-08-18",
       "tier": "press"
      }
     },
     {
      "metric": "Business share of revenue",
      "amount_usd_b": null,
      "period": "2025 (as of Nov 2025 projections)",
      "note": "Corporate customers were about 80% of revenue, per documents seen by the WSJ. The S-1 coverage reviewed did not give a consumer vs business/API split.",
      "source": {
       "title": "OpenAI cash burn, annual losses through 2028, profitable by 2030 (citing WSJ)",
       "publisher": "Fortune",
       "url": "https://www.fortune.com/2025/11/12/openai-cash-burn-rate-annual-losses-2028-profitable-2030-financial-documents",
       "date": "2025-11-12",
       "tier": "press"
      }
     },
     {
      "metric": "Revenue",
      "amount_usd_b": 4.585,
      "period": "FY2025",
      "note": "Up from $0.386B in 2024 and $0.041B in 2023 (S-1, as summarized by a secondary source).",
      "source": {
       "title": "Anthropic's S-1 shows $16.3B in half-year revenue, a 900% NRR and an $80.7B loss that mostly isn't",
       "publisher": "HackerNoon",
       "url": "https://hackernoon.com/anthropics-s-1-shows-$163b-in-half-year-revenue-a-900percent-nrr-and-an-$807b-loss-that-mostly-isnt",
       "date": "2026-10-26",
       "tier": "secondary"
      }
     }
    ],
    "commitments": [
     {
      "what": "Total compute and infrastructure commitments (public S-1)",
      "amount_usd_b": 657.0,
      "firm": false,
      "horizon": "mostly through 2030, remainder 2031-2045",
      "counterparty": "multiple-about-eight-or-nine-contracts",
      "note": "Fortune's tally from the public S-1: $657B total, of which $498B (76%) cannot be cancelled. Fortune estimates the non-cancellable part at roughly $70B a year if most contracts run seven years or less.",
      "source": {
       "title": "Anthropic S-1 IPO filing: financials and profits",
       "publisher": "Fortune",
       "url": "https://fortune.com/2026/10/27/anthropic-s1-ipo-filing-financials-profits/",
       "date": "2026-10-27",
       "tier": "press"
      }
     },
     {
      "what": "Non-cancellable portion of compute commitments (public S-1)",
      "amount_usd_b": 498.0,
      "firm": true,
      "horizon": "mostly through 2030-2033",
      "counterparty": "multiple",
      "note": "Payable regardless of how much computing Anthropic actually uses.",
      "source": {
       "title": "Anthropic S-1 IPO filing: financials and profits",
       "publisher": "Fortune",
       "url": "https://fortune.com/2026/10/27/anthropic-s1-ipo-filing-financials-profits/",
       "date": "2026-10-27",
       "tier": "press"
      }
     },
     {
      "what": "Total cloud and data center commitments (confidential draft)",
      "amount_usd_b": 518.0,
      "firm": false,
      "horizon": "about a decade",
      "counterparty": "Google, Amazon, Microsoft, Broadcom, SpaceXAI, AMD",
      "note": "'At least' $518B in the draft seen by Reuters; about 80% non-cancellable. Superseded by the public S-1 total above, which added deals signed after June.",
      "source": {
       "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
       "publisher": "Business Day / Reuters",
       "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
       "date": "2026-09-29",
       "tier": "press"
      }
     },
     {
      "what": "Google Cloud capacity",
      "amount_usd_b": 111.1,
      "firm": true,
      "horizon": "Apr 2026 - Jul 2033",
      "counterparty": "google",
      "note": "'At least' $111.1B, payable regardless of usage; Anthropic pays any shortfall. The public S-1 reports at least about $114.5B, April 2026 to July 2033.",
      "source": {
       "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
       "publisher": "Business Day / Reuters",
       "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
       "date": "2026-09-29",
       "tier": "press"
      }
     },
     {
      "what": "AWS capacity",
      "amount_usd_b": 110.0,
      "firm": true,
      "horizon": "May 2026 - Apr 2036",
      "counterparty": "amazon",
      "note": "Terms similar to Google's (payable regardless of usage). Announced in April 2026 as 'over $100B over the next decade' for up to 5 GW, including Trainium chips.",
      "source": {
       "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
       "publisher": "Business Day / Reuters",
       "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
       "date": "2026-09-29",
       "tier": "press"
      }
     },
     {
      "what": "Microsoft Azure capacity",
      "amount_usd_b": 31.4,
      "firm": true,
      "horizon": "Nov 2026 - May 2033",
      "counterparty": "microsoft",
      "note": "Cancellable only if Microsoft breaches and fails to fix it. Started as a $30B Azure commitment in Nov 2025. The public S-1 reports at least $44.9B, November 2026 to May 2033, so it was enlarged.",
      "source": {
       "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
       "publisher": "Business Day / Reuters",
       "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
       "date": "2026-09-29",
       "tier": "press"
      }
     },
     {
      "what": "Equipment lease obligations for Broadcom-built Google TPU systems",
      "amount_usd_b": 161.2,
      "firm": true,
      "horizon": "no end date given",
      "counterparty": "broadcom",
      "note": "Excludes interest; neither side can cancel except on default. Includes the $125.2B five-year TPU lease that Broadcom's up-to-$42B convertible loan helps finance.",
      "source": {
       "title": "Anthropic S-1 shows it is at the hyperscalers' mercy",
       "publisher": "The Stack",
       "url": "https://www.thestack.technology/anthropic-s-1-shows-it-is-at-the-hyperscalers-mercy/",
       "date": "2026-10-26",
       "tier": "press"
      }
     },
     {
      "what": "AMD compute",
      "amount_usd_b": 20.0,
      "firm": false,
      "horizon": "not stated",
      "counterparty": "amd",
      "note": "Expected to 'exceed' $20B; cancellation terms not reported.",
      "source": {
       "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
       "publisher": "Business Day / Reuters",
       "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
       "date": "2026-09-29",
       "tier": "press"
      }
     },
     {
      "what": "Nscale and Lambda GPU rentals",
      "amount_usd_b": 86.0,
      "firm": false,
      "horizon": "through 2033-2034",
      "counterparty": "Nscale, Lambda",
      "note": "'Up to' $86B combined, per a draft S-1 viewed by the WSJ (via VKTR). The same report says deals worth up to $150B more were still being negotiated.",
      "source": {
       "title": "Anthropic's S-1 shows $16.3B in revenue and a compute squeeze from its own partners",
       "publisher": "VKTR",
       "url": "https://www.vktr.com/ai-market/anthropics-s1-shows-163b-in-revenue-and-compute-squeeze/",
       "date": "2026-10-21",
       "tier": "press"
      }
     },
     {
      "what": "SpaceXAI compute (Colossus 1 and 2, Nvidia GPUs)",
      "amount_usd_b": 120.5,
      "firm": false,
      "horizon": "through 2029",
      "counterparty": "spacexai",
      "note": "'Up to' $120.5B maximum contract value in the public S-1 (via analyst posts; secondary). Non-cancellable periods end Jan and Mar 2027; after that either side can exit on 90 days' notice. The draft said up to $84.5B; SpaceX's own S-1 described $1.25B a month through May 2029 (about $45B).",
      "source": {
       "title": "Anthropic to pay SpaceX up to $120.5B for AI compute through 2029",
       "publisher": "Basenor",
       "url": "https://www.basenor.com/blogs/news/anthropic-to-pay-spacex-up-to-120-5b-for-ai-compute-through-2029",
       "date": "2026-10-26",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [
     {
      "fact": "Public filing: no single customer above 10% of revenue in the first nine months of 2026; top five customers about 25% (secondary source summarizing the filing). Press has named Cursor and GitHub Copilot as large customers; not a filing figure.",
      "source": {
       "title": "Anthropic's S-1 shows $16.3B in half-year revenue, a 900% NRR and an $80.7B loss that mostly isn't",
       "publisher": "HackerNoon",
       "url": "https://hackernoon.com/anthropics-s-1-shows-$163b-in-half-year-revenue-a-900percent-nrr-and-an-$807b-loss-that-mostly-isnt",
       "date": "2026-10-26",
       "tier": "secondary"
      }
     },
     {
      "fact": "About 20% of H1 2026 revenue came from two unnamed customers (draft S-1 via WSJ). Amazon and Google collected 60% of Anthropic's outstanding customer bills at end-2025, meaning much revenue flows through their cloud marketplaces (Reuters, via VKTR).",
      "source": {
       "title": "Anthropic's S-1 shows $16.3B in revenue and a compute squeeze from its own partners",
       "publisher": "VKTR",
       "url": "https://www.vktr.com/ai-market/anthropics-s1-shows-163b-in-revenue-and-compute-squeeze/",
       "date": "2026-10-21",
       "tier": "press"
      }
     },
     {
      "fact": "Two customers made up nearly a quarter of 2025 revenue (draft prospectus).",
      "source": {
       "title": "Anthropic IPO: $518 billion compute commitments",
       "publisher": "Sovereign Magazine",
       "url": "https://www.sovereignmagazine.com/article/anthropic-ipo-518-billion-compute-commitments",
       "date": "2026-09",
       "tier": "secondary"
      }
     }
    ],
    "observations": [
     "H1 2026 net loss was $80.7B, but about $72.4B of it is a non-cash accounting charge from the rising value of convertible notes and similar instruments; the operating loss was only $0.693B, and adjusted operating income was +$1.62B.",
     "Cash and short-term investments were $131.7B at June 30, 2026, up from about $20.3B at end-2025, because of the Series G and H rounds and investor notes.",
     "FY2025 operating loss was $8.06B on $4.59B of revenue; net loss about $42B including about $34B of non-cash charges (secondary source).",
     "Every large compute supplier is also a funder: Google (up to $40B equity) and Amazon (up to $25B equity) receive about $221B of firm cloud commitments; Broadcom lends up to $42B toward chip leases it supplies; AMD may buy up to $5B of stock while selling over $20B of compute; Microsoft and Nvidia invest up to $15B while Anthropic buys Azure capacity running Nvidia chips.",
     "Anthropic's non-cancellable compute bill (about $498B) is roughly 7.6 times its end-July run-rate revenue of about $65B (simple arithmetic from cited figures)."
    ]
   },
   "openai": {
    "period_note": "Private; no public financial statements. 2025 figures come from leaked audited statements verified by the FT (reported June 2026). Projections come from investor documents reported by The Information (Feb 2026), CNBC/Reuters (Feb 2026) and the FT (Sept 2026). OpenAI reportedly filed a confidential draft S-1 on June 8, 2026 (secondary source); it has said it will not list in 2026.",
    "sources": [
     {
      "type": "revenue",
      "amount_usd_b": 13.07,
      "firm": true,
      "period": "FY2025",
      "from": null,
      "note": "Up 253% from $3.7B in 2024. Monthly revenue neared $2B by year-end.",
      "source": {
       "title": "OpenAI's fast-growing revenues outpaced by massive scale of losses ahead of expected IPO",
       "publisher": "Techstrong.ai",
       "url": "https://techstrong.ai/articles/openais-fast-growing-revenues-outpaced-by-massive-scale-of-losses-ahead-of-expected-ipo/",
       "date": "2026-06-17",
       "tier": "press"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 15.0,
      "firm": true,
      "period": "Feb 2026",
      "from": "amazon",
      "note": "Up-front part of Amazon's $50B commitment in the $110B round. Included in the $122B round below; do not add the two.",
      "source": {
       "title": "OpenAI's $110 billion funding round draws investment from Amazon, Nvidia, SoftBank (Reuters)",
       "publisher": "Yahoo Finance / Reuters",
       "url": "https://finance.yahoo.com/news/openais-110-billion-funding-round-145925079.html",
       "date": "2026-02-27",
       "tier": "press"
      },
      "included_in": "OpenAI's $122B round (closed March 31, 2026)"
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 35.0,
      "firm": true,
      "period": "Feb 2026; paid by Q3 2026",
      "from": "amazon",
      "note": "Second part of Amazon's $50B, originally conditional. Amazon's filing shows $13.7B paid in April to June 2026 and $21.3B after June 30. Included in the $122B round below; do not add the two.",
      "source": {
       "title": "Amazon.com Form 10-Q, quarter ended June 30, 2026",
       "publisher": "Amazon via SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/1018724/000101872426000026/amzn-20260630.htm",
       "date": "2026-07-31",
       "tier": "primary"
      },
      "included_in": "OpenAI's $122B round (closed March 31, 2026)"
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 30.0,
      "firm": true,
      "period": "Feb 2026",
      "from": "nvidia",
      "note": "Part of the $110B round. CNBC reported it is not tied to deployment milestones; unclear whether it replaces the Sept 2025 'up to $100B' letter of intent. Included in the $122B round below; do not add the two.",
      "source": {
       "title": "OpenAI's $110 billion funding round draws investment from Amazon, Nvidia, SoftBank (Reuters)",
       "publisher": "Yahoo Finance / Reuters",
       "url": "https://finance.yahoo.com/news/openais-110-billion-funding-round-145925079.html",
       "date": "2026-02-27",
       "tier": "press"
      },
      "included_in": "OpenAI's $122B round (closed March 31, 2026)"
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 30.0,
      "firm": true,
      "period": "Feb 2026",
      "from": "softbank",
      "note": "SoftBank's share of the $110B round; payment schedule not given in the source. Included in the $122B round below; do not add the two.",
      "source": {
       "title": "OpenAI's $110 billion funding round draws investment from Amazon, Nvidia, SoftBank (Reuters)",
       "publisher": "Yahoo Finance / Reuters",
       "url": "https://finance.yahoo.com/news/openais-110-billion-funding-round-145925079.html",
       "date": "2026-02-27",
       "tier": "press"
      },
      "included_in": "OpenAI's $122B round (closed March 31, 2026)"
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 122.0,
      "firm": true,
      "period": "closed Mar 31, 2026",
      "from": "softbank, amazon, nvidia, microsoft, mgx, venture-funds and others",
      "note": "Final round size: $122B 'committed capital' at an $852B post-money valuation (up from the $110B announced). Led by SoftBank; also a16z, D.E. Shaw, MGX, TPG, T. Rowe Price, Amazon, Nvidia, Microsoft, and almost $3B from individuals via banks. Includes the Amazon, Nvidia and SoftBank amounts above; source does not say which parts are tranched.",
      "source": {
       "title": "OpenAI just closed record-breaking $122B funding round, brings value to $852B",
       "publisher": "SiliconANGLE",
       "url": "https://siliconangle.com/2026/03/31/openai-just-closed-record-breaking-122b-funding-round-brings-value-852b/",
       "date": "2026-03-31",
       "tier": "press"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 4.7,
      "firm": true,
      "period": "as of Mar 2026",
      "from": "banks",
      "note": "Revolving credit line expanded to about $4.7B; undrawn at the time.",
      "source": {
       "title": "OpenAI just closed record-breaking $122B funding round, brings value to $852B",
       "publisher": "SiliconANGLE",
       "url": "https://siliconangle.com/2026/03/31/openai-just-closed-record-breaking-122b-funding-round-brings-value-852b/",
       "date": "2026-03-31",
       "tier": "press"
      }
     },
     {
      "type": "vendor_financing",
      "amount_usd_b": 250.0,
      "firm": false,
      "period": "talks reported July 2026",
      "from": "nvidia",
      "note": "Superseded. Reported in July 2026 as talks on a 10 GW southern Ohio campus developed by a SoftBank energy unit and leased by OpenAI. On August 17, 2026 Nvidia signed guarantees capped at $105B for about 4.25 GW at SB Energy's PORTS-Pike campus in Pike County, Ohio, which appears to be the same project. Kept for the record; not counted anywhere.",
      "source": {
       "title": "Nvidia in talks to backstop $250bn of OpenAI's data-centre financing (citing WSJ)",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/nvidia-openai-250bn-data-centre-financing-guarantee",
       "date": "2026-07-27",
       "tier": "press"
      },
      "superseded": true
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 30.0,
      "firm": false,
      "period": "in talks, Sept-Oct 2026",
      "from": "softbank-mgx-potential",
      "note": "Sought 'at least' $30B at about $1.4T in September to October 2026; cut to about $20B at $1.25T on October 30. About $11B was reported wired by November 6 (Bloomberg, unnamed sources; Reuters also reported the close, citing its own source); OpenAI has not confirmed it, and the rest may close in the following weeks.",
      "source": {
       "title": "OpenAI races to raise $30B at $1.4T valuation ahead of Anthropic IPO (Reuters)",
       "publisher": "Dealroom",
       "url": "https://dealroom.co/news/164161-openai-races-to-raise-30b-at-1-4t-valuation-ahead-of-anthropic-ipo/",
       "date": "2026-10-20",
       "tier": "secondary"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 11.0,
      "firm": true,
      "period": "reported wired by Nov 6, 2026",
      "from": "investors not named",
      "note": "Reported first close of the round at a $1.25T valuation, citing unnamed sources; the round could reach about $20B in total (Bloomberg, via Reuters). Reuters separately reported the close from its own source. Not confirmed by OpenAI.",
      "source": {
       "title": "OpenAI secures $11 billion funding at $1.25 trillion valuation, Bloomberg News reports",
       "publisher": "Reuters via GV Wire",
       "url": "https://gvwire.com/2026/11/06/openai-secures-11-billion-funding-at-1-25-trillion-valuation-bloomberg-news-reports/",
       "date": "2026-11-06",
       "tier": "press"
      },
      "more": [
       "https://www.reuters.com/business/openai-secures-11-billion-funding-125-trillion-valuation-bloomberg-news-reports-2026-11-06/"
      ]
     }
    ],
    "uses": [
     {
      "type": "r_and_d",
      "amount_usd_b": 19.18,
      "firm": true,
      "period": "FY2025",
      "to": null,
      "note": "Includes $10.59B paid to Microsoft (mostly computing). Cost of revenue was a further $7.5B and sales and marketing $5.73B. Operating loss was $20.92B.",
      "source": {
       "title": "OpenAI's fast-growing revenues outpaced by massive scale of losses ahead of expected IPO",
       "publisher": "Techstrong.ai",
       "url": "https://techstrong.ai/articles/openais-fast-growing-revenues-outpaced-by-massive-scale-of-losses-ahead-of-expected-ipo/",
       "date": "2026-06-17",
       "tier": "press"
      }
     },
     {
      "type": "other",
      "amount_usd_b": 8.0,
      "firm": true,
      "period": "FY2025",
      "to": null,
      "note": "Approximate cash burn in 2025 after excluding non-cash items, stock pay and Microsoft computing credits (unnamed sources).",
      "source": {
       "title": "OpenAI's fast-growing revenues outpaced by massive scale of losses ahead of expected IPO",
       "publisher": "Techstrong.ai",
       "url": "https://techstrong.ai/articles/openais-fast-growing-revenues-outpaced-by-massive-scale-of-losses-ahead-of-expected-ipo/",
       "date": "2026-06-17",
       "tier": "press"
      }
     },
     {
      "type": "other",
      "amount_usd_b": 3.7,
      "firm": true,
      "period": "Q1 2026",
      "to": null,
      "note": "Reported cash burn in Q1 2026 (The Information), on revenue of $5.7B.",
      "source": {
       "title": "OpenAI's fast-growing revenues outpaced by massive scale of losses ahead of expected IPO",
       "publisher": "Techstrong.ai",
       "url": "https://techstrong.ai/articles/openais-fast-growing-revenues-outpaced-by-massive-scale-of-losses-ahead-of-expected-ipo/",
       "date": "2026-06-17",
       "tier": "press"
      }
     },
     {
      "type": "compute_contracts",
      "amount_usd_b": 856.0,
      "firm": false,
      "period": "2026-2030 projection",
      "to": null,
      "note": "Compute and infrastructure spending in a July 2026 investor presentation (FT). In February OpenAI had told investors about $600B through 2030; categories may not match exactly.",
      "source": {
       "title": "OpenAI told investors in February its compute bill would be around $600bn. A July presentation puts it at $856bn",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/openai-856bn-compute-vs-600bn-reset-burn-improved",
       "date": "2026-09-19",
       "tier": "press"
      }
     },
     {
      "type": "compute_contracts",
      "amount_usd_b": 600.0,
      "firm": false,
      "period": "through 2030 (Feb 2026 projection)",
      "to": null,
      "note": "Reset from Altman's earlier '$1.4 trillion for 30 GW' talk.",
      "source": {
       "title": "OpenAI expects compute spend of around $600 billion through 2030, source says (Reuters)",
       "publisher": "Yahoo Finance / Reuters",
       "url": "https://finance.yahoo.com/news/openai-sees-compute-spend-around-223950561.html",
       "date": "2026-02-20",
       "tier": "press"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Revenue",
      "amount_usd_b": 13.07,
      "period": "FY2025",
      "note": "Audited figure via leaked statements.",
      "source": {
       "title": "OpenAI's fast-growing revenues outpaced by massive scale of losses ahead of expected IPO",
       "publisher": "Techstrong.ai",
       "url": "https://techstrong.ai/articles/openais-fast-growing-revenues-outpaced-by-massive-scale-of-losses-ahead-of-expected-ipo/",
       "date": "2026-06-17",
       "tier": "press"
      }
     },
     {
      "metric": "Revenue",
      "amount_usd_b": 5.7,
      "period": "Q1 2026",
      "note": "The Information, as cited by Techstrong.",
      "source": {
       "title": "OpenAI's fast-growing revenues outpaced by massive scale of losses ahead of expected IPO",
       "publisher": "Techstrong.ai",
       "url": "https://techstrong.ai/articles/openais-fast-growing-revenues-outpaced-by-massive-scale-of-losses-ahead-of-expected-ipo/",
       "date": "2026-06-17",
       "tier": "press"
      }
     },
     {
      "metric": "Annualized revenue run-rate",
      "amount_usd_b": 50.0,
      "period": "early Oct 2026",
      "note": "About $50B per people familiar (FT/Bloomberg), lower than the 'nearly $70B' reported in September. The FT ties the gap partly to how sales through cloud providers are counted when investors compare OpenAI to Anthropic.",
      "source": {
       "title": "OpenAI's revenue run rate nears $50 billion, less than reported (FT)",
       "publisher": "Bloomberg News",
       "url": "https://news.bgov.com/artificial-intelligence/openais-annualized-revenue-nears-50-billion-ft-says",
       "date": "2026-10-08",
       "tier": "press"
      }
     },
     {
      "metric": "Annualized revenue run-rate (alternative report)",
      "amount_usd_b": 70.0,
      "period": "late Sept 2026",
      "note": "'Nearing $70B', up more than 70% since the start of Q3 (Reuters). OpenAI says it expects $70B by end-2026.",
      "source": {
       "title": "OpenAI targets $30b bridge financing at $1.4 trillion valuation (Reuters, citing Bloomberg)",
       "publisher": "DealStreetAsia / Reuters",
       "url": "https://www.dealstreetasia.com/stories/openai-funding-2-496629",
       "date": "2026-09-30",
       "tier": "press"
      }
     },
     {
      "metric": "Revenue projection",
      "amount_usd_b": 36.0,
      "period": "FY2026",
      "note": "Per a company presentation (FT, Sept 2026). The Information's Feb 2026 figure was $30B.",
      "source": {
       "title": "OpenAI forecasts cash burn near $280 billion by 2030, FT reports (Reuters)",
       "publisher": "The Star / Reuters",
       "url": "https://www.thestar.com.my/tech/tech-news/2026/09/19/openai-forecasts-cash-burn-near-280-billion-by-2030-ft-reports",
       "date": "2026-09-19",
       "tier": "press"
      }
     },
     {
      "metric": "Revenue projection",
      "amount_usd_b": 350.0,
      "period": "2030",
      "note": "FT, Sept 2026. Cumulative 2026-2030 revenue projected at $840B. CNBC in Feb 2026 reported 'more than $280B' for 2030.",
      "source": {
       "title": "OpenAI forecasts cash burn near $280 billion by 2030, FT reports (Reuters)",
       "publisher": "The Star / Reuters",
       "url": "https://www.thestar.com.my/tech/tech-news/2026/09/19/openai-forecasts-cash-burn-near-280-billion-by-2030-ft-reports",
       "date": "2026-09-19",
       "tier": "press"
      }
     },
     {
      "metric": "Business vs consumer split",
      "amount_usd_b": null,
      "period": "Mar 2026",
      "note": "Enterprise was 40% of revenue (up from 30% a year earlier); OpenAI expects parity with consumer by end-2026. Over 50 million paying subscribers; ads over $0.1B annual run-rate (company-reported). 2030 plan per The Information: consumer about $150B, ChatGPT Enterprise/business $70B, API $47.5B, devices $15B.",
      "source": {
       "title": "OpenAI just closed record-breaking $122B funding round, brings value to $852B",
       "publisher": "SiliconANGLE",
       "url": "https://siliconangle.com/2026/03/31/openai-just-closed-record-breaking-122b-funding-round-brings-value-852b/",
       "date": "2026-03-31",
       "tier": "press"
      }
     }
    ],
    "commitments": [
     {
      "what": "Headline compute commitments",
      "amount_usd_b": 1400.0,
      "firm": false,
      "horizon": "about 8 years (stated late 2025)",
      "counterparty": "multiple",
      "note": "Mix of signed contracts and letters of intent; later reset to about $600B through 2030 (Feb 2026) and then $856B of compute and infrastructure spending 2026-2030 in a July 2026 presentation.",
      "source": {
       "title": "OpenAI cash burn, annual losses through 2028, profitable by 2030 (citing WSJ)",
       "publisher": "Fortune",
       "url": "https://www.fortune.com/2025/11/12/openai-cash-burn-rate-annual-losses-2028-profitable-2030-financial-documents",
       "date": "2025-11-12",
       "tier": "press"
      }
     },
     {
      "what": "Oracle cloud capacity",
      "amount_usd_b": 300.0,
      "firm": true,
      "horizon": "about 5 years starting 2027",
      "counterparty": "oracle",
      "note": "Reported by the WSJ; tied to the 4.5 GW Stargate capacity deal. Reported contract, not confirmed in a filing opened here.",
      "source": {
       "title": "OpenAI signs $300bn cloud deal with Oracle - report",
       "publisher": "DatacenterDynamics",
       "url": "https://www.datacenterdynamics.com/en/news/openai-signs-300bn-cloud-deal-with-oracle-report/",
       "date": "2025-09",
       "tier": "press"
      }
     },
     {
      "what": "AWS cloud capacity (original deal)",
      "amount_usd_b": 38.0,
      "firm": true,
      "horizon": "multi-year from Nov 2025",
      "counterparty": "amazon",
      "note": "Nvidia GB200/GB300 capacity.",
      "source": {
       "title": "Amazon invests $50B in OpenAI, deepens AWS partnership with expanded $100B cloud deal",
       "publisher": "GeekWire",
       "url": "https://www.geekwire.com/2026/amazon-invests-50b-in-openai-deepens-aws-partnership-with-expanded-100b-cloud-deal/",
       "date": "2026-02-27",
       "tier": "press"
      }
     },
     {
      "what": "AWS cloud capacity (Feb 2026 expansion)",
      "amount_usd_b": 100.0,
      "firm": true,
      "horizon": "8 years",
      "counterparty": "amazon",
      "note": "Added alongside Amazon's $50B investment; includes 2 GW of Trainium capacity.",
      "source": {
       "title": "Amazon invests $50B in OpenAI, deepens AWS partnership with expanded $100B cloud deal",
       "publisher": "GeekWire",
       "url": "https://www.geekwire.com/2026/amazon-invests-50b-in-openai-deepens-aws-partnership-with-expanded-100b-cloud-deal/",
       "date": "2026-02-27",
       "tier": "press"
      }
     },
     {
      "what": "Cerebras compute",
      "amount_usd_b": 10.0,
      "firm": true,
      "horizon": "2026-2028",
      "counterparty": "cerebras",
      "note": "'Over' $10B for 750 MW, per reports citing people familiar. A May 2026 report put the deal at over $20B; the ledger uses that figure as an 'up to' row.",
      "source": {
       "title": "OpenAI inks multi-year compute deal with Cerebras valued at over $10 billion",
       "publisher": "Storyboard18",
       "url": "https://www.storyboard18.com/amp/brand-marketing/openai-inks-multi-year-compute-deal-with-cerebras-valued-at-over-10-billion-87671.htm",
       "date": "2026-01-15",
       "tier": "press"
      }
     },
     {
      "what": "Nvidia systems letter of intent",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "from H2 2026",
      "counterparty": "nvidia",
      "note": "At least 10 GW of Nvidia systems, with Nvidia investing 'up to $100B' as capacity came online. Still only a letter of intent as of Dec 2025; reported shelved in favor of the $30B direct stake.",
      "source": {
       "title": "Nvidia plans $30bn investment in upcoming OpenAI funding round",
       "publisher": "DatacenterDynamics",
       "url": "https://www.datacenterdynamics.com/en/news/nvidia-plans-30bn-investment-in-upcoming-openai-funding-round/",
       "date": "2026-02",
       "tier": "press"
      }
     },
     {
      "what": "Microsoft Azure",
      "amount_usd_b": 10.59,
      "firm": true,
      "horizon": "FY2025 (paid)",
      "counterparty": "microsoft",
      "note": "Amount OpenAI paid Microsoft in 2025 within R&D. The multi-year commitment is the $250B Azure row.",
      "source": {
       "title": "OpenAI's fast-growing revenues outpaced by massive scale of losses ahead of expected IPO",
       "publisher": "Techstrong.ai",
       "url": "https://techstrong.ai/articles/openais-fast-growing-revenues-outpaced-by-massive-scale-of-losses-ahead-of-expected-ipo/",
       "date": "2026-06-17",
       "tier": "press"
      }
     },
     {
      "what": "Microsoft Azure (incremental commitment)",
      "amount_usd_b": 250.0,
      "firm": true,
      "horizon": "term not disclosed",
      "counterparty": "microsoft",
      "note": "Agreed in OpenAI's October 2025 restructuring. Microsoft booked $10.0B of revenue from OpenAI in July to September 2026 and was owed $7.2B at September 30.",
      "source": {
       "title": "Microsoft investors sweat cloud giant's OpenAI exposure",
       "publisher": "The Register",
       "url": "https://www.theregister.com/2026/01/29/microsoft_earnings_q2_2026/",
       "date": "2026-01-29",
       "tier": "press"
      }
     }
    ],
    "concentration": [
     {
      "fact": "Consumer subscriptions (ChatGPT) were about 60% of revenue in March 2026, with enterprise 40% (company-reported).",
      "source": {
       "title": "OpenAI just closed record-breaking $122B funding round, brings value to $852B",
       "publisher": "SiliconANGLE",
       "url": "https://siliconangle.com/2026/03/31/openai-just-closed-record-breaking-122b-funding-round-brings-value-852b/",
       "date": "2026-03-31",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Projected negative free cash flow of $278B over 2026-2030 (July 2026 presentation, FT), improved from about $305B in May. The FT says OpenAI is on track to use up the $122B March raise by 2028.",
     "The Information's Feb 2026 projection: cash burn of $25B (2026), $57B (2027), $85B (2028), $51B (2029), then +$39B in 2030 - the first positive year.",
     "Planned compute and infrastructure spending of $856B over 2026-2030 is about equal to projected cumulative revenue of $840B over the same years.",
     "2025 net loss was about $39B, of which roughly $30B+ was a one-time non-cash charge from the conversion to a for-profit company. Adjusted gross margin fell to 33% in 2025 from 40% (The Information, via Reuters).",
     "Reported run-rate figures conflict ($50B vs nearly $70B in the same weeks), partly because of how sales through cloud partners are counted."
    ]
   },
   "spacexai": {
    "period_note": "xAI merged into SpaceX in Feb 2026 (all-stock, xAI valued at $250B). SpaceX listed June 12, 2026. Figures: FY2025 and Q1 2026 from the S-1 (via press), Q2 2026 (reported Aug 4) and Q3 2026 (reported Oct 20) from press coverage of results. The AI segment was renamed 'SuperIntelligence' by Q3.",
    "sources": [
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 4.423,
      "firm": true,
      "period": "FY2025",
      "from": null,
      "note": "Operating profit of the Connectivity (Starlink) segment on $11.387B revenue - the profitable business that helps fund AI. Space segment lost $0.657B; AI lost $6.355B; group operating loss $2.589B.",
      "source": {
       "title": "The SpaceX IPO prospectus: 15 key insights from the S-1 filing",
       "publisher": "Trending Topics",
       "url": "https://www.trendingtopics.eu/the-spacex-ipo-prospectus-15-key-insights-from-the-s-1-filing/",
       "date": "2026-05-21",
       "tier": "press"
      }
     },
     {
      "type": "revenue",
      "amount_usd_b": 14.58,
      "firm": true,
      "period": "Q3 2026",
      "from": null,
      "note": "Group revenue; AI segment about $7.6B, Starlink about $5.2-5.3B, Space about $1.8B. Net profit $4.4B, but only $2.79B was operating profit (rest: $1.025B unexplained 'other', interest income, tax benefit).",
      "source": {
       "title": "SpaceX results: can Starlink carry the AI revolution?",
       "publisher": "XTB",
       "url": "https://www.xtb.com/en/market-analysis/spacex-results-can-starlink-carry-the-ai-revolution",
       "date": "2026-10-20",
       "tier": "press"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 20.0,
      "firm": true,
      "period": "drawn before May 2026; matures Sept 2027",
      "from": "banks",
      "note": "Bridge loan from Goldman Sachs, Bank of America, Citi, JPMorgan and Morgan Stanley at about 4.58%. It refinanced $17.5B of high-interest debt from X (about $12.5B from the Twitter buyout) and xAI (a $5B raise in 2025 at up to ~12%).",
      "source": {
       "title": "SpaceX used a $20 billion bridge loan to slash Musk's debt costs in half, IPO filing reveals",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/spacex-bridge-loan-musk-debt-refinancing-ipo",
       "date": "2026-05-21",
       "tier": "press"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 9.0,
      "firm": true,
      "period": "as of S-1 (Mar 31, 2026)",
      "from": null,
      "note": "'Other financings', including obligations tied to AI infrastructure recorded as failed sale-leasebacks (assets sold and leased back but still counted as borrowing). A $5B revolving credit line was undrawn.",
      "source": {
       "title": "SpaceX used a $20 billion bridge loan to slash Musk's debt costs in half, IPO filing reveals",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/spacex-bridge-loan-musk-debt-refinancing-ipo",
       "date": "2026-05-21",
       "tier": "press"
      }
     },
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 20.0,
      "firm": false,
      "period": "announced Oct 2025",
      "from": "private-credit-nvidia",
      "note": "xAI's roughly $20B Colossus 2 raise: $7-8B equity and up to $12B debt, routed through a special-purpose company that buys Nvidia GPUs and leases them to xAI. Nvidia to put in up to $2B of the equity. Lender names (reported elsewhere as Apollo, Valor and others) are not confirmed in the source opened.",
      "source": {
       "title": "Nvidia backs $20 billion xAI chip deal",
       "publisher": "Tom's Hardware",
       "url": "https://www.tomshardware.com/pc-components/gpus/nvidia-backs-20-billion-xai-chip-deal",
       "date": "2025-10-08",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 75.0,
      "firm": true,
      "period": "IPO priced June 11, 2026",
      "from": "stock-market",
      "note": "About $75B at $135/share, $1.75T valuation, about 4% float. Over three-quarters earmarked for repaying debt; under $18B left for growth projects.",
      "source": {
       "title": "SpaceX prices historic $75B IPO at $1.75 trillion",
       "publisher": "AI Weekly / TradingKey",
       "url": "https://aiweekly.co/alerts/spacex-prices-historic-75b-ipo-at-175-trillion",
       "date": "2026-06-11",
       "tier": "secondary"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 20.0,
      "firm": true,
      "period": "Jan 2026 (xAI Series E, pre-merger)",
      "from": "venture-funds, sovereign-funds, nvidia, Cisco",
      "note": "Upsized from a $15B target. Investors: Valor, StepStone, Fidelity, Qatar Investment Authority, MGX, Baron; Nvidia and Cisco as strategic investors. Valuation not stated.",
      "source": {
       "title": "xAI raises $20B Series E",
       "publisher": "StorageNewsletter (edited xAI press release)",
       "url": "https://www.storagenewsletter.com/2026/01/12/xai-raises-20b-series-e/",
       "date": "2026-01-12",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 7.723,
      "firm": true,
      "period": "Q1 2026",
      "to": null,
      "note": "AI capex alone - more than Space and Connectivity combined; about 76% of group capex.",
      "source": {
       "title": "The SpaceX IPO prospectus: 15 key insights from the S-1 filing",
       "publisher": "Trending Topics",
       "url": "https://www.trendingtopics.eu/the-spacex-ipo-prospectus-15-key-insights-from-the-s-1-filing/",
       "date": "2026-05-21",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 18.37,
      "firm": true,
      "period": "Q2 2026",
      "to": null,
      "note": "Group capex; about $15.8-16B went to the AI buildout.",
      "source": {
       "title": "SpaceX tops Q2 expectations as Starlink scales, heavy AI spend weighs on stock",
       "publisher": "Hargreaves Lansdown",
       "url": "https://www.hl.co.uk/shares/stock-market-news/company--news/spacex-tops-q2-expectations-as-starlink-scales,-heavy-ai-spend-weighs-on-stock",
       "date": "2026-08-05",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 37.5,
      "firm": false,
      "period": "Q4 2026 guidance",
      "to": null,
      "note": "Guided $35B-$40B (midpoint shown). SpaceX expects about 3 GW of data center capacity at end-2026 and to add about 10 GW in 2027, citing roughly $30B-$50B of capex per GW.",
      "source": {
       "title": "SpaceX Q3 results: AI powers a big beat",
       "publisher": "Hargreaves Lansdown",
       "url": "https://www.hl.co.uk/shares/share-research/spacex-q3-results-ai-powers-a-big-beat",
       "date": "2026-10-21",
       "tier": "press"
      }
     },
     {
      "type": "acquisitions",
      "amount_usd_b": 60.0,
      "firm": true,
      "period": "closed Aug 14, 2026",
      "to": "cursor",
      "note": "All-stock: Cursor shares converted into about 389.3 million SpaceX Class A shares. No cash paid.",
      "source": {
       "title": "SpaceX completes $60 billion Cursor acquisition",
       "publisher": "VKTR",
       "url": "https://www.vktr.com/ai-market/spacex-completes-60-billion-cursor-acquisition/",
       "date": "2026-08-14",
       "tier": "press"
      }
     },
     {
      "type": "acquisitions",
      "amount_usd_b": 250.0,
      "firm": true,
      "period": "Feb 2026",
      "to": "spacexai",
      "note": "All-stock merger valuing xAI at $250B and SpaceX at $1T. No cash paid.",
      "source": {
       "title": "Musk's SpaceX combines with xAI at $1.25 trillion valuation",
       "publisher": "Bloomberg News",
       "url": "https://news.bloomberglaw.com/ip-law/elon-musks-spacex-said-to-combine-with-xai-ahead-of-mega-ipo",
       "date": "2026-02-03",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 19.6,
      "firm": true,
      "period": "Q3 2026",
      "to": null,
      "note": "Group capex, above quarterly revenue; $16.4B (about 84%) went to AI. Free cash outflow was $10.0B in the quarter.",
      "source": {
       "title": "SpaceX beats Q3 forecasts across all three segments as AI revenue tops $7.5 billion",
       "publisher": "investingLive",
       "url": "https://investinglive.com/stocks/spacex-beats-q3-forecasts-across-all-three-segments-as-ai-revenue-tops-7-5-billion/",
       "date": "2026-10-20",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "AI segment revenue",
      "amount_usd_b": 3.201,
      "period": "FY2025",
      "note": "xAI plus X, consolidated back to earlier periods. AI segment operating loss $6.355B.",
      "source": {
       "title": "The SpaceX IPO prospectus: 15 key insights from the S-1 filing",
       "publisher": "Trending Topics",
       "url": "https://www.trendingtopics.eu/the-spacex-ipo-prospectus-15-key-insights-from-the-s-1-filing/",
       "date": "2026-05-21",
       "tier": "press"
      }
     },
     {
      "metric": "AI segment revenue",
      "amount_usd_b": 0.818,
      "period": "Q1 2026",
      "note": "AI segment loss $2.469B.",
      "source": {
       "title": "The SpaceX IPO prospectus: 15 key insights from the S-1 filing",
       "publisher": "Trending Topics",
       "url": "https://www.trendingtopics.eu/the-spacex-ipo-prospectus-15-key-insights-from-the-s-1-filing/",
       "date": "2026-05-21",
       "tier": "press"
      }
     },
     {
      "metric": "AI segment operating loss",
      "amount_usd_b": -1.26,
      "period": "Q2 2026",
      "note": "Narrower than expected.",
      "source": {
       "title": "SpaceX tops Q2 expectations as Starlink scales, heavy AI spend weighs on stock",
       "publisher": "Hargreaves Lansdown",
       "url": "https://www.hl.co.uk/shares/stock-market-news/company--news/spacex-tops-q2-expectations-as-starlink-scales,-heavy-ai-spend-weighs-on-stock",
       "date": "2026-08-05",
       "tier": "press"
      }
     },
     {
      "metric": "AI ('SuperIntelligence') segment revenue",
      "amount_usd_b": 7.6,
      "period": "Q3 2026",
      "note": "About 52% of group revenue; up more than ninefold, driven by new cloud-services deals and the Cursor acquisition. Segment operating profit about $0.431B. No breakdown by customer; Anthropic pays SpaceX $1.25B a month for Colossus compute (per SpaceX's S-1).",
      "source": {
       "title": "SpaceX results: can Starlink carry the AI revolution?",
       "publisher": "XTB",
       "url": "https://www.xtb.com/en/market-analysis/spacex-results-can-starlink-carry-the-ai-revolution",
       "date": "2026-10-20",
       "tier": "press"
      }
     },
     {
      "metric": "Group annualized revenue target",
      "amount_usd_b": 100.0,
      "period": "December 2026 run-rate (guidance)",
      "note": "Q1 2027 revenue guided at $33B-$37B.",
      "source": {
       "title": "SpaceX Q3 results: AI powers a big beat",
       "publisher": "Hargreaves Lansdown",
       "url": "https://www.hl.co.uk/shares/share-research/spacex-q3-results-ai-powers-a-big-beat",
       "date": "2026-10-21",
       "tier": "press"
      }
     }
    ],
    "commitments": [
     {
      "what": "Anthropic compute contract (SpaceX is the seller)",
      "amount_usd_b": 45.0,
      "firm": false,
      "horizon": "May 2026 - May 2029",
      "counterparty": "anthropic",
      "note": "$1.25B a month for Colossus 1 and 2 capacity (over 220,000 Nvidia GPUs, 300+ MW); either side may cancel on 90 days' notice. Anthropic's S-1 puts the maximum value at up to $120.5B.",
      "source": {
       "title": "Anthropic inks massive SpaceX compute deal ahead of $2 trillion IPO",
       "publisher": "HotHardware",
       "url": "https://hothardware.com/news/anthropic-inks-spacex-deal-ahead-of-2-trillion-ipo",
       "date": "2026-05-21",
       "tier": "press"
      }
     }
    ],
    "concentration": [
     {
      "fact": "AI took about 84% of Q3 2026 capex while contributing about 52% of revenue and under 10% of profit (XTB estimate).",
      "source": {
       "title": "SpaceX results: can Starlink carry the AI revolution?",
       "publisher": "XTB",
       "url": "https://www.xtb.com/en/market-analysis/spacex-results-can-starlink-carry-the-ai-revolution",
       "date": "2026-10-20",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Group net loss was $4.937B in 2025; Q2 2026 net loss was $0.541B (secondary source); Q3 2026 showed a $4.4B profit with about $1.4B from non-operating items.",
     "Q3 2026 free cash outflow was $10.0B; net cash including lease liabilities was $51.0B at quarter end - largely IPO money.",
     "At SpaceX's own rule of thumb ($30B-$50B per GW), the planned ~10 GW added in 2027 implies roughly $300B-$500B of spending (simple arithmetic; not company guidance).",
     "Much of xAI's GPU buildout before the merger was financed with high-yield debt and GPU-backed leasing vehicles; the $17.5B of X/xAI debt was refinanced with a bank bridge loan and then targeted for repayment from IPO proceeds."
    ]
   },
   "cursor": {
    "period_note": "Private until acquired by SpaceX on Aug 14, 2026; now part of SpaceX's AI segment. Few financial figures disclosed.",
    "sources": [
     {
      "type": "equity_raised",
      "amount_usd_b": 2.0,
      "firm": false,
      "period": "in progress Apr 2026 (superseded by the SpaceX deal)",
      "from": "venture-funds-nvidia",
      "note": "Was raising $2B from Andreessen Horowitz, Nvidia and Thrive Capital at a $50B+ valuation (CNBC, via VKTR) when the SpaceX deal emerged.",
      "source": {
       "title": "SpaceX completes $60 billion Cursor acquisition",
       "publisher": "VKTR",
       "url": "https://www.vktr.com/ai-market/spacex-completes-60-billion-cursor-acquisition/",
       "date": "2026-08-14",
       "tier": "press"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 60.0,
      "firm": true,
      "period": "Aug 14, 2026",
      "from": "spacexai",
      "note": "Acquired for $60B, paid entirely in SpaceX stock (about 389.3M Class A shares).",
      "source": {
       "title": "SpaceX completes $60 billion Cursor acquisition",
       "publisher": "VKTR",
       "url": "https://www.vktr.com/ai-market/spacex-completes-60-billion-cursor-acquisition/",
       "date": "2026-08-14",
       "tier": "press"
      }
     }
    ],
    "uses": [],
    "revenue": [
     {
      "metric": "Annualized revenue",
      "amount_usd_b": 1.0,
      "period": "Nov 2025",
      "note": "Crossed $1B in annualized revenue.",
      "source": {
       "title": "SpaceX completes $60 billion Cursor acquisition",
       "publisher": "VKTR",
       "url": "https://www.vktr.com/ai-market/spacex-completes-60-billion-cursor-acquisition/",
       "date": "2026-08-14",
       "tier": "press"
      }
     }
    ],
    "commitments": [],
    "concentration": [],
    "observations": [
     "Cursor is both a large buyer of Anthropic models (named in press as one of Anthropic's biggest customers; not a filing figure) and now owned by SpaceX, which sells compute to Anthropic."
    ]
   },
   "coreweave": {
    "period_note": "Latest reported quarter is Q2 2026 (quarter ended June 30, 2026, reported Aug 11, 2026). Q3 2026 results are scheduled for Nov 10, 2026, so not yet out as of Oct 30, 2026. Debt deals listed through Sept 2026.",
    "sources": [
     {
      "type": "revenue",
      "amount_usd_b": 2.575,
      "firm": true,
      "period": "Q2 2026",
      "from": null,
      "note": "Quarterly revenue, up 112% from a year earlier.",
      "source": {
       "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
       "date": "2026-08-11",
       "tier": "primary"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 0.679,
      "firm": true,
      "period": "Q2 2026",
      "from": null,
      "note": "Cash from operations. Six months to June 30, 2026: $3.663B.",
      "source": {
       "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
       "date": "2026-08-11",
       "tier": "primary"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 3.663,
      "firm": true,
      "period": "H1 2026 (six months to Jun 30, 2026)",
      "from": null,
      "note": "",
      "source": {
       "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
       "date": "2026-08-11",
       "tier": "primary"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 13.457,
      "firm": true,
      "period": "Q2 2026",
      "from": "mixed-banks-bond-market-private-credit",
      "note": "Net proceeds from debt in the quarter per cash flow statement. Company says it raised about $18B in debt, convertibles and equity in Q2.",
      "source": {
       "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
       "date": "2026-08-11",
       "tier": "primary"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 1.0,
      "firm": true,
      "period": "Q2 2026",
      "from": "jane-street",
      "note": "$1B strategic equity investment from trading firm Jane Street ($997M private placement proceeds on cash flow statement). Jane Street is also a CoreWeave customer and a funder/customer of other neoclouds (see Crusoe, Fluidstack).",
      "source": {
       "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
       "date": "2026-08-11",
       "tier": "primary"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 3.1,
      "firm": true,
      "period": "May 2026, about 5.5-year term",
      "from": "banks",
      "note": "DDTL 5.0 GPU-backed delayed-draw term loan, publicly syndicated; SOFR+4.50%; Morgan Stanley and MUFG lead arrangers. Backs infrastructure for two large non-investment-grade customers (not named). Rated Ba2/BB+. Facility size, not necessarily fully drawn.",
      "source": {
       "title": "CoreWeave Closes $3.1 Billion Loan Facility, Expanding Access to Public Markets for GPU-Backed Financing",
       "publisher": "CoreWeave via Business Wire",
       "url": "https://www.businesswire.com/news/home/20260518337916/en/CoreWeave-Closes-3.1-Billion-Loan-Facility-Expanding-Access-to-Public-Markets-for-GPU-Backed-Financing/",
       "date": "2026-05-18",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 1.75,
      "firm": true,
      "period": "Apr 2026, due Oct 1, 2031",
      "from": "bond-market",
      "note": "9.750% senior unsecured notes (high-yield).",
      "source": {
       "title": "CoreWeave Announces Upsize and Pricing of $1,750 Million of Senior Notes",
       "publisher": "CoreWeave via Business Wire",
       "url": "https://stocks.observer-reporter.com/observerreporter/article/bizwire-2026-4-9-coreweave-announces-upsize-and-pricing-of-1750-million-of-senior-notes",
       "date": "2026-04-09",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 1.0,
      "firm": true,
      "period": "Apr 2026, due Oct 1, 2031",
      "from": "bond-market",
      "note": "Additional 9.750% senior notes due 2031.",
      "source": {
       "title": "CoreWeave Announces Pricing of $1,000 million of 9.750% Senior Notes due 2031",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Announces-Pricing-of-1000-million-of-9-750-Senior-Notes-due-2031/default.aspx",
       "date": "2026-04-16",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 1.25,
      "firm": true,
      "period": "Jun 2026, due Jul 15, 2032",
      "from": "bond-market",
      "note": "9.625% senior unsecured notes.",
      "source": {
       "title": "CoreWeave Announces Pricing of $1.25 Billion of Senior Notes and €2 Billion of Senior Notes",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Announces-Pricing-of-1-25-Billion-of-Senior-Notes-and-2-Billion-of-Senior-Notes/default.aspx",
       "date": "2026-06-11",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": null,
      "firm": true,
      "period": "Jun 2026, due Jul 15, 2032",
      "from": "bond-market",
      "note": "€2.0B of 8.500% senior notes (inaugural euro bond). Not converted to dollars because no sourced exchange rate was gathered; at roughly $1.1–1.2 per euro it would be about $2.2–2.4B (estimate, not sourced).",
      "source": {
       "title": "CoreWeave Announces Pricing of $1.25 Billion of Senior Notes and €2 Billion of Senior Notes",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Announces-Pricing-of-1-25-Billion-of-Senior-Notes-and-2-Billion-of-Senior-Notes/default.aspx",
       "date": "2026-06-11",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 3.5,
      "firm": true,
      "period": "Apr 2026, due Oct 1, 2032",
      "from": "bond-market",
      "note": "1.75% convertible senior notes; conversion price about $119.60. Option for $0.5B more.",
      "source": {
       "title": "CoreWeave Prices Upsized $3.5 Billion Convertible Senior Notes Offering",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Prices-Upsized-3-5-Billion-Convertible-Senior-Notes-Offering/default.aspx",
       "date": "2026-04-10",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 3.7,
      "firm": true,
      "period": "Sep 2026, due Apr 1, 2033",
      "from": "bond-market",
      "note": "2.875% convertible senior notes; conversion price about $97.85; about $0.499B of proceeds spent on capped calls. Option for $0.5B more.",
      "source": {
       "title": "CoreWeave Prices Upsized $3.7 Billion Convertible Senior Notes Offering",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Prices-Upsized-3-7-Billion-Convertible-Senior-Notes-Offering/default.aspx",
       "date": "2026-09-18",
       "tier": "primary"
      }
     },
     {
      "type": "customer_prepayment",
      "amount_usd_b": 6.3,
      "firm": true,
      "period": "Sep 2025 – Apr 13, 2032",
      "from": "nvidia",
      "note": "Nvidia order form for $6.3B of capacity; Nvidia is obligated to buy residual unsold capacity through April 13, 2032 if CoreWeave's other customers don't use it (subject to termination, delivery and availability terms). Contract value, not a prepayment.",
      "source": {
       "title": "CoreWeave Form 8-K (NVIDIA order form, Sept 9, 2025)",
       "publisher": "CoreWeave / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/1769628/000176962825000047/crwv-20250909.htm",
       "date": "2025-09-15",
       "tier": "primary"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 2.0,
      "firm": true,
      "period": "Jan 2026",
      "from": "nvidia",
      "note": "Nvidia bought 22.9M Class A shares at $87.20 (private placement, announced Jan 26, 2026). Secondary source says Nvidia's stake rose from about 6.3% to about 12%. Nvidia also said it would use its financial strength to help CoreWeave buy land, power and buildings.",
      "source": {
       "title": "Nvidia Invests $2 Billion More in CoreWeave, Offers New Chip",
       "publisher": "Bloomberg via Bloomberg Law",
       "url": "https://news.bloomberglaw.com/artificial-intelligence/nvidia-invests-2-billion-more-in-coreweave-offers-new-chip-1",
       "date": "2026-01-26",
       "tier": "press"
      }
     },
     {
      "type": "private_credit",
      "amount_usd_b": 8.5,
      "firm": false,
      "period": "Mar 2026, matures Mar 2032",
      "from": "blackstone",
      "note": "DDTL 4.0 delayed-draw term loan: up to $8.5B (about $7.5B available at first, rising to $8.5B as assets stabilize). Floating tranche SOFR+2.25%, fixed tranche about 5.9%. Anchored by Blackstone Credit & Insurance; MUFG, Morgan Stanley, Goldman Sachs, JPMorgan arrangers. Rated A3 (Moody's). Press reports tie it to Meta contracts.",
      "source": {
       "title": "CoreWeave Compute Acquisition Co. VIII, LLC closes $8.5 billion delayed draw term loan facility",
       "publisher": "MarketScreener",
       "url": "https://www.marketscreener.com/news/coreweave-compute-acquisition-co-viii-llc-closes-8-5-billion-delayed-draw-term-loan-facility-ce7e51dedc81f222",
       "date": "2026-03-31",
       "tier": "secondary"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 2.6,
      "firm": true,
      "period": "Aug 2026, about 5-year term",
      "from": "banks",
      "note": "DDTL 5.5 delayed-draw term loan; SOFR+5.50%; JPMorgan and MUFG arrangers; Ba2/BB+. Loan term (about 5 years) is longer than the roughly 3-year average term of the customer contracts backing it. Facility size, not necessarily drawn.",
      "source": {
       "title": "CoreWeave Closes $2.6 Billion Loan Facility Arranged By JPMorgan And MUFG",
       "publisher": "Pulse 2.0",
       "url": "https://pulse2.com/coreweave-closes-2-6-billion-loan-facility-arranged-by-jpmorgan-and-mufg-for-ai-infrastructure/",
       "date": "2026-08-11",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 6.422,
      "firm": true,
      "period": "Q2 2026 (cash paid)",
      "to": null,
      "note": "Purchases of property and equipment on cash flow statement. Six months: $14.117B.",
      "source": {
       "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
       "date": "2026-08-11",
       "tier": "primary"
      }
     },
     {
      "type": "other",
      "amount_usd_b": 0.64,
      "firm": true,
      "period": "Q2 2026",
      "to": "banks-bond-market-private-credit",
      "note": "Net interest expense, up from $0.267B a year earlier, about 25% of quarterly revenue. Q3 2026 guidance: $0.86B–$0.94B.",
      "source": {
       "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
       "date": "2026-08-11",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 9.4,
      "firm": true,
      "period": "Q2 2026",
      "to": null,
      "note": "Company-reported capex (up from $6.8B in Q1). Cash actually paid for property and equipment in Q2 was $6.422B; the gap is equipment received but not yet paid (accrued purchases were $5.52B at June 30).",
      "source": {
       "title": "CoreWeave boosts 2026 spending plan, beats quarterly estimates on AI demand surge",
       "publisher": "Reuters via Investing.com",
       "url": "https://www.investing.com/news/stock-market-news/coreweave-edges-past-quarterly-revenue-estimates-4852603",
       "date": "2026-08-11",
       "tier": "press"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 37.0,
      "firm": false,
      "period": "FY2026 guidance",
      "to": "nvidia",
      "note": "Guidance range $35B–$39B (midpoint shown), raised in Aug 2026 from $31B–$35B. Q3 2026 capex guide $11.5B–$13.5B. All CoreWeave GPUs are Nvidia (per secondary source).",
      "source": {
       "title": "CoreWeave boosts 2026 spending plan, beats quarterly estimates on AI demand surge",
       "publisher": "Reuters via Investing.com",
       "url": "https://www.investing.com/news/stock-market-news/coreweave-edges-past-quarterly-revenue-estimates-4852603",
       "date": "2026-08-11",
       "tier": "press"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Revenue",
      "amount_usd_b": 2.575,
      "period": "Q2 2026",
      "note": "",
      "source": {
       "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
       "date": "2026-08-11",
       "tier": "primary"
      }
     },
     {
      "metric": "Revenue backlog (remaining performance obligations)",
      "amount_usd_b": 103.7,
      "period": "as of Jun 30, 2026",
      "note": "$103.7B per 10-Q ($104.2B headline). 41% expected within 24 months, 39% in months 25–48, 20% in months 49–78. Excludes more than $25B of net new commitments signed in early Q3 2026 (customers not named).",
      "source": {
       "title": "CoreWeave, Inc. Form 10-Q for quarter ended June 30, 2026",
       "publisher": "CoreWeave / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001769628/000176962826000366/crwv-20260630.htm",
       "date": "2026-08",
       "tier": "primary"
      }
     },
     {
      "metric": "Adjusted EBITDA",
      "amount_usd_b": 1.51,
      "period": "Q2 2026",
      "note": "59% margin. GAAP operating loss $0.049B; GAAP net loss $0.626B.",
      "source": {
       "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
       "date": "2026-08-11",
       "tier": "primary"
      }
     },
     {
      "metric": "Revenue guidance",
      "amount_usd_b": 12.8,
      "period": "FY2026 guidance",
      "note": "Range $12.4B–$13.2B (midpoint shown). Q3 2026 guide $3.45B–$3.6B. Year-end annualized run-rate guide $18.5B–$19.5B.",
      "source": {
       "title": "CoreWeave Q2 earnings call highlights",
       "publisher": "MarketBeat",
       "url": "https://www.marketbeat.com/instant-alerts/coreweave-q2-earnings-call-highlights-2026-08-11/",
       "date": "2026-08-11",
       "tier": "secondary"
      }
     }
    ],
    "commitments": [
     {
      "what": "Meta AI cloud capacity (expansion)",
      "amount_usd_b": 21.0,
      "firm": true,
      "horizon": "through Dec 2032",
      "counterparty": "meta",
      "note": "About $21B announced Apr 9, 2026; includes early Nvidia Vera Rubin deployments. Adds to the earlier ~$14.2B Meta contract (2025), about $35B total per secondary source.",
      "source": {
       "title": "CoreWeave and Meta Announce $21 Billion Expanded AI Infrastructure Agreement",
       "publisher": "CoreWeave via Business Wire",
       "url": "https://www.businesswire.com/news/home/20260409138818/en/CoreWeave-and-Meta-Announce-$21-Billion-Expanded-AI-Infrastructure-Agreement",
       "date": "2026-04-09",
       "tier": "primary"
      }
     },
     {
      "what": "OpenAI compute contracts (three deals)",
      "amount_usd_b": 22.4,
      "firm": false,
      "horizon": "multi-year from 2025",
      "counterparty": "openai",
      "note": "Up to $11.9B (Mar 2025) + up to $4B (May 2025) + up to $6.5B (Sep 2025) = about $22.4B total contract value. Each tranche is described as 'up to'.",
      "source": {
       "title": "CoreWeave Expands Agreement with OpenAI by up to $6.5B",
       "publisher": "CoreWeave (press release)",
       "url": "https://investors.coreweave.com/news/news-details/2025/CoreWeave-Expands-Agreement-with-OpenAI-by-up-to-6-5B/default.aspx",
       "date": "2025-09-25",
       "tier": "primary"
      }
     },
     {
      "what": "Anthropic multi-year capacity for Claude",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "phased from late 2026",
      "counterparty": "anthropic",
      "note": "Announced Apr 10, 2026; value not disclosed.",
      "source": {
       "title": "CoreWeave Announces Multi-Year Agreement With Anthropic",
       "publisher": "CoreWeave (press release)",
       "url": "https://coreweave.com/news/coreweave-announces-multi-year-agreement-with-anthropic",
       "date": "2026-04-10",
       "tier": "primary"
      }
     },
     {
      "what": "Nvidia capacity order plus obligation to buy unsold capacity",
      "amount_usd_b": 6.3,
      "firm": true,
      "horizon": "through Apr 13, 2032",
      "counterparty": "nvidia",
      "note": "See sources_of_funds.",
      "source": {
       "title": "CoreWeave Form 8-K (NVIDIA order form, Sept 9, 2025)",
       "publisher": "CoreWeave / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/1769628/000176962825000047/crwv-20250909.htm",
       "date": "2025-09-15",
       "tier": "primary"
      }
     },
     {
      "what": "Meta AI cloud capacity (original 2025 contract)",
      "amount_usd_b": 14.2,
      "firm": false,
      "horizon": "2025–2031 (with expansion options)",
      "counterparty": "meta",
      "note": "Reported by Bloomberg as a contract that 'could generate up to $14.2B'.",
      "source": {
       "title": "CoreWeave Seeks $8.5B Loan as AI Infrastructure Debt Piles Up (citing Bloomberg)",
       "publisher": "The Energy Mag",
       "url": "https://www.theenergymag.com/news/2026-02-25/coreweave-billion-loan-ai",
       "date": "2026-02-25",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [
     {
      "fact": "Largest customer ('Customer A', not named in the 10-Q) was 36% of Q2 2026 revenue and 40% of H1 2026 revenue, down from 71% in Q2 2025. Customer B was 26% and Customer C 10% in Q2 2026, top three = 72% of revenue.",
      "source": {
       "title": "CoreWeave, Inc. Form 10-Q for quarter ended June 30, 2026",
       "publisher": "CoreWeave / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001769628/000176962826000366/crwv-20260630.htm",
       "date": "2026-08",
       "tier": "primary"
      }
     },
     {
      "fact": "Reuters describes Microsoft as one of CoreWeave's biggest customers; Meta and Anthropic are named customers.",
      "source": {
       "title": "CoreWeave boosts 2026 spending plan, beats quarterly estimates on AI demand surge",
       "publisher": "Reuters via Investing.com",
       "url": "https://www.investing.com/news/stock-market-news/coreweave-edges-past-quarterly-revenue-estimates-4852603",
       "date": "2026-08-11",
       "tier": "press"
      }
     },
     {
      "fact": "Customers A and B each accounted for 32% of net accounts receivable at June 30, 2026.",
      "source": {
       "title": "CoreWeave, Inc. Form 10-Q for quarter ended June 30, 2026",
       "publisher": "CoreWeave / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001769628/000176962826000366/crwv-20260630.htm",
       "date": "2026-08",
       "tier": "primary"
      }
     }
    ],
    "observations": [
     "Total debt on the balance sheet was about $35.1B at June 30, 2026 ($31.4B recourse + $3.7B non-recourse), versus cash of $5.5B, and the company issued a further $3.7B convertible and a $2.6B loan facility after quarter end.",
     "Free cash flow (cash from operations minus cash capex) was about −$5.7B in Q2 2026 and about −$10.5B in H1 2026 (derived from the press release).",
     "Interest expense ($0.64B in Q2) ran at about 25% of revenue and is guided to rise to $0.86B–$0.94B in Q3 2026.",
     "New 2026 unsecured bonds carry 8.5%–9.75% coupons (high-yield); Blackstone-anchored investment-grade loan backed by a single big-tech contract priced at SOFR+2.25%, financing cost depends heavily on who the customer is.",
     "Nvidia is simultaneously CoreWeave's chip supplier, a ~12% shareholder (after a $2B purchase in Jan 2026), and a $6.3B customer that must buy unused capacity through 2032.",
     "Named lab/big-tech contracts (Meta ~$35B, OpenAI up to ~$22.4B, Nvidia $6.3B) sum to roughly $64B against a $104B backlog; contract values and backlog are measured differently, so this is only indicative."
    ]
   },
   "nebius": {
    "period_note": "Latest reported quarter is Q2 2026 (ended June 30, 2026; reported Aug 12, 2026). Q3 2026 not yet reported as of Oct 30, 2026.",
    "sources": [
     {
      "type": "revenue",
      "amount_usd_b": 0.5823,
      "firm": true,
      "period": "Q2 2026",
      "from": null,
      "note": "Up 454% from a year earlier. H1 2026: $0.981B.",
      "source": {
       "title": "Nebius reports second quarter 2026 financial results (Form 6-K Ex. 99.1)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094568/tm2622968d1_ex99-1.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 2.246,
      "firm": true,
      "period": "Q2 2026",
      "from": null,
      "note": "Cash from operations is far above revenue because customers prepay: deferred revenue rose $1.2B in Q2 and $4.4B in H1 2026 (to $5.98B). H1 2026 operating cash flow: $4.504B.",
      "source": {
       "title": "Nebius reports second quarter 2026 financial results (Form 6-K Ex. 99.1)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094568/tm2622968d1_ex99-1.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "customer_prepayment",
      "amount_usd_b": 4.395,
      "firm": true,
      "period": "H1 2026",
      "from": "mixed-large-tech-customers-not-named",
      "note": "Increase in deferred revenue, mainly customer prepayments for future services. Management expects over $9B of customer prepayments in 2026; about 70% of Q2 deals included prepayments covering roughly 50–60% of related capex.",
      "source": {
       "title": "Nebius unaudited condensed consolidated financial statements, six months ended June 30, 2026 (Form 6-K Ex. 99.2)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094844/nbis-20260812xex99d2.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "bonds",
      "amount_usd_b": 4.34,
      "firm": true,
      "period": "Mar 2026",
      "from": "bond-market",
      "note": "Convertible notes: $2.25B 1.25% due 2031 and $1.75B 2.625% due 2033 (plus option exercise, $4.34B total principal). Principal accretes to 120% at maturity. Conversion prices about $183 and $180.",
      "source": {
       "title": "Nebius unaudited condensed consolidated financial statements, six months ended June 30, 2026 (Form 6-K Ex. 99.2)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094844/nbis-20260812xex99d2.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 2.85,
      "firm": true,
      "period": "Q2 2026",
      "from": "public equity market (at-the-market program)",
      "note": "12.7M shares sold at a weighted average $223.6 for about $2.8B gross; 12.3M shares remain available.",
      "source": {
       "title": "Nebius Q2 2026 shareholder letter (Form 6-K Ex. 99.2)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094568/tm2622968d1_ex99-2.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 0.775,
      "firm": true,
      "period": "Jul 2026",
      "from": "banks",
      "note": "Asset-backed facility at SOFR+2.50%, secured by deployed GPUs and contracted cash flows from an investment-grade customer. Management says more asset-backed and corporate debt is in progress (amount not given).",
      "source": {
       "title": "Nebius Q2 2026 shareholder letter (Form 6-K Ex. 99.2)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094568/tm2622968d1_ex99-2.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "strategic_investment",
      "amount_usd_b": 2.0,
      "firm": true,
      "period": "Mar 2026",
      "from": "nvidia",
      "note": "Nvidia bought pre-funded warrants exercisable into 21.07M Class A shares (about $95/share implied); six-month lockup. Partnership targets more than 5 GW of Nvidia-powered capacity by end-2030.",
      "source": {
       "title": "Nvidia invests $2 billion in Nebius",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/nvidia-invests-2-billion-in-nebius",
       "date": "2026-03-12",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 5.657,
      "firm": true,
      "period": "Q2 2026",
      "to": "nvidia",
      "note": "Purchases of property, equipment and intangibles, mainly GPUs and data centers. H1 2026: $8.13B. Three suppliers account for capex in 2026.",
      "source": {
       "title": "Nebius reports second quarter 2026 financial results (Form 6-K Ex. 99.1)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094568/tm2622968d1_ex99-1.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "leases",
      "amount_usd_b": 12.054,
      "firm": true,
      "period": "signed, not yet started (as of Jun 30, 2026)",
      "to": "data-center-landlords-not-named",
      "note": "Off-balance-sheet leases signed but not yet commenced; $0.612B already prepaid.",
      "source": {
       "title": "Nebius unaudited condensed consolidated financial statements, six months ended June 30, 2026 (Form 6-K Ex. 99.2)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094844/nbis-20260812xex99d2.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": 22.5,
      "firm": false,
      "period": "FY2026 guidance",
      "to": null,
      "note": "Guidance range $20B–$25B (midpoint shown), raised in May 2026 and reaffirmed in Aug 2026 per secondary summaries; the primary shareholder letters defer the figure to the earnings call.",
      "source": {
       "title": "Nebius (NBIS) Q2 2026 earnings summary",
       "publisher": "Quartr",
       "url": "https://quartr.com/events/nebius-group-n-v-nbis-q2-2026_ozKEzQzr",
       "date": "2026-08-12",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "AI cloud revenue",
      "amount_usd_b": 0.5749,
      "period": "Q2 2026",
      "note": "98% of group revenue.",
      "source": {
       "title": "Nebius Q2 2026 shareholder letter (Form 6-K Ex. 99.2)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094568/tm2622968d1_ex99-2.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "metric": "Annualized run-rate revenue",
      "amount_usd_b": 3.0,
      "period": "end of June 2026",
      "note": "Up from $1.9B at end of March 2026. 2026 year-end guide: $7B–$9B; 2026 revenue guide $3.0B–$3.4B.",
      "source": {
       "title": "Nebius Q2 2026 shareholder letter (Form 6-K Ex. 99.2)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094568/tm2622968d1_ex99-2.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "metric": "Remaining performance obligations (backlog)",
      "amount_usd_b": 37.49,
      "period": "as of Jun 30, 2026",
      "note": "36% expected within 24 months. Management says total customer commitments exceed $40B.",
      "source": {
       "title": "Nebius unaudited condensed consolidated financial statements, six months ended June 30, 2026 (Form 6-K Ex. 99.2)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094844/nbis-20260812xex99d2.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     }
    ],
    "commitments": [
     {
      "what": "Meta optional capacity",
      "amount_usd_b": 15.0,
      "firm": false,
      "horizon": "5 years",
      "counterparty": "meta",
      "note": "Capped at $15B; per Nebius, lets Nebius sell capacity from upcoming clusters to Meta on pre-agreed terms or to other customers at market rates, conditional.",
      "source": {
       "title": "Nebius Q1 2026 shareholder letter (Form 6-K Ex. 99.2)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926059872/tm2614392d1_ex99-2.htm",
       "date": "2026-05-13",
       "tier": "primary"
      }
     },
     {
      "what": "Microsoft GPU capacity contract",
      "amount_usd_b": 17.4,
      "firm": true,
      "horizon": "from Sep 2025, multi-year",
      "counterparty": "microsoft",
      "note": "$17.4B initial value, could rise to $19.4B with additional services. All tranches delivered by Aug 2026.",
      "source": {
       "title": "Meta commits up to $27 billion to Nebius in one of the largest AI infrastructure deals on record",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/meta-nebius-27-billion-ai-infrastructure-deal",
       "date": "2026-03-16",
       "tier": "press"
      }
     },
     {
      "what": "Meta dedicated compute (second contract)",
      "amount_usd_b": 12.0,
      "firm": true,
      "horizon": "5 years from early 2027",
      "counterparty": "meta",
      "note": "Part of a deal described as up to $27B.",
      "source": {
       "title": "Meta commits up to $27 billion to Nebius in one of the largest AI infrastructure deals on record",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/meta-nebius-27-billion-ai-infrastructure-deal",
       "date": "2026-03-16",
       "tier": "press"
      }
     },
     {
      "what": "Meta first contract",
      "amount_usd_b": 3.0,
      "firm": true,
      "horizon": "5 years from Nov 2025",
      "counterparty": "meta",
      "note": "",
      "source": {
       "title": "Meta commits up to $27 billion to Nebius in one of the largest AI infrastructure deals on record",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/meta-nebius-27-billion-ai-infrastructure-deal",
       "date": "2026-03-16",
       "tier": "press"
      }
     }
    ],
    "concentration": [
     {
      "fact": "Three unnamed customers made up 59% of Q2 2026 revenue: Customer C 24%, Customer D 21%, Customer E 14%.",
      "source": {
       "title": "Nebius unaudited condensed consolidated financial statements, six months ended June 30, 2026 (Form 6-K Ex. 99.2)",
       "publisher": "Nebius / SEC EDGAR",
       "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094844/nbis-20260812xex99d2.htm",
       "date": "2026-08-12",
       "tier": "primary"
      }
     },
     {
      "fact": "Microsoft (~$17.4B) and Meta ($3B + $12B firm) contracts total about $32B against $37.5B of backlog, most of the backlog is two hyperscaler customers (indicative; contract value and backlog are measured differently).",
      "source": {
       "title": "Meta commits up to $27 billion to Nebius in one of the largest AI infrastructure deals on record",
       "publisher": "The Next Web",
       "url": "https://thenextweb.com/news/meta-nebius-27-billion-ai-infrastructure-deal",
       "date": "2026-03-16",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Free cash flow (cash from operations minus capex) was about −$3.4B in Q2 2026 and −$3.6B in H1 2026, and operating cash flow itself was inflated by customer prepayments.",
     "Convertible debt principal outstanding was $10.04B at June 30, 2026 (carrying value $8.5B); low coupons (1%–3%) because investors are paid mainly through the option to convert into shares.",
     "Funding mix is unusually equity-heavy: H1 2026 brought $2B from Nvidia, $2.85B of at-the-market stock sales and $4.3B of convertibles, with only $0.775B of secured loans so far.",
     "Cash was $8.0B (plus $1.06B restricted) at June 30, 2026 against $20B–$25B of 2026 capex guidance."
    ]
   },
   "crusoe": {
    "period_note": "Private company, no audited financials published. Figures are funding rounds and loans reported Jan 2025 – Sep 2026.",
    "sources": [
     {
      "type": "loans",
      "amount_usd_b": 7.1,
      "firm": true,
      "period": "May 2025",
      "from": "banks",
      "note": "JPMorgan-led construction loan to the Blue Owl / Crusoe / Primary Digital joint venture for phase two of the 1.2 GW Abilene, Texas campus (part of a $15B JV). Abilene is the first Stargate site built for OpenAI and Oracle.",
      "source": {
       "title": "Newmark Facilitates $7.1 Billion Construction Loan to Develop AI Data Center",
       "publisher": "Newmark via Nasdaq",
       "url": "https://www.nasdaq.com/press-release/newmark-facilitates-71-billion-construction-loan-develop-ai-data-center-2025-05-22",
       "date": "2025-05-22",
       "tier": "primary"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 3.0,
      "firm": true,
      "period": "Sep 2026",
      "from": "sovereign-funds",
      "note": "Bloomberg: 'over $3B' at roughly $30B valuation; Mubadala Capital (Abu Dhabi) participated. Same round as above, do not add.",
      "source": {
       "title": "Crusoe Raises Over $3 Billion in Round at $30 Billion Valuation",
       "publisher": "Bloomberg via Bloomberg Government",
       "url": "https://news.bgov.com/crypto/crusoe-raises-over-3-billion-in-round-at-30-billion-valuation",
       "date": "2026-09-03",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 1.375,
      "firm": true,
      "period": "Oct 2025 (Series E)",
      "from": "nvidia",
      "note": "About $10B valuation; investors included Nvidia, Fidelity, Founders Fund, Valor and Mubadala. Nvidia's amount not disclosed.",
      "source": {
       "title": "Crusoe raises $3B at $30B valuation after landing $13B Jane Street deal",
       "publisher": "Tech Funding News",
       "url": "https://techfundingnews.com/crusoe-raises-3b-at-30b-valuation-after-landing-13b-jane-street-deal/",
       "date": "2026-09-04",
       "tier": "press"
      }
     },
     {
      "type": "revenue",
      "amount_usd_b": 13.0,
      "firm": false,
      "period": "5-year contract, signed 2026",
      "from": "jane-street",
      "note": "Reported $13B five-year contract for Jane Street to use GPUs and AI infrastructure via Crusoe Cloud (Bloomberg, as cited). Contract value over time, not revenue to date.",
      "source": {
       "title": "Crusoe raises $3B at $30B valuation after landing $13B Jane Street deal",
       "publisher": "Tech Funding News",
       "url": "https://techfundingnews.com/crusoe-raises-3b-at-30b-valuation-after-landing-13b-jane-street-deal/",
       "date": "2026-09-04",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 3.9,
      "firm": true,
      "period": "Sep 2026 (Series F)",
      "from": "venture-funds",
      "note": "Reported $3.9B Series F at about $30.9B post-money valuation, co-led by Atreides, Valor Equity Partners and Mubadala; Founders Fund, TPG and Qatar Investment Authority participated (secondary source citing WSJ). Bloomberg earlier reported 'over $3B at about $30B'.",
      "source": {
       "title": "Crusoe Completes $3.9B F-Round Funding at $30.9B Valuation (citing WSJ)",
       "publisher": "KuCoin News / MarsBit",
       "url": "https://www.kucoin.com/news/flash/crusoe-completes-3-9b-f-round-funding-at-30-9b-valuation",
       "date": "2026-09-17",
       "tier": "secondary"
      }
     },
     {
      "type": "loans",
      "amount_usd_b": 0.509,
      "firm": false,
      "period": "Sep 2026",
      "from": "banks",
      "note": "Goldman Sachs delayed-draw term loan; price talk SOFR+4.75–5.00% (secondary source citing Octus).",
      "source": {
       "title": "Crusoe Debt, Lenders and Contracts",
       "publisher": "AM Compute",
       "url": "https://www.amcompute.com/companies/crusoe",
       "date": "2026-10",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": null,
      "firm": true,
      "period": "2025–2026",
      "to": null,
      "note": "Capex not disclosed. Abilene JV is described as a $15B project.",
      "source": {
       "title": "Newmark Facilitates $7.1 Billion Construction Loan to Develop AI Data Center",
       "publisher": "Newmark via Nasdaq",
       "url": "https://www.nasdaq.com/press-release/newmark-facilitates-71-billion-construction-loan-develop-ai-data-center-2025-05-22",
       "date": "2025-05-22",
       "tier": "primary"
      }
     }
    ],
    "revenue": [],
    "commitments": [],
    "concentration": [
     {
      "fact": "Named customers: OpenAI and Oracle (Abilene/Stargate), Microsoft, Meta, Jane Street. No revenue split published.",
      "source": {
       "title": "Crusoe Raises Over $3 Billion in Round at $30 Billion Valuation",
       "publisher": "Bloomberg via Bloomberg Government",
       "url": "https://news.bgov.com/crypto/crusoe-raises-over-3-billion-in-round-at-30-billion-valuation",
       "date": "2026-09-03",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Crusoe's valuation roughly tripled from about $10B (Oct 2025) to about $30B (Sep 2026); Axios reported it met banks about an IPO (as cited by Tech Funding News).",
     "Gulf sovereign money (Mubadala, Qatar Investment Authority) and Nvidia are both in the cap table.",
     "Jane Street is a $13B (reported) customer of Crusoe, a $1B shareholder in CoreWeave, and lead investor in Fluidstack, one trading firm is a buyer and funder across three neoclouds."
    ]
   },
   "fluidstack": {
    "period_note": "Private company. Equity rounds through Sep 2026; Google backstops 2025; revenue figures are investor-memo projections reported by press/aggregators.",
    "sources": [
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 3.2,
      "firm": true,
      "period": "Aug 2025, 10-year leases",
      "from": "google",
      "note": "Google backstops Fluidstack's lease payments to TeraWulf at Lake Mariner, NY: $1.8B initially plus $1.4B more to support project debt = about $3.2B. Google got warrants for about 14% of TeraWulf (pro forma). The backstop lets TeraWulf borrow against Fluidstack's leases.",
      "source": {
       "title": "Google lifting stake in TeraWulf with additional $1.4 billion backstop",
       "publisher": "Dow Jones via MarketScreener",
       "url": "https://au.marketscreener.com/news/google-lifting-stake-in-terawulf-with-additional-1-4-billion-backstop-ce7c51dfd08df526",
       "date": "2025-08-18",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 1.5,
      "firm": true,
      "period": "Sep 2026",
      "from": "jane-street",
      "note": "$1.5B round led by Jane Street at $18B post-money valuation (up from $7.5B about two months earlier).",
      "source": {
       "title": "Fluidstack raises $1.5B led by Jane Street, valuation to $18B",
       "publisher": "Dealroom",
       "url": "https://dealroom.co/news/157101-fluidstack-raises-1-5b-led-by-jane-street-valuation-quadruples-to-18b-in/",
       "date": "2026-09-28",
       "tier": "secondary"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 0.75,
      "firm": true,
      "period": "Apr 2026 (Series A)",
      "from": "venture-funds",
      "note": "'More than $750M' at about $7B valuation (The Telegraph, as cited); investors include Situational Awareness (Leopold Aschenbrenner's fund). Later headlines say the round closed at $830M / $7.5B (not opened). Google reportedly in talks to invest (WSJ, as cited).",
      "source": {
       "title": "Fluidstack raises $750M at $7B as Google and Anthropic anchor its AI data centres",
       "publisher": "Dealroom (citing The Telegraph, WSJ, Bloomberg)",
       "url": "https://dealroom.co/news/127233-fluidstack-raises-750m-at-7b-as-google-and-anthropic-anchor-its-ai-data/",
       "date": "2026-04-06",
       "tier": "secondary"
      }
     },
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 3.03,
      "firm": true,
      "period": "2025",
      "from": "google",
      "note": "Further Google backstops of Fluidstack leases per Sacra: about $1.3B at the TeraWulf Abernathy, TX JV and $1.73B at Cipher Mining (Google gets ~5.4% of Cipher). Hut 8 River Bend (LA) lease also has a Google backstop of undisclosed size. Secondary source, not verified against filings.",
      "source": {
       "title": "Fluidstack revenue, funding & growth rate",
       "publisher": "Sacra",
       "url": "https://sacra.com/research/fluidstack",
       "date": "2026",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "leases",
      "amount_usd_b": 3.7,
      "firm": true,
      "period": "10 years from 2025",
      "to": "TeraWulf",
      "note": "Two 10-year colocation leases for 200+ MW at Lake Mariner, NY; about $3.7B over base term, up to about $8.7B with two five-year extensions.",
      "source": {
       "title": "TeraWulf press release: Fluidstack HPC colocation agreements and Google backstop (Ex. 99.1)",
       "publisher": "TeraWulf (investor relations / SEC exhibit)",
       "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001104659-25-078084/tm2523008d2_ex99-1.htm",
       "date": "2025-08-14",
       "tier": "primary"
      }
     },
     {
      "type": "leases",
      "amount_usd_b": null,
      "firm": true,
      "period": "2025–2041",
      "to": "Cipher Mining, Hut 8, TeraWulf Abernathy JV",
      "note": "Per Sacra: Cipher ~207 MW (~$3.8B base term), TeraWulf Abernathy JV 168 MW (~$9.5B to the JV), Hut 8 River Bend 245 MW 15-year (~$7B base term). Secondary; not summed.",
      "source": {
       "title": "Fluidstack revenue, funding & growth rate",
       "publisher": "Sacra",
       "url": "https://sacra.com/research/fluidstack",
       "date": "2026",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Revenue (projected)",
      "amount_usd_b": 0.66,
      "period": "FY2026 projection",
      "note": "Investor-memo projection reported by Dealroom; 2024 audited revenue $66.2M; 2025 about $200M expected.",
      "source": {
       "title": "Fluidstack raises $1.5B led by Jane Street, valuation to $18B",
       "publisher": "Dealroom",
       "url": "https://dealroom.co/news/157101-fluidstack-raises-1-5b-led-by-jane-street-valuation-quadruples-to-18b-in/",
       "date": "2026-09-28",
       "tier": "secondary"
      }
     }
    ],
    "commitments": [
     {
      "what": "Build and operate custom data centers for Anthropic in Texas and New York",
      "amount_usd_b": 50.0,
      "firm": false,
      "horizon": "from 2026",
      "counterparty": "anthropic",
      "note": "$50B is Anthropic's overall US data center plan; Fluidstack's share of it is not disclosed.",
      "source": {
       "title": "Fluidstack raises $1.5B led by Jane Street, valuation to $18B",
       "publisher": "Dealroom",
       "url": "https://dealroom.co/news/157101-fluidstack-raises-1-5b-led-by-jane-street-valuation-quadruples-to-18b-in/",
       "date": "2026-09-28",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [
     {
      "fact": "Named customers: Anthropic (primary build partner for its $50B US plan), Meta, Mistral, Poolside, Character.AI. No revenue split published.",
      "source": {
       "title": "Fluidstack raises $1.5B led by Jane Street, valuation to $18B",
       "publisher": "Dealroom",
       "url": "https://dealroom.co/news/157101-fluidstack-raises-1-5b-led-by-jane-street-valuation-quadruples-to-18b-in/",
       "date": "2026-09-28",
       "tier": "secondary"
      }
     }
    ],
    "observations": [
     "Fluidstack's ~1 GW of power is mostly leased from converted bitcoin miners whose debt financing relies on Google guaranteeing Fluidstack's rent, Google's credit, not Fluidstack's, underpins the buildout.",
     "Projected 2026 revenue (~$0.66B) is small against multi-billion lease obligations and an $18B valuation; reported debt plans are 'tens of billions' (no figure).",
     "Google benefits twice: the Fluidstack/Anthropic sites run Google TPUs, and Google received equity warrants in the miners in exchange for its backstops."
    ]
   },
   "cerebras": {
    "period_note": "FY2025 figures from the IPO filing (as reported by press); IPO May 14, 2026. Post-IPO quarterly results were not retrieved.",
    "sources": [
     {
      "type": "equity_raised",
      "amount_usd_b": 5.55,
      "firm": true,
      "period": "May 2026 IPO",
      "from": "stock-market",
      "note": "30M shares at $185 (range raised twice from $115–$125). Up to about $6.38B if underwriters' option exercised. About $56B fully diluted value at IPO price; shares opened +108%.",
      "source": {
       "title": "Cerebras stock just hit markets",
       "publisher": "Yahoo Finance",
       "url": "https://finance.yahoo.com/markets/stocks/articles/cerebras-stock-just-hit-markets-150518599.html",
       "date": "2026-05-14",
       "tier": "press"
      }
     },
     {
      "type": "revenue",
      "amount_usd_b": 0.51,
      "firm": true,
      "period": "FY2025",
      "from": "mixed",
      "note": "Up 76% from $290M in 2024. Net income reported as $237.8M (Yahoo/TechCrunch) vs $87.9M (DigiTimes/Dealroom), sources disagree; 2024 net loss $481.6M.",
      "source": {
       "title": "Cerebras stock just hit markets",
       "publisher": "Yahoo Finance",
       "url": "https://finance.yahoo.com/markets/stocks/articles/cerebras-stock-just-hit-markets-150518599.html",
       "date": "2026-05-14",
       "tier": "press"
      }
     },
     {
      "type": "equity_raised",
      "amount_usd_b": 1.0,
      "firm": true,
      "period": "Feb 2026 (Series H)",
      "from": "venture-funds",
      "note": "$1B at $23B valuation. G42 and Abu Dhabi Growth Fund are also investors.",
      "source": {
       "title": "Cerebras, with strong OpenAI connections, launches IPO bid",
       "publisher": "Trending Topics",
       "url": "https://www.trendingtopics.eu/cerebras-ipo-2026-2/",
       "date": "2026-05-05",
       "tier": "secondary"
      }
     }
    ],
    "uses": [],
    "revenue": [
     {
      "metric": "Revenue",
      "amount_usd_b": 0.51,
      "period": "FY2025",
      "note": "",
      "source": {
       "title": "Cerebras raises $5.5B, kicking off 2026's IPO season with a bang",
       "publisher": "TechCrunch",
       "url": "https://techcrunch.com/2026/05/14/cerebras-raises-5-5b-kicking-off-2026s-ipo-season-with-a-bang",
       "date": "2026-05-14",
       "tier": "press"
      }
     },
     {
      "metric": "Remaining performance obligations (backlog)",
      "amount_usd_b": 24.6,
      "period": "as of IPO filing (2026)",
      "note": "About 48x 2025 revenue; mostly the OpenAI deal.",
      "source": {
       "title": "Cerebras stock just hit markets",
       "publisher": "Yahoo Finance",
       "url": "https://finance.yahoo.com/markets/stocks/articles/cerebras-stock-just-hit-markets-150518599.html",
       "date": "2026-05-14",
       "tier": "press"
      }
     }
    ],
    "commitments": [
     {
      "what": "OpenAI agreement for 750 MW of Cerebras compute",
      "amount_usd_b": 20.0,
      "firm": false,
      "horizon": "multi-year, from 2026",
      "counterparty": "openai",
      "note": "Reported as 'over $20B' (Yahoo Finance) / '$20B' (Dealroom); originally reported as a $10B+ deal. Dealroom also reports a $1B working-capital loan tied to the deal (lender/direction not clearly stated). TechCrunch calls it a 'complicated circular deal'; Sam Altman, Greg Brockman and Ilya Sutskever are early angel investors in Cerebras.",
      "source": {
       "title": "Cerebras stock just hit markets",
       "publisher": "Yahoo Finance",
       "url": "https://finance.yahoo.com/markets/stocks/articles/cerebras-stock-just-hit-markets-150518599.html",
       "date": "2026-05-14",
       "tier": "press"
      }
     }
    ],
    "concentration": [
     {
      "fact": "MBZUAI (Abu Dhabi AI university) was 62% and G42 (Abu Dhabi AI group, also a Cerebras investor) 24% of 2025 revenue, 86% from two UAE-linked customers. G42 was over 85% of revenue in H1 2024.",
      "source": {
       "title": "Cerebras stock just hit markets",
       "publisher": "Yahoo Finance",
       "url": "https://finance.yahoo.com/markets/stocks/articles/cerebras-stock-just-hit-markets-150518599.html",
       "date": "2026-05-14",
       "tier": "press"
      }
     },
     {
      "fact": "Dealroom independently reports G42 and MBZUAI together at 86% of 2025 revenue.",
      "source": {
       "title": "Cerebras raises $5.55B in biggest US IPO of 2026",
       "publisher": "Dealroom (citing TechCrunch, FT, Bloomberg, WSJ)",
       "url": "https://dealroom.co/news/128936-cerebras-raises-5-55b-in-biggest-us-ipo-of-2026/",
       "date": "2026-05-14",
       "tier": "secondary"
      }
     }
    ],
    "observations": [
     "Cerebras' backlog ($24.6B) is about 48 times its 2025 revenue, and is concentrated in one customer (OpenAI) that has not yet produced most of it; its past revenue came almost entirely from UAE entities.",
     "The 2026 IPO ($5.55B) was the year's biggest US listing at the time, public equity is now directly funding AI chip supply to OpenAI."
    ]
   },
   "nvidia": {
    "period_note": "Q2 fiscal 2027 = quarter ended July 26, 2026 (reported Aug 26, 2026). H1 = first half of fiscal 2027 (Jan 26 to Jul 26, 2026). Q3 FY27 results not out until about Nov 18, 2026.",
    "sources": [
     {
      "type": "revenue",
      "amount_usd_b": 96.221,
      "firm": true,
      "period": "Q2 FY2027 (quarter ended Jul 26, 2026)",
      "from": null,
      "note": "Total revenue, up 106% from a year earlier.",
      "source": {
       "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 24.077,
      "firm": true,
      "period": "Q2 FY2027",
      "from": null,
      "note": "Cash from operations was well below net income of $59.7B in the same quarter (see observations).",
      "source": {
       "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": 74.421,
      "firm": true,
      "period": "H1 FY2027 (Jan 26 to Jul 26, 2026)",
      "from": null,
      "note": "First-half cash from operations; net income for the same half was $118.0B.",
      "source": {
       "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 2.677,
      "firm": true,
      "period": "Q2 FY2027",
      "to": null,
      "note": "Purchases of property, equipment and intangible assets. H1 FY2027: $4.434B.",
      "source": {
       "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 39.044,
      "firm": true,
      "period": "H1 FY2027",
      "to": null,
      "note": "Share repurchases in the first half (Q2 alone: $19.732B). About $99.0B of buyback authorization remained at Jul 26, 2026.",
      "source": {
       "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "type": "buybacks_dividends",
      "amount_usd_b": 6.29,
      "firm": true,
      "period": "H1 FY2027",
      "to": null,
      "note": "Dividends paid in the first half (Q2 alone: $6.047B).",
      "source": {
       "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 31.0,
      "firm": true,
      "period": "H1 FY2027",
      "to": null,
      "note": "Net additions to stakes in private (non-listed) companies; $13.1B of it in Q2. Balance rose from $22.3B (Jan 25, 2026) to $47.9B (Jul 26, 2026), plus $3.3B of stakes in 'infrastructure financiers'. The 10-Q excerpt read did not name the companies.",
      "source": {
       "title": "NVIDIA Form 10-Q, quarter ended July 26, 2026",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000075/nvda-20260726.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "type": "acquisitions",
      "amount_usd_b": 2.944,
      "firm": true,
      "period": "Q2 FY2027",
      "to": "Groq, Inc.",
      "note": "Deferred payment to Groq under a non-exclusive license agreement, shown in financing cash flows.",
      "source": {
       "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "type": "acquisitions",
      "amount_usd_b": 11.9,
      "firm": false,
      "period": "Expected to close H1 2027",
      "to": "Hugging Face",
      "note": "Agreed Sep 2, 2026 to buy Hugging Face for about $11.9B, plus up to about $1.0B of stock-based retention. Needs regulatory approval.",
      "source": {
       "title": "NVIDIA Form 8-K (agreement to acquire Hugging Face)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000078/nvda-20260902.htm",
       "date": "2026-09-02",
       "tier": "primary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 18.5,
      "firm": true,
      "period": "Q1 FY2027 (quarter ended Apr 26, 2026)",
      "to": null,
      "note": "Purchases of private-company stakes in Q1, versus $649M the quarter before. Excludes listed-company stakes (e.g. Corning, IREN) and commitments not yet closed.",
      "source": {
       "title": "Nvidia posts another record quarter, reveals $43 billion of holdings in startups",
       "publisher": "TechCrunch",
       "url": "https://techcrunch.com/2026/05/20/nvidia-posts-another-record-quarter-reveals-43-billion-of-holdings-in-startups/",
       "date": "2026-05-20",
       "tier": "press"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Data Center revenue",
      "amount_usd_b": 89.0,
      "period": "Q2 FY2027",
      "note": "Up 117% from a year earlier; about 92.5% of total revenue.",
      "source": {
       "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "metric": "Total revenue guidance",
      "amount_usd_b": 108.0,
      "period": "Q3 FY2027 (quarter ending Oct 2026)",
      "note": "Plus or minus 2%; assumes no China data center compute revenue.",
      "source": {
       "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "metric": "Data Center revenue from hyperscalers",
      "amount_usd_b": 48.71,
      "period": "Q2 FY2027",
      "note": "Hyperscale was about 55% of data center sales; the other $40.31B came from AI clouds, industrial and enterprise customers. Split as reported by The Next Platform.",
      "source": {
       "title": "The Network Is More Of Nvidia's Computer Than It Ever Was At Sun",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/compute/2026/08/27/the-network-is-more-of-nvidias-computer-than-it-ever-was-at-sun/5292807",
       "date": "2026-08-27",
       "tier": "press"
      }
     }
    ],
    "commitments": [
     {
      "what": "Residual value guarantees on OpenAI's leased data center campus (PORTS, Pike County, Ohio)",
      "amount_usd_b": 105.0,
      "firm": false,
      "horizon": "Leases are 20 years; capacity from 2028",
      "counterparty": "SB Energy (lessor) for OpenAI (tenant)",
      "note": "A cap, not a payment: Nvidia pays only if OpenAI defaults or goes insolvent and re-letting/sale recovers less than a guaranteed minimum value. Covers about 4.25 GW of IT load; Nvidia may (at its sole option) back another ~3.8 GW. OpenAI agreed to reimburse Nvidia for any amount it actually pays.",
      "source": {
       "title": "NVIDIA Form 8-K (residual value guaranties, PORTS campus)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/nvda-20260817.htm",
       "date": "2026-08-17",
       "tier": "primary"
      }
     },
     {
      "what": "Land, power and shell guarantees for AI cloud partners' data center leases",
      "amount_usd_b": 3.529,
      "firm": false,
      "horizon": "Declines over 5 to 7 years",
      "counterparty": "Unnamed AI cloud partners",
      "note": "Notional amount at Jul 26, 2026. Partners put $712M in escrow to partly cover Nvidia's exposure.",
      "source": {
       "title": "NVIDIA Form 10-Q, quarter ended July 26, 2026",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000075/nvda-20260726.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "what": "Buy CoreWeave's unsold cloud capacity",
      "amount_usd_b": 6.3,
      "firm": true,
      "horizon": "Through Apr 13, 2032",
      "counterparty": "coreweave",
      "note": "Initial value of the order. Nvidia must buy any capacity CoreWeave cannot sell to its own customers.",
      "source": {
       "title": "CoreWeave Form 8-K (NVIDIA order form)",
       "publisher": "CoreWeave (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/1769628/000176962825000047/crwv-20250909.htm",
       "date": "2025-09-15",
       "tier": "primary"
      }
     },
     {
      "what": "Warrants to buy listed-company stock",
      "amount_usd_b": 4.8,
      "firm": true,
      "horizon": "3 to 5 years",
      "counterparty": "Not named",
      "note": "Notional value of warrants held at Jul 26, 2026 (none at Jan 25, 2026); fair value $824M.",
      "source": {
       "title": "NVIDIA Form 10-Q, quarter ended July 26, 2026",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000075/nvda-20260726.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "what": "Compute financing platforms with Apollo, BlackRock, Blackstone, Brookfield, Goldman Sachs and KKR",
      "amount_usd_b": 500.0,
      "firm": false,
      "horizon": "Not stated",
      "counterparty": "apollo-blackstone-brookfield-and-others",
      "note": "Release says the platforms 'could mobilize over $500B in third-party capital', subject to definitive agreements. This is outside money, not Nvidia's.",
      "source": {
       "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "what": "Supply and capacity purchase commitments",
      "amount_usd_b": 279.0,
      "firm": true,
      "horizon": "Mostly fiscal 2027 to 2029 (about $92B rest of FY27, $87B FY28, $88B FY29)",
      "counterparty": "Suppliers (mainly memory makers; not named)",
      "note": "Up from $119B a quarter earlier and $45.8B a year earlier. Company said the jump was 'primarily related to the procurement of memory'. Year split per TIKR.",
      "source": {
       "title": "Nvidia's supply commitments more than doubled to $279 billion",
       "publisher": "The Motley Fool via Nasdaq.com",
       "url": "https://www.nasdaq.com/articles/nvidias-supply-commitments-more-doubled-279-billion-heres-what-it-does-stock",
       "date": "2026-08-27",
       "tier": "secondary"
      }
     },
     {
      "what": "Multi-year cloud service agreements (Nvidia renting compute from clouds)",
      "amount_usd_b": 29.0,
      "firm": true,
      "horizon": "Multi-year",
      "counterparty": "Unnamed cloud partners",
      "note": "Reported by a secondary summary of the 10-Q; the same summary elsewhere cites $36B, unreconciled.",
      "source": {
       "title": "NVIDIA financial analysis",
       "publisher": "sec-api.io",
       "url": "https://sec-api.io/insights/nvidia-financial-analysis",
       "date": "2026",
       "tier": "secondary",
       "date_inferred": true
      }
     },
     {
      "what": "Equity investment commitments not yet funded",
      "amount_usd_b": 25.0,
      "firm": true,
      "horizon": "Not stated",
      "counterparty": "Not named",
      "note": "From secondary summaries of the Q2 FY2027 10-Q; could not read this note in the filing directly.",
      "source": {
       "title": "NVIDIA Q2 2027 earnings (10-Q summary)",
       "publisher": "Hudson Labs",
       "url": "https://www.hudson-labs.com/research/nvidia-q2-2027-earnings",
       "date": "2026",
       "tier": "secondary",
       "date_inferred": true
      }
     }
    ],
    "concentration": [
     {
      "fact": "Q2 FY2027: one direct customer was 16% of total revenue. H1 FY2027: three direct customers were 16%, 15% and 13% (all Compute & Networking). A year earlier (Q2 FY2026) two direct customers were 23% and 16%. Some indirect customers (buying through those direct customers) are also 10%+ each, amounts not given.",
      "source": {
       "title": "NVIDIA Q2 2027 earnings (10-Q summary)",
       "publisher": "Hudson Labs",
       "url": "https://www.hudson-labs.com/research/nvidia-q2-2027-earnings",
       "date": "2026",
       "tier": "secondary",
       "date_inferred": true
      }
     },
     {
      "fact": "Fiscal 2026 (year to Jan 25, 2026): one direct customer was 22% of revenue and another 14%.",
      "source": {
       "title": "NVIDIA financial analysis",
       "publisher": "sec-api.io",
       "url": "https://sec-api.io/insights/nvidia-financial-analysis",
       "date": "2026",
       "tier": "secondary",
       "date_inferred": true
      }
     },
     {
      "fact": "At Jul 26, 2026, five direct customers held 22%, 14%, 13%, 11% and 10% of accounts receivable (70% combined), up from three customers at 25%, 18%, 13% in January 2026.",
      "source": {
       "title": "NVIDIA Form 10-Q, quarter ended July 26, 2026",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000075/nvda-20260726.htm",
       "date": "2026-08-26",
       "tier": "primary"
      }
     },
     {
      "fact": "Hyperscalers were about 55% of Q2 FY2027 data center revenue ($48.71B of $89.0B).",
      "source": {
       "title": "The Network Is More Of Nvidia's Computer Than It Ever Was At Sun",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/compute/2026/08/27/the-network-is-more-of-nvidias-computer-than-it-ever-was-at-sun/5292807",
       "date": "2026-08-27",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "Q2 FY2027 cash from operations ($24.1B) was only 40% of net income ($59.7B). In H1, receivables (money owed by customers) rose about $24.6B to $63.1B and inventory rose about $10.2B to $31.6B. (10-Q)",
     "H1 FY2027 net income included $23.7B of gains on equity stakes, which are paper gains, not cash; that is about 20% of H1 net income. Q2 alone: $7.8B. Many of these stakes are in Nvidia customers.",
     "H1 FY2027 free cash flow was $69.9B. In the same half Nvidia spent $39.0B on buybacks, $6.3B on dividends and added $31.0B of private-company stakes: $76.3B in total, more than free cash flow. (Our arithmetic from the release and 10-Q.)",
     "Free cash flow fell from about $48.6B in Q1 FY2027 to $21.3B in Q2 FY2027 even as revenue rose 18%.",
     "Nvidia's holdings of company stakes at Jul 26, 2026: $42.8B listed (marketable) equity plus $51.2B non-listed, about $94B combined, versus cash and marketable debt of $56.6B. (Our arithmetic from the release; a secondary summary cites $99B.)",
     "CEO Jensen Huang said in March 2026 that existing stakes in OpenAI and Anthropic may be Nvidia's last before they go public.",
     "Nvidia's CFO said component supply was enough to grow data center revenue slightly more than 70% in fiscal 2028."
    ]
   },
   "amd": {
    "period_note": "Q2 2026 (quarter ended late June 2026). Q3 2026 results are due Nov 3, 2026, after this research date.",
    "sources": [
     {
      "type": "revenue",
      "amount_usd_b": 11.54,
      "firm": true,
      "period": "Q2 2026",
      "from": null,
      "note": "Up 50% from a year earlier. Net income just under $3B, helped by interest and gains on AMD's stakes in other companies.",
      "source": {
       "title": "AMD Catches The Agentic AI Wave And Will Ride It Up Masterfully",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/compute/2026/08/05/amd-catches-the-agentic-ai-wave-and-will-ride-it-up-masterfully/5283468",
       "date": "2026-08-05",
       "tier": "press"
      }
     }
    ],
    "uses": [
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 5.0,
      "firm": false,
      "period": "Not stated",
      "to": "anthropic",
      "note": "Reported as a pledge of 'up to $5 billion' to Anthropic; no terms found in a primary source.",
      "source": {
       "title": "AMD Has Ripped 170% This Year: Is It Too Late to Buy?",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/amd-has-ripped-170-this-year-is-it-too-late-to-buy?",
       "date": "2026-10-29",
       "tier": "secondary"
      }
     },
     {
      "type": "investments_in_ai_companies",
      "amount_usd_b": 1.0,
      "firm": false,
      "period": "Oct 27, 2026",
      "to": "meta",
      "note": "Reported that AMD committed $1B to Meta's stock offering. Only a secondary source; not verified.",
      "source": {
       "title": "AMD Has Ripped 170% This Year: Is It Too Late to Buy?",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/amd-has-ripped-170-this-year-is-it-too-late-to-buy?",
       "date": "2026-10-29",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Data Center segment revenue",
      "amount_usd_b": 6.72,
      "period": "Q2 2026",
      "note": "Up 107% from a year earlier. Author estimate: Instinct GPU revenue a little over $3B (AMD does not break it out).",
      "source": {
       "title": "AMD Catches The Agentic AI Wave And Will Ride It Up Masterfully",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/compute/2026/08/05/amd-catches-the-agentic-ai-wave-and-will-ride-it-up-masterfully/5283468",
       "date": "2026-08-05",
       "tier": "press"
      }
     },
     {
      "metric": "Total revenue guidance",
      "amount_usd_b": 13.0,
      "period": "Q3 2026",
      "note": "About $13B at ~56% non-GAAP gross margin.",
      "source": {
       "title": "AMD Has Ripped 170% This Year: Is It Too Late to Buy?",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/amd-has-ripped-170-this-year-is-it-too-late-to-buy?",
       "date": "2026-10-29",
       "tier": "secondary"
      }
     }
    ],
    "commitments": [
     {
      "what": "OpenAI: 6 GW of AMD Instinct GPUs over about five years; AMD issues OpenAI a warrant for up to 160 million AMD shares at $0.01",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "H2 2026 to Oct 2030",
      "counterparty": "openai",
      "note": "Warrant vests in tranches as OpenAI deploys AMD hardware (first after 1 GW of MI450 racks in H2 2026) and as AMD's stock price rises; last tranche needs AMD at $600. Lisa Su said the deal means 'tens of billions of dollars' of revenue. No dollar purchase amount disclosed.",
      "source": {
       "title": "Did AMD Use ChatGPT To Come Up With Its OpenAI Partnership Deal?",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/ai/2025/10/06/did-amd-use-chatgpt-to-come-up-with-its-openai-partnership-deal/1650126",
       "date": "2025-10-06",
       "tier": "press"
      }
     },
     {
      "what": "Meta: 6 GW of AMD GPUs over five years; Meta gets a warrant for up to 160 million AMD shares",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "First 1 GW from H2 2026; rest contracted through 2030",
      "counterparty": "meta",
      "note": "Warrant vests on milestones tied to installed technology and AMD share price; strike price and exact thresholds not in source. Author estimates (not company) ~$115B of GPU spend.",
      "source": {
       "title": "Some More Game Theory, This Time On The AMD-Meta Platforms Deal",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/compute/2026/02/24/some-more-game-theory-this-time-on-the-amd-meta-platforms-deal/4092150",
       "date": "2026-02-24",
       "tier": "press"
      }
     },
     {
      "what": "Guarantee of a partner's data center lease",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "Not stated",
      "counterparty": "Not named",
      "note": "Mentioned only in a secondary source with no amount.",
      "source": {
       "title": "AMD Has Ripped 170% This Year: Is It Too Late to Buy?",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/amd-has-ripped-170-this-year-is-it-too-late-to-buy?",
       "date": "2026-10-29",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "AMD has handed two of its biggest GPU buyers (OpenAI and Meta) warrants for up to 160 million shares each, nearly 10% of AMD apiece by the article's share count, that vest as they buy AMD chips.",
     "CEO Lisa Su said (Oct 6, 2026) AMD will 'substantially increase our supply in 2027' and now plans capacity three to five years out instead of one to two.",
     "Analyst estimates (not company guidance): about $51B revenue in 2026 and $89B in 2027."
    ]
   },
   "broadcom": {
    "period_note": "Q3 fiscal 2026 = quarter ended early August 2026 (reported early Sep 2026). Q4 FY2026 results due December 2026.",
    "sources": [
     {
      "type": "revenue",
      "amount_usd_b": 29.59,
      "firm": true,
      "period": "Q3 FY2026",
      "from": null,
      "note": "Up 85.5% from a year earlier. Net income $13.09B. Debt $59.42B, mostly from the VMware purchase; cash $23.98B.",
      "source": {
       "title": "Broadcom Rides Rocketing Trend For Custom AI Accelerators",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/connect/2026/09/10/broadcom-rides-rocketing-trend-for-custom-ai-accelerators/5295681",
       "date": "2026-09-10",
       "tier": "press"
      }
     }
    ],
    "uses": [],
    "revenue": [
     {
      "metric": "AI revenue",
      "amount_usd_b": 16.74,
      "period": "Q3 FY2026",
      "note": "Up 3.2x from a year earlier; $12.22B AI compute (custom chips) plus $4.52B AI networking.",
      "source": {
       "title": "Broadcom Rides Rocketing Trend For Custom AI Accelerators",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/connect/2026/09/10/broadcom-rides-rocketing-trend-for-custom-ai-accelerators/5295681",
       "date": "2026-09-10",
       "tier": "press"
      }
     },
     {
      "metric": "AI revenue forecast",
      "amount_usd_b": 230.0,
      "period": "Fiscal 2028",
      "note": "CEO Hock Tan's forecast, up from $2.6B in fiscal 2022. A forecast, not backlog; he said he will not update it quarterly.",
      "source": {
       "title": "Broadcom Rides Rocketing Trend For Custom AI Accelerators",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/connect/2026/09/10/broadcom-rides-rocketing-trend-for-custom-ai-accelerators/5295681",
       "date": "2026-09-10",
       "tier": "press"
      }
     }
    ],
    "commitments": [
     {
      "what": "Anthropic custom TPU chips (built for Google's design)",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "About 1 GW this year, 5 GW in 2027, 10 GW in 2028 (likely Broadcom fiscal years)",
      "counterparty": "anthropic",
      "note": "Hock Tan said Anthropic will be Broadcom's largest custom-chip customer in 2027 and 2028. No dollar value given. The Next Platform's author estimates (not company) about $12B per GW for the chip systems.",
      "source": {
       "title": "Broadcom Rides Rocketing Trend For Custom AI Accelerators",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/connect/2026/09/10/broadcom-rides-rocketing-trend-for-custom-ai-accelerators/5295681",
       "date": "2026-09-10",
       "tier": "press"
      }
     },
     {
      "what": "OpenAI custom accelerator ('Jalapeno')",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "1.3 GW in 2027 plus an expected 5 GW in 2028",
      "counterparty": "openai",
      "note": "Would make OpenAI Broadcom's second-largest custom-chip customer. The source gives these GW figures, not the 10 GW headline from 2025.",
      "source": {
       "title": "Broadcom Rides Rocketing Trend For Custom AI Accelerators",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/connect/2026/09/10/broadcom-rides-rocketing-trend-for-custom-ai-accelerators/5295681",
       "date": "2026-09-10",
       "tier": "press"
      }
     },
     {
      "what": "Google long-term TPU development/supply agreement plus supply assurance for networking and rack parts",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "Through end of 2031",
      "counterparty": "google",
      "note": "Disclosed in a Broadcom 8-K on Apr 7, 2026; no dollar value in the article. Tan said Broadcom will ship 'multi-tens of billions of dollars of TPUs annually over the next several years' to Google.",
      "source": {
       "title": "Broadcom And Google Benefit Mightily From Anthropic's Meteoric Growth",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/ai/2026/04/07/broadcom-and-google-benefit-mightily-from-anthropics-meteoric-growth/5214732",
       "date": "2026-04-07",
       "tier": "press"
      }
     },
     {
      "what": "Meta MTIA custom chips",
      "amount_usd_b": null,
      "firm": false,
      "horizon": "Through fiscal 2028",
      "counterparty": "meta",
      "note": "Line of sight to about 3 GW.",
      "source": {
       "title": "Broadcom Rides Rocketing Trend For Custom AI Accelerators",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/connect/2026/09/10/broadcom-rides-rocketing-trend-for-custom-ai-accelerators/5295681",
       "date": "2026-09-10",
       "tier": "press"
      }
     }
    ],
    "concentration": [
     {
      "fact": "Broadcom has six custom-chip (XPU) customers; Google, Anthropic, OpenAI and Meta are confirmed. Total committed XPU capacity across customers is about 30 GW. No revenue percentages by customer were found.",
      "source": {
       "title": "Broadcom Rides Rocketing Trend For Custom AI Accelerators",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/connect/2026/09/10/broadcom-rides-rocketing-trend-for-custom-ai-accelerators/5295681",
       "date": "2026-09-10",
       "tier": "press"
      }
     }
    ],
    "observations": [
     "The reported $42B Anthropic convertible chip financing from Broadcom could not be confirmed in any source we could open; it is not in this file.",
     "Broadcom's custom-chip growth rests on six customers, two of which (Anthropic and OpenAI) are private labs that fund chip purchases largely from outside fundraising."
    ]
   },
   "tsmc": {
    "period_note": "Q3 2026 (quarter ended Sep 30, 2026; reported Oct 15, 2026). Figures from a secondary write-up; TSMC's own release could not be opened.",
    "sources": [
     {
      "type": "revenue",
      "amount_usd_b": 46.8,
      "firm": true,
      "period": "Q3 2026",
      "from": null,
      "note": "Reported as NT$1.49 trillion. US-dollar figure is derived, not reported: Q4 guidance midpoint ($53.3B) is said to be 14% above Q3, implying about $46.8B.",
      "source": {
       "title": "TSMC Record Quarter Highlights Unprecedented Demand for AI Chips",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/tsm-stock-tsmc-record-quarter-ai-chip-demand",
       "date": "2026-10-16",
       "tier": "secondary"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": null,
      "firm": true,
      "period": "Q3 2026",
      "from": null,
      "note": "Not found. Free cash flow was NT$476.56B, versus NT$139.38B a year earlier (no US-dollar conversion available in source).",
      "source": {
       "title": "TSMC Record Quarter Highlights Unprecedented Demand for AI Chips",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/tsm-stock-tsmc-record-quarter-ai-chip-demand",
       "date": "2026-10-16",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 62.0,
      "firm": true,
      "period": "Calendar 2026 guidance",
      "to": null,
      "note": "Guided at $60B to $64B; midpoint shown. TSMC said 2026 to 2028 spending will be well above the prior three years.",
      "source": {
       "title": "TSMC Record Quarter Highlights Unprecedented Demand for AI Chips",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/tsm-stock-tsmc-record-quarter-ai-chip-demand",
       "date": "2026-10-16",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "High-performance computing (HPC, includes AI chips) share of revenue",
      "amount_usd_b": null,
      "period": "Q3 2026",
      "note": "68% of revenue. No separate AI accelerator dollar figure; TSMC says AI chip demand exceeds capacity.",
      "source": {
       "title": "TSMC Record Quarter Highlights Unprecedented Demand for AI Chips",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/tsm-stock-tsmc-record-quarter-ai-chip-demand",
       "date": "2026-10-16",
       "tier": "secondary"
      }
     },
     {
      "metric": "Revenue guidance",
      "amount_usd_b": 53.3,
      "period": "Q4 2026",
      "note": "$52.3B to $54.3B; up 58% from a year earlier at the midpoint. Full-year 2026 growth about 44% in US dollars.",
      "source": {
       "title": "TSMC Record Quarter Highlights Unprecedented Demand for AI Chips",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/tsm-stock-tsmc-record-quarter-ai-chip-demand",
       "date": "2026-10-16",
       "tier": "secondary"
      }
     }
    ],
    "commitments": [],
    "concentration": [],
    "observations": [
     "Net income NT$763.1B in Q3 2026, up 68.7%; operating margin 58.7%.",
     "Second Arizona fab expected to start production in Q3 2027."
    ]
   },
   "sk-hynix": {
    "period_note": "Q3 2026 (quarter ended Sep 30, 2026; reported Oct 28, 2026). Won converted at about 1,326 won per dollar, the rate implied by TIKR's own conversion.",
    "sources": [
     {
      "type": "revenue",
      "amount_usd_b": 78.86,
      "firm": true,
      "period": "Q3 2026",
      "from": null,
      "note": "104.6 trillion won, up 328% from a year earlier; first quarter above 100 trillion won.",
      "source": {
       "title": "SK Hynix Stock Surges 7% After Record Quarterly Profit And Buyback Plan",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/sk-hynix-stock-record-q3-2026-profit-buyback-plan",
       "date": "2026-10-28",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "buybacks_dividends",
      "amount_usd_b": null,
      "firm": true,
      "period": "2026",
      "to": null,
      "note": "About 100 trillion won returned to shareholders this year (over 30 trillion won dividends, over 60 trillion won buybacks); roughly $75B at the implied rate. Q3 dividend 14 trillion won.",
      "source": {
       "title": "SK Hynix Stock Surges 7% After Record Quarterly Profit And Buyback Plan",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/sk-hynix-stock-record-q3-2026-profit-buyback-plan",
       "date": "2026-10-28",
       "tier": "secondary"
      }
     },
     {
      "type": "capex",
      "amount_usd_b": null,
      "firm": true,
      "period": "2027 plan",
      "to": null,
      "note": "Will rise sharply next year; no figure given.",
      "source": {
       "title": "SK Hynix Stock Surges 7% After Record Quarterly Profit And Buyback Plan",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/sk-hynix-stock-record-q3-2026-profit-buyback-plan",
       "date": "2026-10-28",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Operating profit",
      "amount_usd_b": 62.8,
      "period": "Q3 2026",
      "note": "83.3 trillion won (80% margin); dollar figure is our conversion at the implied rate.",
      "source": {
       "title": "SK Hynix Stock Surges 7% After Record Quarterly Profit And Buyback Plan",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/sk-hynix-stock-record-q3-2026-profit-buyback-plan",
       "date": "2026-10-28",
       "tier": "secondary"
      }
     }
    ],
    "commitments": [
     {
      "what": "Long-term supply agreements with 14 major customers",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "2027-2028",
      "counterparty": "Not named",
      "note": "Cover more than half of 2027 and 2028 capacity; priced within agreed ranges that track the market. Management says HBM and DRAM are sold out through 2029.",
      "source": {
       "title": "SK hynix Has Slumped Since September: Why Rosenblatt Sees 175% Upside",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/sk-hynix-has-slumped-since-september-why-rosenblatt-sees-175-upside?",
       "date": "2026-10-29",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [
     {
      "fact": "24.3% of Q1 2026 sales were booked in China.",
      "source": {
       "title": "SK hynix Has Slumped Since September: Why Rosenblatt Sees 175% Upside",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/sk-hynix-has-slumped-since-september-why-rosenblatt-sees-175-upside?",
       "date": "2026-10-29",
       "tier": "secondary"
      }
     }
    ],
    "observations": [
     "No customer prepayment figures found.",
     "China's CXMT plans to start making HBM3E memory, a competitive risk named by analysts."
    ]
   },
   "micron": {
    "period_note": "Fiscal Q4 2026 = quarter ended Sep 3, 2026 (reported Sep 30, 2026).",
    "sources": [
     {
      "type": "revenue",
      "amount_usd_b": 54.23,
      "firm": true,
      "period": "FQ4 2026",
      "from": null,
      "note": "Up 4.8x from a year earlier. Net income $37.7B. Cash $73.45B.",
      "source": {
       "title": "Micron's Numbers Show Why HBM4 Memory Is Worth 15X Its Weight In Gold",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/store/2026/10/02/microns-numbers-show-why-hbm4-memory-is-worth-15x-its-weight-in-gold/5300701",
       "date": "2026-10-02",
       "tier": "press"
      }
     },
     {
      "type": "customer_prepayment",
      "amount_usd_b": 32.0,
      "firm": true,
      "period": "Cumulative to Sep 2026",
      "from": "Not named (strategic customers)",
      "note": "About $32B of customer financial commitments under strategic customer agreements, 'the vast majority in cash deposits'.",
      "source": {
       "title": "Micron Technology Reports Q4 Earnings: Revenue Up 379%, EPS Up 1,003%",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/micron-technology-reports-q4-earnings-revenue-up-379-eps-up-1003",
       "date": "2026-10-01",
       "tier": "secondary"
      }
     },
     {
      "type": "operating_cash_flow",
      "amount_usd_b": null,
      "firm": true,
      "period": "FQ4 2026",
      "from": null,
      "note": "Not found. Adjusted free cash flow was $33.20B.",
      "source": {
       "title": "Micron Technology Reports Q4 Earnings: Revenue Up 379%, EPS Up 1,003%",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/micron-technology-reports-q4-earnings-revenue-up-379-eps-up-1003",
       "date": "2026-10-01",
       "tier": "secondary"
      }
     }
    ],
    "uses": [
     {
      "type": "capex",
      "amount_usd_b": 10.77,
      "firm": true,
      "period": "FQ4 2026",
      "to": null,
      "note": "Net capital spending in the quarter. FY2027 capex to rise above prior plans (mostly cleanroom construction opening late 2028+); no figure given.",
      "source": {
       "title": "Micron Technology Reports Q4 Earnings: Revenue Up 379%, EPS Up 1,003%",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/micron-technology-reports-q4-earnings-revenue-up-379-eps-up-1003",
       "date": "2026-10-01",
       "tier": "secondary"
      }
     }
    ],
    "revenue": [
     {
      "metric": "Total data center revenue",
      "amount_usd_b": 34.29,
      "period": "FQ4 2026",
      "note": "Up 5.6x; includes 'Cloud Memory' (mostly HBM) of $16.28B. Author estimate of HBM alone about $14.3B.",
      "source": {
       "title": "Micron's Numbers Show Why HBM4 Memory Is Worth 15X Its Weight In Gold",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/store/2026/10/02/microns-numbers-show-why-hbm4-memory-is-worth-15x-its-weight-in-gold/5300701",
       "date": "2026-10-02",
       "tier": "press"
      }
     },
     {
      "metric": "Revenue guidance",
      "amount_usd_b": 61.5,
      "period": "FQ1 2027",
      "note": "Plus or minus $1.5B.",
      "source": {
       "title": "Micron's Numbers Show Why HBM4 Memory Is Worth 15X Its Weight In Gold",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/store/2026/10/02/microns-numbers-show-why-hbm4-memory-is-worth-15x-its-weight-in-gold/5300701",
       "date": "2026-10-02",
       "tier": "press"
      }
     }
    ],
    "commitments": [
     {
      "what": "Remaining performance obligations (contracted future revenue)",
      "amount_usd_b": 150.0,
      "firm": true,
      "horizon": "Through about fiscal 2030",
      "counterparty": "Not named",
      "note": "Covers only deals with fixed price floors and committed volumes.",
      "source": {
       "title": "Micron's Numbers Show Why HBM4 Memory Is Worth 15X Its Weight In Gold",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/store/2026/10/02/microns-numbers-show-why-hbm4-memory-is-worth-15x-its-weight-in-gold/5300701",
       "date": "2026-10-02",
       "tier": "press"
      }
     },
     {
      "what": "26 strategic customer agreements (multi-year take-or-pay)",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "Through 2030",
      "counterparty": "Not named",
      "note": "Estimated to cover over 35% of revenue through 2030; about three-quarters have price floors and ceilings.",
      "source": {
       "title": "Micron Technology Reports Q4 Earnings: Revenue Up 379%, EPS Up 1,003%",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/micron-technology-reports-q4-earnings-revenue-up-379-eps-up-1003",
       "date": "2026-10-01",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "The '$100B minimum commitments' figure in the brief was not found; the sourced figure is $150B of remaining performance obligations.",
     "Micron has completed agreements for the vast majority of its calendar 2027 HBM supply at significantly higher prices.",
     "Memory supply deals now run three to five years versus a year or less before, per Bank of America's Vivek Arya (TIKR, Oct 29, 2026)."
    ]
   },
   "marvell": {
    "period_note": "Q2 fiscal 2027 = quarter ended Aug 1, 2026.",
    "sources": [],
    "uses": [],
    "revenue": [
     {
      "metric": "Data center revenue",
      "amount_usd_b": 2.17,
      "period": "Q2 FY2027",
      "note": "Up 45.7% from a year earlier. Author estimates (not company): AI revenue ~$1.82B, of which custom AI chips ~$425M and electro-optics ~$1.4B.",
      "source": {
       "title": "Optics Still Driving Marvell's AI Business More Than Custom Chips",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/connect/2026/09/02/optics-still-driving-marvells-ai-business-more-than-custom-chips/5294018",
       "date": "2026-09-02",
       "tier": "press"
      }
     },
     {
      "metric": "Revenue guidance",
      "amount_usd_b": 3.15,
      "period": "Q3 FY2027",
      "note": "Full fiscal 2027 guidance raised to $12B; fiscal 2028 guidance $18B.",
      "source": {
       "title": "Optics Still Driving Marvell's AI Business More Than Custom Chips",
       "publisher": "The Next Platform",
       "url": "https://www.nextplatform.com/connect/2026/09/02/optics-still-driving-marvells-ai-business-more-than-custom-chips/5294018",
       "date": "2026-09-02",
       "tier": "press"
      }
     }
    ],
    "commitments": [
     {
      "what": "Google custom chip agreement",
      "amount_usd_b": 120.0,
      "firm": false,
      "horizon": "6.5 years",
      "counterparty": "google",
      "note": "An 'up to' opportunity tied to milestones, not booked; management includes only 'some portion' in its fiscal 2031 target.",
      "source": {
       "title": "Marvell Stock Is Still 17% Below Its Investor Day Close: What the AI Funding Scare Means for 2031",
       "publisher": "TIKR",
       "url": "https://www.tikr.com/blog/marvell-stock-is-still-17-below-its-investor-day-close-heres-what-the-ai-funding-scare-means-for-2031?",
       "date": "2026-10-20",
       "tier": "secondary"
      }
     }
    ],
    "concentration": [],
    "observations": [
     "Marvell's AI sales are still driven more by optics than custom chips."
    ]
   },
   "intel": {
    "period_note": "Only the Nvidia stake was sourced; Intel's Q3 2026 results could not be sourced.",
    "sources": [
     {
      "type": "strategic_investment",
      "amount_usd_b": 5.0,
      "firm": true,
      "period": "Dec 26, 2025",
      "from": "nvidia",
      "note": "Intel sold 214,776,632 new shares to Nvidia for about $5B (about $23.28 each by our arithmetic).",
      "source": {
       "title": "Nvidia completes $5B purchase of shares from Intel",
       "publisher": "Seeking Alpha",
       "url": "https://seekingalpha.com/news/4535683-nvidia-completes-5b-purchase-of-shares-from-intel",
       "date": "2025-12-29",
       "tier": "secondary"
      }
     }
    ],
    "uses": [],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": []
   },
   "lumentum": {
    "period_note": "March 2026 Nvidia deal.",
    "sources": [
     {
      "type": "strategic_investment",
      "amount_usd_b": 2.0,
      "firm": true,
      "period": "Mar 2, 2026",
      "from": "nvidia",
      "note": "Nvidia investing $2B; instrument not stated. Funds US manufacturing, R&D and capacity.",
      "source": {
       "title": "NVIDIA Announces Strategic Partnership With Lumentum (8-K exhibit 99.1)",
       "publisher": "Lumentum (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/1633978/000119312526085412/d41019dex991.htm",
       "date": "2026-03-02",
       "tier": "primary"
      }
     }
    ],
    "uses": [],
    "revenue": [],
    "commitments": [
     {
      "what": "Nvidia non-exclusive 'multi-billion' purchase commitment for laser parts, plus future capacity access rights",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "Multi-year",
      "counterparty": "nvidia",
      "note": "No amount or timing disclosed.",
      "source": {
       "title": "NVIDIA Announces Strategic Partnership With Lumentum (8-K exhibit 99.1)",
       "publisher": "Lumentum (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/1633978/000119312526085412/d41019dex991.htm",
       "date": "2026-03-02",
       "tier": "primary"
      }
     }
    ],
    "concentration": [],
    "observations": []
   },
   "coherent": {
    "period_note": "March 2026 Nvidia deal.",
    "sources": [
     {
      "type": "strategic_investment",
      "amount_usd_b": 2.0,
      "firm": true,
      "period": "Mar 2, 2026",
      "from": "nvidia",
      "note": "Nvidia bought 7,788,161 new common shares at $256.80 each for $2B cash. No prepayment terms in the filing.",
      "source": {
       "title": "Coherent Corp. Form 8-K (sale of common stock to NVIDIA)",
       "publisher": "Coherent (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/820318/000119312526084366/d42735d8k.htm",
       "date": "2026-03-02",
       "tier": "primary"
      }
     }
    ],
    "uses": [],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": []
   },
   "amkor": {
    "period_note": "July and October 2026 Nvidia agreements.",
    "sources": [
     {
      "type": "customer_prepayment",
      "amount_usd_b": null,
      "firm": true,
      "period": "2026",
      "from": "nvidia",
      "note": "Nvidia prepayments under multi-year packaging agreements: $1.5B (Arizona, Jul 23, 2026) and $1.3B (South Korea, Oct 21, 2026); Amkor says its Nvidia agreements total $3B. Prepayment amounts within these not disclosed.",
      "source": {
       "title": "Amkor Technology and NVIDIA Advance Strategic Partnership for AI Infrastructure",
       "publisher": "Amkor Technology",
       "url": "https://ir.amkor.com/news-releases/news-release-details/amkor-technology-and-nvidia-advance-strategic-partnership-ai",
       "date": "2026-10-21",
       "tier": "primary"
      }
     }
    ],
    "uses": [],
    "revenue": [],
    "commitments": [],
    "concentration": [],
    "observations": []
   },
   "sb-energy": {
    "period_note": "August 2026 PORTS campus deal.",
    "sources": [
     {
      "type": "strategic_investment",
      "amount_usd_b": 1.5,
      "firm": true,
      "period": "Aug 17, 2026",
      "from": "nvidia",
      "note": "Nvidia invested $1.5B, joining SoftBank Group and OpenAI as investors.",
      "source": {
       "title": "SB Energy, OpenAI and NVIDIA PORTS campus press release (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/sbeoainvidia-portsrelease.htm",
       "date": "2026-08-17",
       "tier": "primary"
      }
     },
     {
      "type": "off_balance_sheet",
      "amount_usd_b": 105.0,
      "firm": false,
      "period": "20-year leases from 2028",
      "from": "nvidia",
      "note": "Nvidia residual value guarantees capped at $105B on leases to OpenAI for ~4.25 GW (see Nvidia commitments).",
      "source": {
       "title": "NVIDIA Form 8-K (residual value guaranties, PORTS campus)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/nvda-20260817.htm",
       "date": "2026-08-17",
       "tier": "primary"
      }
     }
    ],
    "uses": [],
    "revenue": [],
    "commitments": [
     {
      "what": "20-year lease of the PORTS campus to OpenAI",
      "amount_usd_b": null,
      "firm": true,
      "horizon": "20 years, phases from 2028",
      "counterparty": "openai",
      "note": "Initial 4.25 IT-GW, up to 8 IT-GW; at least 10 GW of new generation planned. SB Energy also to invest at least $4.2B in grid upgrades with AEP Ohio.",
      "source": {
       "title": "SB Energy, OpenAI and NVIDIA PORTS campus press release (8-K exhibit)",
       "publisher": "NVIDIA (SEC filing)",
       "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/sbeoainvidia-portsrelease.htm",
       "date": "2026-08-17",
       "tier": "primary"
      }
     }
    ],
    "concentration": [],
    "observations": []
   }
  },
  "flows": [
   {
    "from": "CATL",
    "to": "deepseek",
    "amount_usd_b": 0.74,
    "firm": true,
    "type": "equity",
    "date": "2026-06-03",
    "horizon": "one-time",
    "what": "Battery maker CATL about RMB 5B into DeepSeek's first round (reported by Reuters from sources as 'looking at').",
    "circular": null,
    "source": {
     "title": "DeepSeek slated to draw $7 billion in maiden fundraising, sources say",
     "publisher": "Reuters via MarketScreener",
     "url": "https://www.marketscreener.com/news/deepseek-slated-to-draw-7-billion-in-maiden-fundraising-sources-say-ce7f5ddfd888f724",
     "date": "2026-06-03",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F001"
   },
   {
    "from": "Liang Wenfeng (DeepSeek founder)",
    "to": "deepseek",
    "amount_usd_b": 2.96,
    "firm": true,
    "type": "equity",
    "date": "2026-06-03",
    "horizon": "one-time",
    "what": "Founder committed about RMB 20B of his own money, the largest cheque in the ~RMB 50B round.",
    "circular": null,
    "source": {
     "title": "DeepSeek slated to draw $7 billion in maiden fundraising, sources say",
     "publisher": "Reuters via MarketScreener",
     "url": "https://www.marketscreener.com/news/deepseek-slated-to-draw-7-billion-in-maiden-fundraising-sources-say-ce7f5ddfd888f724",
     "date": "2026-06-03",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F002"
   },
   {
    "from": "Meituan (Long-Z Investments)",
    "to": "moonshot",
    "amount_usd_b": null,
    "firm": true,
    "type": "equity",
    "date": "2026-05-07",
    "horizon": "one-time",
    "what": "Meituan's venture arm led Moonshot's ~US$2B round at US$20B; with Tsinghua Capital, China Mobile, CPE Yuanfeng. Split not disclosed.",
    "circular": null,
    "source": {
     "title": "China's Moonshot AI raises $2B at $20B valuation as demand for open source AI skyrockets",
     "publisher": "TechCrunch",
     "url": "https://techcrunch.com/2026/05/07/chinas-moonshot-ai-raises-2b-at-20b-valuation-as-demand-for-open-source-ai-skyrockets",
     "date": "2026-05-07",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F003"
   },
   {
    "from": "Micron strategic customers (not named)",
    "to": "micron",
    "amount_usd_b": 32.0,
    "firm": true,
    "type": "prepayment",
    "date": "2026-09-30",
    "horizon": "agreements run through 2030",
    "what": "About $32B of customer financial commitments, mostly cash deposits, under 26 multi-year take-or-pay agreements.",
    "circular": null,
    "source": {
     "title": "Micron Technology Reports Q4 Earnings: Revenue Up 379%, EPS Up 1,003%",
     "publisher": "TIKR",
     "url": "https://www.tikr.com/blog/micron-technology-reports-q4-earnings-revenue-up-379-eps-up-1003",
     "date": "2026-10-01",
     "tier": "secondary"
    },
    "group": "semis",
    "id": "F004"
   },
   {
    "from": "Samsung Electronics",
    "to": "mistral",
    "amount_usd_b": null,
    "firm": true,
    "type": "equity",
    "date": "2026-09-08",
    "horizon": "one-time",
    "what": "Samsung led Mistral's EUR 3B Series D (total round ~US$3.5B; Samsung's share not disclosed).",
    "circular": null,
    "source": {
     "title": "Orrick Advises Mistral in its EUR 3B Series D Funding Round at EUR 21B Post-Money Valuation",
     "publisher": "Orrick",
     "url": "https://www.orrick.com/en/News/2026/09/Orrick-Advises-Mistral-in-its-3B-Series-D-at-21B-Post-Money-Valuation",
     "date": "2026-09-08",
     "tier": "primary"
    },
    "group": "gaps_intl",
    "id": "F005"
   },
   {
    "from": "amazon",
    "to": "anthropic",
    "type": "equity",
    "amount_usd_b": 8.0,
    "firm": true,
    "date": "2024-11-22",
    "horizon": "2023 to 2024",
    "what": "Amazon's first $8B in Anthropic (two $4B tranches, 2023 and 2024), as recapped when the April 2026 investment was announced",
    "circular": "Amazon invests in the lab; the lab commits to spend on AWS.",
    "source": {
     "title": "Amazon to invest $25B in Anthropic as part of expanded cloud partnership",
     "publisher": "SiliconANGLE",
     "url": "https://siliconangle.com/2026/04/20/amazon-invest-25b-anthropic-part-expanded-cloud-partnership/",
     "date": "2026-04-20",
     "tier": "press"
    },
    "id": "F006",
    "returns": [
     "F016"
    ]
   },
   {
    "from": "amazon",
    "to": "anthropic",
    "amount_usd_b": 5.0,
    "firm": true,
    "type": "equity",
    "date": "2026-04-20",
    "horizon": "2026",
    "what": "Amazon's additional investment (after $8B earlier)",
    "circular": "Anthropic committed $110B to AWS through 2036.",
    "source": {
     "title": "Amazon to invest $25B in Anthropic as part of expanded cloud partnership",
     "publisher": "SiliconANGLE",
     "url": "https://siliconangle.com/2026/04/20/amazon-invest-25b-anthropic-part-expanded-cloud-partnership/",
     "date": "2026-04-20",
     "tier": "press"
    },
    "group": "labs",
    "id": "F007",
    "returns": [
     "F016"
    ]
   },
   {
    "from": "amazon",
    "to": "anthropic",
    "amount_usd_b": 20.0,
    "firm": false,
    "type": "equity",
    "date": "2026-04-20",
    "horizon": "later, unspecified",
    "what": "Further Amazon investment, 'up to'",
    "circular": "Anthropic committed $110B to AWS through 2036.",
    "source": {
     "title": "Amazon to invest $25B in Anthropic as part of expanded cloud partnership",
     "publisher": "SiliconANGLE",
     "url": "https://siliconangle.com/2026/04/20/amazon-invest-25b-anthropic-part-expanded-cloud-partnership/",
     "date": "2026-04-20",
     "tier": "press"
    },
    "group": "labs",
    "id": "F008",
    "returns": [
     "F016"
    ]
   },
   {
    "from": "amazon",
    "to": "openai",
    "amount_usd_b": 15.0,
    "firm": true,
    "type": "equity",
    "date": "2026-02-27",
    "horizon": "2026",
    "what": "Up-front part of Amazon's $50B",
    "circular": "OpenAI expanded its AWS commitment by $100B over 8 years at the same time.",
    "source": {
     "title": "Amazon invests $50B in OpenAI, deepens AWS partnership with expanded $100B cloud deal",
     "publisher": "GeekWire",
     "url": "https://www.geekwire.com/2026/amazon-invests-50b-in-openai-deepens-aws-partnership-with-expanded-100b-cloud-deal/",
     "date": "2026-02-27",
     "tier": "press"
    },
    "group": "labs",
    "id": "F009",
    "returns": [
     "F122",
     "F123"
    ]
   },
   {
    "from": "amazon",
    "to": "openai",
    "amount_usd_b": 35.0,
    "firm": true,
    "type": "equity",
    "date": "2026-02-27",
    "horizon": "when conditions met (reported completed July 2026)",
    "what": "Second part of Amazon's $50B: $13.7B paid April to June 2026 and the remaining $21.3B after June 30, per Amazon's filing",
    "circular": "Amazon invests in the lab; the lab commits to spend on AWS.",
    "source": {
     "title": "Amazon.com Form 10-Q, quarter ended June 30, 2026",
     "publisher": "Amazon via SEC EDGAR",
     "url": "https://www.sec.gov/Archives/edgar/data/1018724/000101872426000026/amzn-20260630.htm",
     "date": "2026-07-31",
     "tier": "primary"
    },
    "group": "labs",
    "id": "F010",
    "returns": [
     "F122",
     "F123"
    ]
   },
   {
    "from": "amazon",
    "to": "talen",
    "amount_usd_b": 18.0,
    "firm": true,
    "type": "power_contract",
    "date": "2025-06-11",
    "horizon": "2025-2042",
    "what": "1,920 MW nuclear power from Susquehanna; ~$18B is Talen's lifetime revenue estimate at full contracted volume.",
    "circular": null,
    "source": {
     "title": "Talen, Amazon expand Susquehanna nuclear deal to 1.9 GW",
     "publisher": "Utility Dive",
     "url": "https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-center-t/750440/",
     "date": "2025-06-11",
     "tier": "press"
    },
    "group": "energy",
    "id": "F011"
   },
   {
    "from": "amazon",
    "to": "vistra",
    "amount_usd_b": null,
    "firm": true,
    "type": "power_contract",
    "date": "2025",
    "horizon": "2027-2047",
    "what": "20-year, 1.2 GW PPA from Comanche Peak nuclear plant; value not disclosed.",
    "circular": null,
    "source": {
     "title": "Vistra Texas data center pause, Comanche Peak, Amazon (earnings call coverage)",
     "publisher": "Utility Dive",
     "url": "https://www.utilitydive.com/news/vistra-texas-data-center-pause-comanche-amazon-earnings/827434/",
     "date": "2026-08-10",
     "tier": "press"
    },
    "group": "energy",
    "id": "F012"
   },
   {
    "from": "amd",
    "to": "anthropic",
    "amount_usd_b": 5.0,
    "firm": false,
    "type": "equity",
    "date": "2026-09-29",
    "horizon": "not stated",
    "what": "AMD to buy up to $5B of Anthropic stock",
    "circular": "Anthropic expects to spend over $20B on AMD compute.",
    "source": {
     "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
     "publisher": "Business Day / Reuters",
     "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
     "date": "2026-09-29",
     "tier": "press"
    },
    "group": "labs",
    "id": "F013",
    "returns": [
     "F017"
    ]
   },
   {
    "from": "amd",
    "to": "meta",
    "amount_usd_b": null,
    "firm": false,
    "type": "equity",
    "date": "2026-02-23",
    "horizon": "through 2030",
    "what": "Warrant for up to 160 million AMD shares, vesting on installed-technology and share-price milestones.",
    "circular": "AMD gives Meta shares that vest as Meta buys AMD chips.",
    "source": {
     "title": "Some More Game Theory, This Time On The AMD-Meta Platforms Deal",
     "publisher": "The Next Platform",
     "url": "https://www.nextplatform.com/compute/2026/02/24/some-more-game-theory-this-time-on-the-amd-meta-platforms-deal/4092150",
     "date": "2026-02-24",
     "tier": "press"
    },
    "group": "semis",
    "id": "F014",
    "returns": [
     "F080"
    ]
   },
   {
    "from": "amd",
    "to": "openai",
    "amount_usd_b": null,
    "firm": false,
    "type": "equity",
    "date": "2025-10-06",
    "horizon": "H2 2026 to Oct 2030",
    "what": "Warrant for up to 160 million AMD shares at $0.01, vesting as OpenAI deploys AMD GPUs (6 GW) and AMD's stock rises (to $600 for the last tranche).",
    "circular": "AMD gives OpenAI shares that vest only as OpenAI buys AMD chips.",
    "source": {
     "title": "Did AMD Use ChatGPT To Come Up With Its OpenAI Partnership Deal?",
     "publisher": "The Next Platform",
     "url": "https://www.nextplatform.com/ai/2025/10/06/did-amd-use-chatgpt-to-come-up-with-its-openai-partnership-deal/1650126",
     "date": "2025-10-06",
     "tier": "press"
    },
    "group": "semis",
    "id": "F015",
    "returns": [
     "F124"
    ]
   },
   {
    "from": "anthropic",
    "to": "amazon",
    "amount_usd_b": 110.0,
    "firm": true,
    "type": "compute_contract",
    "date": "2026-09-29",
    "horizon": "May 2026 - Apr 2036",
    "what": "AWS capacity incl. Trainium, payable regardless of use",
    "circular": null,
    "source": {
     "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
     "publisher": "Business Day / Reuters",
     "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
     "date": "2026-09-29",
     "tier": "press"
    },
    "group": "labs",
    "id": "F016"
   },
   {
    "from": "anthropic",
    "to": "amd",
    "amount_usd_b": 20.0,
    "firm": false,
    "type": "compute_contract",
    "date": "2026-09-29",
    "horizon": "not stated",
    "what": "AMD compute, expected to exceed $20B",
    "circular": null,
    "source": {
     "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
     "publisher": "Business Day / Reuters",
     "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
     "date": "2026-09-29",
     "tier": "press"
    },
    "group": "labs",
    "id": "F017"
   },
   {
    "from": "anthropic",
    "to": "broadcom",
    "amount_usd_b": null,
    "firm": false,
    "type": "chip_purchase",
    "date": null,
    "horizon": "about 1 GW 2026, 5 GW 2027, 10 GW 2028",
    "what": "Custom TPU chips; Anthropic to be Broadcom's largest custom-chip customer in 2027-28. No dollar value disclosed.",
    "circular": null,
    "source": {
     "title": "Broadcom Rides Rocketing Trend For Custom AI Accelerators",
     "publisher": "The Next Platform",
     "url": "https://www.nextplatform.com/connect/2026/09/10/broadcom-rides-rocketing-trend-for-custom-ai-accelerators/5295681",
     "date": "2026-09-10",
     "tier": "press"
    },
    "group": "semis",
    "id": "F018"
   },
   {
    "from": "anthropic",
    "to": "broadcom",
    "amount_usd_b": 161.2,
    "firm": true,
    "type": "lease_guarantee",
    "date": "2026-10-26",
    "horizon": "no end date given",
    "what": "Equipment lease obligations for Broadcom-built Google TPU systems, excluding interest",
    "circular": null,
    "source": {
     "title": "Anthropic S-1 shows it is at the hyperscalers' mercy",
     "publisher": "The Stack",
     "url": "https://www.thestack.technology/anthropic-s-1-shows-it-is-at-the-hyperscalers-mercy/",
     "date": "2026-10-26",
     "tier": "press"
    },
    "group": "labs",
    "id": "F019"
   },
   {
    "from": "anthropic",
    "to": "fluidstack",
    "amount_usd_b": 50.0,
    "firm": false,
    "type": "compute_contract",
    "date": "2025-11-12",
    "horizon": "through 2026",
    "what": "Custom data centers in Texas and New York (announced plan)",
    "circular": null,
    "source": {
     "title": "Anthropic announces $50 billion data center plan (TechCrunch)",
     "publisher": "Yahoo Finance / TechCrunch",
     "url": "https://finance.yahoo.com/news/anthropic-announces-50-billion-data-155247322.html",
     "date": "2025-11-12",
     "tier": "press"
    },
    "group": "labs",
    "id": "F020"
   },
   {
    "from": "anthropic",
    "to": "google",
    "amount_usd_b": 111.1,
    "firm": true,
    "type": "compute_contract",
    "date": "2026-09-29",
    "horizon": "Apr 2026 - Jul 2033",
    "what": "Google Cloud capacity, payable regardless of use (public S-1: at least about $114.5B)",
    "circular": null,
    "source": {
     "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
     "publisher": "Business Day / Reuters",
     "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
     "date": "2026-09-29",
     "tier": "press"
    },
    "group": "labs",
    "id": "F021"
   },
   {
    "from": "anthropic",
    "to": "microsoft",
    "amount_usd_b": 31.4,
    "firm": true,
    "type": "compute_contract",
    "date": "2026-09-29",
    "horizon": "Nov 2026 - May 2033",
    "what": "Azure capacity (public S-1: at least $44.9B)",
    "circular": null,
    "source": {
     "title": "Anthropic plans $518bn AI infrastructure spend, 80% non-cancellable (Reuters)",
     "publisher": "Business Day / Reuters",
     "url": "https://www.businessday.co.za/world/international-companies/2026-09-29-anthropic-plans-518bn-ai-infrastructure-spend-80-non-cancellable/",
     "date": "2026-09-29",
     "tier": "press"
    },
    "group": "labs",
    "id": "F022"
   },
   {
    "from": "anthropic",
    "to": "spacexai",
    "amount_usd_b": 120.5,
    "firm": false,
    "type": "compute_contract",
    "date": "2026-10-26",
    "horizon": "through 2029",
    "what": "Colossus compute, 'up to'; cancellable on 90 days' notice after early 2027",
    "circular": null,
    "source": {
     "title": "Anthropic to pay SpaceX up to $120.5B for AI compute through 2029",
     "publisher": "Basenor",
     "url": "https://www.basenor.com/blogs/news/anthropic-to-pay-spacex-up-to-120-5b-for-ai-compute-through-2029",
     "date": "2026-10-26",
     "tier": "secondary"
    },
    "group": "labs",
    "id": "F023"
   },
   {
    "from": "apple",
    "to": "google",
    "amount_usd_b": 1.0,
    "firm": false,
    "type": "compute_contract",
    "date": "2025-11-05",
    "horizon": "per year, multi-year",
    "what": "Reported ~$1B a year for a custom Gemini model behind the new Siri (Bloomberg, unconfirmed by the companies; deal itself confirmed Jan 2026 without terms).",
    "circular": null,
    "source": {
     "title": "Apple will reportedly pay Google $1 billion a year for Gemini-powered Siri (citing Bloomberg)",
     "publisher": "9to5Mac",
     "url": "https://9to5mac.com/2025/11/05/google-gemini-1-billion-deal-apple-siri/",
     "date": "2025-11-05",
     "tier": "press"
    },
    "group": "gaps_us",
    "id": "F024"
   },
   {
    "from": "asml",
    "to": "mistral",
    "amount_usd_b": 1.52,
    "firm": true,
    "type": "equity",
    "date": "2025-09-09",
    "horizon": "one-time",
    "what": "ASML invested EUR 1.3B for about 11% of Mistral.",
    "circular": null,
    "source": {
     "title": "ASML confirms EUR 1.3 billion investment in French AI firm",
     "publisher": "DutchNews.nl",
     "url": "https://www.dutchnews.nl/2025/09/asml-confirms-e1-3-billion-investment-in-french-ai-firm",
     "date": "2025-09-09",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F025"
   },
   {
    "from": "banks",
    "to": "coreweave",
    "amount_usd_b": 3.1,
    "firm": true,
    "type": "loan",
    "date": "2026-05-18",
    "horizon": "~5.5 years",
    "what": "Morgan Stanley/MUFG-led GPU-backed loan (DDTL 5.0), SOFR+4.50%",
    "circular": null,
    "source": {
     "title": "CoreWeave Closes $3.1 Billion Loan Facility, Expanding Access to Public Markets for GPU-Backed Financing",
     "publisher": "CoreWeave via Business Wire",
     "url": "https://www.businesswire.com/news/home/20260518337916/en/CoreWeave-Closes-3.1-Billion-Loan-Facility-Expanding-Access-to-Public-Markets-for-GPU-Backed-Financing/",
     "date": "2026-05-18",
     "tier": "primary"
    },
    "group": "neoclouds",
    "id": "F026"
   },
   {
    "from": "banks",
    "to": "coreweave",
    "amount_usd_b": 2.6,
    "firm": true,
    "type": "loan",
    "date": "2026-08-11",
    "horizon": "~5 years",
    "what": "JPMorgan/MUFG-led loan (DDTL 5.5), SOFR+5.50%",
    "circular": null,
    "source": {
     "title": "CoreWeave Closes $2.6 Billion Loan Facility Arranged By JPMorgan And MUFG",
     "publisher": "Pulse 2.0",
     "url": "https://pulse2.com/coreweave-closes-2-6-billion-loan-facility-arranged-by-jpmorgan-and-mufg-for-ai-infrastructure/",
     "date": "2026-08-11",
     "tier": "secondary"
    },
    "group": "neoclouds",
    "id": "F027"
   },
   {
    "from": "banks",
    "to": "crusoe",
    "amount_usd_b": 7.1,
    "firm": true,
    "type": "loan",
    "date": "2025-05-22",
    "horizon": "Construction loan",
    "what": "JPMorgan-led construction loan for Abilene phase 2 (Crusoe/Blue Owl/Primary Digital $15B JV, 1.2 GW). The site is leased to Oracle and used by OpenAI.",
    "circular": null,
    "source": {
     "title": "Newmark Facilitates $7.1 Billion Construction Loan to Develop AI Data Center",
     "publisher": "Newmark (press release via Nasdaq)",
     "url": "https://www.nasdaq.com/press-release/newmark-facilitates-71-billion-construction-loan-develop-ai-data-center-2025-05-22",
     "date": "2025-05-22",
     "tier": "primary"
    },
    "group": "funders",
    "id": "F028"
   },
   {
    "from": "banks",
    "to": "mistral",
    "amount_usd_b": 0.83,
    "firm": true,
    "type": "loan",
    "date": "2026-03-30",
    "horizon": "not disclosed",
    "what": "Seven-bank loan (BNP Paribas, Credit Agricole CIB, HSBC, MUFG and three others) to buy Nvidia chips for a Paris-area data center.",
    "circular": null,
    "source": {
     "title": "France's Mistral raises $830 million in debt for AI data centre build-up",
     "publisher": "Reuters via Yahoo Finance",
     "url": "https://finance.yahoo.com/sectors/technology/articles/frances-mistral-raises-830-million-060341046.html",
     "date": "2026-03-30",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F029"
   },
   {
    "from": "banks",
    "to": "oracle",
    "amount_usd_b": 38.0,
    "firm": false,
    "type": "loan",
    "date": "2025-09-30",
    "horizon": null,
    "what": "Oracle reportedly sought about $38B of debt for data-center projects (September 2025); lenders not named",
    "circular": null,
    "source": {
     "title": "Blue Owl opts not to fund Oracle's $10bn Michigan data center",
     "publisher": "DatacenterDynamics (citing Financial Times)",
     "url": "https://www.datacenterdynamics.com/en/news/blue-owl-opts-not-to-fund-oracles-10bn-michigan-data-center/",
     "date": "2025-12-17",
     "tier": "press"
    },
    "group": "funders",
    "id": "F030"
   },
   {
    "from": "banks",
    "to": "softbank",
    "amount_usd_b": 40.0,
    "firm": true,
    "type": "loan",
    "date": "2026-03-27",
    "horizon": "Closed September 30, 2026 (was due March 2027)",
    "what": "Bridge facility (facility limit $40B; JPMorgan, Goldman Sachs, Mizuho, SMBC, MUFG) to fund the 2026 OpenAI investment. Closed: the $30B drawn was fully repaid by September 15, 2026, and the $10B undrawn was canceled effective September 30, 2026.",
    "circular": null,
    "source": {
     "title": "Execution of Bridge Facility Agreement Primarily for the Follow-on Investments in OpenAI",
     "publisher": "SoftBank Group",
     "url": "https://group.softbank/en/news/press/20260327",
     "date": "2026-03-27",
     "tier": "primary"
    },
    "group": "funders",
    "id": "F031",
    "sources_more": [
     {
      "title": "Financial Report for the Six-Month Period Ended September 30, 2026",
      "publisher": "SoftBank Group",
      "url": "https://group.softbank/media/Project/sbg/sbg/pdf/ir/financials/financial_reports/financial-report_q2fy2026_01_en.pdf",
      "date": "2026-11-10",
      "tier": "primary"
     }
    ]
   },
   {
    "from": "banks",
    "to": "softbank",
    "amount_usd_b": 20.0,
    "firm": true,
    "type": "loan",
    "date": "2026-08-04",
    "horizon": "Outstanding",
    "what": "Margin loan secured on SoftBank's Arm Holdings shares.",
    "circular": null,
    "source": {
     "title": "SoftBank's AI funding plans to face reckoning at earnings",
     "publisher": "Reuters via The Star",
     "url": "https://www.thestar.com.my/tech/tech-news/2026/08/04/softbank039s-ai-funding-plans-to-face-reckoning-at-earnings",
     "date": "2026-08-04",
     "tier": "press"
    },
    "group": "funders",
    "id": "F032"
   },
   {
    "from": "banks",
    "to": "softbank",
    "amount_usd_b": 10.0,
    "firm": true,
    "type": "loan",
    "date": "2026-08-06",
    "horizon": "Two years, due August 2028",
    "what": "Margin loan secured on SoftBank's OpenAI shares, drawn in August 2026",
    "circular": null,
    "source": {
     "title": "Financial Report for the Six-Month Period Ended September 30, 2026",
     "publisher": "SoftBank Group",
     "url": "https://group.softbank/media/Project/sbg/sbg/pdf/ir/financials/financial_reports/financial-report_q2fy2026_01_en.pdf",
     "date": "2026-11-10",
     "tier": "primary"
    },
    "group": "funders",
    "id": "F033"
   },
   {
    "from": "banks",
    "to": "softbank",
    "amount_usd_b": 11.87,
    "firm": true,
    "type": "loan",
    "date": "2026-09-17",
    "horizon": "Two years",
    "what": "Syndicated loan from about 20 banks. The source says it was arranged about a week before the September 24 bond sale, so the date is approximate.",
    "circular": null,
    "source": {
     "title": "SoftBank Pays a Steep Price for Record Bond Sale to Fund Its OpenAI Bet",
     "publisher": "European Business Magazine",
     "url": "https://europeanbusinessmagazine.com/softbank-pays-for-record-bond-sale/",
     "date": "2026-09-25",
     "tier": "secondary"
    },
    "group": "funders",
    "id": "F034"
   },
   {
    "from": "banks",
    "to": "spacexai",
    "amount_usd_b": 20.0,
    "firm": true,
    "type": "loan",
    "date": "2026-05-21",
    "horizon": "matures Sept 2027",
    "what": "Bridge loan refinancing X and xAI high-yield debt",
    "circular": null,
    "source": {
     "title": "SpaceX used a $20 billion bridge loan to slash Musk's debt costs in half, IPO filing reveals",
     "publisher": "The Next Web",
     "url": "https://thenextweb.com/news/spacex-bridge-loan-musk-debt-refinancing-ipo",
     "date": "2026-05-21",
     "tier": "press"
    },
    "group": "labs",
    "id": "F035"
   },
   {
    "from": "banks",
    "to": "stack-infrastructure",
    "amount_usd_b": 18.0,
    "firm": true,
    "type": "loan",
    "date": "2025-11",
    "horizon": null,
    "what": "Debt (SMBC, MUFG, BNP Paribas, Goldman Sachs led; may include bonds) for an Oracle-affiliated Stargate site in New Mexico.",
    "circular": null,
    "source": {
     "title": "Banks prep series of multibillion-dollar debt offerings for Oracle",
     "publisher": "Octus",
     "url": "https://octus.com/resources/articles/banks-prep-series-of-multibillion-dollar-debt-offerings-for-oracle/",
     "date": "2025-11-11",
     "tier": "press"
    },
    "group": "hyperscalers",
    "id": "F036"
   },
   {
    "from": "banks",
    "to": "vantage-data-centers",
    "amount_usd_b": 38.0,
    "firm": true,
    "type": "loan",
    "date": "2025-11",
    "horizon": "5-year loans",
    "what": "'Jacquard' project loans (JPMorgan, MUFG lead) for Stargate campuses in Texas and Wisconsin.",
    "circular": null,
    "source": {
     "title": "Three AI Megadeals Are Breaking New Ground on Wall Street (WSJ, republished)",
     "publisher": "Wall Street Journal via Tiger Brokers",
     "url": "https://www.itiger.com/hant/news/2582394141",
     "date": "2025-11-11",
     "tier": "press"
    },
    "group": "hyperscalers",
    "id": "F037"
   },
   {
    "from": "blackrock",
    "to": "meta",
    "amount_usd_b": 12.0,
    "firm": false,
    "type": "bond",
    "date": "2026-07",
    "horizon": null,
    "what": "Reported ~$12B of bonds via BlackRock-backed 'Sopaipilla Investor' (80% owner) for Meta's El Paso data center, backed by Meta's 20-year lease from 2028.",
    "circular": null,
    "source": {
     "title": "Meta's Latest AI Data Center Debt Raise Could Reportedly Cost More Than Its 2025 Record Deal (citing Financial Times)",
     "publisher": "Stocktwits",
     "url": "https://stocktwits.com/news-articles/markets/equity/meta-s-latest-ai-data-center-debt-raise-could-reportedly-cost-more-than-its-2025-record-deal/cZZYrCsR7yK",
     "date": "2026-07-24",
     "tier": "secondary"
    },
    "group": "hyperscalers",
    "id": "F038"
   },
   {
    "from": "blackstone",
    "to": "coreweave",
    "amount_usd_b": 8.5,
    "firm": false,
    "type": "loan",
    "date": "2026-03-31",
    "horizon": "to Mar 2032",
    "what": "Anchor of 'up to' $8.5B investment-grade delayed-draw loan (DDTL 4.0), SOFR+2.25% / ~5.9% fixed, backed by a big-tech contract (reported as Meta)",
    "circular": null,
    "source": {
     "title": "CoreWeave Compute Acquisition Co. VIII, LLC closes $8.5 billion delayed draw term loan facility",
     "publisher": "MarketScreener",
     "url": "https://www.marketscreener.com/news/coreweave-compute-acquisition-co-viii-llc-closes-8-5-billion-delayed-draw-term-loan-facility-ce7e51dedc81f222",
     "date": "2026-03-31",
     "tier": "secondary"
    },
    "group": "neoclouds",
    "id": "F039"
   },
   {
    "from": "blue-owl",
    "to": "crusoe",
    "amount_usd_b": null,
    "firm": true,
    "type": "equity",
    "date": "2025-05-21",
    "horizon": null,
    "what": "Blue Owl equity in the $15B Abilene JV. Its own amount was not disclosed.",
    "circular": null,
    "source": {
     "title": "Blue Owl, Crusoe, Primary Digital enter second phase of $15B joint venture",
     "publisher": "TipRanks / TheFly",
     "url": "https://www.tipranks.com/news/the-fly/blue-owl-crusoe-primary-digital-enter-second-phase-of-15b-joint-venture",
     "date": "2025-05-21",
     "tier": "secondary"
    },
    "group": "funders",
    "id": "F040"
   },
   {
    "from": "blue-owl",
    "to": "hyperion-jv",
    "amount_usd_b": 3.0,
    "firm": true,
    "type": "equity",
    "date": "2025-10",
    "horizon": null,
    "what": "Blue Owl funds put in about $3B for an 80% stake; Meta keeps 20%.",
    "circular": null,
    "source": {
     "title": "Three AI Megadeals Are Breaking New Ground on Wall Street (WSJ, republished)",
     "publisher": "Wall Street Journal via Tiger Brokers",
     "url": "https://www.itiger.com/hant/news/2582394141",
     "date": "2025-11-11",
     "tier": "press"
    },
    "group": "hyperscalers",
    "id": "F041"
   },
   {
    "from": "blue-owl",
    "to": "hyperion-jv",
    "amount_usd_b": 7.0,
    "firm": true,
    "type": "equity",
    "date": "2025-10-21",
    "horizon": null,
    "what": "Blue Owl funds' cash contribution for 80% of Meta's Hyperion data-center JV (partly funded by the Pimco-led bonds).",
    "circular": null,
    "source": {
     "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
     "publisher": "Meta",
     "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
     "date": "2025-10-21",
     "tier": "primary"
    },
    "group": "funders",
    "id": "F042"
   },
   {
    "from": "bond-market",
    "to": "amazon",
    "amount_usd_b": 15.0,
    "firm": true,
    "type": "bond",
    "date": "2025-11-17",
    "horizon": null,
    "what": "Amazon $15B bond (November 2025, day approximate).",
    "circular": null,
    "source": {
     "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
     "publisher": "Reuters via Yahoo Finance",
     "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
     "date": "2026-02-09",
     "tier": "press"
    },
    "group": "funders",
    "id": "F043"
   },
   {
    "from": "bond-market",
    "to": "amazon",
    "amount_usd_b": 54.0,
    "firm": true,
    "type": "bond",
    "date": "2026-03-13",
    "horizon": null,
    "what": "Amazon's roughly $54B global bond sale: about $37B in dollars (about $126B of orders) plus a debut €14.5B (about $16.8B) euro deal.",
    "circular": null,
    "source": {
     "title": "Amazon Raises $54B in Record Bond Sales as Investors Place $126B Orders",
     "publisher": "Yahoo Finance / GuruFocus",
     "url": "https://finance.yahoo.com/news/amazon-raises-54b-record-bond-144705950.html",
     "date": "2026-03-13",
     "tier": "secondary"
    },
    "group": "funders",
    "id": "F044"
   },
   {
    "from": "bond-market",
    "to": "amazon",
    "amount_usd_b": 25.0,
    "firm": true,
    "type": "bond",
    "date": "2026-07-07",
    "horizon": null,
    "what": "Amazon $25B eight-part bond. Peak orders were $62B, about half its March demand.",
    "circular": null,
    "source": {
     "title": "Amazon secures $25 billion for AI buildout as bond demand cools",
     "publisher": "Investing.com",
     "url": "https://www.investing.com/news/stock-market-news/amazon-launches-eightpart-us-investment-grade-bond-offering-4779013",
     "date": "2026-07-07",
     "tier": "press"
    },
    "group": "funders",
    "id": "F045"
   },
   {
    "from": "bond-market",
    "to": "coreweave",
    "type": "bond",
    "amount_usd_b": 3.5,
    "firm": true,
    "date": "2026-04-10",
    "horizon": "due 2032",
    "what": "Convertible notes, 1.75% due 2032 (April 2026)",
    "circular": null,
    "source": {
     "title": "CoreWeave Prices Upsized $3.5 Billion Convertible Senior Notes Offering",
     "publisher": "CoreWeave (press release)",
     "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Prices-Upsized-3-5-Billion-Convertible-Senior-Notes-Offering/default.aspx",
     "date": "2026-04-10",
     "tier": "primary"
    },
    "id": "F046"
   },
   {
    "from": "bond-market",
    "to": "coreweave",
    "amount_usd_b": 4.0,
    "firm": true,
    "type": "bond",
    "date": "2026-06-11",
    "horizon": "2031–2032",
    "what": "High-yield unsecured notes in 2026: $1.75B + $1.0B at 9.75% (2031) and $1.25B at 9.625% (2032); excludes €2B 8.5% 2032 notes",
    "circular": null,
    "source": {
     "title": "CoreWeave Announces Pricing of $1.25 Billion of Senior Notes and €2 Billion of Senior Notes",
     "publisher": "CoreWeave (press release)",
     "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Announces-Pricing-of-1-25-Billion-of-Senior-Notes-and-2-Billion-of-Senior-Notes/default.aspx",
     "date": "2026-06-11",
     "tier": "primary"
    },
    "group": "neoclouds",
    "id": "F047"
   },
   {
    "from": "bond-market",
    "to": "coreweave",
    "amount_usd_b": 3.7,
    "firm": true,
    "type": "bond",
    "date": "2026-09-18",
    "horizon": "2032–2033",
    "what": "Convertible notes, 2.875% due 2033 (September 2026). An earlier $3.5B 1.75% convertible is listed on CoreWeave's page",
    "circular": null,
    "source": {
     "title": "CoreWeave Prices Upsized $3.7 Billion Convertible Senior Notes Offering",
     "publisher": "CoreWeave (press release)",
     "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Prices-Upsized-3-7-Billion-Convertible-Senior-Notes-Offering/default.aspx",
     "date": "2026-09-18",
     "tier": "primary"
    },
    "group": "neoclouds",
    "id": "F048"
   },
   {
    "from": "bond-market",
    "to": "google",
    "amount_usd_b": 17.5,
    "firm": true,
    "type": "bond",
    "date": "2025-11-03",
    "horizon": null,
    "what": "Alphabet $17.5B US bond (November 2025, day approximate), plus a separate €6.5B euro deal the same month.",
    "circular": null,
    "source": {
     "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
     "publisher": "Reuters via Yahoo Finance",
     "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
     "date": "2026-02-09",
     "tier": "press"
    },
    "group": "funders",
    "id": "F049"
   },
   {
    "from": "bond-market",
    "to": "google",
    "amount_usd_b": 20.0,
    "firm": true,
    "type": "bond",
    "date": "2026-02-09",
    "horizon": null,
    "what": "Alphabet $20B seven-part US bond, followed in 2026 by sterling (including a 100-year bond), Swiss franc, euro, Canadian dollar and yen deals.",
    "circular": null,
    "source": {
     "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
     "publisher": "Reuters via Yahoo Finance",
     "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
     "date": "2026-02-09",
     "tier": "press"
    },
    "group": "funders",
    "id": "F050"
   },
   {
    "from": "bond-market",
    "to": "hyperion-jv",
    "amount_usd_b": 9.0,
    "firm": true,
    "type": "bond",
    "date": "2025-10-22",
    "horizon": "To about 2049",
    "what": "The rest of the $27B Hyperion bonds bought by other investors. This is our subtraction: $27B total minus Pimco's roughly $18B.",
    "circular": null,
    "source": {
     "title": "Meta Pushes Its Largest Data Center Project Off Its Books With $27B Joint Venture",
     "publisher": "Bisnow",
     "url": "https://www.bisnow.com/national/news/data-center-capital-markets/meta-pushes-its-largest-data-center-project-off-its-books-with-27b-joint-venture-131490",
     "date": "2025-10-22",
     "tier": "press"
    },
    "group": "funders",
    "id": "F051"
   },
   {
    "from": "bond-market",
    "to": "meta",
    "amount_usd_b": 30.0,
    "firm": true,
    "type": "bond",
    "date": "2025-10-30",
    "horizon": null,
    "what": "Meta $30B bond, the largest non-acquisition high-grade bond sale ever.",
    "circular": null,
    "source": {
     "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
     "publisher": "Reuters via Yahoo Finance",
     "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
     "date": "2026-02-09",
     "tier": "press"
    },
    "group": "funders",
    "id": "F052"
   },
   {
    "from": "bond-market",
    "to": "meta",
    "amount_usd_b": 24.91,
    "firm": true,
    "type": "bond",
    "date": "2026-04-30",
    "horizon": "9 months to Sep 2026",
    "what": "Meta long-term debt proceeds in 2026 (consistent with the ~$25B April 2026 bond sale).",
    "circular": null,
    "source": {
     "title": "Meta Reports Third Quarter 2026 Results (Form 8-K Exhibit 99.1)",
     "publisher": "Meta Platforms via SEC EDGAR",
     "url": "https://www.sec.gov/Archives/edgar/data/0001326801/000162828026066700/meta-09302026xexhibit991.htm",
     "date": "2026-10-21",
     "tier": "primary"
    },
    "group": "hyperscalers",
    "id": "F053"
   },
   {
    "from": "bond-market",
    "to": "microsoft",
    "amount_usd_b": 25.0,
    "firm": true,
    "type": "bond",
    "date": "2026-10-29",
    "horizon": "2028–2066",
    "what": "Microsoft sold $25.0B of notes in 10 pieces (first bond sale since 2017 per press); proceeds for general purposes including capital expenditures.",
    "circular": null,
    "source": {
     "title": "Microsoft pricing term sheet (Form FWP) for $25B notes",
     "publisher": "Microsoft via SEC EDGAR",
     "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526439794/d799291dfwp.htm",
     "date": "2026-10-29",
     "tier": "primary"
    },
    "group": "gaps_us",
    "id": "F054"
   },
   {
    "from": "bond-market",
    "to": "nebius",
    "amount_usd_b": 4.34,
    "firm": true,
    "type": "bond",
    "date": "2026-03-17",
    "horizon": "2031–2033",
    "what": "Convertible notes, 1.25% (2031) and 2.625% (2033)",
    "circular": null,
    "source": {
     "title": "Nebius unaudited condensed consolidated financial statements, six months ended June 30, 2026 (Form 6-K Ex. 99.2)",
     "publisher": "Nebius / SEC EDGAR",
     "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926094844/nbis-20260812xex99d2.htm",
     "date": "2026-08-12",
     "tier": "primary"
    },
    "group": "neoclouds",
    "id": "F055"
   },
   {
    "from": "bond-market",
    "to": "nvidia",
    "amount_usd_b": 25.0,
    "firm": true,
    "type": "bond",
    "date": "2026-06-15",
    "horizon": null,
    "what": "Nvidia's $25B bond in June 2026 (day approximate), its first in five years. Nvidia is itself a big investor in OpenAI ($30B) and xAI.",
    "circular": null,
    "source": {
     "title": "The AI boom's debt blitz is testing investor demand",
     "publisher": "Fortune",
     "url": "https://fortune.com/2026/07/17/ai-boom-debt-blitz-investor-demand-hyperscaler-bond-issuance/",
     "date": "2026-07-17",
     "tier": "press"
    },
    "group": "funders",
    "id": "F056"
   },
   {
    "from": "bond-market",
    "to": "oracle",
    "amount_usd_b": 18.0,
    "firm": true,
    "type": "bond",
    "date": "2025-09-24",
    "horizon": null,
    "what": "Oracle $18B investment-grade bond (September 2025, day approximate).",
    "circular": null,
    "source": {
     "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
     "publisher": "Reuters via Yahoo Finance",
     "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
     "date": "2026-02-09",
     "tier": "press"
    },
    "group": "funders",
    "id": "F057"
   },
   {
    "from": "bond-market",
    "to": "oracle",
    "amount_usd_b": 25.0,
    "firm": true,
    "type": "bond",
    "date": "2026-02-02",
    "horizon": null,
    "what": "Oracle $25B note sale (February 2026)",
    "circular": null,
    "source": {
     "title": "Alphabet's debt raise fuels forecasts for record year in corporate bond sales",
     "publisher": "Reuters via Yahoo Finance",
     "url": "https://finance.yahoo.com/news/alphabets-debt-raise-fuels-forecasts-220057088.html",
     "date": "2026-02-09",
     "tier": "press"
    },
    "group": "funders",
    "id": "F058"
   },
   {
    "from": "bond-market",
    "to": "qts",
    "amount_usd_b": 4.6,
    "firm": true,
    "type": "bond",
    "date": "2026-04-06",
    "horizon": null,
    "what": "QTS debut high-grade bond for a Georgia data center with Microsoft as tenant.",
    "circular": null,
    "source": {
     "title": "Microsoft-Tied Data Center Bond Sale Draws $12.5 Billion Demand",
     "publisher": "Bloomberg",
     "url": "https://www.bloomberg.com/news/articles/2026-04-06/blackstone-backed-data-center-firm-qts-kicks-off-bond-sale",
     "date": "2026-04-06",
     "tier": "press"
    },
    "group": "hyperscalers",
    "id": "F059"
   },
   {
    "from": "bond-market",
    "to": "softbank",
    "amount_usd_b": 6.3,
    "firm": true,
    "type": "bond",
    "date": "2026-09-01",
    "horizon": null,
    "what": "¥1 trillion bond for Japanese retail investors, issued earlier in September 2026 (exact day not given).",
    "circular": null,
    "source": {
     "title": "SoftBank raises US$11.1bil in world's biggest high-yield corporate bond sale",
     "publisher": "Bloomberg/Reuters via The Star",
     "url": "https://www.thestar.com.my/business/business-news/2026/09/24/softbank-raises-us111bil-in-world039s-biggest-high-yield-corporate-bond-sale",
     "date": "2026-09-24",
     "tier": "press"
    },
    "group": "funders",
    "id": "F060"
   },
   {
    "from": "bond-market",
    "to": "softbank",
    "amount_usd_b": 11.1,
    "firm": true,
    "type": "bond",
    "date": "2026-09-24",
    "horizon": "3.5 to 7.5 years",
    "what": "Record high-yield bond sale at 8.625% to 9.75% coupons on the dollar notes, to fund OpenAI.",
    "circular": null,
    "source": {
     "title": "SoftBank raises US$11.1bil in world's biggest high-yield corporate bond sale",
     "publisher": "Bloomberg/Reuters via The Star",
     "url": "https://www.thestar.com.my/business/business-news/2026/09/24/softbank-raises-us111bil-in-world039s-biggest-high-yield-corporate-bond-sale",
     "date": "2026-09-24",
     "tier": "press"
    },
    "group": "funders",
    "id": "F061"
   },
   {
    "from": "bond-market",
    "to": "spacexai",
    "amount_usd_b": 25.0,
    "firm": true,
    "type": "bond",
    "date": "2026-06-23",
    "horizon": null,
    "what": "SpaceX (merged with xAI) sold $25B of bonds days after its IPO (exact date approximate).",
    "circular": null,
    "source": {
     "title": "The AI boom's debt blitz is testing investor demand",
     "publisher": "Fortune",
     "url": "https://fortune.com/2026/07/17/ai-boom-debt-blitz-investor-demand-hyperscaler-bond-issuance/",
     "date": "2026-07-17",
     "tier": "press"
    },
    "group": "funders",
    "id": "F062"
   },
   {
    "from": "broadcom",
    "to": "anthropic",
    "amount_usd_b": 42.0,
    "firm": false,
    "type": "vendor_financing",
    "date": "2026-10-01",
    "horizon": "tied to five-year TPU lease",
    "what": "Convertible loan, 'up to', to help pay for leased TPU systems",
    "circular": "Broadcom lends money that is used to lease chips Broadcom helps build.",
    "source": {
     "title": "Exclusive: Broadcom to lend Anthropic up to $42 billion to lease its chips, filing says (Reuters)",
     "publisher": "The Star / Reuters",
     "url": "https://www.thestar.com.my/tech/tech-news/2026/10/01/exclusive-broadcom-to-lend-anthropic-up-to-42-billion-to-lease-its-chips-filing-says",
     "date": "2026-10-01",
     "tier": "press"
    },
    "group": "labs",
    "id": "F063",
    "returns": [
     "F018",
     "F019"
    ]
   },
   {
    "from": "brookfield",
    "to": "bloom",
    "amount_usd_b": 25.0,
    "firm": false,
    "type": "loan",
    "date": "2026-06-30",
    "horizon": "not disclosed",
    "what": "Financing framework to pay for Bloom fuel cell power projects for AI data centers (up from $5B in Oct 2025). Framework, not drawn; exact structure (loan, ownership, lease) not disclosed.",
    "circular": null,
    "source": {
     "title": "Brookfield and Bloom Energy Expand AI Infrastructure Partnership to $25 Billion",
     "publisher": "Bloom Energy (press release)",
     "url": "https://www.bloomenergy.com/news/brookfield-and-bloom-energy-expand-ai-infrastructure-partnership/",
     "date": "2026-06-30",
     "tier": "primary"
    },
    "group": "energy",
    "id": "F064"
   },
   {
    "from": "china-big-fund",
    "to": "deepseek",
    "amount_usd_b": null,
    "firm": false,
    "type": "equity",
    "date": "2026-06-03",
    "horizon": "one-time",
    "what": "China's national AI fund (backed mainly by the Big Fund) in final talks to join DeepSeek's first round; amount not given.",
    "circular": null,
    "source": {
     "title": "DeepSeek slated to draw $7 billion in maiden fundraising, sources say",
     "publisher": "Reuters via MarketScreener",
     "url": "https://www.marketscreener.com/news/deepseek-slated-to-draw-7-billion-in-maiden-fundraising-sources-say-ce7f5ddfd888f724",
     "date": "2026-06-03",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F065"
   },
   {
    "from": "coreweave",
    "to": "nvidia",
    "amount_usd_b": null,
    "firm": true,
    "type": "chip_purchase",
    "date": "2026",
    "horizon": "2026",
    "what": "CoreWeave GPU purchases (all GPUs are Nvidia); exact dollar amount not disclosed, the bulk of $35–39B 2026 capex",
    "circular": null,
    "source": {
     "title": "Nvidia-CoreWeave $2 billion AI factory investment",
     "publisher": "Fintool",
     "url": "https://fintool.com/news/nvidia-coreweave-2-billion-ai-factory",
     "date": "2026-01-26",
     "tier": "secondary"
    },
    "group": "neoclouds",
    "id": "F066"
   },
   {
    "from": "deepseek",
    "to": "huawei",
    "amount_usd_b": null,
    "firm": false,
    "type": "chip_purchase",
    "date": "2026-09-04",
    "horizon": "depends on Huawei production",
    "what": "Planned order of at least 160,000 Huawei Ascend 950DT chips for an Inner Mongolia data center; value not disclosed.",
    "circular": null,
    "source": {
     "title": "DeepSeek Plans Big Huawei AI Chip Order to Power New Data Center",
     "publisher": "Bloomberg",
     "url": "https://news.bgov.com/artificial-intelligence/deepseek-plans-big-huawei-ai-chip-order-to-power-new-data-center",
     "date": "2026-09-04",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F067"
   },
   {
    "from": "fluidstack",
    "to": "TeraWulf",
    "amount_usd_b": 3.7,
    "firm": true,
    "type": "lease_guarantee",
    "date": "2025-08-14",
    "horizon": "10 years (up to ~$8.7B with extensions)",
    "what": "Fluidstack colocation leases for 200+ MW",
    "circular": null,
    "source": {
     "title": "TeraWulf press release: Fluidstack HPC colocation agreements and Google backstop (Ex. 99.1)",
     "publisher": "TeraWulf (investor relations / SEC exhibit)",
     "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001104659-25-078084/tm2523008d2_ex99-1.htm",
     "date": "2025-08-14",
     "tier": "primary"
    },
    "group": "neoclouds",
    "id": "F068"
   },
   {
    "from": "g42",
    "to": "cerebras",
    "amount_usd_b": 0.44,
    "firm": true,
    "type": "chip_purchase",
    "date": "2025-12-31",
    "horizon": "FY2025",
    "what": "MBZUAI (62%) and G42 (24%), 86% of Cerebras' $0.51B 2025 revenue (amount derived); G42 is also an investor",
    "circular": null,
    "source": {
     "title": "Cerebras stock just hit markets",
     "publisher": "Yahoo Finance",
     "url": "https://finance.yahoo.com/markets/stocks/articles/cerebras-stock-just-hit-markets-150518599.html",
     "date": "2026-05-14",
     "tier": "press"
    },
    "group": "neoclouds",
    "id": "F069"
   },
   {
    "from": "google",
    "to": "Cipher Mining",
    "amount_usd_b": 1.73,
    "firm": true,
    "type": "lease_guarantee",
    "date": "2025",
    "horizon": "~10 years",
    "what": "Google backstop of Fluidstack lease at Cipher (Texas), for ~5.4% of Cipher (secondary)",
    "circular": null,
    "source": {
     "title": "Fluidstack revenue, funding & growth rate",
     "publisher": "Sacra",
     "url": "https://sacra.com/research/fluidstack",
     "date": "2026",
     "tier": "secondary"
    },
    "group": "neoclouds",
    "id": "F070"
   },
   {
    "from": "google",
    "to": "TeraWulf",
    "amount_usd_b": 3.2,
    "firm": true,
    "type": "lease_guarantee",
    "date": "2025-08-18",
    "horizon": "10 years",
    "what": "Google backstops $1.8B of Fluidstack's lease payments to TeraWulf plus $1.4B of the project's debt, for warrants worth about 14% of TeraWulf",
    "circular": null,
    "source": {
     "title": "Google lifting stake in TeraWulf with additional $1.4 billion backstop",
     "publisher": "Dow Jones via MarketScreener",
     "url": "https://au.marketscreener.com/news/google-lifting-stake-in-terawulf-with-additional-1-4-billion-backstop-ce7c51dfd08df526",
     "date": "2025-08-18",
     "tier": "press"
    },
    "group": "neoclouds",
    "id": "F071"
   },
   {
    "from": "google",
    "to": "anthropic",
    "amount_usd_b": 10.0,
    "firm": true,
    "type": "equity",
    "date": "2026-04-24",
    "horizon": "2026",
    "what": "Google cash investment at a $350B valuation",
    "circular": "Anthropic owes Google at least about $114.5B for cloud capacity, payable regardless of use (public S-1).",
    "source": {
     "title": "Google plans to invest up to $40 billion in Anthropic (Bloomberg via Reuters)",
     "publisher": "Cyprus Mail",
     "url": "https://www.cyprus-mail.com/2026/04/24/google-plans-to-invest-up-to-40-billion-in-anthropic",
     "date": "2026-04-24",
     "tier": "press"
    },
    "group": "labs",
    "id": "F072",
    "returns": [
     "F021"
    ]
   },
   {
    "from": "google",
    "to": "anthropic",
    "amount_usd_b": 30.0,
    "firm": false,
    "type": "equity",
    "date": "2026-04-24",
    "horizon": "conditional",
    "what": "Further Google investment if Anthropic hits performance targets",
    "circular": "Google invests; Anthropic commits to spend on Google Cloud and TPUs.",
    "source": {
     "title": "Google plans to invest up to $40 billion in Anthropic (Bloomberg via Reuters)",
     "publisher": "Cyprus Mail",
     "url": "https://www.cyprus-mail.com/2026/04/24/google-plans-to-invest-up-to-40-billion-in-anthropic",
     "date": "2026-04-24",
     "tier": "press"
    },
    "group": "labs",
    "id": "F073",
    "returns": [
     "F021"
    ]
   },
   {
    "from": "google",
    "to": "apple",
    "amount_usd_b": 20.0,
    "firm": false,
    "type": "revenue_share",
    "date": "2025-09-03",
    "horizon": "per year (2022 estimate)",
    "what": "Estimated payment for Google being Safari's default search engine (court-document estimate for 2022).",
    "circular": null,
    "source": {
     "title": "Apple dodged a $20 billion hit, thanks to Google antitrust ruling",
     "publisher": "Yahoo Finance",
     "url": "https://finance.yahoo.com/news/apple-dodged-a-20-billion-hit-thanks-to-google-antitrust-ruling-163056806.html",
     "date": "2025-09-03",
     "tier": "press"
    },
    "group": "gaps_us",
    "id": "F074"
   },
   {
    "from": "google",
    "to": "marvell",
    "amount_usd_b": 120.0,
    "firm": false,
    "type": "chip_purchase",
    "date": null,
    "horizon": "6.5 years",
    "what": "'Up to' $120B of custom products, tied to milestones, not booked.",
    "circular": null,
    "source": {
     "title": "Marvell Stock Is Still 17% Below Its Investor Day Close: What the AI Funding Scare Means for 2031",
     "publisher": "TIKR",
     "url": "https://www.tikr.com/blog/marvell-stock-is-still-17-below-its-investor-day-close-heres-what-the-ai-funding-scare-means-for-2031?",
     "date": "2026-10-20",
     "tier": "secondary"
    },
    "group": "semis",
    "id": "F075"
   },
   {
    "from": "hyperion-jv",
    "to": "meta",
    "amount_usd_b": 3.0,
    "firm": true,
    "type": "acquisition",
    "date": "2025-10-21",
    "horizon": null,
    "what": "One-time distribution of about $3B to Meta for contributing the land and construction in progress (Blue Owl effectively bought 80% of the project).",
    "circular": null,
    "source": {
     "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
     "publisher": "Meta",
     "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
     "date": "2025-10-21",
     "tier": "primary"
    },
    "group": "funders",
    "id": "F076"
   },
   {
    "from": "jane-street",
    "to": "coreweave",
    "amount_usd_b": 1.0,
    "firm": true,
    "type": "equity",
    "date": "2026-Q2",
    "horizon": null,
    "what": "Strategic equity investment in Q2 2026",
    "circular": null,
    "source": {
     "title": "CoreWeave Reports Strong Second Quarter 2026 Results",
     "publisher": "CoreWeave (press release)",
     "url": "https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx",
     "date": "2026-08-11",
     "tier": "primary"
    },
    "group": "neoclouds",
    "id": "F077"
   },
   {
    "from": "jane-street",
    "to": "crusoe",
    "amount_usd_b": 13.0,
    "firm": false,
    "type": "compute_contract",
    "date": "2026-09-04",
    "horizon": "5 years",
    "what": "Reported five-year Crusoe Cloud contract",
    "circular": null,
    "source": {
     "title": "Crusoe raises $3B at $30B valuation after landing $13B Jane Street deal",
     "publisher": "Tech Funding News",
     "url": "https://techfundingnews.com/crusoe-raises-3b-at-30b-valuation-after-landing-13b-jane-street-deal/",
     "date": "2026-09-04",
     "tier": "press"
    },
    "group": "neoclouds",
    "id": "F078"
   },
   {
    "from": "jane-street",
    "to": "fluidstack",
    "amount_usd_b": 1.5,
    "firm": true,
    "type": "equity",
    "date": "2026-09-28",
    "horizon": null,
    "what": "Lead of $1.5B round at $18B valuation",
    "circular": null,
    "source": {
     "title": "Fluidstack raises $1.5B led by Jane Street, valuation to $18B",
     "publisher": "Dealroom",
     "url": "https://dealroom.co/news/157101-fluidstack-raises-1-5b-led-by-jane-street-valuation-quadruples-to-18b-in/",
     "date": "2026-09-28",
     "tier": "secondary"
    },
    "group": "neoclouds",
    "id": "F079"
   },
   {
    "from": "meta",
    "to": "amd",
    "amount_usd_b": null,
    "firm": false,
    "type": "chip_purchase",
    "date": "2026-02-23",
    "horizon": "H2 2026 to 2030",
    "what": "6 GW of AMD GPUs over five years; first 1 GW from H2 2026, rest contracted successively through 2030.",
    "circular": null,
    "source": {
     "title": "Some More Game Theory, This Time On The AMD-Meta Platforms Deal",
     "publisher": "The Next Platform",
     "url": "https://www.nextplatform.com/compute/2026/02/24/some-more-game-theory-this-time-on-the-amd-meta-platforms-deal/4092150",
     "date": "2026-02-24",
     "tier": "press"
    },
    "group": "semis",
    "id": "F080"
   },
   {
    "from": "meta",
    "to": "constellation",
    "amount_usd_b": null,
    "firm": true,
    "type": "power_contract",
    "date": "2025-06-03",
    "horizon": "June 2027-2047",
    "what": "20-year PPA for 1,121 MW from Clinton nuclear plant; value not disclosed.",
    "circular": null,
    "source": {
     "title": "Constellation and Meta 20-year Clinton nuclear agreement",
     "publisher": "Business Wire (Constellation press release)",
     "url": "https://www.businesswire.com/news/home/20250603781894/en",
     "date": "2025-06-03",
     "tier": "primary"
    },
    "group": "energy",
    "id": "F081"
   },
   {
    "from": "meta",
    "to": "coreweave",
    "amount_usd_b": 14.2,
    "firm": false,
    "type": "compute_contract",
    "date": "2025-09",
    "horizon": "2025–2031",
    "what": "Original Meta compute contract ('up to' $14.2B)",
    "circular": null,
    "source": {
     "title": "CoreWeave Seeks $8.5B Loan as AI Infrastructure Debt Piles Up (citing Bloomberg)",
     "publisher": "The Energy Mag",
     "url": "https://www.theenergymag.com/news/2026-02-25/coreweave-billion-loan-ai",
     "date": "2026-02-25",
     "tier": "secondary"
    },
    "group": "neoclouds",
    "id": "F082"
   },
   {
    "from": "meta",
    "to": "coreweave",
    "amount_usd_b": 21.0,
    "firm": true,
    "type": "compute_contract",
    "date": "2026-04-09",
    "horizon": "2026–2032",
    "what": "Expanded AI cloud capacity agreement",
    "circular": null,
    "source": {
     "title": "CoreWeave and Meta Announce $21 Billion Expanded AI Infrastructure Agreement",
     "publisher": "CoreWeave via Business Wire",
     "url": "https://www.businesswire.com/news/home/20260409138818/en/CoreWeave-and-Meta-Announce-$21-Billion-Expanded-AI-Infrastructure-Agreement",
     "date": "2026-04-09",
     "tier": "primary"
    },
    "group": "neoclouds",
    "id": "F083"
   },
   {
    "from": "meta",
    "to": "entergy",
    "amount_usd_b": null,
    "firm": true,
    "type": "power_contract",
    "date": "2026-03",
    "horizon": "multi-decade",
    "what": "Meta's tariff payments and contributions to cover the cost of seven new gas units (5.2+ GW) plus grid work in Louisiana, tied to $15B of Entergy capital spending; plus ~$2B of customer benefits. Total payments not disclosed.",
    "circular": null,
    "source": {
     "title": "New generation adds $12B to Entergy capital plan",
     "publisher": "Utility Dive",
     "url": "https://www.utilitydive.com/news/new-generation-adds-12b-entergy-capital-plan/818790/",
     "date": "2026-04-30",
     "tier": "press"
    },
    "group": "energy",
    "id": "F084"
   },
   {
    "from": "meta",
    "to": "hyperion-jv",
    "amount_usd_b": null,
    "firm": true,
    "type": "lease_guarantee",
    "date": "2025-10",
    "horizon": "4-year renewable lease blocks, ~16-year residual value guarantee",
    "what": "Meta leases Hyperion from the JV and guarantees investors are repaid if it leaves.",
    "circular": null,
    "source": {
     "title": "The Meta/Blue Owl deal broken down: off-balance-sheet gymnastics 24 years after Enron",
     "publisher": "IFR",
     "url": "https://www.ifre.com/opinion/2363199/the-metablue-owl-deal-broken-down-off-balance-sheet-gymnastics-24-years-after-enron",
     "date": "2026",
     "tier": "press",
     "date_inferred": true
    },
    "group": "hyperscalers",
    "id": "F085"
   },
   {
    "from": "meta",
    "to": "hyperion-jv",
    "amount_usd_b": null,
    "firm": true,
    "type": "lease_guarantee",
    "date": "2025-10-21",
    "horizon": "Leases with a four-year initial term. Value guarantee covers the first 16 years",
    "what": "Meta rents the campus and guarantees its residual value (a capped cash payment if it walks away).",
    "circular": null,
    "source": {
     "title": "Meta Announces Joint Venture With Funds Managed by Blue Owl Capital to Develop Hyperion Data Center",
     "publisher": "Meta",
     "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
     "date": "2025-10-21",
     "tier": "primary"
    },
    "group": "funders",
    "id": "F086"
   },
   {
    "from": "meta",
    "to": "nebius",
    "amount_usd_b": 3.0,
    "firm": true,
    "type": "compute_contract",
    "date": "2025-11",
    "horizon": "5 years",
    "what": "First Meta contract",
    "circular": null,
    "source": {
     "title": "Meta commits up to $27 billion to Nebius in one of the largest AI infrastructure deals on record",
     "publisher": "The Next Web",
     "url": "https://thenextweb.com/news/meta-nebius-27-billion-ai-infrastructure-deal",
     "date": "2026-03-16",
     "tier": "press"
    },
    "group": "neoclouds",
    "id": "F087"
   },
   {
    "from": "meta",
    "to": "nebius",
    "amount_usd_b": 15.0,
    "firm": false,
    "type": "compute_contract",
    "date": "2026-03-16",
    "horizon": "5 years",
    "what": "Optional capacity, capped at $15B; can be sold to others",
    "circular": null,
    "source": {
     "title": "Nebius Q1 2026 shareholder letter (Form 6-K Ex. 99.2)",
     "publisher": "Nebius / SEC EDGAR",
     "url": "https://www.sec.gov/Archives/edgar/data/0001513845/000110465926059872/tm2614392d1_ex99-2.htm",
     "date": "2026-05-13",
     "tier": "primary"
    },
    "group": "neoclouds",
    "id": "F088"
   },
   {
    "from": "meta",
    "to": "nebius",
    "amount_usd_b": 12.0,
    "firm": true,
    "type": "compute_contract",
    "date": "2026-03-16",
    "horizon": "2027–2032",
    "what": "Meta dedicated compute (firm part of 'up to $27B' deal)",
    "circular": null,
    "source": {
     "title": "Meta commits up to $27 billion to Nebius in one of the largest AI infrastructure deals on record",
     "publisher": "The Next Web",
     "url": "https://thenextweb.com/news/meta-nebius-27-billion-ai-infrastructure-deal",
     "date": "2026-03-16",
     "tier": "press"
    },
    "group": "neoclouds",
    "id": "F089"
   },
   {
    "from": "meta",
    "to": "oklo",
    "amount_usd_b": null,
    "firm": true,
    "type": "prepayment",
    "date": "2026-01-09",
    "horizon": "as early as 2030",
    "what": "Meta prepays for power from a planned 1.2 GW Oklo campus in Ohio; funds go to nuclear fuel. Amount not disclosed.",
    "circular": null,
    "source": {
     "title": "Oklo, Meta announce agreement in support of 1.2 GW nuclear energy development in southern Ohio",
     "publisher": "Orrick (deal counsel news)",
     "url": "https://www.orrick.com/en/News/2026/01/Oklo-Meta-Announce-Agreement-in-Support-of-1-2-GW-Nuclear-Energy-Development-in-Southern-Ohio",
     "date": "2026-01-13",
     "tier": "secondary"
    },
    "group": "energy",
    "id": "F090"
   },
   {
    "from": "meta",
    "to": "terrapower",
    "amount_usd_b": null,
    "firm": true,
    "type": "prepayment",
    "date": "2026-01-09",
    "horizon": "by 2035",
    "what": "Meta funds development of two Natrium units with rights to up to six more (2.8 GW total). Amount and form undisclosed.",
    "circular": null,
    "source": {
     "title": "Meta strikes deals with Vistra, Oklo, TerraPower",
     "publisher": "American Nuclear Society (Nuclear News)",
     "url": "https://www.ans.org/news/article-7666/meta-strikes-deals-with-vistra-oklo-terrapower/",
     "date": "2026-01-12",
     "tier": "press"
    },
    "group": "energy",
    "id": "F091"
   },
   {
    "from": "meta",
    "to": "vistra",
    "amount_usd_b": null,
    "firm": true,
    "type": "power_contract",
    "date": "2026-01-09",
    "horizon": "early 2030s onward",
    "what": "Meta-supported uprates of about 433 MW at three Vistra nuclear plants; value not disclosed",
    "circular": null,
    "source": {
     "title": "Meta strikes deals with Vistra, Oklo, TerraPower",
     "publisher": "American Nuclear Society (Nuclear News)",
     "url": "https://www.ans.org/news/article-7666/meta-strikes-deals-with-vistra-oklo-terrapower/",
     "date": "2026-01-12",
     "tier": "press"
    },
    "group": "energy",
    "id": "F092"
   },
   {
    "from": "mgx",
    "to": "Aligned Data Centers",
    "amount_usd_b": 40.0,
    "firm": true,
    "type": "acquisition",
    "date": "2025-10-15",
    "horizon": null,
    "what": "Takeover of Aligned Data Centers by the AI Infrastructure Partnership (BlackRock GIP, MGX, Microsoft, Nvidia). This is the consortium total. MGX's share was not disclosed.",
    "circular": null,
    "source": {
     "title": "Abu Dhabi's AI investment firm MGX raises $49bn for new fund",
     "publisher": "The National",
     "url": "https://www.thenationalnews.com/business/markets/2026/07/01/abu-dhabis-ai-investment-firm-mgx-raises-49bn-for-new-fund/",
     "date": "2026-07-01",
     "tier": "press"
    },
    "group": "funders",
    "id": "F093"
   },
   {
    "from": "mgx",
    "to": "anthropic",
    "amount_usd_b": null,
    "firm": true,
    "type": "equity",
    "date": "2026-05-29",
    "horizon": null,
    "what": "Invested in Anthropic's $30B Series G (Feb 2026) and $65B Series H (May 2026). Amounts were not disclosed.",
    "circular": null,
    "source": {
     "title": "Abu Dhabi's AI investment firm MGX raises $49bn for new fund",
     "publisher": "The National",
     "url": "https://www.thenationalnews.com/business/markets/2026/07/01/abu-dhabis-ai-investment-firm-mgx-raises-49bn-for-new-fund/",
     "date": "2026-07-01",
     "tier": "press"
    },
    "group": "funders",
    "id": "F094"
   },
   {
    "from": "mgx",
    "to": "openai",
    "amount_usd_b": null,
    "firm": true,
    "type": "equity",
    "date": "2026-03-31",
    "horizon": null,
    "what": "Co-led OpenAI's $122B round. MGX's amount was not disclosed.",
    "circular": null,
    "source": {
     "title": "UAE's MGX closes $49B AI fund anchored in US AI ecosystem",
     "publisher": "UAE Preferred",
     "url": "https://www.uaepreferred.com/perspectives/uaes-mgx-closes-49b-ai-fund-anchored-in-us-ai-ecosystem",
     "date": "2026-07-02",
     "tier": "secondary"
    },
    "group": "funders",
    "id": "F095"
   },
   {
    "from": "mgx",
    "to": "spacexai",
    "amount_usd_b": null,
    "firm": true,
    "type": "equity",
    "date": "2026-01-05",
    "horizon": null,
    "what": "Backed xAI's $20B Series E. MGX's amount was not disclosed.",
    "circular": null,
    "source": {
     "title": "UAE's MGX closes $49B AI fund anchored in US AI ecosystem",
     "publisher": "UAE Preferred",
     "url": "https://www.uaepreferred.com/perspectives/uaes-mgx-closes-49b-ai-fund-anchored-in-us-ai-ecosystem",
     "date": "2026-07-02",
     "tier": "secondary"
    },
    "group": "funders",
    "id": "F096"
   },
   {
    "from": "mgx",
    "to": "stargate",
    "amount_usd_b": 7.0,
    "firm": false,
    "type": "equity",
    "date": "2025-01-23",
    "horizon": "Initial commitment",
    "what": "Reported initial equity commitment to the Stargate JV.",
    "circular": null,
    "source": {
     "title": "Stargate LLC",
     "publisher": "Wikipedia (citing The Information)",
     "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
     "date": "2025-01-23",
     "tier": "secondary"
    },
    "group": "funders",
    "id": "F097"
   },
   {
    "from": "microsoft",
    "to": "anthropic",
    "amount_usd_b": 5.0,
    "firm": false,
    "type": "equity",
    "date": "2025-11-18",
    "horizon": "not stated",
    "what": "Microsoft committed to invest up to $5B.",
    "circular": "Anthropic committed to buy $30B of Azure compute from Microsoft in the same deal.",
    "source": {
     "title": "Microsoft, NVIDIA and Anthropic Announce Strategic Partnerships",
     "publisher": "NVIDIA blog",
     "url": "https://blogs.nvidia.com/blog/microsoft-nvidia-anthropic-announce-partnership",
     "date": "2025-11-18",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F098",
    "returns": [
     "F022"
    ]
   },
   {
    "from": "microsoft",
    "to": "constellation",
    "amount_usd_b": null,
    "firm": true,
    "type": "power_contract",
    "date": "",
    "horizon": "20 years from restart (signing date not confirmed in sources read)",
    "what": "20-year PPA for output of restarted Crane (Three Mile Island Unit 1); value not disclosed.",
    "circular": null,
    "source": {
     "title": "Constellation signed 920 megawatts of new power deals, including a Walmart PPA",
     "publisher": "The Motley Fool",
     "url": "https://www.fool.com/investing/2026/08/07/constellation-signed-920-megawatts-of-new-power-deals-including-a-walmart-ppa-heres-what-it-means-for-ceg-stock/",
     "date": "2026-08-07",
     "tier": "secondary"
    },
    "group": "energy",
    "id": "F099"
   },
   {
    "from": "microsoft",
    "to": "nebius",
    "amount_usd_b": 17.4,
    "firm": true,
    "type": "compute_contract",
    "date": "2025-09",
    "horizon": "multi-year from 2025",
    "what": "Microsoft GPU capacity contract (could reach $19.4B)",
    "circular": null,
    "source": {
     "title": "Meta commits up to $27 billion to Nebius in one of the largest AI infrastructure deals on record",
     "publisher": "The Next Web",
     "url": "https://thenextweb.com/news/meta-nebius-27-billion-ai-infrastructure-deal",
     "date": "2026-03-16",
     "tier": "press"
    },
    "group": "neoclouds",
    "id": "F100"
   },
   {
    "from": "microsoft",
    "to": "openai",
    "amount_usd_b": 13.0,
    "firm": true,
    "type": "equity",
    "date": "2019-2023",
    "horizon": "cumulative",
    "what": "Microsoft's total funding commitment to OpenAI; $11.9B funded by June 30, 2026, for an approximate 25% stake on an as-converted basis",
    "circular": "OpenAI spends heavily on Azure ($250B incremental commitment) and pays Microsoft a revenue share, so Microsoft's investment returns to it as revenue.",
    "source": {
     "title": "Microsoft Form 8-K Exhibit 99.1 (fiscal 2026 annual report items recast for new segments)",
     "publisher": "Microsoft via SEC EDGAR",
     "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
     "date": "2026-10-28",
     "tier": "primary"
    },
    "group": "hyperscalers",
    "id": "F101",
    "returns": [
     "F128",
     "F129"
    ]
   },
   {
    "from": "mistral",
    "to": "nvidia",
    "amount_usd_b": null,
    "firm": true,
    "type": "chip_purchase",
    "date": "2026-03-30",
    "horizon": "2026",
    "what": "13,800 Nvidia chips for the Bruyeres-le-Chatel data center; price not disclosed (funded by the US$0.83B loan).",
    "circular": null,
    "source": {
     "title": "France's Mistral raises $830 million in debt for AI data centre build-up",
     "publisher": "Reuters via Yahoo Finance",
     "url": "https://finance.yahoo.com/sectors/technology/articles/frances-mistral-raises-830-million-060341046.html",
     "date": "2026-03-30",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F102"
   },
   {
    "from": "moonshot",
    "to": "alibaba-cloud",
    "amount_usd_b": null,
    "firm": true,
    "type": "compute_contract",
    "date": "2026-08-20",
    "horizon": "ongoing",
    "what": "Alibaba supplies cloud computing to Moonshot; value not disclosed.",
    "circular": null,
    "source": {
     "title": "Alibaba's quarterly revenue up 9%, misses adjusted profit due to heavy AI spend",
     "publisher": "Reuters via BNN Bloomberg",
     "url": "https://www.bnnbloomberg.ca/business/company-news/2026/08/20/alibabas-quarterly-revenue-up-9-misses-adjusted-profit-due-to-heavy-ai-spend/",
     "date": "2026-08-20",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F103"
   },
   {
    "from": "nvidia",
    "to": "Groq, Inc.",
    "amount_usd_b": 2.944,
    "firm": true,
    "type": "acquisition",
    "date": "2026-07-26",
    "horizon": null,
    "what": "Deferred payment under Nvidia's non-exclusive license agreement with Groq, paid in Q2 FY2027.",
    "circular": null,
    "source": {
     "title": "NVIDIA Announces Financial Results for Second Quarter Fiscal 2027 (8-K exhibit)",
     "publisher": "NVIDIA (SEC filing)",
     "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm",
     "date": "2026-08-26",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F104"
   },
   {
    "from": "nvidia",
    "to": "Hugging Face",
    "amount_usd_b": 11.9,
    "firm": false,
    "type": "acquisition",
    "date": "2026-09-02",
    "horizon": "close expected H1 2027",
    "what": "Agreement to acquire Hugging Face for about $11.9B, pending regulatory approval.",
    "circular": null,
    "source": {
     "title": "NVIDIA Form 8-K (agreement to acquire Hugging Face)",
     "publisher": "NVIDIA (SEC filing)",
     "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000078/nvda-20260902.htm",
     "date": "2026-09-02",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F105"
   },
   {
    "from": "nvidia",
    "to": "King Yuan Electronics (KYEC)",
    "amount_usd_b": 1.1,
    "firm": true,
    "type": "prepayment",
    "date": "2026-10-21",
    "horizon": "production from Apr 2027",
    "what": "$1.1B capacity reservation advance for new US chip-testing plants. Nvidia also gave IBIDEN a 'multibillion-dollar' advance (amount undisclosed).",
    "circular": null,
    "source": {
     "title": "Nvidia's $1.1 Billion KYEC Deal Is the Small Number in a $279 Billion Supply Bet",
     "publisher": "TIKR",
     "url": "https://www.tikr.com/blog/nvidias-1-1-billion-kyec-deal-is-the-small-number-in-a-279-billion-supply-bet?.tsrc=rss",
     "date": "2026",
     "tier": "secondary",
     "date_inferred": true
    },
    "group": "semis",
    "id": "F106"
   },
   {
    "from": "nvidia",
    "to": "amkor",
    "amount_usd_b": 1.5,
    "firm": true,
    "type": "prepayment",
    "date": "2026-07-23",
    "horizon": "multi-year",
    "what": "$1.5B multi-year packaging agreement for Arizona capacity, including a prepayment of undisclosed size.",
    "circular": null,
    "source": {
     "title": "Amkor Technology Announces Strategic Partnership with NVIDIA to Expand Advanced Packaging and Test",
     "publisher": "Amkor Technology",
     "url": "https://ir.amkor.com/news-releases/news-release-details/amkor-technology-announces-strategic-partnership-nvidia-expand",
     "date": "2026-07-23",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F107"
   },
   {
    "from": "nvidia",
    "to": "amkor",
    "amount_usd_b": 1.3,
    "firm": true,
    "type": "prepayment",
    "date": "2026-10-21",
    "horizon": "multi-year",
    "what": "$1.3B South Korea agreement with prepayments; Amkor's Nvidia agreements now total $3B.",
    "circular": null,
    "source": {
     "title": "Amkor Technology and NVIDIA Advance Strategic Partnership for AI Infrastructure",
     "publisher": "Amkor Technology",
     "url": "https://ir.amkor.com/news-releases/news-release-details/amkor-technology-and-nvidia-advance-strategic-partnership-ai",
     "date": "2026-10-21",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F108"
   },
   {
    "from": "nvidia",
    "to": "anthropic",
    "amount_usd_b": 10.0,
    "firm": false,
    "type": "equity",
    "date": "2025-11-18",
    "horizon": "not stated",
    "what": "Nvidia committed to invest up to $10B in Anthropic",
    "circular": "Anthropic committed to up to 1 GW of Nvidia Grace Blackwell and Vera Rubin compute in the same deal.",
    "source": {
     "title": "Microsoft, NVIDIA and Anthropic Announce Strategic Partnerships",
     "publisher": "NVIDIA blog",
     "url": "https://blogs.nvidia.com/blog/microsoft-nvidia-anthropic-announce-partnership",
     "date": "2025-11-18",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F109"
   },
   {
    "from": "nvidia",
    "to": "coherent",
    "amount_usd_b": 2.0,
    "firm": true,
    "type": "equity",
    "date": "2026-03-02",
    "horizon": null,
    "what": "Nvidia bought 7,788,161 Coherent shares at $256.80 for $2B cash; access to five extra product families for co-packaged optics.",
    "circular": null,
    "source": {
     "title": "Coherent Corp. Form 8-K (sale of common stock to NVIDIA)",
     "publisher": "Coherent (SEC filing)",
     "url": "https://www.sec.gov/Archives/edgar/data/820318/000119312526084366/d42735d8k.htm",
     "date": "2026-03-02",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F110"
   },
   {
    "from": "nvidia",
    "to": "coreweave",
    "amount_usd_b": 6.3,
    "firm": true,
    "type": "compute_contract",
    "date": "2025-09-09",
    "horizon": "2025–2032",
    "what": "Nvidia capacity order plus obligation to buy any unsold CoreWeave capacity through Apr 13, 2032",
    "circular": "Nvidia is backstopping demand for capacity built with its own GPUs, which CoreWeave finances partly with Nvidia's equity.",
    "source": {
     "title": "CoreWeave Form 8-K (NVIDIA order form, Sept 9, 2025)",
     "publisher": "CoreWeave / SEC EDGAR",
     "url": "https://www.sec.gov/Archives/edgar/data/1769628/000176962825000047/crwv-20250909.htm",
     "date": "2025-09-15",
     "tier": "primary"
    },
    "group": "neoclouds",
    "id": "F111",
    "returns": [
     "F066"
    ]
   },
   {
    "from": "nvidia",
    "to": "coreweave",
    "amount_usd_b": 2.0,
    "firm": true,
    "type": "equity",
    "date": "2026-01-26",
    "horizon": null,
    "what": "Nvidia bought $2B of CoreWeave Class A stock at $87.20 per share and pledged to use its 'financial strength' to help CoreWeave get land, power and shells for 5+ GW by 2030.",
    "circular": "CoreWeave is a major buyer of Nvidia GPUs; Nvidia is also its shareholder and its backstop customer.",
    "source": {
     "title": "NVIDIA and CoreWeave Strengthen Collaboration to Accelerate Buildout of AI Factories",
     "publisher": "NVIDIA Newsroom",
     "url": "https://nvidianews.nvidia.com/news/nvidia-and-coreweave-strengthen-collaboration-to-accelerate-buildout-of-ai-factories",
     "date": "2026-01-26",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F112",
    "returns": [
     "F066"
    ]
   },
   {
    "from": "nvidia",
    "to": "intel",
    "amount_usd_b": 5.0,
    "firm": true,
    "type": "equity",
    "date": "2025-12-26",
    "horizon": null,
    "what": "Nvidia bought 214,776,632 newly issued Intel shares for about $5B.",
    "circular": null,
    "source": {
     "title": "Nvidia completes $5B purchase of shares from Intel",
     "publisher": "Seeking Alpha",
     "url": "https://seekingalpha.com/news/4535683-nvidia-completes-5b-purchase-of-shares-from-intel",
     "date": "2025-12-29",
     "tier": "secondary"
    },
    "group": "semis",
    "id": "F113"
   },
   {
    "from": "nvidia",
    "to": "lumentum",
    "amount_usd_b": 2.0,
    "firm": true,
    "type": "equity",
    "date": "2026-03-02",
    "horizon": "multi-year",
    "what": "Nvidia investing $2B (instrument not stated) plus a non-exclusive 'multi-billion' commitment to buy Lumentum laser parts.",
    "circular": null,
    "source": {
     "title": "NVIDIA Announces Strategic Partnership With Lumentum (8-K exhibit 99.1)",
     "publisher": "Lumentum (SEC filing)",
     "url": "https://www.sec.gov/Archives/edgar/data/1633978/000119312526085412/d41019dex991.htm",
     "date": "2026-03-02",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F114"
   },
   {
    "from": "nvidia",
    "to": "mistral",
    "amount_usd_b": null,
    "firm": true,
    "type": "equity",
    "date": "2026-09-08",
    "horizon": "one-time",
    "what": "Existing investor Nvidia added to its Mistral stake in the Series D; amount not disclosed.",
    "circular": null,
    "source": {
     "title": "Mistral AI raises record EUR 3 billion in Samsung-led funding round",
     "publisher": "Euronews",
     "url": "https://www.euronews.com/2026/09/08/mistral-ai-raises-record-3-billion-in-samsung-led-funding-round",
     "date": "2026-09-08",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F115"
   },
   {
    "from": "nvidia",
    "to": "nebius",
    "amount_usd_b": 2.0,
    "firm": true,
    "type": "equity",
    "date": "2026-03-12",
    "horizon": null,
    "what": "Nvidia buys pre-funded warrants for 21.07M Nebius shares",
    "circular": "Nebius' capex ($5.7B in Q2 2026) goes mainly to GPUs, i.e., largely back to Nvidia.",
    "source": {
     "title": "Nvidia invests $2 billion in Nebius",
     "publisher": "The Next Web",
     "url": "https://thenextweb.com/news/nvidia-invests-2-billion-in-nebius",
     "date": "2026-03-12",
     "tier": "press"
    },
    "group": "neoclouds",
    "id": "F116"
   },
   {
    "from": "nvidia",
    "to": "openai",
    "amount_usd_b": 30.0,
    "firm": true,
    "type": "equity",
    "date": "2026-02-27",
    "horizon": "one-time (funding round)",
    "what": "Nvidia's $30B in OpenAI's $110B round at a $730B pre-money valuation (round closed Mar 31, 2026 at $122B committed, $852B post-money). Funding schedule not disclosed.",
    "circular": "OpenAI committed in the same announcement to 3 GW of inference capacity and 2 GW of training on Nvidia Vera Rubin systems, so much of the money is expected to come back to Nvidia as chip purchases.",
    "source": {
     "title": "Scaling AI for everyone",
     "publisher": "OpenAI",
     "url": "https://openai.com/index/scaling-ai-for-everyone/",
     "date": "2026-02-27",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F117"
   },
   {
    "from": "nvidia",
    "to": "sb-energy",
    "amount_usd_b": 1.5,
    "firm": true,
    "type": "equity",
    "date": "2026-08-17",
    "horizon": null,
    "what": "Nvidia invested $1.5B in SB Energy, builder of OpenAI's PORTS campus in Ohio, where Nvidia will be the exclusive AI compute supplier.",
    "circular": "Nvidia funds and guarantees the landlord of an OpenAI campus that will be filled with Nvidia systems.",
    "source": {
     "title": "SB Energy, OpenAI and NVIDIA PORTS campus press release (8-K exhibit)",
     "publisher": "NVIDIA (SEC filing)",
     "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/sbeoainvidia-portsrelease.htm",
     "date": "2026-08-17",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F118"
   },
   {
    "from": "nvidia",
    "to": "sb-energy",
    "amount_usd_b": 105.0,
    "firm": false,
    "type": "lease_guarantee",
    "date": "2026-08-17",
    "horizon": "20-year leases from 2028",
    "what": "Cap on Nvidia's residual value guarantees for ~4.25 GW of OpenAI leases; paid only if OpenAI defaults and re-letting falls short. OpenAI must reimburse Nvidia.",
    "circular": "The guarantee makes it possible to finance a campus whose tenant (OpenAI) is also an Nvidia investee and whose chips will be Nvidia's.",
    "source": {
     "title": "NVIDIA Form 8-K (residual value guaranties, PORTS campus)",
     "publisher": "NVIDIA (SEC filing)",
     "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/nvda-20260817.htm",
     "date": "2026-08-17",
     "tier": "primary"
    },
    "group": "semis",
    "id": "F119"
   },
   {
    "from": "nvidia",
    "to": "spacexai",
    "amount_usd_b": 2.0,
    "firm": false,
    "type": "equity",
    "date": "2025-10-08",
    "horizon": "2025-2026",
    "what": "Nvidia reportedly investing up to $2B of equity in xAI's Colossus 2 financing; the debt side buys Nvidia GPUs and leases them to xAI",
    "circular": "The vehicle uses the money to buy Nvidia GPUs.",
    "source": {
     "title": "Nvidia backs $20 billion xAI chip deal",
     "publisher": "Tom's Hardware",
     "url": "https://www.tomshardware.com/pc-components/gpus/nvidia-backs-20-billion-xai-chip-deal",
     "date": "2025-10-08",
     "tier": "press"
    },
    "group": "labs",
    "id": "F120"
   },
   {
    "from": "nvidia",
    "to": "terrapower",
    "amount_usd_b": null,
    "firm": true,
    "type": "equity",
    "date": "2025-06-18",
    "horizon": null,
    "what": "NVentures (NVIDIA's venture arm) took part in TerraPower's $650M round; NVIDIA's share undisclosed.",
    "circular": null,
    "source": {
     "title": "TerraPower raises $650M with NVIDIA and Gates backing",
     "publisher": "Crunchbase News",
     "url": "https://news.crunchbase.com/venture/nuclear-terrapower-raise-nvda-gates/",
     "date": "2025-06-18",
     "tier": "press"
    },
    "group": "energy",
    "id": "F121"
   },
   {
    "from": "openai",
    "to": "amazon",
    "amount_usd_b": 38.0,
    "firm": true,
    "type": "compute_contract",
    "date": "2025-11-03",
    "horizon": "multi-year",
    "what": "AWS capacity on Nvidia GB200/GB300",
    "circular": null,
    "source": {
     "title": "Amazon invests $50B in OpenAI, deepens AWS partnership with expanded $100B cloud deal",
     "publisher": "GeekWire",
     "url": "https://www.geekwire.com/2026/amazon-invests-50b-in-openai-deepens-aws-partnership-with-expanded-100b-cloud-deal/",
     "date": "2026-02-27",
     "tier": "press"
    },
    "group": "labs",
    "id": "F122"
   },
   {
    "from": "openai",
    "to": "amazon",
    "amount_usd_b": 100.0,
    "firm": true,
    "type": "compute_contract",
    "date": "2026-02-27",
    "horizon": "8 years",
    "what": "AWS expansion incl. 2 GW of Trainium",
    "circular": null,
    "source": {
     "title": "Amazon invests $50B in OpenAI, deepens AWS partnership with expanded $100B cloud deal",
     "publisher": "GeekWire",
     "url": "https://www.geekwire.com/2026/amazon-invests-50b-in-openai-deepens-aws-partnership-with-expanded-100b-cloud-deal/",
     "date": "2026-02-27",
     "tier": "press"
    },
    "group": "labs",
    "id": "F123"
   },
   {
    "from": "openai",
    "to": "amd",
    "amount_usd_b": null,
    "firm": false,
    "type": "chip_purchase",
    "date": "2025-10-06",
    "horizon": "H2 2026 to Oct 2030",
    "what": "6 GW of AMD Instinct GPUs; AMD says 'tens of billions of dollars' of revenue.",
    "circular": null,
    "source": {
     "title": "Did AMD Use ChatGPT To Come Up With Its OpenAI Partnership Deal?",
     "publisher": "The Next Platform",
     "url": "https://www.nextplatform.com/ai/2025/10/06/did-amd-use-chatgpt-to-come-up-with-its-openai-partnership-deal/1650126",
     "date": "2025-10-06",
     "tier": "press"
    },
    "group": "semis",
    "id": "F124"
   },
   {
    "from": "openai",
    "to": "broadcom",
    "amount_usd_b": null,
    "firm": false,
    "type": "chip_purchase",
    "date": null,
    "horizon": "1.3 GW 2027, ~5 GW 2028",
    "what": "Custom 'Jalapeno' accelerator; no dollar value disclosed.",
    "circular": null,
    "source": {
     "title": "Broadcom Rides Rocketing Trend For Custom AI Accelerators",
     "publisher": "The Next Platform",
     "url": "https://www.nextplatform.com/connect/2026/09/10/broadcom-rides-rocketing-trend-for-custom-ai-accelerators/5295681",
     "date": "2026-09-10",
     "tier": "press"
    },
    "group": "semis",
    "id": "F125"
   },
   {
    "from": "openai",
    "to": "cerebras",
    "amount_usd_b": 20.0,
    "firm": false,
    "type": "compute_contract",
    "date": "2026-01",
    "horizon": "multi-year",
    "what": "750 MW Cerebras compute for OpenAI, reported as 'over $20B'",
    "circular": null,
    "source": {
     "title": "Cerebras stock just hit markets",
     "publisher": "Yahoo Finance",
     "url": "https://finance.yahoo.com/markets/stocks/articles/cerebras-stock-just-hit-markets-150518599.html",
     "date": "2026-05-14",
     "tier": "press"
    },
    "group": "neoclouds",
    "id": "F126"
   },
   {
    "from": "openai",
    "to": "coreweave",
    "amount_usd_b": 22.4,
    "firm": false,
    "type": "compute_contract",
    "date": "2025-09-25",
    "horizon": "multi-year from 2025",
    "what": "Three OpenAI compute contracts, each 'up to' ($11.9B + $4B + $6.5B)",
    "circular": null,
    "source": {
     "title": "CoreWeave Expands Agreement with OpenAI by up to $6.5B",
     "publisher": "CoreWeave (press release)",
     "url": "https://investors.coreweave.com/news/news-details/2025/CoreWeave-Expands-Agreement-with-OpenAI-by-up-to-6-5B/default.aspx",
     "date": "2025-09-25",
     "tier": "primary"
    },
    "group": "neoclouds",
    "id": "F127"
   },
   {
    "from": "openai",
    "to": "microsoft",
    "amount_usd_b": 250.0,
    "firm": true,
    "type": "compute_contract",
    "date": "2025-10-28",
    "horizon": "multi-year (term not stated in source)",
    "what": "Incremental commitment by OpenAI to buy $250B of Azure cloud services, agreed during OpenAI's restructuring in fall 2025. By January 2026, 45% of Microsoft's $625B commercial backlog was directly attributable to OpenAI.",
    "circular": null,
    "source": {
     "title": "Microsoft investors sweat cloud giant's OpenAI exposure",
     "publisher": "The Register",
     "url": "https://www.theregister.com/2026/01/29/microsoft_earnings_q2_2026/",
     "date": "2026-01-29",
     "tier": "press"
    },
    "group": "demand",
    "id": "F128"
   },
   {
    "from": "openai",
    "to": "microsoft",
    "amount_usd_b": 24.1,
    "firm": true,
    "type": "revenue_share",
    "date": "2026-06-30",
    "horizon": "FY2026",
    "what": "Revenue Microsoft recorded from commercial arrangements with OpenAI (Azure plus revenue share) in fiscal 2026; ~$10B more in July–Sept 2026 (secondary).",
    "circular": null,
    "source": {
     "title": "Microsoft Form 8-K Exhibit 99.1 (fiscal 2026 annual report items recast for new segments)",
     "publisher": "Microsoft via SEC EDGAR",
     "url": "https://www.sec.gov/Archives/edgar/data/0000789019/000119312526436149/msft-ex99_1.htm",
     "date": "2026-10-28",
     "tier": "primary"
    },
    "group": "hyperscalers",
    "id": "F129"
   },
   {
    "from": "openai",
    "to": "oracle",
    "amount_usd_b": 300.0,
    "firm": true,
    "type": "compute_contract",
    "date": "2025-09-10",
    "horizon": "about 5 years from 2027",
    "what": "Oracle cloud capacity (Stargate 4.5 GW)",
    "circular": null,
    "source": {
     "title": "OpenAI signs $300bn cloud deal with Oracle - report",
     "publisher": "DatacenterDynamics",
     "url": "https://www.datacenterdynamics.com/en/news/openai-signs-300bn-cloud-deal-with-oracle-report/",
     "date": "2025-09",
     "tier": "press"
    },
    "group": "labs",
    "id": "F130"
   },
   {
    "from": "openai",
    "to": "stargate",
    "amount_usd_b": 19.0,
    "firm": false,
    "type": "equity",
    "date": "2025-01-23",
    "horizon": "Initial commitment",
    "what": "Reported initial equity commitment to the Stargate JV.",
    "circular": null,
    "source": {
     "title": "Stargate LLC",
     "publisher": "Wikipedia (citing The Information)",
     "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
     "date": "2025-01-23",
     "tier": "secondary"
    },
    "group": "funders",
    "id": "F131"
   },
   {
    "from": "oracle",
    "to": "bloom",
    "amount_usd_b": null,
    "firm": false,
    "type": "power_contract",
    "date": "2026-10",
    "horizon": "not disclosed",
    "what": "Up to 2.8 GW of Bloom fuel cells (1.2 GW reported contracted). Value not disclosed; secondary source.",
    "circular": null,
    "source": {
     "title": "Bloom Energy gains as Oracle's 2.8 GW deal and $25 billion Brookfield pact set a high bar",
     "publisher": "TIKR",
     "url": "https://www.tikr.com/blog/bloom-energy-gains-as-oracles-2-8-gw-deal-and-25-billion-brookfield-pact-set-a-high-bar",
     "date": "2026-10-22",
     "tier": "secondary"
    },
    "group": "energy",
    "id": "F132"
   },
   {
    "from": "oracle",
    "to": "stargate",
    "amount_usd_b": 7.0,
    "firm": false,
    "type": "equity",
    "date": "2025-01-23",
    "horizon": "Initial commitment",
    "what": "Reported initial equity commitment to the Stargate JV.",
    "circular": null,
    "source": {
     "title": "Stargate LLC",
     "publisher": "Wikipedia (citing The Information)",
     "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
     "date": "2025-01-23",
     "tier": "secondary"
    },
    "group": "funders",
    "id": "F133"
   },
   {
    "from": "oracle",
    "to": "vantage-data-centers",
    "amount_usd_b": null,
    "firm": true,
    "type": "lease_guarantee",
    "date": "2025-11",
    "horizon": "15 years",
    "what": "Oracle's 15-year lease on the Vantage campuses services the $38B loan; OpenAI is the end user.",
    "circular": null,
    "source": {
     "title": "Three AI Megadeals Are Breaking New Ground on Wall Street (WSJ, republished)",
     "publisher": "Wall Street Journal via Tiger Brokers",
     "url": "https://www.itiger.com/hant/news/2582394141",
     "date": "2025-11-11",
     "tier": "press"
    },
    "group": "hyperscalers",
    "id": "F134"
   },
   {
    "from": "pimco",
    "to": "related-digital",
    "amount_usd_b": 10.0,
    "firm": true,
    "type": "bond",
    "date": "2026-04",
    "horizon": null,
    "what": "Pimco bought ~$10B of the ~$14B bond tranche in the $16.3B Michigan Stargate campus financing (Bank of America structured).",
    "circular": null,
    "source": {
     "title": "Oracle needed the world's biggest bond fund to finance the world's biggest data centre",
     "publisher": "The Next Web",
     "url": "https://thenextweb.com/news/oracle-data-centre-16-billion-financing-stargate",
     "date": "2026-04-25",
     "tier": "press"
    },
    "group": "hyperscalers",
    "id": "F135"
   },
   {
    "from": "apollo",
    "to": "anthropic",
    "amount_usd_b": 35.0,
    "firm": false,
    "type": "loan",
    "date": "2026-06-13",
    "horizon": "Staged. About $15B reportedly available by early 2027",
    "what": "A chip-backed special-purpose company arranged by Apollo and Blackstone for Anthropic's compute (reported as $35B or $36B).",
    "circular": null,
    "source": {
     "title": "Goldman: skjult 1,8 billion USD stor off-balance-sheet tidsbombe skaber tvivl om AI-supercyklussen",
     "publisher": "Ugebrev Investor",
     "url": "https://ugebrev.dk/formue/goldman-skjult-18-billion-usd-stor-off-balance-sheet-tidsbombe-skaber-tvivl-om-ai-supercyklussen/",
     "date": "2026-06-13",
     "tier": "press"
    },
    "group": "funders",
    "id": "F136",
    "co_funders": [
     "blackstone"
    ]
   },
   {
    "from": "apollo",
    "to": "spacexai",
    "amount_usd_b": 12.5,
    "firm": false,
    "type": "loan",
    "date": "2025-10-08",
    "horizon": "Five-year chip rental",
    "what": "Up to $12.5B of debt (Apollo, Diameter) to a special-purpose company that buys Nvidia GPUs for xAI's Colossus 2 and rents them to xAI.",
    "circular": null,
    "source": {
     "title": "Nvidia to invest in Musk's xAI as part of US$20bil funding",
     "publisher": "Free Malaysia Today (Bloomberg report)",
     "url": "https://www.freemalaysiatoday.com/category/business/2025/10/08/nvidia-to-invest-in-musks-xai-as-part-of-us20bil-funding",
     "date": "2025-10-08",
     "tier": "press"
    },
    "group": "funders",
    "id": "F137",
    "co_funders": [
     "diameter"
    ]
   },
   {
    "from": "softbank",
    "to": "openai",
    "amount_usd_b": 30.0,
    "firm": true,
    "type": "equity",
    "date": "2025-12-26",
    "horizon": "April to December 2025",
    "what": "SoftBank's first $30B in OpenAI (April and December 2025)",
    "circular": null,
    "source": {
     "title": "SoftBank closes $41B OpenAI investment as Stargate buildout expands",
     "publisher": "TechInformed",
     "url": "https://techinformed.com/softbank-closes-41b-openai-investment-as-stargate-buildout-expands",
     "date": "2026-01-07",
     "tier": "press"
    },
    "group": "funders",
    "id": "F138"
   },
   {
    "from": "softbank",
    "to": "openai",
    "amount_usd_b": 30.0,
    "firm": true,
    "type": "equity",
    "date": "2026-10-01",
    "horizon": "2026, three $10B tranches",
    "what": "SoftBank's 2026 OpenAI investment, part of the $122B round at an $852B valuation. SoftBank reports a cumulative $64.6B for about 13%; that is $4.6B more than the two rows here, and our sources do not itemize the difference.",
    "circular": null,
    "source": {
     "title": "SoftBank completes final phase of $30 billion investment in OpenAI",
     "publisher": "Reuters via The Star",
     "url": "https://www.thestar.com.my/tech/tech-news/2026/10/02/softbank-completes-final-phase-of-30-billion-investment-in-openai",
     "date": "2026-10-01",
     "tier": "press"
    },
    "group": "funders",
    "id": "F139"
   },
   {
    "from": "softbank",
    "to": "stargate",
    "amount_usd_b": 19.0,
    "firm": false,
    "type": "equity",
    "date": "2025-01-23",
    "horizon": "Initial commitment",
    "what": "Reported initial equity commitment to the Stargate JV.",
    "circular": null,
    "source": {
     "title": "Stargate LLC",
     "publisher": "Wikipedia (citing The Information)",
     "url": "https://en.wikipedia.org/wiki/Stargate_LLC",
     "date": "2025-01-23",
     "tier": "secondary"
    },
    "group": "funders",
    "id": "F140"
   },
   {
    "from": "sovereign-funds",
    "to": "alibaba-cloud",
    "amount_usd_b": 10.2,
    "firm": true,
    "type": "equity",
    "date": "2026-08-26",
    "horizon": "one-time",
    "what": "Alibaba sold HK$80B of new shares to non-US investors; all proceeds earmarked for AI infrastructure. Buyers not named; Reuters says demand included sovereign wealth funds, so the 'from' is a partial label.",
    "circular": null,
    "source": {
     "title": "Completion of placing (Form 6-K Ex. 99.1)",
     "publisher": "Alibaba Group / SEC",
     "url": "https://www.sec.gov/Archives/edgar/data/0001577552/000119312526365894/baba-ex99_1.htm",
     "date": "2026-08-26",
     "tier": "primary"
    },
    "group": "gaps_intl",
    "id": "F141"
   },
   {
    "from": "sovereign-funds",
    "to": "crusoe",
    "amount_usd_b": 3.9,
    "firm": true,
    "type": "equity",
    "date": "2026-09-17",
    "horizon": null,
    "what": "Series F at ~$30.9B valuation; co-led by Atreides, Valor and Mubadala (Abu Dhabi), with Qatar Investment Authority, Founders Fund, TPG (amount by investor not disclosed)",
    "circular": null,
    "source": {
     "title": "Crusoe Completes $3.9B F-Round Funding at $30.9B Valuation (citing WSJ)",
     "publisher": "KuCoin News / MarsBit",
     "url": "https://www.kucoin.com/news/flash/crusoe-completes-3-9b-f-round-funding-at-30-9b-valuation",
     "date": "2026-09-17",
     "tier": "secondary"
    },
    "group": "neoclouds",
    "id": "F142"
   },
   {
    "from": "spacexai",
    "to": "cursor",
    "amount_usd_b": 60.0,
    "firm": true,
    "type": "acquisition",
    "date": "2026-08-14",
    "horizon": "closed",
    "what": "All-stock purchase of Cursor",
    "circular": null,
    "source": {
     "title": "SpaceX completes $60 billion Cursor acquisition",
     "publisher": "VKTR",
     "url": "https://www.vktr.com/ai-market/spacex-completes-60-billion-cursor-acquisition/",
     "date": "2026-08-14",
     "tier": "press"
    },
    "group": "labs",
    "id": "F143"
   },
   {
    "from": "spacexai",
    "to": "tesla",
    "amount_usd_b": 0.303,
    "firm": true,
    "type": "chip_purchase",
    "date": "2026-06-04",
    "horizon": "Jan 1 – Apr 30, 2026",
    "what": "xAI bought $303M of Tesla products and services, of which $269M was Megapack batteries for its data centers (per SpaceX IPO filing). Type is 'equipment purchase' (closest allowed type).",
    "circular": null,
    "source": {
     "title": "SpaceX Reveals Another $269 Million Megapack Purchase From Tesla",
     "publisher": "Drive Tesla Canada",
     "url": "https://driveteslacanada.ca/news/spacex-tesla-megapack-purchases-2026/",
     "date": "2026-06-04",
     "tier": "secondary"
    },
    "group": "gaps_us",
    "id": "F144"
   },
   {
    "from": "spacexai",
    "to": "tesla",
    "amount_usd_b": 0.588,
    "firm": false,
    "type": "prepayment",
    "date": "2026-09-30",
    "horizon": "billed, unpaid at Sept 30, 2026",
    "what": "Tesla billed SpaceX $588M for Megapacks not yet delivered; unpaid at quarter end (per Tesla 10-Q as reported by Electrek).",
    "circular": null,
    "source": {
     "title": "Tesla cuts 2026 capex guidance; Q3 cash flow",
     "publisher": "Electrek",
     "url": "https://electrek.co/2026/10/22/tesla-cuts-2026-capex-guidance-q3-cash-flow/?extended-comments=1",
     "date": "2026-10-22",
     "tier": "press"
    },
    "group": "gaps_us",
    "id": "F145"
   },
   {
    "from": "stock-market",
    "to": "spacexai",
    "amount_usd_b": 75.0,
    "firm": true,
    "type": "equity",
    "date": "2026-06-11",
    "horizon": "2026",
    "what": "IPO proceeds, mostly to repay debt",
    "circular": null,
    "source": {
     "title": "SpaceX prices historic $75B IPO at $1.75 trillion",
     "publisher": "AI Weekly / TradingKey",
     "url": "https://aiweekly.co/alerts/spacex-prices-historic-75b-ipo-at-175-trillion",
     "date": "2026-06-11",
     "tier": "secondary"
    },
    "group": "labs",
    "id": "F146"
   },
   {
    "from": "tencent",
    "to": "deepseek",
    "amount_usd_b": 1.48,
    "firm": true,
    "type": "equity",
    "date": "2026-06-03",
    "horizon": "one-time",
    "what": "About RMB 10B into DeepSeek's first round (reported by Reuters from sources as 'considering'; later press reports it as done).",
    "circular": null,
    "source": {
     "title": "DeepSeek slated to draw $7 billion in maiden fundraising, sources say",
     "publisher": "Reuters via MarketScreener",
     "url": "https://www.marketscreener.com/news/deepseek-slated-to-draw-7-billion-in-maiden-fundraising-sources-say-ce7f5ddfd888f724",
     "date": "2026-06-03",
     "tier": "press"
    },
    "group": "gaps_intl",
    "id": "F147"
   },
   {
    "from": "tesla",
    "to": "samsung-foundry",
    "amount_usd_b": 16.54,
    "firm": true,
    "type": "chip_purchase",
    "date": "2025-07-28",
    "horizon": "2025–2033",
    "what": "Chip manufacturing and supply contract (Samsung filing, customer unnamed; Musk confirmed Tesla), for AI6 chips at Samsung's Texas fab per Musk.",
    "circular": null,
    "source": {
     "title": "Samsung foundry wins $16.5 bil. chip order from Tesla",
     "publisher": "The Korea Times",
     "url": "https://www.koreatimes.co.kr/business/tech-science/20250728/samsung-foundry-wins-165-bil-chip-order-from-tesla",
     "date": "2025-07-28",
     "tier": "press"
    },
    "group": "gaps_us",
    "id": "F148"
   },
   {
    "from": "tesla",
    "to": "spacexai",
    "amount_usd_b": 2.0,
    "firm": true,
    "type": "equity",
    "date": "2026-01-28",
    "horizon": "closed in 2026 (cash paid $2.002B in 9 months to Sep 2026)",
    "what": "Tesla invested $2B in xAI's Series E; now held as SpaceX shares after the merger.",
    "circular": null,
    "source": {
     "title": "Tesla invested $2B in Elon Musk's xAI",
     "publisher": "TechCrunch",
     "url": "https://techcrunch.com/2026/01/28/tesla-invested-2b-in-elon-musks-xai",
     "date": "2026-01-28",
     "tier": "press"
    },
    "group": "gaps_us",
    "id": "F149"
   },
   {
    "from": "us-doe",
    "to": "constellation",
    "amount_usd_b": 1.0,
    "firm": true,
    "type": "loan",
    "date": "2025-11-18",
    "horizon": null,
    "what": "Federal loan backing the Crane nuclear restart that will supply Microsoft.",
    "circular": null,
    "source": {
     "title": "Constellation 8-K Exhibit 99.1: Crane restart backed by $1 billion DOE loan",
     "publisher": "SEC EDGAR",
     "url": "https://www.sec.gov/Archives/edgar/data/1868275/000186827525000099/ceg-202511188kexh991.htm",
     "date": "2025-11-18",
     "tier": "primary"
    },
    "group": "energy",
    "id": "F150"
   },
   {
    "from": "us-doe",
    "to": "terrapower",
    "amount_usd_b": 2.0,
    "firm": false,
    "type": "grant",
    "date": "2025-11-07",
    "horizon": "through ~2030",
    "what": "Up to $2B federal 50:50 cost share (Advanced Reactor Demonstration Program) for the Kemmerer, Wyoming Natrium plant. Type 'grant' proposed (not in schema list).",
    "circular": null,
    "source": {
     "title": "Natrium reactor and energy storage system, US - update",
     "publisher": "Engineering News",
     "url": "https://www.engineeringnews.co.za/article/natrium-reactor-and-energy-storage-system-us-update-2025-11-07",
     "date": "2025-11-07",
     "tier": "press"
    },
    "group": "energy",
    "id": "F151"
   },
   {
    "from": "venture-funds",
    "to": "anthropic",
    "amount_usd_b": 30.0,
    "firm": true,
    "type": "equity",
    "date": "2026-02-17",
    "horizon": "2026",
    "what": "Series G at $380B, led by GIC (sovereign) and Coatue",
    "circular": null,
    "source": {
     "title": "Anthropic raises $30B Series G at $380B post-money valuation",
     "publisher": "Orrick",
     "url": "https://www.orrick.com/en/News/2026/02/Anthropic-Raises-30B-Series-G-at-380B-Post-Money-Valuation",
     "date": "2026-02-17",
     "tier": "secondary"
    },
    "group": "labs",
    "id": "F152"
   },
   {
    "from": "venture-funds",
    "to": "anthropic",
    "amount_usd_b": 65.0,
    "firm": true,
    "type": "equity",
    "date": "2026-05-29",
    "horizon": "2026",
    "what": "Series H at $965B, led by Altimeter, Dragoneer, Greenoaks, Sequoia",
    "circular": null,
    "source": {
     "title": "Anthropic raises $65B Series H at $965B post-money valuation",
     "publisher": "Orrick",
     "url": "https://www.orrick.com/en/News/2026/05/Anthropic-Raises-65B-Series-H-at-965B-Post-Money-Valuation",
     "date": "2026-05-29",
     "tier": "secondary"
    },
    "group": "labs",
    "id": "F153"
   },
   {
    "from": "venture-funds",
    "to": "openai",
    "amount_usd_b": null,
    "firm": true,
    "type": "equity",
    "date": "2026-03-31",
    "horizon": null,
    "what": "Andreessen Horowitz and D. E. Shaw (co-leads), Sequoia, Thrive and others in the $122B round. VC amounts were not disclosed. About $9B to $12B of the round is not attributed to Amazon, Nvidia or SoftBank.",
    "circular": null,
    "source": {
     "title": "OpenAI raises $122 billion at $852 billion valuation, opens to retail investors",
     "publisher": "The Next Web",
     "url": "https://thenextweb.com/news/openai-122-billion-round-852-billion-valuation-retail-investors",
     "date": "2026-03-31",
     "tier": "press"
    },
    "group": "funders",
    "id": "F154"
   },
   {
    "from": "venture-funds",
    "to": "spacexai",
    "amount_usd_b": 20.0,
    "firm": true,
    "type": "equity",
    "date": "2026-01-12",
    "horizon": "2026",
    "what": "xAI Series E (Valor, StepStone, Fidelity, QIA, MGX, Baron, Nvidia, Cisco)",
    "circular": null,
    "source": {
     "title": "xAI raises $20B Series E",
     "publisher": "StorageNewsletter (edited xAI press release)",
     "url": "https://www.storagenewsletter.com/2026/01/12/xai-raises-20b-series-e/",
     "date": "2026-01-12",
     "tier": "secondary"
    },
    "group": "labs",
    "id": "F155"
   },
   {
    "from": "vistra",
    "to": "Helix Digital Infrastructure",
    "amount_usd_b": 1.0,
    "firm": false,
    "type": "equity",
    "date": "2026-08-07",
    "horizon": "not disclosed",
    "what": "Up to $1.0B initial Vistra commitment to a data center platform formed with KKR, KIA and NVIDIA; Vistra is preferred power supplier.",
    "circular": null,
    "source": {
     "title": "Vistra Q2 2026 earnings release (8-K)",
     "publisher": "SEC EDGAR",
     "url": "https://www.sec.gov/Archives/edgar/data/0001692819/000169281926000017/vistra-20260630xearningsre.htm",
     "date": "2026-08-07",
     "tier": "primary"
    },
    "group": "energy",
    "id": "F156"
   }
  ],
  "note": "Sources and uses of AI money per entity, and money flows between named parties. amount_usd_b in US dollar billions; firm=false means an 'up to' or conditional amount. Field 'circular' explains when money returns to the payer."
 },
 "power": {
  "sites": [
   {
    "id": "abilene",
    "campus_id": "stargate-abilene",
    "name": "Stargate Abilene",
    "buyer": "openai",
    "developer": "crusoe",
    "location": "Abilene, Texas",
    "gw": 1.2,
    "now_gw": 0.82,
    "gw_basis": "facility (running figure is IT load)",
    "status": "construction",
    "online": "all 8 buildings about Nov 2026",
    "power": "Grid plus an on-site gas plant.",
    "note": "Oracle confirmed about 0.62 GW of IT load running in September; Epoch estimates all eight buildings, about 0.82 GW, by November. Oracle and OpenAI dropped a planned expansion toward 2.1 GW in March 2026.",
    "firm": true,
    "source": "p_705ea9a5"
   },
   {
    "id": "abilene-msft",
    "campus_id": "crusoe-abilene-microsoft",
    "name": "Crusoe Abilene expansion",
    "buyer": "microsoft",
    "developer": "crusoe",
    "location": "Abilene, Texas",
    "gw": 0.9,
    "now_gw": 0,
    "gw_basis": "basis unknown (two buildings of 336 MW computing load each)",
    "status": "construction",
    "online": "first building mid-2027",
    "power": "A 900 MW on-site power plant plus batteries.",
    "note": "The capacity OpenAI and Oracle gave up next door went to Microsoft.",
    "firm": true,
    "source": "p_24a4186d",
    "more": [
     "p_bfb441a1"
    ]
   },
   {
    "id": "shackelford",
    "campus_id": "stargate-shackelford",
    "name": "Stargate Shackelford County",
    "buyer": "openai",
    "developer": "oracle",
    "location": "Shackelford County, Texas",
    "gw": 1.4,
    "now_gw": 0,
    "gw_basis": "IT load (about 2 GW at the meter)",
    "status": "construction",
    "online": "first building about Aug 2027, full late 2028",
    "power": "On-site gas.",
    "note": "Five of ten building shells done in September 2026; first building now expected about a year later than first planned.",
    "firm": true,
    "source": "p_25ae42ec"
   },
   {
    "id": "new-mexico",
    "campus_id": "stargate-new-mexico",
    "name": "Stargate New Mexico (Project Jupiter)",
    "buyer": "openai",
    "developer": "oracle",
    "location": "Doña Ana County, New Mexico",
    "gw": 1.75,
    "now_gw": 0,
    "gw_basis": "IT load",
    "status": "construction",
    "online": "planned late 2028; at risk",
    "power": "Off-grid: up to 2.45 GW of Bloom fuel cells, which replaced planned gas turbines in April 2026, plus solar.",
    "note": "On September 24, 2026, press reports said Oracle had sent a force-majeure notice to the developer, citing potential delays in securing power. Oracle said the notices did not establish a delay or change delivery expectations and that the project remained on its planned schedule.",
    "firm": true,
    "source": "p_53729d81",
    "more": [
     "p_4c0cd9fb",
     "p_57d9461c"
    ]
   },
   {
    "id": "milam",
    "campus_id": "stargate-milam",
    "name": "Stargate Milam County",
    "buyer": "openai",
    "developer": null,
    "location": "Milam County, Texas",
    "gw": 0.857,
    "now_gw": 0,
    "gw_basis": "IT load",
    "status": "construction",
    "online": "late 2028",
    "power": "SB Energy: mostly new solar and batteries plus grid.",
    "note": "",
    "firm": true,
    "source": "p_769d1add"
   },
   {
    "id": "port-washington",
    "campus_id": "stargate-port-washington",
    "name": "Stargate Port Washington (Project Lighthouse)",
    "buyer": "openai",
    "developer": "oracle",
    "location": "Port Washington, Wisconsin",
    "gw": 0.902,
    "now_gw": 0,
    "gw_basis": "IT load (1.3 GW at the meter)",
    "status": "construction",
    "online": "delay scenario: partial power about June 2028, full about April 2029",
    "power": "Grid, about 70% from solar, wind and batteries.",
    "note": "A restarted review of the transmission line feeding it would push power to those dates.",
    "firm": true,
    "source": "p_174110fc",
    "more": []
   },
   {
    "id": "saline",
    "campus_id": "stargate-michigan-saline",
    "name": "Stargate Saline Township",
    "buyer": "openai",
    "developer": "oracle",
    "location": "Saline Township, Michigan",
    "gw": 1.4,
    "now_gw": 0,
    "gw_basis": "facility",
    "status": "construction",
    "online": "2028",
    "power": "DTE 1.4 GW supply contract plus a 1.4 GW utility battery.",
    "note": "Some local and environmental permits still pending.",
    "firm": true,
    "source": "p_6d492639"
   },
   {
    "id": "lordstown",
    "campus_id": "stargate-lordstown",
    "name": "Stargate Lordstown",
    "buyer": "openai",
    "developer": null,
    "location": "Lordstown, Ohio",
    "gw": 0.3,
    "now_gw": 0,
    "gw_basis": "facility, up to",
    "status": "announced",
    "online": "no date",
    "power": "Not stated.",
    "note": "No visible construction.",
    "firm": false,
    "source": "p_6d492639"
   },
   {
    "id": "uae",
    "campus_id": "stargate-uae",
    "name": "Stargate UAE",
    "buyer": "openai",
    "developer": null,
    "location": "Abu Dhabi, UAE",
    "gw": 1.0,
    "now_gw": 0,
    "gw_basis": "basis unknown",
    "status": "construction",
    "online": "first 200 MW due 2026, not confirmed running",
    "power": "Not stated.",
    "note": "A 1 GW cluster inside a 5 GW campus.",
    "firm": true,
    "source": "p_9f7a1121"
   },
   {
    "id": "norway",
    "campus_id": "stargate-norway",
    "name": "Nscale Narvik (formerly Stargate Norway)",
    "buyer": "microsoft",
    "developer": null,
    "location": "Narvik, Norway",
    "gw": 0.23,
    "now_gw": 0,
    "gw_basis": "basis unknown",
    "status": "construction",
    "online": "initial 230 MW; about 290 MW more under discussion",
    "power": "Hydropower.",
    "note": "Microsoft took the capacity OpenAI was to anchor (30,000 chips through Nscale), per Aker. The 230 MW initial size is from press reports.",
    "firm": true,
    "source": "p_23b9d255",
    "more": []
   },
   {
    "id": "rainier",
    "campus_id": "amazon-new-carlisle-rainier",
    "name": "Project Rainier, New Carlisle",
    "buyer": "anthropic",
    "developer": "amazon",
    "location": "New Carlisle, Indiana",
    "gw": 1.925,
    "now_gw": 1.04,
    "gw_basis": "IT load",
    "status": "construction",
    "online": "full about early 2028",
    "power": "Not stated.",
    "note": "The largest AI site running today. Amazon owns the chips; Anthropic uses them. Sources do not say whether it counts toward Amazon's up-to-5 GW deal with Anthropic.",
    "firm": true,
    "source": "p_1de6af48"
   },
   {
    "id": "colossus-1",
    "campus_id": "xai-colossus-1",
    "name": "Colossus 1",
    "buyer": "anthropic",
    "developer": "spacexai",
    "location": "Memphis, Tennessee",
    "gw": 0.34,
    "now_gw": 0.34,
    "gw_basis": "IT load",
    "status": "operating",
    "online": "running",
    "power": "Grid plus gas turbines.",
    "note": "Built by xAI; Anthropic now rents its computing.",
    "firm": true,
    "source": "p_f5a61e5b"
   },
   {
    "id": "colossus-2",
    "campus_id": "xai-colossus-2",
    "name": "Colossus 2",
    "buyer": "spacexai",
    "developer": null,
    "location": "Memphis, Tennessee and Southaven, Mississippi",
    "gw": 1.53,
    "now_gw": 0.95,
    "gw_basis": "IT load",
    "status": "construction",
    "online": "full about early 2027",
    "power": "On-site gas: 69 temporary turbines being replaced by a permanent 1.2 GW plant by July 2027, plus batteries.",
    "note": "Also used by Anthropic and Cursor.",
    "firm": true,
    "source": "p_c081d1d2"
   },
   {
    "id": "monarch",
    "campus_id": "nscale-monarch-wv",
    "name": "Nscale Monarch (Anthropic's share)",
    "buyer": "anthropic",
    "developer": null,
    "location": "West Virginia",
    "gw": 0.46,
    "now_gw": 0,
    "gw_basis": "basis unknown",
    "status": "announced",
    "online": "2027",
    "power": "About 2 GW of on-site gas engines planned.",
    "note": "About 460 MW for Anthropic, about $45B over six years (Bloomberg); first phase late 2027. The campus targets 2 GW initially; Microsoft's non-binding 1.35 GW letter was reportedly dropped.",
    "firm": true,
    "source": "p_abbf68ac",
    "more": [
     "p_23b9d255",
     "p_db02f0e7"
    ]
   },
   {
    "id": "beacon-point",
    "campus_id": "hut8-beacon-point-tx",
    "name": "Hut 8 Beacon Point",
    "buyer": "nvidia",
    "developer": null,
    "location": "Texas",
    "gw": 0.704,
    "now_gw": 0,
    "gw_basis": "basis unknown",
    "status": "announced",
    "online": "2027",
    "power": "Not stated.",
    "note": "Two 352 MW leases to one tenant, reported by the WSJ and FT to be Nvidia; Lambda reportedly installs the chips and sells about 350 MW to Anthropic.",
    "firm": true,
    "source": "p_00dbabe5"
   },
   {
    "id": "hyperion",
    "campus_id": "meta-hyperion",
    "name": "Meta Hyperion",
    "buyer": "meta",
    "developer": null,
    "location": "Richland Parish, Louisiana",
    "gw": 5.0,
    "now_gw": 0,
    "gw_basis": "basis unknown",
    "status": "construction",
    "online": "2 GW by 2030; 5 GW about 2032",
    "power": "Entergy gas plants: 2.25 GW approved, about 5.25 GW more awaiting state approval; plus solar.",
    "note": "Nothing running yet. Meta moved 80% of the campus to a Blue Owl vehicle.",
    "firm": true,
    "source": "p_fec132ab"
   },
   {
    "id": "prometheus",
    "campus_id": "meta-prometheus",
    "name": "Meta Prometheus",
    "buyer": "meta",
    "developer": null,
    "location": "New Albany, Ohio",
    "gw": 1.02,
    "now_gw": 0.47,
    "gw_basis": "IT load",
    "status": "construction",
    "online": "about 1 GW by mid-2028",
    "power": "Grid plus off-grid gas (Williams 'Socrates' plants).",
    "note": "Includes tent-style buildings.",
    "firm": true,
    "source": "p_cd833095"
   },
   {
    "id": "el-paso",
    "campus_id": "meta-el-paso",
    "name": "Meta El Paso",
    "buyer": "meta",
    "developer": null,
    "location": "El Paso, Texas",
    "gw": 1.0,
    "now_gw": 0,
    "gw_basis": "basis unknown",
    "status": "construction",
    "online": "from 2028",
    "power": "366 MW of modular gas generators awaiting a state vote.",
    "note": "BlackRock funds own 80%.",
    "firm": true,
    "source": "p_53297b92"
   },
   {
    "id": "fairwater-atl",
    "campus_id": "microsoft-fairwater-atlanta",
    "name": "Microsoft Fairwater Atlanta",
    "buyer": "microsoft",
    "developer": null,
    "location": "Atlanta, Georgia",
    "gw": 0.64,
    "now_gw": 0.64,
    "gw_basis": "IT load",
    "status": "operating",
    "online": "running",
    "power": "Grid.",
    "note": "",
    "firm": true,
    "source": "p_71081154"
   },
   {
    "id": "fairwater-wi",
    "campus_id": "microsoft-fairwater-wisconsin",
    "name": "Microsoft Fairwater Wisconsin",
    "buyer": "microsoft",
    "developer": null,
    "location": "Mount Pleasant, Wisconsin",
    "gw": 2.26,
    "now_gw": 0.37,
    "gw_basis": "IT load",
    "status": "construction",
    "online": "about 2.3 GW by May 2028",
    "power": "Grid.",
    "note": "",
    "firm": true,
    "source": "p_e88d95ab"
   },
   {
    "id": "abilene-exp",
    "campus_id": "stargate-abilene-expansion",
    "name": "Stargate Abilene expansion",
    "buyer": "openai",
    "developer": "oracle",
    "location": "Abilene, Texas",
    "gw": 0.6,
    "now_gw": 0,
    "gw_basis": "basis unknown",
    "status": "cancelled",
    "online": "dropped March 2026",
    "power": "",
    "note": "The capacity went to Microsoft through Crusoe.",
    "firm": true,
    "source": "p_bfb441a1"
   },
   {
    "id": "river-bend",
    "campus_id": "hut8-river-bend-la",
    "name": "Hut 8 River Bend",
    "buyer": "anthropic",
    "developer": "fluidstack",
    "location": "West Feliciana Parish, Louisiana",
    "gw": 0.245,
    "now_gw": 0,
    "gw_basis": "IT load",
    "status": "announced",
    "online": "",
    "power": "Not stated.",
    "note": "15-year lease with Fluidstack; Anthropic is the reported end user.",
    "firm": true,
    "source": "p_00dbabe5"
   },
   {
    "id": "ports-pike",
    "campus_id": "ports-pike",
    "name": "PORTS-Pike campus",
    "buyer": "openai",
    "developer": "SB Energy",
    "location": "Piketon, Ohio",
    "gw": 4.25,
    "now_gw": 0,
    "gw_basis": "IT load (3.75 GW more optional)",
    "status": "announced",
    "online": "in phases from 2028",
    "power": "At least 10 GW of new generation built by SB Energy.",
    "note": "OpenAI is the tenant on a 20-year lease; Nvidia invests $1.5B and guarantees the campus hosts only Nvidia chips.",
    "firm": true,
    "source": "p_9b29bfe4"
   },
   {
    "id": "pecos",
    "campus_id": "msft-pecos",
    "name": "Microsoft Pecos",
    "buyer": "microsoft",
    "developer": null,
    "location": "Pecos, Texas",
    "gw": 2.0,
    "now_gw": 0,
    "gw_basis": "basis unknown",
    "status": "announced",
    "online": "first power 2028",
    "power": "Chevron plant next door, up to 2.67 GW (listed under sources).",
    "note": "",
    "firm": true,
    "source": "p_97f46bf3",
    "more": []
   },
   {
    "id": "google-cheyenne",
    "campus_id": "google-cheyenne",
    "name": "Google Cheyenne (Project Tembo, formerly Project Jade)",
    "buyer": "google",
    "developer": null,
    "location": "Cheyenne, Wyoming",
    "gw": null,
    "now_gw": 0,
    "gw_basis": "computing load not disclosed; Google redesigned the campus with four buildings instead of Crusoe's five",
    "status": "construction",
    "online": "power from late 2027, full in 2030",
    "power": "Black Hills: 2.7 GW resource portfolio including reserves, plus Tallgrass power and fuel cells (listed under sources).",
    "note": "Crusoe left the project in June 2026; Google's subsidiary Jupiter Star Holdings took over construction.",
    "firm": true,
    "source": "p_af143cbf",
    "more": [
     "p_bddcb140",
     "p_767db2c0"
    ]
   },
   {
    "id": "google-pryor",
    "campus_id": "google-pryor",
    "name": "Google Pryor (North)",
    "buyer": "google",
    "developer": null,
    "location": "Pryor, Oklahoma",
    "gw": 0.368,
    "now_gw": 0.368,
    "gw_basis": "IT load",
    "status": "operating",
    "online": "",
    "power": "Not stated.",
    "note": "",
    "firm": true,
    "source": "p_89dfde2a"
   },
   {
    "id": "google-columbus",
    "campus_id": "google-columbus",
    "name": "Google Columbus",
    "buyer": "google",
    "developer": null,
    "location": "Columbus, Ohio",
    "gw": 0.386,
    "now_gw": 0.303,
    "gw_basis": "IT load",
    "status": "construction",
    "online": "about 0.39 GW by the third quarter of 2027",
    "power": "Not stated.",
    "note": "",
    "firm": true,
    "source": "p_89dfde2a"
   },
   {
    "id": "google-new-albany",
    "campus_id": "google-new-albany",
    "name": "Google New Albany",
    "buyer": "google",
    "developer": null,
    "location": "New Albany, Ohio",
    "gw": 0.333,
    "now_gw": 0.333,
    "gw_basis": "IT load",
    "status": "operating",
    "online": "",
    "power": "Not stated.",
    "note": "",
    "firm": true,
    "source": "p_89dfde2a"
   },
   {
    "id": "gw-ranch",
    "campus_id": "amazon-gw-ranch",
    "name": "Amazon GW Ranch",
    "buyer": "amazon",
    "developer": null,
    "location": "Pecos County, Texas",
    "gw": null,
    "now_gw": 0,
    "gw_basis": "computing load not disclosed",
    "status": "announced",
    "online": "",
    "power": "Planned on-site gas: a 5 GW permit; the developer describes up to 7.65 GW of gas plus batteries and solar.",
    "note": "8,000-acre site bought by Amazon.",
    "firm": true,
    "source": "p_0d9fcb3b"
   },
   {
    "id": "homer-city-campus",
    "campus_id": "homer-city",
    "name": "Homer City campus",
    "buyer": "amazon",
    "developer": null,
    "location": "Homer City, Pennsylvania",
    "gw": null,
    "now_gw": 0,
    "gw_basis": "computing load not disclosed",
    "status": "announced",
    "online": "",
    "power": "The Homer City gas plant (listed under sources).",
    "note": "Amazon is named as the expected user in a county filing; no signed tenant announced, and the county tabled the building plan.",
    "firm": false,
    "source": "p_b74a787f"
   }
  ],
  "deals": [
   {
    "id": "openai-oracle-4.5gw",
    "buyer": "openai",
    "seller": "oracle",
    "gw": 4.5,
    "status": "announced",
    "firm": true,
    "start": "2026",
    "note": "Cloud capacity across Stargate sites; overlaps the sites above.",
    "source": "p_a2d37ec7"
   },
   {
    "id": "openai-nvidia-10gw-loi",
    "buyer": "openai",
    "seller": "nvidia",
    "gw": 10.0,
    "status": "option",
    "firm": false,
    "start": "2026",
    "note": "Letter of intent only. Reports in February 2026 said Nvidia's roughly $30B investment in OpenAI replaced it; others say the two are separate. Not counted in our totals.",
    "source": "p_8bcbf211"
   },
   {
    "id": "openai-amd-1gw",
    "buyer": "openai",
    "seller": "amd",
    "gw": 1.0,
    "status": "announced",
    "firm": true,
    "start": "2026",
    "note": "Binding commitment to buy the first 1 GW, deploying from the second half of 2026.",
    "source": "p_c05f65c7"
   },
   {
    "id": "openai-amd-5gw",
    "buyer": "openai",
    "seller": "amd",
    "gw": 5.0,
    "status": "option",
    "firm": false,
    "start": "",
    "note": "Further purchases up to 6 GW in all, tied to AMD share warrants; not committed.",
    "source": "p_c05f65c7"
   },
   {
    "id": "openai-broadcom-10gw",
    "buyer": "openai",
    "seller": "broadcom",
    "gw": 10.0,
    "status": "announced",
    "firm": false,
    "start": "2026",
    "note": "OpenAI-designed chips, racks deployed from late 2026 to the end of 2029; signed as a term sheet.",
    "source": "p_9113d6da"
   },
   {
    "id": "openai-aws-2gw",
    "buyer": "openai",
    "seller": "amazon",
    "gw": 2.0,
    "status": "announced",
    "firm": true,
    "start": "",
    "note": "Trainium capacity.",
    "source": "p_ad6b302b"
   },
   {
    "id": "openai-cerebras-750mw",
    "buyer": "openai",
    "seller": "cerebras",
    "gw": 0.75,
    "status": "announced",
    "firm": true,
    "start": "2026",
    "note": "Through 2028.",
    "source": "p_e62e4549"
   },
   {
    "id": "anthropic-aws-5gw",
    "buyer": "anthropic",
    "seller": "amazon",
    "gw": 5.0,
    "status": "announced",
    "firm": false,
    "start": "2026",
    "note": "Up to 5 GW of Trainium; about 1 GW by end-2026.",
    "source": "p_462f6e7f"
   },
   {
    "id": "anthropic-google-broadcom-tpu",
    "buyer": "anthropic",
    "seller": "google",
    "gw": 5.0,
    "status": "announced",
    "firm": false,
    "start": "2027",
    "note": "3.5 GW of Google TPUs through Broadcom from 2027 is reported; one person said it could reach close to 5 GW.",
    "source": "p_bd22738c"
   },
   {
    "id": "anthropic-google-tpu-2025",
    "buyer": "anthropic",
    "seller": "google",
    "gw": 1.0,
    "status": "construction",
    "firm": true,
    "start": "2026",
    "note": "The first Google TPU deal (October 2025), coming online in 2026.",
    "source": "p_7491bf32"
   },
   {
    "id": "anthropic-microsoft-nvidia-1gw",
    "buyer": "anthropic",
    "seller": "microsoft",
    "gw": 1.0,
    "status": "announced",
    "firm": false,
    "start": "",
    "note": "About 1 GW on Nvidia systems in Azure.",
    "source": "p_d46ed596"
   },
   {
    "id": "anthropic-amd-2gw",
    "buyer": "anthropic",
    "seller": "amd",
    "gw": 2.0,
    "status": "announced",
    "firm": false,
    "start": "2027",
    "note": "Up to 2 GW; the first 1 GW deploys from the first half of 2027. AMD will invest up to $5B in Anthropic.",
    "source": "p_d63ad512"
   }
  ],
  "supply": [
   {
    "id": "xai-southaven-permanent-plant",
    "type": "gas_dedicated_plant",
    "project": "Permanent gas plant beside Colossus 2, Southaven, Mississippi",
    "buyer": "spacexai",
    "campus_id": "xai-colossus-2",
    "gw": 1.2,
    "status": "construction",
    "firm": true,
    "online": "",
    "note": "41 turbines, permitted March 2026, being built. Replaces the 69 temporary turbines, which must go by July 2027.",
    "source": "p_0188dc9c"
   },
   {
    "id": "meta-hyperion-entergy-3ccgt",
    "type": "gas_dedicated_plant",
    "project": "Three Entergy gas plants for Meta's Hyperion",
    "buyer": "meta",
    "campus_id": "meta-hyperion",
    "gw": 2.25,
    "status": "construction",
    "firm": true,
    "online": "2029",
    "note": "Approved by Louisiana regulators in August 2025; due mid to late 2029.",
    "source": "p_dfdab44c"
   },
   {
    "id": "meta-hyperion-entergy-7more",
    "type": "gas_dedicated_plant",
    "project": "Seven more Entergy gas plants for Hyperion",
    "buyer": "meta",
    "campus_id": "meta-hyperion",
    "gw": 5.25,
    "status": "announced",
    "firm": true,
    "online": "",
    "note": "Plan tripled in March 2026 to ten plants and 7.5 GW, with Meta paying about $11B; these seven still need state approval. 5.25 GW is our subtraction.",
    "source": "p_1f452ab8"
   },
   {
    "id": "meta-hyperion-renewables",
    "type": "solar_storage",
    "project": "Renewable power tied to Hyperion",
    "buyer": "meta",
    "campus_id": "meta-hyperion",
    "gw": 2.5,
    "status": "announced",
    "firm": true,
    "online": "",
    "note": "About 2.5 GW reported alongside the gas deal; mix not given. Overlaps 1.5 GW of solar approved in 2025.",
    "source": "p_1f452ab8"
   },
   {
    "id": "voltagrid-oracle-texas",
    "type": "gas_onsite",
    "project": "VoltaGrid gas engines for Oracle in Texas",
    "buyer": "oracle",
    "campus_id": null,
    "gw": 2.3,
    "status": "announced",
    "firm": true,
    "online": "",
    "note": "2.3 GW of modular gas engines; sites and dates not disclosed. May overlap Stargate Shackelford's on-site gas.",
    "source": "p_b3dd6c22"
   },
   {
    "id": "stargate-shackelford-gas",
    "type": "gas_onsite",
    "project": "On-site gas for Stargate Shackelford County",
    "buyer": "openai",
    "campus_id": "stargate-shackelford",
    "gw": 2.0,
    "status": "construction",
    "firm": true,
    "online": "2028",
    "note": "About 2 GW at the meter for a 1.4 GW computing load; supplier not confirmed.",
    "source": "p_6d492639"
   },
   {
    "id": "chevron-microsoft-west-texas",
    "type": "gas_dedicated_plant",
    "project": "Chevron gas plant for Microsoft's Pecos campus, Texas",
    "buyer": "microsoft",
    "campus_id": null,
    "gw": 2.67,
    "status": "announced",
    "firm": true,
    "online": "2028",
    "note": "Up to 2.67 GW in phases on a 20-year contract for Microsoft's 2 GW campus next door; first power targeted 2028; Chevron's final investment decision expected later in 2026.",
    "source": "p_9cb7571d",
    "more": [
     "p_97f46bf3"
    ]
   },
   {
    "id": "engine1-crusoe-4p5gw",
    "type": "gas_dedicated_plant",
    "project": "Engine No. 1 and Chevron gas for Crusoe",
    "buyer": "crusoe",
    "campus_id": null,
    "gw": 4.5,
    "status": "option",
    "firm": false,
    "online": "",
    "note": "A 2025 framework for up to 4.5 GW using GE Vernova turbines; sites never published.",
    "source": "p_ca180862"
   },
   {
    "id": "homer-city-gas",
    "type": "gas_dedicated_plant",
    "project": "Homer City gas plant, Pennsylvania",
    "buyer": "amazon",
    "campus_id": "homer-city",
    "gw": 4.4,
    "status": "construction",
    "firm": true,
    "online": "2027",
    "note": "About 4.4 GW on a former coal site. Vertical construction began April 2026; the first two heat-recovery steam generators are installed and the first gas turbine is set on its foundation (October 2026). Sources differ on first power: 2027 (Baxtel) or the first 1.2 GW in 2029 under GE Vernova's slot reservation (Turbomachinery Magazine). Amazon is named as the expected user in a county filing, but no tenant has signed.",
    "source": "p_4414d6b3",
    "more": [
     "p_b74a787f",
     "p_7078f8bc"
    ]
   },
   {
    "id": "meta-el-paso-gas",
    "type": "gas_dedicated_plant",
    "project": "Gas generators for Meta El Paso",
    "buyer": "meta",
    "campus_id": "meta-el-paso",
    "gw": 0.366,
    "status": "announced",
    "firm": true,
    "online": "",
    "note": "813 small gas generators dedicated to the campus for five years, then to the grid; awaiting a state vote.",
    "source": "p_b12b07ba"
   },
   {
    "id": "fermi-matador-gas",
    "type": "mixed",
    "project": "Fermi America 'Matador' private grid, Texas",
    "buyer": "TensorWave and others",
    "campus_id": "fermi-matador",
    "gw": 11.0,
    "status": "option",
    "firm": false,
    "online": "2027",
    "note": "Planned about 11 GW of gas, solar and nuclear combined; first tenant signed August 2026; first leased turbines arrive 2027.",
    "source": "p_48ff352c"
   },
   {
    "id": "nscale-monarch-cat",
    "type": "gas_onsite",
    "project": "Gas engines for Nscale Monarch, West Virginia",
    "buyer": "Nscale",
    "campus_id": "nscale-monarch",
    "gw": 2.0,
    "status": "option",
    "firm": false,
    "online": "",
    "note": "About 2 GW of Caterpillar gas engines planned for the site.",
    "source": "p_db02f0e7"
   },
   {
    "id": "wartsila-ohio-hyperscale",
    "type": "gas_onsite",
    "project": "Wärtsilä gas engines for an unnamed cloud company, Ohio",
    "buyer": "unnamed cloud company",
    "campus_id": null,
    "gw": 0.412,
    "status": "announced",
    "firm": true,
    "online": "2028",
    "note": "40 engines, 412 MW, running from early 2028.",
    "source": "p_db02f0e7"
   },
   {
    "id": "proenergy-crusoe-aero",
    "type": "gas_onsite",
    "project": "ProEnergy gas turbines for Crusoe",
    "buyer": "crusoe",
    "campus_id": null,
    "gw": 0.65,
    "status": "announced",
    "firm": true,
    "online": "",
    "note": "Thirteen 50 MW units; site not named.",
    "source": "p_db02f0e7"
   },
   {
    "id": "nextera-gev-gas",
    "type": "gas_dedicated_plant",
    "project": "NextEra gas for data centers",
    "buyer": "unnamed cloud companies",
    "campus_id": null,
    "gw": 4.0,
    "status": "option",
    "firm": false,
    "online": "2032",
    "note": "4 GW of GE Vernova turbine slots secured; targets 4 to 8 GW of new gas through 2032; buyers not named.",
    "source": "p_f1f19505"
   },
   {
    "id": "nextera-exxon-gulf-site",
    "type": "gas_dedicated_plant",
    "project": "NextEra and Exxon site on the Gulf Coast",
    "buyer": "no buyer signed",
    "campus_id": null,
    "gw": 1.2,
    "status": "option",
    "firm": false,
    "online": "",
    "note": "A 1.2 GW site marketed to data centers; no customer announced.",
    "source": "p_f1f19505"
   },
   {
    "id": "talen-amazon-susquehanna",
    "type": "nuclear_existing_ppa",
    "project": "Susquehanna nuclear plant for Amazon, Pennsylvania",
    "buyer": "amazon",
    "campus_id": "amazon-susquehanna",
    "gw": 1.92,
    "status": "operating",
    "firm": false,
    "online": "2025",
    "note": "Up to 1.92 GW. The plant runs today; delivery to Amazon ramps to the full amount by 2032, contract through 2042.",
    "source": "p_7a47a16b"
   },
   {
    "id": "ceg-meta-clinton",
    "type": "nuclear_existing_ppa",
    "project": "Clinton nuclear plant for Meta, Illinois",
    "buyer": "meta",
    "campus_id": null,
    "gw": 1.121,
    "status": "announced",
    "firm": true,
    "online": "2027",
    "note": "1.12 GW for 20 years from June 2027; keeps an existing plant running, plus a 30 MW upgrade.",
    "source": "p_13377303"
   },
   {
    "id": "ceg-msft-crane",
    "type": "nuclear_restart",
    "project": "Crane (Three Mile Island) restart for Microsoft",
    "buyer": "microsoft",
    "campus_id": null,
    "gw": 0.835,
    "status": "construction",
    "firm": true,
    "online": "2027",
    "note": "835 MW, target 2027. FERC let 760 MW of grid-connection rights move from Eddystone to Crane in June 2026, easing a risk that full grid upgrades could take until after 2030.",
    "source": "p_661ac985"
   },
   {
    "id": "vistra-amazon-comanche-peak",
    "type": "nuclear_existing_ppa",
    "project": "Comanche Peak nuclear plant for Amazon, Texas",
    "buyer": "amazon",
    "campus_id": null,
    "gw": 1.2,
    "status": "announced",
    "firm": true,
    "online": "2027",
    "note": "1.2 GW for 20 years; deliveries start about late 2027, full by 2032.",
    "source": "p_c8fe0cad"
   },
   {
    "id": "vistra-meta-perry-davisbesse",
    "type": "nuclear_existing_ppa",
    "project": "Perry and Davis-Besse nuclear plants for Meta, Ohio",
    "buyer": "meta",
    "campus_id": null,
    "gw": 2.176,
    "status": "announced",
    "firm": true,
    "online": "2026",
    "note": "2.18 GW of existing output; Perry from December 2026, Davis-Besse from December 2027.",
    "source": "p_c8fe0cad"
   },
   {
    "id": "vistra-meta-uprates",
    "type": "nuclear_uprate",
    "project": "Upgrades at Vistra nuclear plants for Meta",
    "buyer": "meta",
    "campus_id": null,
    "gw": 0.433,
    "status": "announced",
    "firm": true,
    "online": "2031",
    "note": "433 MW of new capacity, one upgrade a year from 2031 to 2034.",
    "source": "p_03c1b541"
   },
   {
    "id": "nee-google-duane-arnold",
    "type": "nuclear_restart",
    "project": "Duane Arnold nuclear restart for Google, Iowa",
    "buyer": "google",
    "campus_id": null,
    "gw": 0.615,
    "status": "announced",
    "firm": true,
    "online": "2029",
    "note": "About 615 MW on a 25-year contract; return expected early 2029, pending approvals.",
    "source": "p_2222c042"
   },
   {
    "id": "kairos-google-500mw",
    "type": "nuclear_new",
    "project": "Kairos small reactors for Google",
    "buyer": "google",
    "campus_id": null,
    "gw": 0.5,
    "status": "announced",
    "firm": true,
    "online": "2035",
    "note": "500 MW of new reactors by 2035; the first 50 MW unit is due in 2030.",
    "source": "p_a3155f7d"
   },
   {
    "id": "xenergy-amazon-5gw",
    "type": "nuclear_new",
    "project": "X-energy small reactors for Amazon",
    "buyer": "amazon",
    "campus_id": null,
    "gw": 5.0,
    "status": "option",
    "firm": false,
    "online": "2039",
    "note": "Options for up to 5 GW by 2039, not firm orders; the first project is 320 MW in Washington State, early 2030s.",
    "source": "p_cfca327b"
   },
   {
    "id": "terrapower-meta",
    "type": "nuclear_new",
    "project": "TerraPower Natrium reactors for Meta",
    "buyer": "meta",
    "campus_id": null,
    "gw": 2.8,
    "status": "option",
    "firm": false,
    "online": "2035",
    "note": "Up to eight units and 2.8 GW; Meta funds two, the rest are rights; first delivery year not set.",
    "source": "p_03c1b541"
   },
   {
    "id": "oklo-meta-pike-county",
    "type": "nuclear_new",
    "project": "Oklo reactors for Meta, Ohio",
    "buyer": "meta",
    "campus_id": null,
    "gw": 1.2,
    "status": "option",
    "firm": false,
    "online": "2030",
    "note": "Up to 1.2 GW, first power as early as 2030; no construction approval yet.",
    "source": "p_03c1b541"
   },
   {
    "id": "entra1-nuscale-tva",
    "type": "nuclear_new",
    "project": "ENTRA1 and NuScale reactors for TVA",
    "buyer": "TVA, no named data-center buyer",
    "campus_id": null,
    "gw": 6.0,
    "status": "option",
    "firm": false,
    "online": "2030",
    "note": "Up to 6 GW on a term sheet only; no named data-center buyer; 2030 start is aspirational.",
    "source": "p_e24c13c0"
   },
   {
    "id": "google-intersect-meitner",
    "type": "solar_storage",
    "project": "Intersect wind, solar and batteries for a Google campus, Texas",
    "buyer": "google",
    "campus_id": "google-meitner-tx",
    "gw": 1.0,
    "status": "construction",
    "firm": true,
    "online": "",
    "note": "More than 1 GW built next to the data center, with some gas for backup; construction began June 2026.",
    "source": "p_c22ad5c4"
   },
   {
    "id": "meta-nextera-ppas",
    "type": "solar_storage",
    "project": "NextEra solar and batteries for Meta",
    "buyer": "meta",
    "campus_id": null,
    "gw": 2.5,
    "status": "construction",
    "firm": true,
    "online": "2028",
    "note": "About 2.5 GW across 11 contracts and two battery deals, entering service 2026 to 2028, over the grid.",
    "source": "p_2222c042"
   },
   {
    "id": "stargate-milam-sbenergy",
    "type": "solar_storage",
    "project": "SB Energy power for Stargate Milam County",
    "buyer": "openai",
    "campus_id": "stargate-milam",
    "gw": 1.2,
    "status": "construction",
    "firm": true,
    "online": "2028",
    "note": "Mostly new solar and batteries for a 1.2 GW site; due late 2028.",
    "source": "p_6d492639"
   },
   {
    "id": "stargate-port-washington-grid",
    "type": "grid_upgrade",
    "project": "Grid supply for Stargate Port Washington",
    "buyer": "openai",
    "campus_id": "stargate-port-washington",
    "gw": 1.3,
    "status": "construction",
    "firm": true,
    "online": "2028",
    "note": "1.3 GW from the grid, about 70% from solar, wind and batteries; full power now about April 2029.",
    "source": "p_6d492639"
   },
   {
    "id": "stargate-saline-dte",
    "type": "grid_upgrade",
    "project": "DTE supply for Stargate Saline Township",
    "buyer": "openai",
    "campus_id": "stargate-saline",
    "gw": 1.4,
    "status": "announced",
    "firm": true,
    "online": "2028",
    "note": "A 19-year 1.4 GW contract plus a 1.4 GW utility battery, conditionally approved December 2025.",
    "source": "p_f22b68e8"
   },
   {
    "id": "fervo-google-cape",
    "type": "geothermal",
    "project": "Fervo geothermal for Google, Utah",
    "buyer": "google",
    "campus_id": null,
    "gw": 0.396,
    "status": "construction",
    "firm": true,
    "online": "2026",
    "note": "396 MW contract; about 100 MW by early 2027.",
    "source": "p_48f4bc76"
   },
   {
    "id": "bloom-oracle",
    "type": "fuel_cell",
    "project": "Bloom fuel cells for Oracle, including Stargate New Mexico",
    "buyer": "oracle",
    "campus_id": null,
    "gw": 2.8,
    "status": "option",
    "firm": false,
    "online": "",
    "note": "Up to 2.8 GW, about 1.2 GW firm. Includes up to 2.45 GW at Project Jupiter in New Mexico, which replaced planned gas turbines and diesel generators.",
    "source": "p_4f120d7b",
    "more": [
     "p_27eac97b"
    ]
   },
   {
    "id": "bloom-aep",
    "type": "fuel_cell",
    "project": "Bloom fuel cells for AEP's data-center customers",
    "buyer": "unnamed AEP data-center customers",
    "campus_id": null,
    "gw": 1.0,
    "status": "announced",
    "firm": false,
    "online": "",
    "note": "Up to 1 GW, about $2.65B; customers not named. Single secondary source.",
    "source": "p_27eac97b"
   },
   {
    "id": "ceg-amazon-calvert-new",
    "type": "nuclear_uprate",
    "project": "Calvert Cliffs upgrades for Amazon, Maryland",
    "buyer": "amazon",
    "campus_id": null,
    "gw": 0.19,
    "status": "announced",
    "firm": true,
    "online": "2030-2032",
    "note": "About 190 MW of new capacity within a 690 MW, 20-year contract.",
    "source": "p_75db1c03"
   },
   {
    "id": "ceg-amazon-calvert-existing",
    "type": "nuclear_existing_ppa",
    "project": "Calvert Cliffs existing output for Amazon, Maryland",
    "buyer": "amazon",
    "campus_id": null,
    "gw": 0.5,
    "status": "announced",
    "firm": true,
    "online": "",
    "note": "The rest of the 690 MW contract; supports relicensing the plant for 20 more years.",
    "source": "p_75db1c03"
   },
   {
    "id": "socrates-1",
    "type": "gas_onsite",
    "project": "Williams 'Socrates' gas plant phase one for Meta, Ohio",
    "buyer": "meta",
    "campus_id": "meta-new-albany",
    "gw": 0.2,
    "status": "operating",
    "firm": true,
    "online": "2026",
    "note": "First phase complete (August 2026); output dedicated to Meta's campus and not connected to the grid.",
    "source": "p_5ad4cc5c",
    "more": [
     "p_a20e813b",
     "p_eb3ea3b2"
    ]
   },
   {
    "id": "socrates-2",
    "type": "gas_onsite",
    "project": "Williams 'Socrates' gas plant phase two for Meta, Ohio",
    "buyer": "meta",
    "campus_id": "meta-new-albany",
    "gw": 0.2,
    "status": "construction",
    "firm": true,
    "online": "late 2026",
    "note": "Second phase targeted for the fourth quarter.",
    "source": "p_5ad4cc5c",
    "more": [
     "p_a20e813b",
     "p_eb3ea3b2"
    ]
   },
   {
    "id": "ceg-google-uprates",
    "type": "nuclear_uprate",
    "project": "Constellation reactor upgrades for Google",
    "buyer": "google",
    "campus_id": null,
    "gw": 0.89,
    "status": "announced",
    "firm": true,
    "online": "first by 2028, all by 2032",
    "note": "Upgrades at 11 reactors in Illinois, Pennsylvania and New Jersey on a 20-year contract.",
    "source": "p_ca8349c0"
   },
   {
    "id": "ceg-google-existing",
    "type": "nuclear_existing_ppa",
    "project": "Constellation existing nuclear output for Google",
    "buyer": "google",
    "campus_id": null,
    "gw": 2.7,
    "status": "announced",
    "firm": true,
    "online": "",
    "note": "15-year contract for output from plants already running; no new capacity.",
    "source": "p_ca8349c0"
   },
   {
    "id": "blackhills-google",
    "type": "utility_portfolio",
    "project": "Black Hills supply for Google Cheyenne, Wyoming",
    "buyer": "google",
    "campus_id": "google-cheyenne",
    "gw": 2.7,
    "status": "announced",
    "firm": true,
    "online": "late 2027, full in 2030",
    "note": "2.7 GW portfolio including reserves: up to 590 MW from the grid and about 2.1 GW from third-party resources through a private microgrid. Black Hills is also building 564 MW of new gas plants, which appear to sit within its share.",
    "source": "p_767db2c0"
   },
   {
    "id": "crusoe-abilene-msft-plant",
    "type": "onsite_unspecified",
    "project": "On-site plant for Crusoe's Microsoft campus, Abilene",
    "buyer": "microsoft",
    "campus_id": "crusoe-abilene-microsoft",
    "gw": 0.9,
    "status": "construction",
    "firm": true,
    "online": "mid-2027",
    "note": "900 MW plant beside the campus plus batteries; fuel not stated in the release.",
    "source": "p_24a4186d"
   }
  ],
  "sources": {
   "p_e1d2808e": {
    "title": "Meta Hyperion (AI data center directory entry)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory/meta-hyperion",
    "date": "2026-09-21",
    "tier": "secondary"
   },
   "p_b6d37248": {
    "title": "Largest AI data centers by power capacity",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/graphs/largest-ai-data-centers-by-power-capacity",
    "date": "2026-11",
    "tier": "secondary"
   },
   "p_977fe7b9": {
    "title": "Oracle/OpenAI drop plans to expand flagship Abilene Stargate site; Meta in talks to pick up Crusoe capacity",
    "publisher": "DatacenterDynamics",
    "url": "https://www.datacenterdynamics.com/en/news/oracleopenai-drop-plans-to-expand-flagship-abilene-stargate-site-meta-in-talks-to-pick-up-crusoe-capacity-with-nvidias-help/",
    "date": "2026-03-06",
    "tier": "press"
   },
   "p_bd47d502": {
    "title": "Oracle Cloud Infrastructure revenue up 93% as firm's capex keeps climbing",
    "publisher": "SDxCentral (DatacenterDynamics)",
    "url": "https://www.sdxcentral.com/news/oracle-cloud-infrastructure-revenue-up-93-as-firms-capex-keeps-climbing/",
    "date": "2026-06",
    "tier": "press"
   },
   "p_c22ad5c4": {
    "title": "Google launches 1-GW-plus co-located data center and generation complex in Texas Panhandle",
    "publisher": "POWER Magazine",
    "url": "https://www.powermag.com/google-launches-1-gw-plus-co-located-data-center-and-generation-complex-in-texas-panhandle/",
    "date": "2026-06",
    "tier": "press"
   },
   "p_4a37c2b3": {
    "title": "Microsoft brings 1GW of capacity online in latest quarter, again",
    "publisher": "DatacenterDynamics",
    "url": "https://www.datacenterdynamics.com/en/news/microsoft-brings-1gw-of-capacity-online-in-latest-quarter-again/",
    "date": "2026-04",
    "tier": "press"
   },
   "p_16d9410f": {
    "title": "Microsoft brought 88 data centers online in FY2026",
    "publisher": "DatacenterDynamics",
    "url": "https://www.datacenterdynamics.com/en/news/microsoft-brought-88-data-centers-online-in-fy2026/",
    "date": "2026-07",
    "tier": "press"
   },
   "p_7ae3b2b0": {
    "title": "Amazon (AMZN) Q2 2026 earnings call transcript",
    "publisher": "The Motley Fool",
    "url": "https://www.fool.com/earnings/call-transcripts/2026/08/07/amazon-amzn-q2-2026-earnings-call-transcript/",
    "date": "2026-07-30",
    "tier": "press"
   },
   "p_3cdb5c1f": {
    "title": "Amazon.com Inc Q3 2026 earnings call transcript",
    "publisher": "The Singju Post",
    "url": "https://singjupost.com/amazon-com-inc-q3-2026-earnings-call-transcript/",
    "date": "2026-10-29",
    "tier": "secondary"
   },
   "p_41bfd813": {
    "title": "Oracle's Q1 FY2027 Results: The Backlog Is the Headline, the Capex Is the Story",
    "publisher": "FourWeekMBA",
    "url": "https://fourweekmba.com/ai-oracle-q1-fy2027-backlog-capex-analysis/",
    "date": "2026-09-10",
    "tier": "secondary"
   },
   "p_705ea9a5": {
    "title": "OpenAI Stargate Abilene (satellite explorer)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateAbilene",
    "date": "2026-10-28",
    "tier": "secondary"
   },
   "p_24a4186d": {
    "title": "Crusoe announces new 900 MW AI factory campus in Abilene, Texas to support Microsoft AI infrastructure",
    "publisher": "Crusoe",
    "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure",
    "date": "2026-03-27",
    "tier": "primary"
   },
   "p_25ae42ec": {
    "title": "OpenAI Stargate Shackelford (AI data centers directory)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-shackelford",
    "date": "2026-07-31",
    "tier": "secondary"
   },
   "p_53729d81": {
    "title": "OpenAI Stargate New Mexico (AI data centers directory)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-new-mexico",
    "date": "2026-07-31",
    "tier": "secondary"
   },
   "p_769d1add": {
    "title": "OpenAI Stargate Milam (AI data centers directory)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-milam",
    "date": "2026-05-22",
    "tier": "secondary"
   },
   "p_174110fc": {
    "title": "OpenAI Stargate Wisconsin (satellite explorer)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateWisconsin",
    "date": "2026-07-24",
    "tier": "secondary"
   },
   "p_6d492639": {
    "title": "OpenAI Stargate: where the US sites stand",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
    "date": "2026-04-17",
    "tier": "secondary"
   },
   "p_9f7a1121": {
    "title": "New update on Stargate UAE: First phase of 200MW to complete by 2026",
    "publisher": "Gulf News",
    "url": "https://gulfnews.com/business/markets/stargate-uae-first-phase-of-200mw-to-complete-by-2026-1.500310364",
    "date": "2025-10-16",
    "tier": "press"
   },
   "p_ffb841ce": {
    "title": "OpenAI to launch AI data center in Norway, its first in Europe",
    "publisher": "TechCrunch",
    "url": "https://techcrunch.com/2025/07/31/openai-to-launch-ai-data-center-in-norway-its-first-in-europe/",
    "date": "2025-07-31",
    "tier": "press"
   },
   "p_1de6af48": {
    "title": "Anthropic-Amazon New Carlisle (AI data centers directory)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle",
    "date": "2026-10-19",
    "tier": "secondary"
   },
   "p_f5a61e5b": {
    "title": "Colossus 1 (AI data centers directory)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory/colossus-1",
    "date": "2026-06-16",
    "tier": "secondary"
   },
   "p_c081d1d2": {
    "title": "Colossus 2 (AI data centers directory)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory/colossus-2",
    "date": "2026-07-30",
    "tier": "secondary"
   },
   "p_57952021": {
    "title": "Anthropic signs $45 billion compute deal with Nscale for 460 megawatts in West Virginia",
    "publisher": "VKTR",
    "url": "https://www.vktr.com/ai-market/anthropic-signs-45-billion-compute-deal-with-nscale-for-460-megawatts-in-west-virginia/",
    "date": "2026-08-26",
    "tier": "press"
   },
   "p_2c03b77a": {
    "title": "Anthropic signs $35bn cloud agreement with Lambda - report",
    "publisher": "DatacenterDynamics",
    "url": "https://www.datacenterdynamics.com/en/news/anthropic-signs-35bn-cloud-agreement-with-lambda-report/",
    "date": "2026-09",
    "tier": "press"
   },
   "p_fec132ab": {
    "title": "Meta Takes Hyperion To 5GW (And Off Its Balance Sheet)",
    "publisher": "Global Data Center Hub",
    "url": "https://www.globaldatacenterhub.com/p/meta-scales-hyperion-to-5gw-and-over",
    "date": "2026-07-20",
    "tier": "press"
   },
   "p_cd833095": {
    "title": "Meta Prometheus (AI data center directory entry)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory/meta-prometheus",
    "date": "2026-10-02",
    "tier": "secondary"
   },
   "p_53297b92": {
    "title": "Meta hands BlackRock majority stake in 1 GW El Paso data center",
    "publisher": "W.Media",
    "url": "https://w.media/meta-hands-blackrock-majority-stake-in-1-gw-el-paso-data-center/",
    "date": "2026-07-28",
    "tier": "press"
   },
   "p_71081154": {
    "title": "Microsoft Fairwater Atlanta (AI data center directory entry)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-atlanta",
    "date": "2026-07-17",
    "tier": "secondary"
   },
   "p_e88d95ab": {
    "title": "Microsoft Fairwater Wisconsin (AI data center directory entry)",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin",
    "date": "2026-07-25",
    "tier": "secondary"
   },
   "p_bddcb140": {
    "title": "Crusoe Touts 5 Gigawatts of Data Centers, Pauses Wyoming Site",
    "publisher": "Bloomberg Tax (Bloomberg News)",
    "url": "https://news.bloombergtax.com/artificial-intelligence/crusoe-touts-5-gigawatts-of-data-centers-pauses-wyoming-site",
    "date": "2026-06-09",
    "tier": "press"
   },
   "p_bfb441a1": {
    "title": "Oracle and OpenAI scrap planned 600MW Abilene expansion",
    "publisher": "Tom's Hardware",
    "url": "https://www.tomshardware.com/tech-industry/oracle-and-openai-scrap-planned-600mw-abilene-expansion",
    "date": "2026-03",
    "tier": "press"
   },
   "p_a2d37ec7": {
    "title": "As reports of Stargate struggles emerge, OpenAI confirms 4.5GW Oracle deal",
    "publisher": "DatacenterDynamics",
    "url": "https://www.datacenterdynamics.com/en/news/as-reports-of-stargate-struggles-emerge-openai-confirms-45gw-oracle-deal/",
    "date": "2025-07",
    "tier": "press"
   },
   "p_8bcbf211": {
    "title": "Nvidia plans $30bn investment in upcoming OpenAI funding round",
    "publisher": "DatacenterDynamics",
    "url": "https://www.datacenterdynamics.com/en/news/nvidia-plans-30bn-investment-in-upcoming-openai-funding-round/",
    "date": "2026-02",
    "tier": "press"
   },
   "p_eec6ea4c": {
    "title": "AMD and OpenAI announce strategic partnership to deploy 6 gigawatts of AMD GPUs",
    "publisher": "AMD",
    "url": "https://ir.amd.com/news-events/press-releases/detail/1260/amd-and-openai-announce-strategic-partnership-to-deploy-6-gigawatts-of-amd-gpus",
    "date": "2025-10-06",
    "tier": "primary"
   },
   "p_9113d6da": {
    "title": "OpenAI and Broadcom announce strategic collaboration to deploy 10 gigawatts of OpenAI-designed AI accelerators",
    "publisher": "OpenAI",
    "url": "https://openai.com/index/openai-and-broadcom-announce-strategic-collaboration/",
    "date": "2025-10-13",
    "tier": "primary"
   },
   "p_ad6b302b": {
    "title": "OpenAI says it hit its 10 gigawatt compute goal years ahead of schedule",
    "publisher": "The Decoder",
    "url": "https://the-decoder.com/openai-says-it-hit-its-10-gigawatt-compute-goal-years-ahead-of-schedule/",
    "date": "2026-04-30",
    "tier": "press"
   },
   "p_e62e4549": {
    "title": "Cerebras Systems Discloses Q1 2026 Financials and 750 MW Infrastructure Agreement With OpenAI",
    "publisher": "The Energy Mag",
    "url": "https://www.theenergymag.com/news/market-news/cerebras-systems-reports-q1-2026-revenue-of-193-4-million",
    "date": "2026",
    "tier": "press"
   },
   "p_462f6e7f": {
    "title": "Anthropic and Amazon expand compute partnership",
    "publisher": "Anthropic",
    "url": "https://anthropic.com/news/anthropic-amazon-compute",
    "date": "2026-04-20",
    "tier": "primary"
   },
   "p_bd22738c": {
    "title": "Anthropic Locks In Hundreds of Billions in Google and Broadcom Compute",
    "publisher": "Yahoo Finance (Bloomberg)",
    "url": "https://finance.yahoo.com/sectors/technology/articles/anthropic-locks-hundreds-billions-google-151813439.html",
    "date": "2026-04-07",
    "tier": "press"
   },
   "p_7491bf32": {
    "title": "Anthropic's $50B AI Bet Starts in Texas and New York",
    "publisher": "TechRepublic",
    "url": "https://www.techrepublic.com/de/article/news-anthropic-50b-ai-data-centers-texas-new-york/",
    "date": "2025-11-13",
    "tier": "press"
   },
   "p_d46ed596": {
    "title": "How Anthropic clinched $517 billion in compute deals in 11 months",
    "publisher": "Dealroom (summarising The Information)",
    "url": "https://dealroom.co/news/info-iclajk-how-anthropic-clinched-517-billion-in-compute-deals-in-11-months/",
    "date": "2026-09-06",
    "tier": "secondary"
   },
   "p_938c5d4c": {
    "title": "AMD and Anthropic Announce Strategic Partnership to Deploy up to 2 Gigawatts of AMD Instinct MI450 Series GPUs",
    "publisher": "AMD",
    "url": "https://newsroom.amd.com/news/amd-anthropic-strategic-partnership/",
    "date": "2026-07-22",
    "tier": "primary"
   },
   "p_2d6038cd": {
    "title": "SpaceXAI Southaven turbines deadline",
    "publisher": "Mississippi Today",
    "url": "https://mississippitoday.org/2026/07/31/southaven-xai-turbines-deadline/",
    "date": "2026-07-31",
    "tier": "press"
   },
   "p_0188dc9c": {
    "title": "SpaceX agrees to remove temporary gas turbines at Colossus data center by 2027",
    "publisher": "Gizmodo",
    "url": "https://gizmodo.com/spacex-agrees-to-remove-temporary-gas-turbines-at-colossus-data-center-by-2027-2000793559",
    "date": "2026-08-01",
    "tier": "press"
   },
   "p_dfdab44c": {
    "title": "Louisiana greenlights massive power projects for Meta data center",
    "publisher": "Industrial Info Resources",
    "url": "https://www.industrialinfo.com/news/article/louisiana-greenlights-massive-power-projects-for-meta-data-center--345274",
    "date": "2025-08",
    "tier": "press"
   },
   "p_1f452ab8": {
    "title": "Meta triples order of gas-fired power plants for its AI campus in Louisiana",
    "publisher": "The Lens",
    "url": "https://thelensnola.org/2026/03/30/meta-triples-order-of-gas-fired-power-plants-for-its-ai-campus-in-louisiana/",
    "date": "2026-04-03",
    "tier": "press"
   },
   "p_5ad4cc5c": {
    "title": "Williams delivers strong second quarter 2026 results",
    "publisher": "Williams (investor release)",
    "url": "https://investor.williams.com/news-releases/news-release-details/williams-delivers-strong-second-quarter-2026-results-announces",
    "date": "2026-08-03",
    "tier": "primary"
   },
   "p_b3dd6c22": {
    "title": "Oracle taps VoltaGrid for 2.3-GW modular gas fleet to power AI data centers across Texas",
    "publisher": "POWER Magazine",
    "url": "https://www.powermag.com/oracle-taps-voltagrid-for-2-3-gw-modular-gas-fleet-to-power-ai-data-centers-across-texas/",
    "date": "2025-10-15",
    "tier": "press"
   },
   "p_9cb7571d": {
    "title": "Chevron signs 20-year Microsoft power deal for West Texas AI project",
    "publisher": "World Oil",
    "url": "https://worldoil.com/news/2026/6/22/chevron-signs-20-year-microsoft-power-deal-for-west-texas-ai-project/",
    "date": "2026-06-22",
    "tier": "press"
   },
   "p_ca180862": {
    "title": "Crusoe adds 4.5 GW natural gas to fuel AI, expands Abilene data center to 1.2 GW",
    "publisher": "Data Center Frontier",
    "url": "https://www.datacenterfrontier.com/hyperscale/article/55276169/crusoe-adds-45-gw-natural-gas-to-fuel-ai-expands-abilene-data-center-to-12-gw",
    "date": "2025-03-24",
    "tier": "press"
   },
   "p_b74a787f": {
    "title": "AWS files 36-building data center plan at 4.5GW Homer City campus",
    "publisher": "Baxtel",
    "url": "https://baxtel.com/news/aws-files-36-building-data-center-plan-at-4-5gw-homer-city-campus",
    "date": "2026-10-07",
    "tier": "press"
   },
   "p_b12b07ba": {
    "title": "Texas electric utility only considered gas to power $10 billion Meta data center",
    "publisher": "Inside Climate News",
    "url": "https://insideclimatenews.org/news/24092026/el-paso-electric-only-considered-gas-to-power-meta-data-center/",
    "date": "2026-09-24",
    "tier": "press"
   },
   "p_48ff352c": {
    "title": "Fermi Inc. Form 10-Q for quarter ended June 30, 2026",
    "publisher": "Fermi Inc. / SEC EDGAR",
    "url": "https://www.sec.gov/Archives/edgar/data/0002071778/000207177826000051/frmi-20260630.htm",
    "date": "2026-08",
    "tier": "primary"
   },
   "p_db02f0e7": {
    "title": "Data center power crunch lifts engines, aeroderivatives into larger role",
    "publisher": "Power Engineering",
    "url": "https://www.power-eng.com/gas/data-center-power-crunch-lifts-engines-aeroderivatives-into-larger-role/",
    "date": "2026-04-16",
    "tier": "press"
   },
   "p_f1f19505": {
    "title": "NextEra leans into 'bring your own generation' as data centers chase reliable power",
    "publisher": "Power Engineering",
    "url": "https://www.power-eng.com/onsite-power/nextera-leans-into-bring-your-own-generation-as-data-centers-chase-firm-power/",
    "date": "2025-12-11",
    "tier": "press"
   },
   "p_7a47a16b": {
    "title": "Talen and Amazon nuclear energy PPA",
    "publisher": "Power Technology",
    "url": "https://www.power-technology.com/news/talen-amazon-nuclear-energy-ppa/",
    "date": "2025-06-12",
    "tier": "press"
   },
   "p_13377303": {
    "title": "Constellation, Meta sign 20-year deal for clean, reliable nuclear energy in Illinois",
    "publisher": "Constellation Energy",
    "url": "https://www.constellationenergy.com/newsroom/2025/constellation-meta-sign-20-year-deal-for-clean-reliable-nuclear-energy-in-illinois.html",
    "date": "2025-06-03",
    "tier": "primary"
   },
   "p_003e4155": {
    "title": "Constellation seeks FERC help with Crane restart",
    "publisher": "American Nuclear Society (Nuclear Newswire)",
    "url": "https://www.ans.org/news/2026-04-03/article-7905/constellation-seeks-ferc-help-with-crane-restart/",
    "date": "2026-04-03",
    "tier": "press"
   },
   "p_c8fe0cad": {
    "title": "Amazon and Meta agreements boost Vistra nuclear plants",
    "publisher": "World Nuclear News",
    "url": "https://world-nuclear-news.org/articles/ppas-support-extended-operations-at-vistra-plants",
    "date": "2026-02-27",
    "tier": "press"
   },
   "p_03c1b541": {
    "title": "Meta strikes deals with Vistra, Oklo, TerraPower",
    "publisher": "American Nuclear Society (Nuclear Newswire)",
    "url": "https://www.ans.org/news/2026-01-12/article-7666/meta-strikes-deals-with-vistra-oklo-terrapower/",
    "date": "2026-01-12",
    "tier": "press"
   },
   "p_75db1c03": {
    "title": "Constellation and Amazon announce 20-year power purchase agreement at Calvert Cliffs",
    "publisher": "Constellation Energy",
    "url": "https://www.constellationenergy.com/news/2026/09/constellation-and-amazon-announce-20-year-power-purchase-agreement-at-calvert-cliffs.html",
    "date": "2026-09-30",
    "tier": "primary"
   },
   "p_d3f1b3b4": {
    "title": "Palisades: Restart projects, Holtec IPO, lawsuit dismissal - but no restart date",
    "publisher": "American Nuclear Society (Nuclear Newswire)",
    "url": "https://www.ans.org/news/2026-07-08/article-8187/",
    "date": "2026-07-08",
    "tier": "press"
   },
   "p_2222c042": {
    "title": "NextEra's AI bet: Google, Meta, and more gas",
    "publisher": "Latitude Media",
    "url": "https://www.latitudemedia.com/news/nexteras-ai-bet-google-meta-and-more-gas/",
    "date": "2025-12-08",
    "tier": "press"
   },
   "p_a3155f7d": {
    "title": "Kairos Power's Hermes 2 plant to deliver 50 MW of energy to TVA grid powering Google data centers",
    "publisher": "T&D World",
    "url": "https://tdworld.com/distributed-energy-resources/news/55310975/kairos-powers-hermes-2-plant-to-deliver-50-mw-of-energy-to-tva-grid-powering-google-data-centers-in-tennessee-and-alabama",
    "date": "2025-08-20",
    "tier": "press"
   },
   "p_cfca327b": {
    "title": "X-Energy, Inc. final prospectus (Form 424B4)",
    "publisher": "X-Energy / SEC EDGAR",
    "url": "https://www.sec.gov/Archives/edgar/data/0002088896/000110465926049515/tm2527015-22_424b4.htm",
    "date": "2026-04-23",
    "tier": "primary"
   },
   "p_e24c13c0": {
    "title": "NuScale Power's ENTRA1 deal deepens: can it deliver 6GW by 2030?",
    "publisher": "Zacks",
    "url": "https://www.zacks.com/stock/news/2796052/nuscale-power-s-entra1-deal-deepens-can-it-deliver-6gw-by-2030",
    "date": "2025-11-26",
    "tier": "secondary"
   },
   "p_28bff0b7": {
    "title": "Westinghouse enters partnership for $80 billion of new nuclear reactors",
    "publisher": "POWER Magazine",
    "url": "https://www.powermag.com/westinghouse-enters-partnership-for-80-billion-of-new-nuclear-reactors/",
    "date": "2025-10-29",
    "tier": "press"
   },
   "p_f599bb3f": {
    "title": "Microsoft's 10.5 GW Brookfield deal rewrites corporate energy procurement",
    "publisher": "Introl",
    "url": "https://introl.com/blog/microsoft-brookfield-10-5-gw-renewable-energy-deal-2026",
    "date": "2026-01-14",
    "tier": "secondary"
   },
   "p_f22b68e8": {
    "title": "What the Michigan Stargate site says about today's AI market",
    "publisher": "Latitude Media",
    "url": "https://www.latitudemedia.com/news/what-the-michigan-stargate-site-says-about-todays-ai-market/",
    "date": "2026-01-07",
    "tier": "press"
   },
   "p_48f4bc76": {
    "title": "Google signs record geothermal power deal with Fervo",
    "publisher": "ESG Today",
    "url": "https://www.esgtoday.com/google-signs-record-geothermal-power-deal-with-fervo/",
    "date": "2026-09-01",
    "tier": "press"
   },
   "p_27eac97b": {
    "title": "Bloom Energy SOFC manufacturing, 2.8 GW Oracle deal, $5B Brookfield financing, and MTAR supply chain ramp (2021-2026)",
    "publisher": "EnkiAI",
    "url": "https://enkiai.com/fuel-cells/bloom-energy-fuel-cell-2026-1-gw-aep-supply-pact/",
    "date": "2026",
    "tier": "secondary"
   },
   "p_7877ccd8": {
    "title": "Bloom Energy third quarter 2026 financial results (Exhibit 99.1)",
    "publisher": "Bloom Energy / SEC EDGAR",
    "url": "https://www.sec.gov/Archives/edgar/data/0001664703/000162828026066890/ex991_q326financialresults.htm",
    "date": "2026-10-22",
    "tier": "primary"
   },
   "p_0cb7a1c7": {
    "title": "GE Vernova in $9B deal to buy high-voltage manufacturer as gas turbine orders slow",
    "publisher": "Utility Dive",
    "url": "https://www.utilitydive.com/news/ge-vernova-in-9b-deal-to-buy-high-voltage-manufacturer-as-gas-turbine-orde/873223/",
    "date": "2026-10-29",
    "tier": "press"
   },
   "p_9e15ac71": {
    "title": "Data centers drive record surge in GE Vernova power equipment orders as turbine slots tighten through 2030",
    "publisher": "Power Engineering",
    "url": "https://www.power-eng.com/gas/turbines/data-centers-drive-record-surge-in-ge-vernova-power-equipment-orders-as-turbine-slots-tighten-through-2030/",
    "date": "2026-04-23",
    "tier": "press"
   },
   "p_893ce34e": {
    "title": "Siemens gas turbine backlog nears 70 GW as company expands manufacturing",
    "publisher": "Utility Dive",
    "url": "https://www.utilitydive.com/news/siemens-gas-turbine-backlog-nears-70-gw-as-company-expands-manufacturing/827390/",
    "date": "2026-08-10",
    "tier": "press"
   },
   "p_b385f2b0": {
    "title": "Mitsubishi gas turbine backlog (earnings)",
    "publisher": "Utility Dive",
    "url": "https://www.utilitydive.com/news/mitsubishi-gas-turbine-backlog-earnings/827761/",
    "date": "2026-08-13",
    "tier": "press"
   },
   "p_23777456": {
    "title": "Caterpillar to triple power generation capacity, raises 2030 targets",
    "publisher": "Manufacturing Dive",
    "url": "https://www.manufacturingdive.com/news/caterpillar-triple-power-generation-capacity-raises-2030-targets-q1-2026-earnings/",
    "date": "2026-05-01",
    "tier": "press"
   },
   "p_09395a50": {
    "title": "U.S. transformer market faces severe supply constraints as lead times extend to four years",
    "publisher": "pv magazine USA",
    "url": "https://pv-magazine-usa.com/2026/05/11/u-s-transformer-market-faces-severe-supply-constraints-as-lead-times-extend-to-four-years/",
    "date": "2026-05-11",
    "tier": "press"
   },
   "p_c1f83491": {
    "title": "New U.S. electric generating capacity expected to reach record high in 2026",
    "publisher": "U.S. Energy Information Administration",
    "url": "https://www.eia.gov/todayinenergy/detail.php?id=67205",
    "date": "2026-02-20",
    "tier": "primary"
   },
   "p_09414f1b": {
    "title": "DOE unveils initiative to add 5 GW of nuclear capacity through uprates and restarts",
    "publisher": "POWER Magazine",
    "url": "https://powermag.com/doe-unveils-initiative-to-add-5-gw-of-nuclear-capacity-through-uprates-and-restarts",
    "date": "2026-03-12",
    "tier": "press"
   },
   "p_4f120d7b": {
    "title": "Oracle, BorderPlex, and Bloom Energy to Power Project Jupiter with Fuel Cell Technology",
    "publisher": "Oracle",
    "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
    "date": "2026-04-27",
    "tier": "primary"
   },
   "p_9b29bfe4": {
    "title": "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "publisher": "NVIDIA (investor relations)",
    "url": "https://investor.nvidia.com/news/press-release-details/2026/NVIDIA-Guarantees-SB-Energys-PORTS-Pike-Technology-Campus-in-Ohio-to-Exclusively-Host-NVIDIA-AI-Compute/default.aspx",
    "date": "2026-08-17",
    "tier": "primary"
   },
   "p_ca8349c0": {
    "title": "Google deal backs 890 MW of Constellation nuclear uprates at 11 PJM reactors",
    "publisher": "POWER Magazine",
    "url": "https://www.powermag.com/google-deal-backs-890-mw-of-constellation-nuclear-uprates-at-11-pjm-reactors/",
    "date": "2026-10-06",
    "tier": "press"
   },
   "p_661ac985": {
    "title": "NRC and FERC boosts for Crane Clean Energy Center project",
    "publisher": "World Nuclear News",
    "url": "https://world-nuclear-news.org/articles/ferc-waiver-clears-way-for-crane-clean-nuclear-interconnection",
    "date": "2026-06-08",
    "tier": "press"
   },
   "p_767db2c0": {
    "title": "Black Hills Corp. Executes Definitive Agreements to Serve Google's Planned Data Center in Cheyenne, Wyoming",
    "publisher": "Black Hills Corp. (via Finviz/Business Wire)",
    "url": "https://finviz.com/news/399523/black-hills-corp-executes-definitive-agreements-to-serve-googles-planned-data-center-in-cheyenne-wyoming",
    "date": "2026-10-06",
    "tier": "primary"
   },
   "p_97f46bf3": {
    "title": "Microsoft plans 2GW data center campus in Pecos, Texas",
    "publisher": "DatacenterDynamics",
    "url": "https://www.datacenterdynamics.com/en/news/microsoft-plans-2gw-data-center-campus-in-pecos-texas",
    "date": "2026-06-22",
    "tier": "press"
   },
   "p_0d9fcb3b": {
    "title": "Amazon Explores Grid Connection for 8,000-Acre AI Campus",
    "publisher": "Data Center Knowledge",
    "url": "https://www.datacenterknowledge.com/energy-power-supply/amazon-explores-grid-connection-for-8-000-acre-ai-campus",
    "date": "2026-08-17",
    "tier": "press"
   },
   "p_abbf68ac": {
    "title": "Anthropic Secures 460 MW at Nscale Campus in $45 Billion Deal: Report",
    "publisher": "The Energy Mag (citing Bloomberg)",
    "url": "https://theenergymag.com/news/market-news/anthropic-secures-460-mw-at-nscale-campus-in-45-billion-deal-report",
    "date": "2026-08-26",
    "tier": "secondary"
   },
   "p_23b9d255": {
    "title": "Aker ASA reports first quarter results 2026",
    "publisher": "Aker ASA (via Borskollen)",
    "url": "https://www.borskollen.se/pressmeddelanden/aker-asa-reports-first-quarter-results-2026",
    "date": "2026-05-08",
    "tier": "primary"
   },
   "p_00dbabe5": {
    "title": "Anthropic's $35B Lambda Deal Connects Nvidia to Hut 8's Texas AI Data Center",
    "publisher": "The Energy Mag",
    "url": "https://theenergymag.com/news/market-news/anthropic-lambda-nvidia-hut-ai-texas-beacon-point",
    "date": "2026-09-01",
    "tier": "secondary"
   },
   "p_4c22ff07": {
    "title": "Homer City Generation Highlights Kiewit's One-Year Anniversary of Being Active on Site as EPC Partner",
    "publisher": "Homer City Generation (Business Wire via Offshore Source)",
    "url": "https://offshoresource.com/business-wire/homer-city-generation-highlights-kiewits-one-year-anniversary-of-being-active-on-site-as-engineering-procurement-and-construction-partner/",
    "date": "2026-10-20",
    "tier": "primary"
   },
   "p_f658c7b6": {
    "title": "FERC order on PJM Reliability Backstop Procurement (ER26-3380-000)",
    "publisher": "FERC (hosted by PJM)",
    "url": "https://www.pjm.com/pjmfiles/directory/etariff/FercOrders/9154/20260929-er26-3380-000.pdf",
    "date": "2026-09-29",
    "tier": "primary"
   },
   "p_e009af11": {
    "title": "Energy Department Closes $1.9 Billion Loan to Restart Duane Arnold Nuclear Plant",
    "publisher": "U.S. Department of Energy",
    "url": "https://www.energy.gov/articles/energy-department-closes-19-billion-loan-restart-duane-arnold-nuclear-plant",
    "date": "2026-09-08",
    "tier": "primary"
   },
   "p_2e511454": {
    "title": "GE Vernova and Crusoe announce major 29-unit aeroderivative gas turbine deal",
    "publisher": "GE Vernova",
    "url": "https://www.gevernova.com/news/press-releases/ge-vernova-crusoe-announce-major-29-unit-aeroderivative-gas-turbine-deliver-ai-data-centers",
    "date": "2025-07-22",
    "tier": "primary"
   },
   "p_d63ad512": {
    "title": "AMD and Anthropic Announce Strategic Partnership to Deploy Up to 2 Gigawatts of AMD Instinct MI450 Series GPUs",
    "publisher": "AMD",
    "url": "https://ir.amd.com/news-events/press-releases/detail/1292",
    "date": "2026-07-22",
    "tier": "primary"
   },
   "p_89dfde2a": {
    "title": "Epoch AI - AI Data Centers directory",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers/directory",
    "date": "2026-11-01",
    "tier": "secondary"
   },
   "p_af143cbf": {
    "title": "Say Hello To Google, The Mystery Owner Behind Wyoming's Largest Data Center Project",
    "publisher": "Cowboy State Daily",
    "url": "https://cowboystatedaily.com/2026/07/08/google-revealed-as-owner-of-wyomings-largest-data-center-now-project-tembo/",
    "date": "2026-07-08",
    "tier": "press"
   },
   "p_a20e813b": {
    "title": "Socrates Power Solution Facilities",
    "publisher": "Williams",
    "url": "https://williams.com/?p=193105",
    "date": "2026",
    "tier": "primary"
   },
   "p_eb3ea3b2": {
    "title": "Onsite gas turbines, reciprocating engines to power Meta data center",
    "publisher": "Power Engineering",
    "url": "https://www.power-eng.com/onsite-power/onsite-gas-turbines-reciprocating-engines-to-power-meta-data-center/",
    "date": "2025-06",
    "tier": "press"
   },
   "p_c868d7cd": {
    "title": "Nscale's S-1 shows it still needs financing for $44.6B Anthropic deal",
    "publisher": "The Stack",
    "url": "https://www.thestack.technology/nscales-s-1-shows-it-still-needs-financing-for-44-6b-anthropic-deal/",
    "date": "2026-09",
    "tier": "press"
   },
   "p_c05f65c7": {
    "title": "AMD Form 8-K: warrant and binding commitment for the initial 1 GW",
    "publisher": "AMD (SEC filing)",
    "url": "https://www.sec.gov/Archives/edgar/data/2488/000119312525230895/d28189d8k.htm",
    "date": "2025-10-06",
    "tier": "primary"
   },
   "p_7078f8bc": {
    "title": "GE Vernova's H-Class turbines power new Pennsylvania data center",
    "publisher": "Turbomachinery Magazine",
    "url": "https://www.turbomachinerymag.com/view/ge-vernova-s-h-class-turbines-power-new-pennsylvania-data-center",
    "date": "2025",
    "tier": "press"
   },
   "p_4414d6b3": {
    "title": "Homer City Generation highlights Kiewit's one-year anniversary of being active on site",
    "publisher": "Homer City Redevelopment",
    "url": "https://www.homercityredevelopment.com/post/homer-city-generation-highlights-kiewit-s-one-year-anniversary-of-being-active-on-site-as-engineerin",
    "date": "2026-10-20",
    "tier": "primary"
   },
   "p_08cf8b7a": {
    "title": "AI data centers hub",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data/ai-data-centers",
    "date": "2026-11-01",
    "tier": "secondary"
   },
   "p_1920eb19": {
    "title": "Data center grid power demand to rise 22% in 2025, nearly triple by 2030",
    "publisher": "S&P Global",
    "url": "https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/101425-data-center-grid-power-demand-to-rise-22-in-2025-nearly-triple-by-2030",
    "date": "2025-10-14",
    "tier": "secondary"
   },
   "p_501c5aeb": {
    "title": "Berkeley Lab report evaluates increase in electricity demand from data centers",
    "publisher": "Lawrence Berkeley National Laboratory",
    "url": "https://newscenter.lbl.gov/2025/01/15/berkeley-lab-report-evaluates-increase-in-electricity-demand-from-data-centers/",
    "date": "2024-12-20",
    "tier": "primary"
   },
   "p_41e05627": {
    "title": "DOE releases new report evaluating increase in electricity demand from data centers",
    "publisher": "US Department of Energy",
    "url": "https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers",
    "date": "2024-12-20",
    "tier": "primary"
   },
   "p_3ba21f79": {
    "title": "Data centers' share of US electricity seen doubling by 2030",
    "publisher": "E&E News",
    "url": "https://eenews.net/articles/data-centers-share-of-us-electricity-seen-doubling-by-2030",
    "date": "2026-02-26",
    "tier": "press"
   },
   "p_aeb4fea6": {
    "title": "Data-center power forecasts climb to unreachable heights",
    "publisher": "Canary Media",
    "url": "https://www.canarymedia.com/articles/data-centers/data-center-power-forecasts-climb-to-unreachable-heights",
    "date": "2025-11-18",
    "tier": "press"
   },
   "p_8db61d8e": {
    "title": "US data center power demand could reach 106 GW by 2035: BloombergNEF",
    "publisher": "Utility Dive",
    "url": "https://www.utilitydive.com/news/us-data-center-power-demand-could-reach-106-gw-by-2035-bloombergnef/",
    "date": "2025-12-03",
    "tier": "press"
   },
   "p_7df04bc0": {
    "title": "US data center load set to double by 2028, report finds",
    "publisher": "Semafor",
    "url": "https://www.semafor.com/article/01/20/2026/us-data-center-load-set-to-double-by-2028-report-finds",
    "date": "2026-01-20",
    "tier": "press"
   },
   "p_2cd42b00": {
    "title": "US grid constraints: towards 40GW",
    "publisher": "SemiAnalysis",
    "url": "https://newsletter.semianalysis.com/p/us-grid-constraints-towards-40gw",
    "date": "2026-06-25",
    "tier": "secondary"
   },
   "p_85e85dcd": {
    "title": "NERC warns long-term grid reliability risks mounting",
    "publisher": "POWER Magazine",
    "url": "https://www.powermag.com/nerc-warns-long-term-grid-reliability-risks-mounting/",
    "date": "2026-01-29",
    "tier": "press"
   },
   "p_98c5743e": {
    "title": "Global data center power demand to double by 2030 on AI surge: IEA",
    "publisher": "S&P Global",
    "url": "https://www.spglobal.com/commodity-insights/en/news-research/latest-news/electric-power/041025-global-data-center-power-demand-to-double-by-2030-on-ai-surge-iea",
    "date": "2025-04-10",
    "tier": "secondary"
   },
   "p_4fcfd378": {
    "title": "Data center power demand will double by 2030: IEA",
    "publisher": "W.Media",
    "url": "https://w.media/data-center-power-demand-will-double-by-2030-iea/",
    "date": "2026-04-20",
    "tier": "press"
   },
   "p_0c6dc398": {
    "title": "Texas PUC to audit ERCOT data center queue",
    "publisher": "Utility Dive",
    "url": "https://utilitydive.com/news/ercot-texas-puc-data-center-audit/828472",
    "date": "2026-08-21",
    "tier": "press"
   },
   "p_1eedfade": {
    "title": "AEP adds 28 GW in four months to load additions forecast",
    "publisher": "T&D World",
    "url": "https://tdworld.com/utility-business/news/55357282/aep-adds-28-gw-in-four-months-to-load-additions-forecast",
    "date": "2026-02-12",
    "tier": "press"
   },
   "p_beae868e": {
    "title": "Southern Company's data center pipeline keeps filling up",
    "publisher": "Atlanta Journal-Constitution",
    "url": "https://www.ajc.com/business/2026/07/southern-companys-data-center-pipeline-keeps-filling-up/",
    "date": "2026-07-31",
    "tier": "press"
   },
   "p_44df2a11": {
    "title": "Dominion Energy Q2 earnings call highlights",
    "publisher": "MarketBeat",
    "url": "https://www.marketbeat.com/instant-alerts/dominion-energy-q2-earnings-call-highlights-2026-07-31/",
    "date": "2026-07-31",
    "tier": "press"
   },
   "p_26889998": {
    "title": "Entergy outlines $41B capital plan through 2029 while expanding data center pipeline to 12 GW",
    "publisher": "Seeking Alpha",
    "url": "https://seekingalpha.com/news/4510640-entergy-outlines-41b-capital-plan-through-2029-while-expanding-data-center-pipeline-to-12-gw",
    "date": "2025-10-29",
    "tier": "press"
   },
   "p_286f1e39": {
    "title": "Key questions on energy and AI (IEA presentation)",
    "publisher": "IEA via Asian Development Bank Asia Clean Energy Forum",
    "url": "https://asiacleanenergyforum.adb.org/wp-content/uploads/2026/06/Key-questions-on-energy-and-AI.pdf",
    "date": "2026-06-11",
    "tier": "primary"
   },
   "p_51c5cf74": {
    "title": "OpenAI Computing Capacity Triples to 1.9 Gigawatts Amid Global AI Infrastructure Push",
    "publisher": "Yahoo Finance",
    "url": "https://finance.yahoo.com/news/openai-computing-capacity-triples-1-183801881.html",
    "date": "2026-03-11",
    "tier": "press"
   },
   "p_0f4780a2": {
    "title": "OpenAI sets 30GW compute power goal for 2030",
    "publisher": "Android Headlines",
    "url": "https://www.androidheadlines.com/2026/04/openai-30gw-compute-power-2030-goal.html",
    "date": "2026-04-22",
    "tier": "press"
   },
   "p_4f7fe2a4": {
    "title": "Building 250GW Data Centers by 2033: Is OpenAI's Ambitious Plan Realistic?",
    "publisher": "Tiger Brokers (iTiger)",
    "url": "https://www.itiger.com/news/1120540066",
    "date": "2025-09-30",
    "tier": "secondary"
   },
   "p_a4bb4ddf": {
    "title": "OpenAI data center capacity (GW) in 2027",
    "publisher": "FutureSearch",
    "url": "https://futuresearch.ai/app/p/a/openai-data-center-capacity-gw-2027?idx=5",
    "date": "2026-10-17",
    "tier": "secondary"
   },
   "p_4abfd1f6": {
    "title": "Anthropic reportedly plans to have 5GW worth of compute by the end of 2026, reports NYT",
    "publisher": "Newsquawk",
    "url": "https://www.newsquawk.com/headlines/anthropic-reportedly-plans-to-have-5gw-worth-of-compute-by-the-end-of-2026-reports-nyt",
    "date": "2026-09-18",
    "tier": "press"
   },
   "p_18797638": {
    "title": "SpaceX Lists at $1.75 Trillion With Two Anchor Compute Tenants",
    "publisher": "Global Data Center Hub",
    "url": "https://www.globaldatacenterhub.com/p/spacex-lists-at-175-trillion-with",
    "date": "2026-06-16",
    "tier": "secondary"
   },
   "p_42081cb6": {
    "title": "SpaceXAI 5 data center locations, more energy, Rubin chips, $300 billion revenue run-rate",
    "publisher": "NextBigFuture",
    "url": "https://www.nextbigfuture.com/2026/06/spacexai-5-data-center-locations-more-energy-rubin-chips-300-billion-revenue-runrate.html",
    "date": "2026-06-14",
    "tier": "secondary"
   },
   "p_891d9ef1": {
    "title": "Mistral AI vise une capacité de calcul d'un gigawatt à l'horizon 2030",
    "publisher": "Maddyness",
    "url": "https://www.maddyness.com/2026/05/28/mistral-ai-vise-une-capacite-de-calcul-dun-gigawatt-a-lhorizon-2030/",
    "date": "2026-05-28",
    "tier": "press"
   },
   "p_91604e85": {
    "title": "Microsoft data center capacity: 38GW by 2032",
    "publisher": "Global Data Center Hub (citing Bloomberg)",
    "url": "https://www.globaldatacenterhub.com/p/microsoft-data-center-capacity-38gw-2032",
    "date": "2026-09-10",
    "tier": "press"
   },
   "p_86e004dc": {
    "title": "Amazon.com Q4 earnings call highlights",
    "publisher": "MarketBeat",
    "url": "https://www.marketbeat.com/instant-alerts/amazoncom-q4-earnings-call-highlights-2026-02-05/",
    "date": "2026-02-05",
    "tier": "press"
   },
   "p_c6726a91": {
    "title": "Alphabet filing shows computing and data centre commitments above $1tn",
    "publisher": "Let's Data Science (citing Bloomberg / 10-Q)",
    "url": "https://letsdatascience.com/news/alphabet-filing-shows-computing-and-data-centre-commitments-56513fbc",
    "date": "2026-10-29",
    "tier": "press"
   },
   "p_c27ac761": {
    "title": "Oracle stood up 400MW of data center capacity in latest quarter, has secured 10GW of power for the next three years",
    "publisher": "DatacenterDynamics",
    "url": "https://datacenterdynamics.com/en/news/oracle-stood-up-400mw-of-data-center-capacity-in-latest-quarter-has-secured-10gw-of-power-for-the-next-three-years/",
    "date": "2026-03",
    "tier": "press"
   },
   "p_6e07a119": {
    "title": "CoreWeave Q2 earnings call highlights",
    "publisher": "MarketBeat",
    "url": "https://www.marketbeat.com/instant-alerts/coreweave-q2-earnings-call-highlights-2026-08-11/",
    "date": "2026-08-11",
    "tier": "press"
   },
   "p_4f82ea20": {
    "title": "Nebius Group Q2 earnings call highlights",
    "publisher": "MarketBeat",
    "url": "https://www.marketbeat.com/instant-alerts/nebius-group-q2-earnings-call-highlights-2026-08-12/",
    "date": "2026-08-12",
    "tier": "press"
   },
   "p_5cff4482": {
    "title": "Nscale IPO Filing Reveals $103.4 Billion In Active And Contracted AI Infrastructure Agreements",
    "publisher": "Pulse 2.0",
    "url": "https://pulse2.com/nscale-ipo-filing-reveals-103-4-billion-in-active-and-contracted-ai-infrastructure-agreements/",
    "date": "2026-09",
    "tier": "press"
   },
   "p_ac59171f": {
    "title": "Microsoft signs multi-billion dollar cloud capacity deal with Lambda",
    "publisher": "DatacenterDynamics",
    "url": "https://datacenterdynamics.com/en/news/microsoft-signs-multi-billion-dollar-cloud-capacity-deal-with-lambda",
    "date": "2025-11",
    "tier": "press"
   },
   "p_7e3d2b5e": {
    "title": "PJM's 2028/2029 capacity auction falls short of reliability standard for second straight year",
    "publisher": "POWER Magazine",
    "url": "https://www.powermag.com/pjms-2028-2029-capacity-auction-falls-short-of-reliability-standard-for-second-straight-year/",
    "date": "2026-07-17",
    "tier": "press"
   },
   "p_22955f33": {
    "title": "PJM capacity auction procures 138,318 MW of generation resources",
    "publisher": "PJM Interconnection",
    "url": "https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2026-releases/20260714-pjm-capacity-auction-procures-138318-mw-of-generation-resources.pdf",
    "date": "2026-07-14",
    "tier": "primary"
   },
   "p_56a8451a": {
    "title": "Texas pauses data center interconnections pending statewide audit",
    "publisher": "Akin Gump",
    "url": "https://www.akingump.com/en/insights/alerts/texas-pauses-data-center-interconnections-pending-statewide-audit",
    "date": "2026-08-07",
    "tier": "secondary"
   },
   "p_ff1618f2": {
    "title": "The Texas data center boom",
    "publisher": "S&P Global (451 Research)",
    "url": "https://www.spglobal.com/energy/en/technology-ai-research-insights/blogs/the-texas-data-center-boom",
    "date": "2026-10-08",
    "tier": "secondary"
   },
   "p_7c2bd56a": {
    "title": "Behind-the-meter data centers: full report",
    "publisher": "Cleanview",
    "url": "https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-frontier",
    "date": "2026",
    "tier": "secondary"
   },
   "p_370c8e89": {
    "title": "Governor Hochul launches first statewide moratorium on new hyperscale data centers",
    "publisher": "New York State Governor's Office",
    "url": "https://www.governor.ny.gov/news/first-statewide-moratorium-new-hyperscale-data-centers-launched-governor-kathy-hochul",
    "date": "2026-07-14",
    "tier": "primary"
   },
   "p_142b305d": {
    "title": "Hyperscalers sign White House pledge to fund data center power grid upgrades",
    "publisher": "POWER Magazine",
    "url": "https://www.powermag.com/hyperscalers-sign-white-house-pledge-to-fund-data-center-power-grid-upgrades/",
    "date": "2026-03-04",
    "tier": "press"
   },
   "p_e3c6ec21": {
    "title": "Morgan Stanley: US data center power gap 2026-2028 (Powering AI: Racking Up the Power Shortfall)",
    "publisher": "Zhitong Finance via Webull",
    "url": "https://www.webull.com/news/15695876726391808",
    "date": "2026-10-05",
    "tier": "press"
   },
   "p_afc9f693": {
    "title": "2026 won't deliver 21 GW of data centers",
    "publisher": "SynMax Vulcan",
    "url": "https://blog.synmax.com/vulcan/2026-wont-deliver-21-gw-of-data-centers",
    "date": "2026-07-24",
    "tier": "secondary"
   },
   "p_4c195fc9": {
    "title": "Sightline Climate launches Powerstack newsletter with analysis finding 30-50% of 2026 data center capacity unlikely to come online",
    "publisher": "Sightline Climate (press release via Utility Dive)",
    "url": "https://www.utilitydive.com/press-release/20260305-sightline-climate-launches-powerstack-newsletter-with-analysis-finding-30-5-1",
    "date": "2026-03-05",
    "tier": "primary"
   },
   "p_5faef325": {
    "title": "EPRI Report: US Data Center Grid Strain Casts Cloud Over AI Race",
    "publisher": "Data Center Knowledge",
    "url": "https://www.datacenterknowledge.com/build-design/epri-report-us-data-center-grid-strain-casts-cloud-over-ai-race",
    "date": "2026-03-05",
    "tier": "press"
   },
   "p_93860665": {
    "title": "United States Data Center Energy Usage Report: 2025 Update",
    "publisher": "Lawrence Berkeley National Laboratory",
    "url": "https://eta-publications.lbl.gov/publications/united-states-data-center-energy-2025",
    "date": "2026-06",
    "tier": "primary"
   },
   "p_ab7a23d6": {
    "title": "One US load growth estimate quadrupled in just two years",
    "publisher": "Latitude Media",
    "url": "https://www.latitudemedia.com/news/one-us-load-growth-estimate-quadrupled-in-just-two-years/",
    "date": "2025-11-18",
    "tier": "press"
   },
   "p_f9021d2b": {
    "title": "DOE Fact Sheet: Resource Adequacy Report (Grid Report July 2025)",
    "publisher": "US Department of Energy",
    "url": "https://www.energy.gov/sites/default/files/2025-07/DOE_Fact_Sheet_Grid_Report_July_2025.pdf",
    "date": "2025-07-07",
    "tier": "primary"
   },
   "p_b597e6e3": {
    "title": "BNEF nearly doubles its US data center power forecast to 194GW",
    "publisher": "Tom's Hardware",
    "url": "https://www.tomshardware.com/tech-industry/data-centers/bnef-nearly-doubles-its-us-data-center-power-forecast-to-194gw",
    "date": "2026-07-22",
    "tier": "press"
   },
   "p_33c48a81": {
    "title": "Goldman Sachs expects US data centre power demand to grow 38% in 2026 and 38% in 2027",
    "publisher": "Newsquawk",
    "url": "https://www.newsquawk.com/headlines/goldman-sachs-expects-us-data-centre-power-demand-to-grow-38-in-2026-and-38-in-2027",
    "date": "2026-10-05",
    "tier": "press"
   },
   "p_55ea7efb": {
    "title": "TrendForce forecasts global data center power demand to hit 161 GW in 2026; grid gap to widen from 2028",
    "publisher": "TrendForce",
    "url": "https://www.trendforce.com/presscenter/news/20260916-13237.html",
    "date": "2026-09-16",
    "tier": "primary"
   },
   "p_5a5f68e8": {
    "title": "Cuanto cuesta construir una fabrica de IA: CEO de Nvidia lo calcula (Computex 2026)",
    "publisher": "El Financiero",
    "url": "https://www.elfinanciero.com.mx/economia/2026/06/01/cuanto-cuesta-construir-una-fabrica-de-ia-ceo-de-nvidia-lo-calcula",
    "date": "2026-06-01",
    "tier": "press"
   },
   "p_ac689429": {
    "title": "The great AI power grab: grid bottlenecks, chip shortages and a world not ready (on IEA 'Key Questions on Energy and AI')",
    "publisher": "Thailand Business News",
    "url": "https://thailand-business-news.com/finance/305367-the-great-ai-power-grab-grid-bottlenecks",
    "date": "2026-05-05",
    "tier": "press"
   },
   "p_c30dd105": {
    "title": "US data centre additions return to growth in Q2 2026 as developers push construction and pipeline continues to expand",
    "publisher": "Wood Mackenzie via Energy-Pedia",
    "url": "https://www.energy-pedia.com/news/general/us-data-centre-additions-return-to-growth-in-q2-2026-as-developers-push-construction-and-pipeline-continues-to-expand-205866",
    "date": "2026-10-28",
    "tier": "press"
   },
   "p_88cf0374": {
    "title": "FT: 47 US data center projects cancelled or delayed in 2026; Bernstein judges 35% of pipeline credible",
    "publisher": "AI Weekly (summarising Financial Times)",
    "url": "https://aiweekly.co/fr/alerts/ft-47-projets-de-data-centers-us-annuls-ou-retards-en-2026-bernstein-juge-35-du",
    "date": "2026-10-18",
    "tier": "press"
   },
   "p_a77ec766": {
    "title": "Texas data center interconnections: audit gate and Governor Abbott directive update",
    "publisher": "Pillsbury Winthrop Shaw Pittman",
    "url": "https://www.pillsburylaw.com/en/news-and-insights/texas-data-center-interconnections-audit-gate-governor-abbott-directive-update.html",
    "date": "2026-08-24",
    "tier": "secondary"
   },
   "p_e5aaf484": {
    "title": "AI race may depend more on access to power infrastructure (Morgan Stanley, 'What Power Shortages Mean for Semiconductors')",
    "publisher": "NewKerala / ANI",
    "url": "https://www.newkerala.com/news/a/ai-race-may-depend-more-access-power-infrastructure-978.htm",
    "date": "2026-10-17",
    "tier": "press"
   },
   "p_65f1b2a8": {
    "title": "Morgan Stanley Reports 38 Gigawatt Power Shortfall for AI Data Centers by 2028",
    "publisher": "KuCoin News",
    "url": "https://www.kucoin.com/news/flash/morgan-stanley-reports-38-gigawatt-power-shortfall-for-ai-data-centers-by-2028",
    "date": "2026-08-26",
    "tier": "press"
   },
   "p_60652b55": {
    "title": "Looming US power crunch to impair AI abilities, Schneider says",
    "publisher": "Bloomberg",
    "url": "https://www.bloomberg.com/news/articles/2025-11-26/looming-us-power-crunch-to-impair-ai-abilities-schneider-says",
    "date": "2025-11-26",
    "tier": "press"
   },
   "p_b88bab43": {
    "title": "PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand",
    "publisher": "PJM Inside Lines",
    "url": "https://insidelines.pjm.com/pjm-capacity-auction-procures-138318-mw-of-generation-resources-as-work-continues-to-address-growing-electricity-demand/",
    "date": "2026-07-14",
    "tier": "primary"
   },
   "p_e140ec48": {
    "title": "'A meaningful risk': Oracle's massive 1.3GW Wisconsin AI campus faces severe power delays as grid review restarts",
    "publisher": "TechRadar",
    "url": "https://www.techradar.com/pro/a-meaningful-risk-oracles-massive-1-3-gw-wisconsin-ai-campus-faces-severe-power-delays-as-grid-review-restarts-pushing-customer-delivery-past-2027",
    "date": "2026-10-04",
    "tier": "press"
   },
   "p_babecd61": {
    "title": "Power constraints push Oracle to delay $18 billion data center campus",
    "publisher": "Propmodo",
    "url": "https://propmodo.com/power-constraints-push-oracle-to-delay-18-billion-data-center-campus/",
    "date": "2026-09-27",
    "tier": "press"
   },
   "p_db5bdab8": {
    "title": "Texas data center pause puts US pipeline at risk of delay: BNEF",
    "publisher": "Utility Dive",
    "url": "https://utilitydive.com/news/texas-data-center-pause-puts-us-pipeline-risk-of-delay-bnef/827185",
    "date": "2026-08-06",
    "tier": "press"
   },
   "p_d4409463": {
    "title": "Why half of all planned mega data centers may never be built",
    "publisher": "TechRepublic",
    "url": "https://www.techrepublic.com/article/news-ai-mega-data-centers-delays-cancellations/",
    "date": "2026-01-29",
    "tier": "press"
   },
   "p_f294270b": {
    "title": "Microsoft has AI GPUs sitting in inventory because it lacks the power necessary to install them",
    "publisher": "DatacenterDynamics",
    "url": "https://www.datacenterdynamics.com/en/news/microsoft-has-ai-gpus-sitting-in-inventory-because-it-lacks-the-power-necessary-to-install-them",
    "date": "2025-11",
    "tier": "press"
   },
   "p_38ec3ec7": {
    "title": "CERAWeek: Wait time to connect to the Virginia power grid climbs to 10 years, Google energy exec says",
    "publisher": "Reuters via LongPort",
    "url": "https://longportapp.cn/news/280503250",
    "date": "2026-03-25",
    "tier": "press"
   },
   "p_c818dd24": {
    "title": "How long does it take to power a data center?",
    "publisher": "Electrical Contractor (EC&M) Magazine",
    "url": "https://www.ecmag.com/magazine/articles/article-detail/how-long-does-it-take-to-power-a-data-center",
    "date": "2026-08-17",
    "tier": "press"
   },
   "p_cfa7ca6a": {
    "title": "Foxconn pegs Vera Rubin datacenter cost per gigawatt",
    "publisher": "Let's Data Science (summarising Wccftech)",
    "url": "https://letsdatascience.com/news/foxconn-pegs-vera-rubin-datacenter-cost-per-gigawatt-b65c4e9b",
    "date": "2026-06-20",
    "tier": "press"
   },
   "p_f1ec80ac": {
    "title": "Huang says 10GW project equates to millions of GPUs (CNBC)",
    "publisher": "Texxr / CNBC",
    "url": "https://texxr.com/890488/huang-says-10gw-project-equates-to-millions-of-gpus",
    "date": "2025-09-23",
    "tier": "press"
   },
   "p_fff94e66": {
    "title": "How much does a GW of data center capacity actually cost",
    "publisher": "Investing.com",
    "url": "https://www.investing.com/news/stock-market-news/how-much-does-a-gw-of-data-center-capacity-actually-cost-4314046",
    "date": "2025-11-01",
    "tier": "press"
   },
   "p_f44b7785": {
    "title": "Servers account for 60% of the total cost of ownership of a one-gigawatt AI data center",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data-insights/ai-datacenter-cost-breakdown",
    "date": "2026-05-14",
    "tier": "secondary"
   },
   "p_ada95dfc": {
    "title": "Data centre construction costs rise to $11.3M per MW in 2026",
    "publisher": "Datacentres.com",
    "url": "https://www.datacentres.com/news/data-centre-construction-costs-11m-per-mw",
    "date": "2026-05-12",
    "tier": "press"
   },
   "p_d686c893": {
    "title": "AI Data Center Development Costs in 2026: What Developers and Investors Need to Know",
    "publisher": "COR Advisors",
    "url": "https://www.coradvisors.net/2026/06/ai-data-center-development-costs-2026.html",
    "date": "2026-07-24",
    "tier": "secondary"
   },
   "p_13d1666e": {
    "title": "GPUs account for about 40% of power usage in AI data centers",
    "publisher": "Epoch AI",
    "url": "https://epoch.ai/data-insights/gpus-power-usage-in-ai-data-centers",
    "date": "2025-12-18",
    "tier": "secondary"
   },
   "p_d154d500": {
    "title": "Global data center PUE stalls at 1.54 (Uptime Institute Global Data Center Survey 2025)",
    "publisher": "mGrid",
    "url": "https://mgrid.org/2025/10/01/uptime-institute-data-center-pue-stagnation-2025-liquid-cooling/",
    "date": "2025-10-01",
    "tier": "secondary"
   },
   "p_2b58cfa8": {
    "title": "Can We Build a Five Gigawatt Data Center?",
    "publisher": "Asterisk Magazine",
    "url": "https://asteriskmag.com/issues/09/can-we-build-a-five-gigawatt-data-center",
    "date": "2025-01",
    "tier": "secondary"
   },
   "p_3aca05be": {
    "title": "Projected data center growth spurs PJM capacity prices by factor of 10",
    "publisher": "IEEFA",
    "url": "https://ieefa.org/resources/projected-data-center-growth-spurs-pjm-capacity-prices-factor-10",
    "date": "2025-07-30",
    "tier": "secondary"
   },
   "p_1805fe80": {
    "title": "Report: Data Centers Create About US$6.3 Billion in Electric Costs for PJM Customers",
    "publisher": "Industrial Info Resources",
    "url": "https://www.industrialinfo.com/iirenergy/industry-news/article/report-data-centers-create-about-us63-billion-in-electric-costs-for-pjm-customers--360334",
    "date": "2026-07-17",
    "tier": "press"
   },
   "p_78cd08e5": {
    "title": "PJM data center electricity costs hit $23.1 billion and ratepayers may not get it back",
    "publisher": "Remio",
    "url": "https://www.remio.ai/post/pjm-data-center-electricity-costs-hit-23-1-billion-and-ratepayers-may-not-get-it-back",
    "date": "2026-07-15",
    "tier": "secondary"
   },
   "p_44a4fd67": {
    "title": "Short-Term Energy Outlook: Electricity, coal and renewables (October 2026)",
    "publisher": "US Energy Information Administration",
    "url": "https://www.eia.gov/outlooks/steo/report/elec_coal_renew.php",
    "date": "2026-10-06",
    "tier": "primary"
   },
   "p_b9ebcc7c": {
    "title": "Data centers to push commercial electricity use past residential in 2027: EIA",
    "publisher": "Utility Dive",
    "url": "https://www.utilitydive.com/news/data-centers-electricity-residential-rates-eia/820342/",
    "date": "2026-05-15",
    "tier": "press"
   },
   "p_d435c880": {
    "title": "AI Weekly: Data Center Regulatory Risk (September 23 update)",
    "publisher": "MUFG Americas",
    "url": "https://www.mufgamericas.com/sites/default/files/document/mufgamericas_com/2026-10/AI_Weekly_10_2_Data_Center_Regulatory_Risk.pdf",
    "date": "2026-10-02",
    "tier": "secondary"
   },
   "p_eb1feca7": {
    "title": "Data center backlash widens as Texas freezes 474 GW grid queue",
    "publisher": "Troutman Pepper Locke",
    "url": "https://www.troutman.com/insights/data-center-backlash-widens-as-texas-freezes-474-gw-grid-queue/",
    "date": "2026-08-12",
    "tier": "secondary"
   },
   "p_4c0cd9fb": {
    "title": "Oracle Cites Force Majeure to Shield Itself on Data Center",
    "publisher": "Bloomberg via Bloomberg Government",
    "url": "https://news.bgov.com/artificial-intelligence/oracle-cites-force-majeure-to-shield-itself-on-big-data-center",
    "date": "2026-09-24",
    "tier": "press"
   },
   "p_57d9461c": {
    "title": "Oracle sends force majeure notice on its New Mexico Stargate data center",
    "publisher": "TechCrunch",
    "url": "https://techcrunch.com/2026/09/24/oracle-sends-force-majeure-notice-on-its-new-mexico-stargate-data-center/",
    "date": "2026-09-24",
    "tier": "press"
   },
   "p_824cff36": {
    "title": "Market Notice M-A080326-01: Update Regarding Batch Zero Timelines and Processes",
    "publisher": "ERCOT",
    "url": "https://www.ercot.com/services/comm/mkt_notices/M-A080326-01",
    "date": "2026-08-03",
    "tier": "primary"
   },
   "p_b2c4e243": {
    "title": "Market Notice M-A080326-02: PUC Approval of Good Cause Exceptions Relating To Batch Zero Process",
    "publisher": "ERCOT",
    "url": "https://www.ercot.com/services/comm/mkt_notices/M-A080326-02",
    "date": "2026-08-21",
    "tier": "primary"
   }
  },
  "note": "Sources and uses of AI gigawatts. sites: physical campuses (gw = planned size, now_gw = running today, gw_basis says computing load or grid draw). deals: chip and cloud deals sized in GW, never added to sites. supply: power deals tied to AI buyers. firm=false means an up-to or optional amount. source is a key into sources."
 },
 "permission": {
  "rows": [
   {
    "id": "P001",
    "group": "sell",
    "needs": {
     "name": "Anthropic",
     "ids": [
      "anthropic"
     ]
    },
    "grants": {
     "name": "US Commerce (BIS)",
     "ids": [
      "us-commerce"
     ]
    },
    "for_what": "Selling Fable 5 to customers",
    "status": "restored",
    "last_record": "2026-07-01",
    "record": "On June 12, 2026 a Commerce directive requiring export licenses for foreign access took effect immediately. Anthropic switched the model off for all customers the same day. Controls were lifted June 30 and access was restored July 1.",
    "what_it_takes_to_pull": "A Commerce directive, effective immediately. The model went dark for every customer, not only foreign ones.",
    "what_rides_on_it": "All customer access to the model from June 12 until access was restored July 1. Revenue effect not disclosed.",
    "basis": "stated",
    "sources": [
     {
      "title": "Commerce restricted access to Anthropic's latest models: what comes next",
      "publisher": "CSIS",
      "url": "https://www.csis.org/analysis/department-commerce-restricted-access-anthropics-latest-models-what-comes-next",
      "date": "2026-06-16",
      "tier": "press"
     },
     {
      "title": "Statement on Fable and Mythos access",
      "publisher": "Anthropic",
      "url": "https://www.anthropic.com/news/fable-mythos-access",
      "date": "2026-07-01",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P002",
    "group": "sell",
    "needs": {
     "name": "Anthropic",
     "ids": [
      "anthropic"
     ]
    },
    "grants": {
     "name": "US government",
     "ids": []
    },
    "for_what": "Selling Mythos 5 to customers",
    "status": "conditional",
    "last_record": "2026-07-01",
    "record": "Switched off with Fable 5 on June 12, 2026. Returned July 1 for selected US organizations, following US government approval. The record does not say who selected them.",
    "what_it_takes_to_pull": "The same directive.",
    "what_rides_on_it": "Access for every customer outside the selected US organizations. Revenue effect not disclosed.",
    "basis": "stated",
    "sources": [
     {
      "title": "Commerce restricted access to Anthropic's latest models: what comes next",
      "publisher": "CSIS",
      "url": "https://www.csis.org/analysis/department-commerce-restricted-access-anthropics-latest-models-what-comes-next",
      "date": "2026-06-16",
      "tier": "press"
     },
     {
      "title": "Statement on Fable and Mythos access",
      "publisher": "Anthropic",
      "url": "https://www.anthropic.com/news/fable-mythos-access",
      "date": "2026-07-01",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P003",
    "group": "sell",
    "needs": {
     "name": "Anthropic",
     "ids": [
      "anthropic"
     ]
    },
    "grants": {
     "name": "Pentagon",
     "ids": [
      "pentagon"
     ]
    },
    "for_what": "Standing as a supplier to the US military",
    "status": "blocked",
    "last_record": "2026-10-13",
    "record": "The Pentagon labeled Anthropic a supply chain risk. An appeals court upheld the label 2-1 on September 25, 2026. On October 13 Anthropic asked the court to rehear the case.",
    "what_it_takes_to_pull": "A government label, tested in court and left standing.",
    "what_rides_on_it": "Not disclosed.",
    "basis": "stated",
    "sources": [
     {
      "title": "Appeals court declines to block Pentagon blacklisting of Anthropic",
      "publisher": "ABC News",
      "url": "https://abcnews.com/Business/anthropic-appeals-court-declines-block-pentagon-blacklisting/story?id=136755690",
      "date": "2026-09-25",
      "tier": "press"
     },
     {
      "title": "Anthropic seeks rehearing of case over Pentagon's security risk branding",
      "publisher": "Reuters (via The Star)",
      "url": "https://www.thestar.com.my/tech/tech-news/2026/10/14/anthropic-seeks-rehearing-of-case-over-pentagon039s-security-risk-branding",
      "date": "2026-10-13",
      "tier": "press"
     }
    ]
   },
   {
    "id": "P004",
    "group": "sell",
    "needs": {
     "name": "Nvidia",
     "ids": [
      "nvidia"
     ]
    },
    "grants": {
     "name": "US Commerce (BIS)",
     "ids": [
      "us-commerce"
     ]
    },
    "for_what": "Selling H200 chips to China",
    "status": "conditional",
    "last_record": "2026-08-26",
    "record": "Beginning in February 2026 the US government granted licenses to ship small amounts of H200 chips to specific customers in China. Each chip must pass a US inspection before it ships. Nvidia says it has made only a fraction of the shipments allowed.",
    "what_it_takes_to_pull": "US export licenses, granted customer by customer.",
    "what_rides_on_it": "H200 shipments under the licenses were less than 1% of Nvidia's data-center revenue in the quarter ended July 26, 2026, and Nvidia took a $0.4 billion charge for excess H200 inventory and purchase obligations in the first half of its fiscal year (filing figures).",
    "basis": "stated",
    "sources": [
     {
      "title": "Form 10-Q for the quarter ended July 26, 2026",
      "publisher": "Nvidia (SEC filing)",
      "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000075/nvda-20260726.htm",
      "date": "2026-08-26",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P005",
    "group": "sell",
    "needs": {
     "name": "Nvidia",
     "ids": [
      "nvidia"
     ]
    },
    "grants": {
     "name": "US Commerce (BIS)",
     "ids": [
      "us-commerce"
     ]
    },
    "for_what": "Selling Blackwell and Rubin chips to China",
    "status": "blocked",
    "last_record": "2026-11-10",
    "record": "US licensing requirements in place since October 2023 cover Nvidia's Blackwell products, including the B200 and GB200, Nvidia's filing says. Press reporting in November 2026 describes both Blackwell and the newer Rubin chips as banned from export to China.",
    "what_it_takes_to_pull": "US export licensing rules.",
    "what_rides_on_it": "Nvidia says it was effectively shut out of China's market for data-center computing as of July 26, 2026 (filing).",
    "basis": "stated",
    "sources": [
     {
      "title": "Form 10-Q for the quarter ended July 26, 2026",
      "publisher": "Nvidia (SEC filing)",
      "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000075/nvda-20260726.htm",
      "date": "2026-08-26",
      "tier": "primary"
     },
     {
      "title": "How China gets the Nvidia chips it needs to develop AI despite US bans",
      "publisher": "Malay Mail",
      "url": "https://www.malaymail.com/news/money/2026/11/10/how-china-gets-the-nvidia-chips-it-needs-to-develop-ai-despite-us-bans/242726",
      "date": "2026-11-10",
      "tier": "press"
     }
    ]
   },
   {
    "id": "P006",
    "group": "sell",
    "needs": {
     "name": "Nvidia",
     "ids": [
      "nvidia"
     ]
    },
    "grants": {
     "name": "China regulators",
     "ids": [
      "china-gov"
     ]
    },
    "for_what": "Delivering H200 chips into mainland China",
    "status": "conditional",
    "last_record": "2026-11-05",
    "record": "China's customs stopped H200 shipments in January 2026. Nvidia's August filing says the Chinese government restricted the sales, so it could not sell all the chips it holds US licenses for. Reuters reported on November 5, 2026 that China has let some chips in while withholding approval for large-volume imports.",
    "what_it_takes_to_pull": "Import approval withheld by the Chinese government.",
    "what_rides_on_it": "About 600,000 H200 chips stored in Hong Kong awaiting shipment (outside estimate: Reuters, citing two people familiar with the matter).",
    "basis": "stated",
    "sources": [
     {
      "title": "China customs blocks Nvidia H200",
      "publisher": "Taipei Times",
      "url": "https://www.taipeitimes.com/News/biz/archives/2026/01/15/2003850605",
      "date": "2026-01-15",
      "tier": "press"
     },
     {
      "title": "Form 10-Q for the quarter ended July 26, 2026",
      "publisher": "Nvidia (SEC filing)",
      "url": "https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000075/nvda-20260726.htm",
      "date": "2026-08-26",
      "tier": "primary"
     },
     {
      "title": "Nvidia chips pile up in Hong Kong as China withholds import approval",
      "publisher": "Reuters (via The Express Tribune)",
      "url": "https://tribune.com.pk/story/2638831/nvidia-chips-pile-up-in-hong-kong-as-china-withholds-import-approval",
      "date": "2026-11-05",
      "tier": "press"
     }
    ]
   },
   {
    "id": "P007",
    "group": "sell",
    "needs": {
     "name": "Providers of general-purpose AI models in the EU, including OpenAI and Mistral",
     "ids": [
      "openai",
      "mistral"
     ]
    },
    "grants": {
     "name": "EU AI Office",
     "ids": [
      "eu-ai-office"
     ]
    },
    "for_what": "Offering general-purpose models in the EU",
    "status": "conditional",
    "last_record": "2026-10-26",
    "record": "The Commission's enforcement powers over AI Act obligations for providers of the most advanced models entered into application on August 2, 2026, a year after the obligations began to apply. The AI Office has since sent its first information requests to model makers; our record does not name the recipients. The official source names no company: listing OpenAI and Mistral as covered providers is our inference.",
    "what_it_takes_to_pull": "The AI Office can request information, test a model, require fixes, and ask a provider to restrict, withdraw or recall a model.",
    "what_rides_on_it": "Fines of up to 3% of global annual turnover.",
    "basis": "inferred",
    "sources": [
     {
      "title": "The Commission's enforcement powers related to AI Act obligations for providers of the most advanced models",
      "publisher": "European Commission, AI Act Service Desk",
      "url": "https://ai-act-service-desk.ec.europa.eu/en/ai-act/faq/commissions-enforcement-powers-related-ai-act-obligations-providers-most-advanced-models",
      "date": "2026",
      "tier": "primary"
     },
     {
      "title": "EU AI Act: the AI Office sends its first requests for information to leading AI developers",
      "publisher": "Reed Smith",
      "url": "https://www.reedsmith.com/our-insights/blogs/technology-law-dispatch/102o6as/eu-ai-act-the-ai-office-sends-its-first-requests-for-information-to-leading-ai/",
      "date": "2026-10-26",
      "tier": "secondary"
     }
    ]
   },
   {
    "id": "P008",
    "group": "sell",
    "needs": {
     "name": "Exporters of advanced AI technology from China",
     "ids": []
    },
    "grants": {
     "name": "China regulators (Ministry of Commerce)",
     "ids": [
      "china-gov"
     ]
    },
    "for_what": "Exporting AI technology that China proposes to put on its export catalogue",
    "status": "pending",
    "last_record": "2026-10-16",
    "record": "Still pending: on October 16, 2026 China's commerce and science ministries proposed adding 40 technologies to the catalogue of technologies banned or restricted from export, 23 of them in AI: large models, agents, computing clusters and information processing. Comment is open to November 15. Technology already public through open source or academic papers is left out. The revised catalogue has not been issued.",
    "what_it_takes_to_pull": "A listing on China's export catalogue, not yet final.",
    "what_rides_on_it": "Not disclosed.",
    "basis": "stated",
    "sources": [
     {
      "title": "Announcement No. 48 of 2026: public comment on revising the catalogue of technologies banned or restricted from export, with interim registration",
      "publisher": "China Ministry of Commerce",
      "url": "https://www.mofcom.gov.cn/zwgk/zcfb/art/2026/art_0a31a3c9ac404f7a9b0e917ce3412997.html",
      "date": "2026-10-16",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P008A",
    "group": "sell",
    "needs": {
     "name": "Exporters of advanced AI technology from China",
     "ids": []
    },
    "grants": {
     "name": "China regulators (Ministry of Commerce)",
     "ids": [
      "china-gov"
     ]
    },
    "for_what": "Exporting technology on the proposed list, subject to registration first",
    "status": "conditional",
    "last_record": "2026-10-16",
    "record": "In force since October 16, 2026: exporters must register on the commerce ministry's platform before exporting any technology on the proposed list, including exports already under way. Registration covers transfers of ownership abroad, licenses for use abroad and changes of control to a foreign party. It applies until the revised catalogue takes effect. The announcement describes it as registration, not as a license or an approval.",
    "what_it_takes_to_pull": "An interim rule issued with the proposal and effective the same day.",
    "what_rides_on_it": "Not disclosed.",
    "basis": "stated",
    "sources": [
     {
      "title": "Announcement No. 48 of 2026: public comment on revising the catalogue of technologies banned or restricted from export, with interim registration",
      "publisher": "China Ministry of Commerce",
      "url": "https://www.mofcom.gov.cn/zwgk/zcfb/art/2026/art_0a31a3c9ac404f7a9b0e917ce3412997.html",
      "date": "2026-10-16",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P009",
    "group": "build",
    "needs": {
     "name": "Builders of new hyperscale data centers in New York",
     "ids": []
    },
    "grants": {
     "name": "New York State",
     "ids": [
      "new-york"
     ]
    },
    "for_what": "Building new sites over 50 MW",
    "status": "blocked",
    "last_record": "2026-07-14",
    "record": "First statewide moratorium, launched July 14, 2026: a pause of up to one year on discretionary environmental permits for projects over 50 MW.",
    "what_it_takes_to_pull": "A state moratorium.",
    "what_rides_on_it": "Not disclosed.",
    "basis": "stated",
    "sources": [
     {
      "title": "Governor Hochul launches first statewide moratorium on new hyperscale data centers",
      "publisher": "New York State Governor's Office",
      "url": "https://www.governor.ny.gov/news/first-statewide-moratorium-new-hyperscale-data-centers-launched-governor-kathy-hochul",
      "date": "2026-07-14",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P010",
    "group": "build",
    "needs": {
     "name": "Data centers waiting for a grid connection in Texas",
     "ids": []
    },
    "grants": {
     "name": "ERCOT and the Texas regulator",
     "ids": [
      "ercot"
     ]
    },
    "for_what": "Connecting to the Texas grid",
    "status": "conditional",
    "last_record": "2026-10-19",
    "record": "On August 3, 2026 the governor directed ERCOT, the Texas grid operator, to verify data-center projects before advancing them. ERCOT said the same day it would not issue the large-load classifications due August 7. On August 20 the state regulator excused the missed deadline and let ERCOT classify large loads conditionally. On September 18 the regulator adopted a rule setting interconnection standards, including capital contributions and financial security, for qualifying new and expanded large-load interconnections at a single ERCOT site. Separately from grid connection, on September 21 the governor directed the state environmental agency, TCEQ, to halt issuing permits sought by data centers pending grid and water audits; TCEQ said on October 19 that it had paused issuance for covered infrastructure and was screening pending applications.",
    "what_it_takes_to_pull": "A governor's directive.",
    "what_rides_on_it": "About 49.8 GW of projects touched by the August grid-classification pause (outside estimate, BNEF). No estimate for the September permit directive.",
    "basis": "stated",
    "sources": [
     {
      "title": "Market Notice M-A080326-01: Update Regarding Batch Zero Timelines and Processes",
      "publisher": "ERCOT",
      "url": "https://www.ercot.com/services/comm/mkt_notices/M-A080326-01",
      "date": "2026-08-03",
      "tier": "primary"
     },
     {
      "title": "Market Notice M-A080326-02: PUC Approval of Good Cause Exceptions Relating To Batch Zero Process",
      "publisher": "ERCOT",
      "url": "https://www.ercot.com/services/comm/mkt_notices/M-A080326-02",
      "date": "2026-08-21",
      "tier": "primary"
     },
     {
      "title": "Texas data center pause puts US pipeline at risk of delay: BNEF",
      "publisher": "Utility Dive",
      "url": "https://utilitydive.com/news/texas-data-center-pause-puts-us-pipeline-risk-of-delay-bnef/827185",
      "date": "2026-08-06",
      "tier": "press"
     },
     {
      "title": "16 TAC §25.194, large load interconnection standards (Project No. 58481), adopted rule",
      "publisher": "Texas Register",
      "url": "https://www.sos.state.tx.us/texreg/pdf/backview/1002/1002adop.pdf",
      "date": "2026-10-02",
      "tier": "primary"
     },
     {
      "title": "Governor Abbott directs TCEQ to halt data center permits",
      "publisher": "Office of the Texas Governor",
      "url": "https://gov.texas.gov/news/post/governor-abbott-directs-tceq-to-halt-data-center-permits",
      "date": "2026-09-21",
      "tier": "primary"
     },
     {
      "title": "TCEQ response to the governor's data center directive",
      "publisher": "Texas Commission on Environmental Quality",
      "url": "https://www.tceq.texas.gov/downloads/response/tceq-response-gov-abbott-dc-directive.pdf",
      "date": "2026-10-19",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P011",
    "group": "build",
    "needs": {
     "name": "Large new loads in six US grid regions",
     "ids": []
    },
    "grants": {
     "name": "FERC, through six grid operators",
     "ids": [
      "ferc",
      "pjm"
     ]
    },
    "for_what": "Connecting large loads to the grid",
    "status": "pending",
    "last_record": "2026-06-18",
    "record": "FERC ordered six grid operators to justify or rewrite their rules for connecting large loads.",
    "what_it_takes_to_pull": "A federal regulator's order.",
    "what_rides_on_it": "Not disclosed.",
    "basis": "stated",
    "sources": [
     {
      "title": "FERC acts to advance data center large-load integration",
      "publisher": "Duane Morris",
      "url": "https://www.duanemorris.com/alerts/ferc_acts_advance_data_center_large_load_integration_six_rto_regions_0626.html",
      "date": "2026-06-18",
      "tier": "press"
     }
    ]
   },
   {
    "id": "P012",
    "group": "build",
    "needs": {
     "name": "Meta (Hyperion campus, Louisiana)",
     "ids": [
      "meta"
     ]
    },
    "grants": {
     "name": "Louisiana Public Service Commission",
     "ids": []
    },
    "for_what": "Seven more gas plants to power the campus",
    "status": "pending",
    "last_record": "2026-11-09",
    "record": "Three Entergy gas plants were approved in August 2025. The plan tripled in March 2026 to ten plants. In April 2026 the commission voted 4-1 to fast-track the request for the other seven, with its vote set for December 2026.",
    "what_it_takes_to_pull": "A state commission vote not yet taken.",
    "what_rides_on_it": "5.25 GW of planned power (our arithmetic: the 7.5 GW plan less the 2.25 GW approved).",
    "basis": "stated",
    "sources": [
     {
      "title": "Louisiana greenlights massive power projects for Meta data center",
      "publisher": "Industrial Info Resources",
      "url": "https://www.industrialinfo.com/news/article/louisiana-greenlights-massive-power-projects-for-meta-data-center--345274",
      "date": "2025-08",
      "tier": "press"
     },
     {
      "title": "Meta triples order of gas-fired power plants for its AI campus in Louisiana",
      "publisher": "The Lens",
      "url": "https://thelensnola.org/2026/03/30/meta-triples-order-of-gas-fired-power-plants-for-its-ai-campus-in-louisiana/",
      "date": "2026-04-03",
      "tier": "press"
     },
     {
      "title": "LPSC approves request by Entergy Louisiana to fast-track gas power plant construction plan for Meta's Richland Parish data center",
      "publisher": "Louisiana Radio Network",
      "url": "https://louisianaradionetwork.com/2026/04/16/46165/",
      "date": "2026-04-16",
      "tier": "press"
     },
     {
      "title": "Entergy wants their land for Meta's power lines. They're suing the regulators approving them",
      "publisher": "WWNO (via KRVS)",
      "url": "https://www.krvs.org/louisiana-news/2026-11-09/entergy-wants-their-land-for-metas-power-lines-theyre-suing-the-regulators-approving-them",
      "date": "2026-11-09",
      "tier": "press"
     }
    ]
   },
   {
    "id": "P013",
    "group": "build",
    "needs": {
     "name": "Oracle and Vantage (Port Washington campus, Wisconsin)",
     "ids": [
      "oracle"
     ]
    },
    "grants": {
     "name": "Wisconsin's state regulator",
     "ids": []
    },
    "for_what": "A transmission line to power the campus",
    "status": "pending",
    "last_record": "2026-10-04",
    "record": "The regulator closed the transmission-line case after the utility kept changing its filing. The utility refiled September 18, 2026, restarting the review clock. Partial power is now expected about June 2028 and the full 1.3 GW about April 2029.",
    "what_it_takes_to_pull": "A regulator's review clock.",
    "what_rides_on_it": "1.3 GW of grid draw.",
    "basis": "stated",
    "sources": [
     {
      "title": "'A meaningful risk': Oracle's massive 1.3GW Wisconsin AI campus faces severe power delays as grid review restarts",
      "publisher": "TechRadar",
      "url": "https://www.techradar.com/pro/a-meaningful-risk-oracles-massive-1-3-gw-wisconsin-ai-campus-faces-severe-power-delays-as-grid-review-restarts-pushing-customer-delivery-past-2027",
      "date": "2026-10-04",
      "tier": "press"
     }
    ]
   },
   {
    "id": "P014",
    "group": "sell",
    "needs": {
     "name": "Synopsys",
     "ids": [
      "synopsys"
     ]
    },
    "grants": {
     "name": "US Commerce (BIS)",
     "ids": [
      "us-commerce"
     ]
    },
    "for_what": "Rescission of the license requirement Commerce placed on Synopsys in May 2025",
    "status": "restored",
    "last_record": "2026-08-26",
    "record": "On May 29, 2025 Commerce sent Synopsys a letter requiring a license to export, re-export or transfer chip-design (EDA) software and technology in two export-control categories (3D991 and 3E991) whenever a party to the deal is in China or is a Chinese military end user anywhere. On July 2, 2025 Commerce told Synopsys that requirement was rescinded, effective immediately. The rescission lifted that one requirement; it is not a general exemption, and other US export rules on chip-design software still apply. Synopsys's filing for the quarter ended July 31, 2026 still reports the effect: the rescinded restrictions hurt its business in China and may keep affecting it.",
    "what_it_takes_to_pull": "A letter from Commerce, in both directions.",
    "what_rides_on_it": "No dollar figure disclosed. Synopsys says the restrictions negatively affected its China business, including its design IP segment (filing).",
    "basis": "stated",
    "sources": [
     {
      "title": "Form 10-Q for the quarter ended July 31, 2025",
      "publisher": "Synopsys (SEC filing)",
      "url": "https://www.sec.gov/Archives/edgar/data/883241/000088324125000024/snps-20250731.htm",
      "date": "2025",
      "tier": "primary"
     },
     {
      "title": "Synopsys Issues Statement in Connection to the Lifting of Recent U.S. Export Restrictions Related to China",
      "publisher": "Synopsys",
      "url": "https://news.synopsys.com/2025-07-02-Synopsys-Issues-Statement-in-Connection-to-the-Lifting-of-Recent-U-S-Export-Restrictions-Related-to-China",
      "date": "2025-07-02",
      "tier": "primary"
     },
     {
      "title": "Form 10-Q for the quarter ended July 31, 2026",
      "publisher": "Synopsys (SEC filing)",
      "url": "https://www.sec.gov/Archives/edgar/data/0000883241/000088324126000025/snps-20260731.htm",
      "date": "2026-08-26",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P015",
    "group": "sell",
    "needs": {
     "name": "Salesforce",
     "ids": [
      "salesforce"
     ]
    },
    "grants": {
     "name": "US government (FedRAMP)",
     "ids": []
    },
    "for_what": "Using Agentforce AI agents inside Government Cloud Plus, Salesforce's FedRAMP High environment",
    "status": "granted",
    "last_record": "2026-11-10",
    "record": "The FedRAMP Marketplace lists Salesforce Government Cloud Plus as FedRAMP Certified at the High level (Class D), certified since May 27, 2020, with 67 authorization letters on record as of November 10, 2026. The Marketplace record does not name Agentforce. Salesforce announced on June 4, 2025 that Agentforce had achieved FedRAMP High authorization, and its help page says Agentforce in Government Cloud Plus is FedRAMP High authorized.",
    "what_it_takes_to_pull": "A federal security authorization for the environment the agents run in.",
    "what_rides_on_it": "Not disclosed.",
    "basis": "stated",
    "sources": [
     {
      "title": "FedRAMP Marketplace: Salesforce Government Cloud Plus (package FR2003061248)",
      "publisher": "FedRAMP",
      "url": "https://www.fedramp.gov/marketplace/products/FR2003061248/",
      "date": "2026-11-10",
      "tier": "primary"
     },
     {
      "title": "Salesforce products, including Agentforce, now FedRAMP High authorized",
      "publisher": "Salesforce",
      "url": "https://www.salesforce.com/news/stories/fedramp-high-agentforce-salesforce-platform/",
      "date": "2025-06-04",
      "tier": "primary"
     },
     {
      "title": "Agentforce in Government Cloud",
      "publisher": "Salesforce Help",
      "url": "https://help.salesforce.com/s/articleView?id=ind.government_cloud_agentforce.htm&language=en_US&type=5",
      "date": "2026",
      "tier": "primary"
     },
     {
      "title": "Salesforce's AI agents receive FedRAMP high authorization",
      "publisher": "Nextgov/FCW",
      "url": "https://www.nextgov.com/artificial-intelligence/2025/06/salesforces-ai-agent-receives-fedramp-high-authorization/405798/",
      "date": "2025-06-04",
      "tier": "press"
     }
    ]
   },
   {
    "id": "P016",
    "group": "sell",
    "needs": {
     "name": "ServiceNow",
     "ids": [
      "servicenow"
     ]
    },
    "grants": {
     "name": "US government (FedRAMP and the Defense Department)",
     "ids": []
    },
    "for_what": "Running AI agents inside ServiceNow's two authorized government clouds",
    "status": "granted",
    "last_record": "2026-03-05",
    "record": "ServiceNow's Government Community Cloud holds a FedRAMP High authorization (since August 2019) and a Defense Department Impact Level 4 authorization (since October 2019). Its National Security Cloud holds a Defense Department Impact Level 5 provisional authorization. ServiceNow said on March 5, 2026 that its Autonomous Workforce was available in both clouds; on that date the first AI specialist was in controlled availability, with general release expected in the second quarter of 2026. ServiceNow says Moveworks, its AI assistant, is authorized at FedRAMP Moderate.",
    "what_it_takes_to_pull": "Federal security authorizations for the two environments.",
    "what_rides_on_it": "Not disclosed.",
    "basis": "stated",
    "sources": [
     {
      "title": "ServiceNow AI Platform compliance",
      "publisher": "ServiceNow",
      "url": "https://www.servicenow.com/company/trust/compliance.html",
      "date": "2026",
      "tier": "primary"
     },
     {
      "title": "ServiceNow powers government reinvention with trusted AI that drives mission-critical outcomes at scale",
      "publisher": "ServiceNow",
      "url": "https://newsroom.servicenow.com/press-releases/details/2026/ServiceNow-powers-government-reinvention-with-trusted-AI-that-drives-mission-critical-outcomes-at-scale/default.aspx",
      "date": "2026-03-05",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P017",
    "group": "buy",
    "needs": {
     "name": "SoftBank",
     "ids": []
    },
    "grants": {
     "name": "US and foreign regulators",
     "ids": []
    },
    "for_what": "Buying DigitalBridge, an investor in data centers and other digital infrastructure",
    "status": "granted",
    "last_record": "2026-09-30",
    "record": "DigitalBridge's proxy statement listed the approvals the deal needed. In the United States: antitrust clearance, the Committee on Foreign Investment in the United States, the FCC, FERC and state utility commissions. Abroad: antitrust reviews in the European Union, Australia, Japan and Mexico, the EU's foreign-subsidies review, foreign-investment reviews in fourteen countries including the United Kingdom, Germany, France and Canada, and financial regulators in the United Kingdom and Singapore. On September 22, 2026 DigitalBridge announced that all required approvals had been received, naming FERC and the foreign-investment committee. SoftBank completed the purchase on September 30, 2026.",
    "what_it_takes_to_pull": "Approvals from regulators in more than a dozen countries.",
    "what_rides_on_it": "About $3.1 billion, at $16.00 per share in cash (company figures).",
    "basis": "stated",
    "sources": [
     {
      "title": "DigitalBridge definitive proxy statement for the SoftBank mergers (DEFM14A)",
      "publisher": "DigitalBridge (SEC filing)",
      "url": "https://www.sec.gov/Archives/edgar/data/1679688/000110465926033634/tm267669-2_defm14a.htm",
      "date": "2026",
      "tier": "primary"
     },
     {
      "title": "DigitalBridge Receives All Regulatory Approvals Required to Complete Acquisition by SoftBank Group Corp.",
      "publisher": "DigitalBridge",
      "url": "https://ir.digitalbridge.com/news-releases/news-release-details/digitalbridge-receives-all-regulatory-approvals-required",
      "date": "2026-09-22",
      "tier": "primary"
     },
     {
      "title": "Completion of Acquisition of DigitalBridge",
      "publisher": "SoftBank Group",
      "url": "https://group.softbank/en/news/press/20260930",
      "date": "2026-09-30",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P018",
    "group": "buy",
    "needs": {
     "name": "Nvidia",
     "ids": [
      "nvidia"
     ]
    },
    "grants": {
     "name": "Regulators",
     "ids": []
    },
    "for_what": "Buying Hugging Face",
    "status": "pending",
    "last_record": "2026-09-02",
    "record": "Nvidia agreed on September 2, 2026 to buy Hugging Face. Closing is expected in the first half of 2027 and depends on required regulatory approvals.",
    "what_it_takes_to_pull": "Regulatory approvals not yet given.",
    "what_rides_on_it": "About $11.9 billion, plus up to about $1.0 billion of stock-based retention (filing figure).",
    "basis": "stated",
    "sources": [
     {
      "title": "NVIDIA Form 8-K (agreement to acquire Hugging Face)",
      "publisher": "NVIDIA (SEC filing)",
      "url": "https://www.sec.gov/Archives/edgar/data/1045810/000104581026000078/nvda-20260902.htm",
      "date": "2026-09-02",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P019",
    "group": "build",
    "needs": {
     "name": "CoreWeave",
     "ids": [
      "coreweave"
     ]
    },
    "grants": {
     "name": "ERCOT and the Texas regulator",
     "ids": [
      "ercot"
     ]
    },
    "for_what": "Moving its Texas data-center projects forward",
    "status": "conditional",
    "last_record": "2026-08-18",
    "record": "On August 18, 2026 the Texas governor's office said CoreWeave had committed to comply with the governor's data-center standards. Under them the state regulator and the grid operator must receive and audit each project's information before it moves forward, and a company that fails the audit will have its approval denied.",
    "what_it_takes_to_pull": "A state audit each project must pass.",
    "what_rides_on_it": "Not disclosed.",
    "basis": "stated",
    "sources": [
     {
      "title": "Governor Abbott Announces Power House Data Centers, CoreWeave And Emergent Data Centers Commit To Comply With His Data Centers Standards",
      "publisher": "Office of the Texas Governor",
      "url": "https://gov.texas.gov/news/post/governor-abbott-announces-power-house-data-centers-coreweave-and-emergent-data-centers-commit-to-comply-with-his-data-centers-standards",
      "date": "2026-08-18",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P020",
    "group": "build",
    "needs": {
     "name": "Amazon",
     "ids": [
      "amazon"
     ]
    },
    "grants": {
     "name": "FERC",
     "ids": [
      "ferc"
     ]
    },
    "for_what": "Raising the direct supply from the Susquehanna nuclear plant, Pennsylvania, by 180 MW",
    "status": "blocked",
    "last_record": "2026-08-05",
    "record": "On November 1, 2024 FERC rejected an amended grid agreement (189 FERC ¶ 61,078) that would have raised the direct, co-located supply to Amazon's data center beside the plant from 300 MW to 480 MW. The vote was 2-1. That increase remains blocked. Separately, in June 2025 Talen, the plant's majority owner, and Amazon signed a revised agreement under which Talen expects to supply up to 1,920 MW through the grid through 2042, phased in over several years. Talen's filing for the quarter ended June 30, 2026 says the switch to the revised agreement took place in April 2026.",
    "what_it_takes_to_pull": "A vote by the federal power regulator.",
    "what_rides_on_it": "180 MW of added direct supply (our arithmetic: 480 MW less 300 MW). Separately, Talen estimates about $18 billion of revenue over the life of the replacement agreement at full quantity (company estimate).",
    "basis": "stated",
    "sources": [
     {
      "title": "Order Rejecting Amendments to Interconnection Service Agreement, 189 FERC ¶ 61,078 (Dockets ER24-2172-000 and -001)",
      "publisher": "FERC",
      "url": "https://www.ferc.gov/sites/default/files/2024-11/20241101-3061_ER24-2172-000.pdf",
      "date": "2024-11-01",
      "tier": "primary"
     },
     {
      "title": "FERC rejects interconnection pact for Talen-Amazon data center deal at nuclear plant",
      "publisher": "Utility Dive",
      "url": "https://www.utilitydive.com/news/ferc-interconnection-isa-talen-amazon-data-center-susquehanna-exelon/731841/",
      "date": "2024-11-04",
      "tier": "press"
     },
     {
      "title": "Talen to sell Amazon 1.9 GW from Susquehanna nuclear plant",
      "publisher": "Utility Dive",
      "url": "https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-centert/750440/",
      "date": "2025-06-11",
      "tier": "press"
     },
     {
      "title": "Form 10-Q for the quarter ended June 30, 2026",
      "publisher": "Talen Energy (SEC filing)",
      "url": "https://www.sec.gov/Archives/edgar/data/0001622536/000162253626000066/tln-20260630.htm",
      "date": "2026-08-05",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P021",
    "group": "build",
    "needs": {
     "name": "NextEra, for Google (Duane Arnold nuclear restart, Iowa)",
     "ids": [
      "google"
     ]
    },
    "grants": {
     "name": "Nuclear Regulatory Commission",
     "ids": []
    },
    "for_what": "Restarting the reactor that will supply Google",
    "status": "pending",
    "last_record": "2026-09-08",
    "record": "NextEra is restarting the plant under a 25-year power contract with Google. On April 23, 2026 the NRC opened a hearing opportunity on the license changes needed to restart, and said it had not yet decided. The Energy Department closed a loan of up to $1.9 billion for the restart on September 8, 2026. The NRC's licensing decision is still pending.",
    "what_it_takes_to_pull": "A federal license decision not yet made.",
    "what_rides_on_it": "About 615 MW on a 25-year contract.",
    "basis": "stated",
    "sources": [
     {
      "title": "NRC Announces Opportunity to Request Hearing for Duane Arnold Energy Center Restart License Amendments (No. 26-045)",
      "publisher": "US Nuclear Regulatory Commission",
      "url": "https://www.nrc.gov/sites/default/files/cdn/doc-collection-news/2026/26-045.pdf",
      "date": "2026-04-23",
      "tier": "primary"
     },
     {
      "title": "Energy Department Closes $1.9 Billion Loan to Restart Duane Arnold Nuclear Plant",
      "publisher": "U.S. Department of Energy",
      "url": "https://www.energy.gov/articles/energy-department-closes-19-billion-loan-restart-duane-arnold-nuclear-plant",
      "date": "2026-09-08",
      "tier": "primary"
     },
     {
      "title": "NextEra's AI bet: Google, Meta, and more gas",
      "publisher": "Latitude Media",
      "url": "https://www.latitudemedia.com/news/nexteras-ai-bet-google-meta-and-more-gas/",
      "date": "2025-12-08",
      "tier": "press"
     },
     {
      "title": "Duane Arnold",
      "publisher": "US Department of Energy",
      "url": "https://www.energy.gov/edf/duane-arnold",
      "date": "2026",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "P022",
    "group": "build",
    "needs": {
     "name": "Constellation, the applicant (Crane nuclear restart; Microsoft is the power customer)",
     "ids": [
      "constellation",
      "microsoft"
     ]
    },
    "grants": {
     "name": "FERC",
     "ids": [
      "ferc"
     ]
    },
    "for_what": "A waiver to move grid-connection rights to the reactor Constellation plans to restart",
    "status": "granted",
    "last_record": "2026-06-01",
    "record": "On June 1, 2026 FERC granted Constellation a one-time, limited waiver of the grid operator's rules (195 FERC ¶ 61,162, Docket ER26-2028-000). It lets Constellation move 760 MW of grid-connection rights from Eddystone Units 3 and 4 to the Crane Clean Energy Center, the former Three Mile Island unit it is restarting. FERC said the waiver does not change Crane's place in the queue or prejudge the grid operator's studies. The order does not name Microsoft. Constellation announced on September 20, 2024 that it had signed a 20-year agreement to sell the plant's power to Microsoft.",
    "what_it_takes_to_pull": "A waiver from the federal power regulator.",
    "what_rides_on_it": "About 835 MW of plant capacity (company figure).",
    "basis": "stated",
    "sources": [
     {
      "title": "FERC eLibrary: Order Granting Waiver Request, Docket ER26-2028-000 (accession 20260601-3068)",
      "publisher": "FERC",
      "url": "https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260601-3068",
      "date": "2026-06-01",
      "tier": "primary"
     },
     {
      "title": "Constellation Energy Generation, LLC, Order Granting Waiver Request, 195 FERC ¶ 61,162 (Docket ER26-2028-000)",
      "publisher": "FERC (copy hosted by RTO Insider)",
      "url": "https://www.rtoinsider.com/wp-content/uploads/2026/06/FERC-ER26-2028-000-Crane-Eddystone-Waiver.pdf",
      "date": "2026-06-01",
      "tier": "primary"
     },
     {
      "title": "Constellation to Launch Crane Clean Energy Center, Restoring Jobs and Carbon-Free Power to the Grid",
      "publisher": "Constellation",
      "url": "https://www.constellationenergy.com/news/2024/Constellation-to-Launch-Crane-Clean-Energy-Center-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html",
      "date": "2024-09-20",
      "tier": "primary"
     }
    ]
   }
  ],
  "statuses": {
   "granted": "Granted",
   "blocked": "Blocked",
   "conditional": "Conditional",
   "pending": "Rule or approval pending",
   "restored": "Pulled, then restored"
  },
  "groups": [
   {
    "id": "sell",
    "name": "Permission to sell"
   },
   {
    "id": "buy",
    "name": "Permission to buy"
   },
   {
    "id": "build",
    "name": "Permission to build and switch on"
   }
  ],
  "page": "https://ailattice.ai/permission/",
  "note": "A map of permission relationships (Alignment force): who needs permission to sell, build or act, who grants it, where it stands and what it takes to pull it. A selection, not a census: the status mix says nothing about AI as a whole. last_record is the date of the latest source, not a claim about today. basis=inferred marks a relationship the source implies but does not state."
 },
 "interface": {
  "doors": [
   {
    "id": "I001",
    "group": "search",
    "door": "Google Search, with AI Overviews and AI Mode",
    "owner": {
     "name": "Google",
     "ids": [
      "google"
     ]
    },
    "models": [
     {
      "name": "Gemini",
      "ids": [
       "google-deepmind"
      ],
      "role": "own"
     }
    ],
    "kind": "own",
    "last_record": "2026-11-04",
    "reach": "AI Mode: more than 1 billion monthly active users (company figure).",
    "who_pays_whom": "Google pays distributors",
    "terms": "Google pays device and browser makers for search placement. The court record put its payment to Apple at $20 billion in 2022.",
    "how_it_could_be_lost": "The final judgment, which generally runs six years from its effective date, restricts exclusive contracts, tying and covered paid placement in the United States, and generally limits covered paid-placement agreements to one year. The government has cross-appealed, seeking to stop search-distribution payments; Google has appealed the ruling against it; Apple has filed in support of the payments.",
    "sources": [
     {
      "title": "Alphabet Q2 2026 earnings: CEO remarks",
      "publisher": "Google",
      "url": "https://blog.google/company-news/inside-google/message-ceo/alphabet-earnings-q2-2026/",
      "date": "2026-07-22",
      "tier": "primary"
     },
     {
      "title": "Google's $20B default search deal with Apple violates antitrust law, judge rules",
      "publisher": "9to5Mac (reporting the court's opinion)",
      "url": "https://9to5mac.com/?p=961401",
      "date": "2024-08-05",
      "tier": "press"
     },
     {
      "title": "United States v. Google LLC: final judgment (search remedies), entered December 5, 2025",
      "publisher": "US Department of Justice",
      "url": "https://www.justice.gov/atr/media/1421546/dl?inline=",
      "date": "2025-12-05",
      "tier": "primary"
     },
     {
      "title": "United States v. Google LLC: reply brief for the United States as cross-appellant",
      "publisher": "US Department of Justice",
      "url": "https://www.justice.gov/atr/media/1469586/dl?inline=",
      "date": "2026-10-29",
      "tier": "primary"
     },
     {
      "title": "Google Appeals Antitrust Ruling, Says Apple Chose Its Search Engine 'Fair and Square'",
      "publisher": "MacRumors",
      "url": "https://www.macrumors.com/2026/05/22/google-search-monopoly-appeal/",
      "date": "2026-05-22",
      "tier": "press"
     },
     {
      "title": "Apple Defends Google Search Payments as Antitrust Fight Heads to Appeals Court",
      "publisher": "PYMNTS",
      "url": "https://www.pymnts.com/cpi-posts/apple-defends-google-search-payments-as-antitrust-fight-heads-to-appeals-court/",
      "date": "2026-11-04",
      "tier": "press"
     }
    ]
   },
   {
    "id": "I002",
    "group": "search",
    "door": "Siri AI on iPhone, iPad and Mac",
    "owner": {
     "name": "Apple",
     "ids": [
      "apple"
     ]
    },
    "models": [
     {
      "name": "Apple Foundation Models, co-developed with Google",
      "ids": [
       "apple"
      ],
      "role": "own"
     }
    ],
    "kind": "own",
    "last_record": "2026-10-26",
    "reach": "No Siri user count published. Device base: more than 2.5 billion active Apple devices in January 2026 (company figure); not all of them run Siri AI.",
    "who_pays_whom": "Apple and Google: not disclosed",
    "terms": "Apple's own model on Apple's own door, with Google in the supply chain: Apple says it co-developed its third-generation foundation models with Google and runs AFM 3 Cloud Pro on Google Cloud. The multi-year collaboration was announced in January 2026; financial terms were not disclosed. Bloomberg reported in November 2025, while the deal was being negotiated, a proposed payment of about $1 billion a year.",
    "how_it_could_be_lost": "Apple owns the door and the model; Google supplies co-development and cloud under a contract. Apple widened Siri AI to more languages in October 2026. Siri AI is not a Gemini chatbot served inside Siri.",
    "sources": [
     {
      "title": "Introducing the third generation of Apple Foundation Models",
      "publisher": "Apple Machine Learning Research",
      "url": "https://machinelearning.apple.com/research/introducing-third-generation-of-apple-foundation-models",
      "date": "2026-06-08",
      "tier": "primary"
     },
     {
      "title": "Joint statement from Google and Apple",
      "publisher": "Google",
      "url": "https://blog.google/company-news/inside-google/company-announcements/joint-statement-google-apple/",
      "date": "2026-01-12",
      "tier": "primary"
     },
     {
      "title": "Apple plans to use 1.2 trillion parameter Google Gemini model to power new Siri",
      "publisher": "Bloomberg",
      "url": "https://www.bloomberg.com/news/articles/2025-11-05/apple-plans-to-use-1-2-trillion-parameter-google-gemini-model-to-power-new-siri",
      "date": "2025-11-05",
      "tier": "press"
     },
     {
      "title": "Siri AI is available in more languages starting today",
      "publisher": "Apple Newsroom",
      "url": "https://www.apple.com/newsroom/2026/10/siri-ai-is-available-in-more-languages-starting-today/",
      "date": "2026-10-26",
      "tier": "primary"
     },
     {
      "title": "Apple reports first quarter results",
      "publisher": "Apple Newsroom",
      "url": "https://www.apple.com/newsroom/2026/01/apple-reports-first-quarter-results/",
      "date": "2026-01-29",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "I003",
    "group": "search",
    "door": "The ChatGPT extension in Siri and Apple Intelligence",
    "owner": {
     "name": "Apple",
     "ids": [
      "apple"
     ]
    },
    "models": [
     {
      "name": "ChatGPT",
      "ids": [
       "openai"
      ],
      "role": "rented"
     }
    ],
    "kind": "rented",
    "last_record": "2026-05-06",
    "reach": "No figure published. Bloomberg reported in May 2026 that usage had been lower than Apple and OpenAI expected.",
    "who_pays_whom": "Not disclosed",
    "terms": "An optional extension that users switch on; Siri can then pass questions to ChatGPT. Terms not disclosed.",
    "how_it_could_be_lost": "Bloomberg reported in March 2026 that Apple planned to open Siri to other chatbots with iOS 27, ending ChatGPT's exclusive place. Apple's iOS 27 guide documents the ChatGPT extension (undated page; checked November 11, 2026).",
    "sources": [
     {
      "title": "Use Siri to get answers from ChatGPT on iPhone (iOS 27)",
      "publisher": "Apple Support",
      "url": "https://support.apple.com/guide/iphone/use-siri-to-get-answers-from-chatgpt-iph0193a9d54/27/ios/27",
      "date": "undated page, checked 2026-11-11",
      "tier": "primary"
     },
     {
      "title": "Apple Plans to Let Rival AI Chatbots Integrate With Siri in iOS 27",
      "publisher": "MacRumors (reporting Bloomberg)",
      "url": "https://macrumors.com/2026/03/26/apple-ios-27-siri-chatbot-integration",
      "date": "2026-03-26",
      "tier": "press"
     },
     {
      "title": "Apple to Let Users Choose Rival AI Models Across Apple Intelligence in iOS 27",
      "publisher": "iClarified (reporting Bloomberg)",
      "url": "https://www.iclarified.com/100774/apple-to-let-users-choose-rival-ai-models-across-apple-intelligence-in-ios-27-report",
      "date": "2026-05-06",
      "tier": "press"
     }
    ]
   },
   {
    "id": "I004",
    "group": "search",
    "door": "Gemini preinstalled on Samsung Galaxy phones",
    "owner": {
     "name": "Samsung",
     "ids": []
    },
    "models": [
     {
      "name": "Gemini",
      "ids": [
       "google-deepmind"
      ],
      "role": "rented"
     }
    ],
    "kind": "rented",
    "last_record": "2026-01-05",
    "reach": "No count for Gemini preinstallation itself. Broader context: Samsung said its Galaxy AI suite, largely powered by Gemini, had rolled out to about 400 million mobile devices by the end of 2025, and set a target of 800 million in 2026 (rollout figures for the whole suite, devices not users).",
    "who_pays_whom": "Google paid Samsung (from January 2025)",
    "terms": "Court testimony reported by Bloomberg in April 2025 showed Google paying Samsung, from January 2025, to preinstall the Gemini app; the amounts were described as enormous sums. Whether those terms still apply is not on record.",
    "how_it_could_be_lost": "Default-assistant placement is a separate question from the payment. The final judgment's limits on exclusivity and covered paid placement reach Google's distribution deals for Gemini.",
    "sources": [
     {
      "title": "Google paid Samsung 'enormous sums' for Gemini AI app installs",
      "publisher": "Bloomberg",
      "url": "https://www.bloomberg.com/news/articles/2025-04-21/google-paid-samsung-enormous-sums-for-gemini-ai-app-installs",
      "date": "2025-04-21",
      "tier": "press"
     },
     {
      "title": "United States v. Google LLC: final judgment (search remedies), entered December 5, 2025",
      "publisher": "US Department of Justice",
      "url": "https://www.justice.gov/atr/media/1421546/dl?inline=",
      "date": "2025-12-05",
      "tier": "primary"
     },
     {
      "title": "Samsung to double mobile devices powered by Google's Gemini to 800 million units this year",
      "publisher": "Reuters",
      "url": "https://www.reuters.com/world/china/samsung-double-mobile-devices-powered-by-googles-gemini-800-mln-units-this-year-2026-01-05/",
      "date": "2026-01-05",
      "tier": "press"
     }
    ]
   },
   {
    "id": "I005",
    "group": "apps",
    "door": "The ChatGPT app",
    "owner": {
     "name": "OpenAI",
     "ids": [
      "openai"
     ]
    },
    "models": [
     {
      "name": "GPT models",
      "ids": [
       "openai"
      ],
      "role": "own"
     }
    ],
    "kind": "own",
    "last_record": "2026-09-29",
    "reach": "1.2 billion weekly users (company figure, September 29, 2026).",
    "who_pays_whom": "Own product",
    "terms": "OpenAI's own app. On phones it is distributed through Apple's and Google's app stores.",
    "how_it_could_be_lost": "No contract to lose. OpenAI has no phone, browser default or operating system of its own in this selection.",
    "sources": [
     {
      "title": "DevDay 2026 recap",
      "publisher": "OpenAI",
      "url": "https://openai.com/index/devday-2026-recap/",
      "date": "2026-09-29",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "I006",
    "group": "apps",
    "door": "The Gemini app",
    "owner": {
     "name": "Google",
     "ids": [
      "google"
     ]
    },
    "models": [
     {
      "name": "Gemini",
      "ids": [
       "google-deepmind"
      ],
      "role": "own"
     }
    ],
    "kind": "own",
    "last_record": "2026-10-28",
    "reach": "Passed one billion users (company figure, Q3 2026 earnings call).",
    "who_pays_whom": "Own product",
    "terms": "Google's own app, also distributed through preinstallation deals such as Samsung's.",
    "how_it_could_be_lost": "The final judgment's limits on exclusivity and covered paid placement apply to the Gemini app's distribution deals.",
    "sources": [
     {
      "title": "Alphabet Q3 2026 earnings call transcript",
      "publisher": "Alphabet",
      "url": "https://s206.q4cdn.com/479360582/files/doc_events/2026/Oct/28/2026_Q3_Earnings_Transcript.pdf",
      "date": "2026-10-28",
      "tier": "primary"
     },
     {
      "title": "United States v. Google LLC: final judgment (search remedies), entered December 5, 2025",
      "publisher": "US Department of Justice",
      "url": "https://www.justice.gov/atr/media/1421546/dl?inline=",
      "date": "2025-12-05",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "I007",
    "group": "apps",
    "door": "Meta AI and the Muse agent, inside Facebook, Instagram and WhatsApp",
    "owner": {
     "name": "Meta",
     "ids": [
      "meta"
     ]
    },
    "models": [
     {
      "name": "Meta's own models",
      "ids": [
       "meta"
      ],
      "role": "own"
     }
    ],
    "kind": "own",
    "last_record": "2026-10-21",
    "reach": "More than 10 million US and Canadian Muse accounts (company figure). Company-wide context, not use of this door: Meta's apps reach 3.64 billion people daily.",
    "who_pays_whom": "Own product",
    "terms": "Meta's own apps. Muse was promoted through house ads on Facebook, Instagram and WhatsApp.",
    "how_it_could_be_lost": "No contract to lose. The door is Meta's own apps.",
    "sources": [
     {
      "title": "Meta Q3 revenue tops estimates; Zuckerberg says Muse accounts top 10 million",
      "publisher": "KSAT (AP)",
      "url": "https://www.ksat.com/business/2026/10/21/meta-q3-revenue-tops-estimates-and-zuckerberg-says-muse-accounts-have-topped-10-million/",
      "date": "2026-10-21",
      "tier": "press"
     },
     {
      "title": "Meta Q3: Boosts AI Spend, Ad Biz, Users",
      "publisher": "MediaPost",
      "url": "https://www.mediapost.com/publications/article/418930/meta-q3-boosts-ai-spend-ad-biz-users.html",
      "date": "2026-10-21",
      "tier": "press"
     },
     {
      "title": "Meta is putting its muscle behind Muse as the AI app takes off",
      "publisher": "TechCrunch",
      "url": "https://techcrunch.com/2026/09/25/meta-is-putting-its-muscle-behind-muse-as-the-ai-app-takes-off/",
      "date": "2026-09-25",
      "tier": "press"
     }
    ]
   },
   {
    "id": "I013",
    "group": "apps",
    "door": "The Claude apps and Claude Code",
    "owner": {
     "name": "Anthropic",
     "ids": [
      "anthropic"
     ]
    },
    "models": [
     {
      "name": "Claude",
      "ids": [
       "anthropic"
      ],
      "role": "own"
     }
    ],
    "kind": "own",
    "last_record": "2026-10-26",
    "reach": "No user count published by Anthropic. Outside estimate for the Claude assistant only: about 245 million monthly users across web and mobile in May 2026 (Sensor Tower). No reach figure for Claude Code. Company-wide context, not use of this door: more than 11,900 customers paying $100,000 or more a year at September 30, 2026 (company filing).",
    "who_pays_whom": "Own product",
    "terms": "Anthropic's own apps and coding tool, sold directly to people and businesses.",
    "how_it_could_be_lost": "No contract to lose.",
    "sources": [
     {
      "title": "Anthropic PBC registration statement (Form S-1)",
      "publisher": "Anthropic / SEC",
      "url": "https://www.sec.gov/Archives/edgar/data/0002130357/000162828026067168/anthropicpbc-sx1.htm",
      "date": "2026-10-26",
      "tier": "primary"
     },
     {
      "title": "ChatGPT's market share slips below 50% for first time",
      "publisher": "TechCrunch (reporting Sensor Tower)",
      "url": "https://techcrunch.com/2026/06/16/chatgpts-market-share-slips-below-50-for-first-time/",
      "date": "2026-06-16",
      "tier": "press"
     }
    ]
   },
   {
    "id": "I008",
    "group": "work",
    "door": "Microsoft 365 Copilot",
    "owner": {
     "name": "Microsoft",
     "ids": [
      "microsoft"
     ]
    },
    "models": [
     {
      "name": "GPT models",
      "ids": [
       "openai"
      ],
      "role": "rented"
     },
     {
      "name": "Claude",
      "ids": [
       "anthropic"
      ],
      "role": "rented"
     },
     {
      "name": "Microsoft's own models",
      "ids": [
       "microsoft"
      ],
      "role": "own"
     }
    ],
    "kind": "mixed",
    "last_record": "2026-10-29",
    "reach": "More than 30 million paid seats at June 30, 2026 (company figure); the October results gave no seat update.",
    "who_pays_whom": "Not disclosed",
    "terms": "Microsoft sells the seats and chooses the model. It added Anthropic's Claude beside OpenAI's models; 90 percent of Copilot queries use an automatic mode that routes each task across models (company statement).",
    "how_it_could_be_lost": "Microsoft can shift work between model makers request by request, without the user seeing it.",
    "sources": [
     {
      "title": "Microsoft Claims 15 Million Paid M365 Copilot Seats",
      "publisher": "Directions on Microsoft",
      "url": "https://www.directionsonmicrosoft.com/blog/microsoft-claims-15-million-paid-m365-copilot-seats",
      "date": "2026-01-29",
      "tier": "secondary"
     },
     {
      "title": "Microsoft (MSFT) Q4 2026 earnings call transcript",
      "publisher": "The Motley Fool",
      "url": "https://www.fool.com/earnings/call-transcripts/2026/08/07/microsoft-msft-q4-2026-earnings-call-transcript/",
      "date": "2026-08-07",
      "tier": "press"
     },
     {
      "title": "Microsoft Q1 FY2027 earnings call transcript",
      "publisher": "ROIC.ai",
      "url": "https://www.roic.ai/quote/MSFT/transcripts/2027-year/1-quarter",
      "date": "2026-10-28",
      "tier": "secondary"
     },
     {
      "title": "Microsoft Q1: Copilot Usage Jumps, Seat Count Goes Missing",
      "publisher": "UC Today",
      "url": "https://uctoday.com/microsoft-q1-copilot-usage-jumps-seat-count-goes-missing",
      "date": "2026-10-29",
      "tier": "press"
     }
    ]
   },
   {
    "id": "I009",
    "group": "work",
    "door": "GitHub Copilot",
    "owner": {
     "name": "Microsoft (GitHub)",
     "ids": [
      "microsoft"
     ]
    },
    "models": [
     {
      "name": "GPT models",
      "ids": [
       "openai"
      ],
      "role": "rented"
     },
     {
      "name": "Claude",
      "ids": [
       "anthropic"
      ],
      "role": "rented"
     },
     {
      "name": "Gemini",
      "ids": [
       "google-deepmind"
      ],
      "role": "rented"
     },
     {
      "name": "Kimi",
      "ids": [
       "moonshot"
      ],
      "role": "rented"
     },
     {
      "name": "Grok",
      "ids": [
       "spacexai"
      ],
      "role": "rented"
     },
     {
      "name": "Microsoft's own models",
      "ids": [
       "microsoft"
      ],
      "role": "own"
     }
    ],
    "kind": "mixed",
    "last_record": "2026-08-14",
    "reach": "50 million users (company figure, July 29, 2026 call); over 4.7 million paid subscribers (company figure, January 28, 2026 call).",
    "who_pays_whom": "Not disclosed",
    "terms": "GitHub picks the models offered. Free and student users get only automatic selection; paid users can also hand tasks to Anthropic's and OpenAI's own coding agents. The models shown are a selection as of GitHub's August 13 and 14, 2026 changelogs (Kimi K3 and Microsoft's MAI-Code on August 13, Grok 4.6 on August 14); the list changes often.",
    "how_it_could_be_lost": "GitHub retires and swaps models on a published schedule.",
    "sources": [
     {
      "title": "GitHub Copilot weekly releases, August 10",
      "publisher": "GitHub Changelog",
      "url": "https://github.blog/changelog/2026-08-13-github-copilot-weekly-releases-august-10/",
      "date": "2026-08-13",
      "tier": "primary"
     },
     {
      "title": "Grok 4.6 is now available in GitHub Copilot",
      "publisher": "GitHub Changelog",
      "url": "https://github.blog/changelog/2026-08-14-grok-4-6-is-now-available-in-github-copilot/",
      "date": "2026-08-14",
      "tier": "primary"
     },
     {
      "title": "GitHub is letting developers choose between Copilot and its biggest rivals",
      "publisher": "The New Stack",
      "url": "https://thenewstack.io/github-agent-hq/",
      "date": "2026-02-04",
      "tier": "press"
     },
     {
      "title": "Microsoft earnings, fiscal 2026 fourth quarter",
      "publisher": "Microsoft Investor Relations",
      "url": "https://www.microsoft.com/en-us/investor/events/fy-2026/earnings-fy-2026-q4",
      "date": "2026-07-29",
      "tier": "primary"
     },
     {
      "title": "Microsoft earnings, fiscal 2026 second quarter",
      "publisher": "Microsoft Investor Relations",
      "url": "https://www.microsoft.com/en-us/investor/events/fy-2026/earnings-fy-2026-q2",
      "date": "2026-01-28",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "I010",
    "group": "work",
    "door": "Cursor",
    "owner": {
     "name": "SpaceXAI (since August 14, 2026)",
     "ids": [
      "spacexai",
      "cursor"
     ]
    },
    "models": [
     {
      "name": "Grok and Composer, its owner's own",
      "ids": [
       "spacexai"
      ],
      "role": "own"
     },
     {
      "name": "Claude",
      "ids": [
       "anthropic"
      ],
      "role": "rented"
     },
     {
      "name": "GPT models",
      "ids": [
       "openai"
      ],
      "role": "rented"
     },
     {
      "name": "Gemini",
      "ids": [
       "google-deepmind"
      ],
      "role": "rented"
     }
    ],
    "kind": "mixed",
    "last_record": "2026-08-14",
    "reach": "No current user count published. More than 50,000 enterprises (company website, checked November 11, 2026). Older figure: more than 1 million daily users, reported by Bloomberg in April 2025. Commercial scale: more than $4 billion of annualized revenue on June 8, 2026, as reported by Forbes citing one unnamed source.",
    "who_pays_whom": "Not disclosed",
    "terms": "Cursor offers its owner's Grok and Cursor's own Composer models beside third-party models, as listed on Cursor's documentation page (undated; checked November 11, 2026); the list changes often. Composer was trained from Moonshot's open-source Kimi as a base checkpoint, which is model lineage, not a model Cursor rents to users.",
    "how_it_could_be_lost": "The door now belongs to a company that makes competing models and can steer users to them.",
    "sources": [
     {
      "title": "Form 8-K (completion of the Anysphere merger)",
      "publisher": "SpaceX (SEC filing)",
      "url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026056945/spcx-20260814.htm",
      "date": "2026-08-14",
      "tier": "primary"
     },
     {
      "title": "Available models",
      "publisher": "Cursor documentation",
      "url": "https://prod.cursor.com/help/models-and-usage/available-models",
      "date": "undated page, checked 2026-11-11",
      "tier": "primary"
     },
     {
      "title": "Composer 2.5",
      "publisher": "Cursor",
      "url": "https://cursor.com/en-US/blog/composer-2-5",
      "date": "2026-05",
      "tier": "primary"
     },
     {
      "title": "Cursor tops $4 billion in annualized revenue",
      "publisher": "Forbes",
      "url": "https://tollbit.forbes.com/sites/richardnieva/2026/06/08/cursor-4-billion-annualized-revenue/",
      "date": "2026-06-08",
      "tier": "press"
     },
     {
      "title": "Cursor, an AI coding assistant, draws a million users without even trying",
      "publisher": "Bloomberg",
      "url": "https://www.bloomberg.com/news/articles/2025-04-07/cursor-an-ai-coding-assistant-draws-a-million-users-without-even-trying",
      "date": "2025-04-07",
      "tier": "press"
     },
     {
      "title": "Cursor for Enterprise",
      "publisher": "Cursor",
      "url": "https://cursor.com/enterprise",
      "date": "undated page, checked 2026-11-11",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "I011",
    "group": "work",
    "door": "Alexa+",
    "owner": {
     "name": "Amazon",
     "ids": [
      "amazon"
     ]
    },
    "models": [
     {
      "name": "Amazon Nova",
      "ids": [
       "amazon"
      ],
      "role": "own"
     },
     {
      "name": "Claude",
      "ids": [
       "anthropic"
      ],
      "role": "rented"
     }
    ],
    "kind": "mixed",
    "last_record": "2026-10-29",
    "reach": "Tens of millions of Alexa+ customers (company figure, January 5, 2026). Separate context: Alexa for Shopping, which combined Alexa+ and Rufus for shopping in May 2026, was used by more than 400 million customers in the 12 months to October 2026 (company figure); that is a broader shopping product, not Alexa+ alone.",
    "who_pays_whom": "Not disclosed",
    "terms": "Amazon reaches Claude through its own Bedrock service and still lists both Nova and Anthropic models behind Alexa+. Amazon is Anthropic's largest investor.",
    "how_it_could_be_lost": "Business Insider reported in July 2026 internal plans to route more Alexa+ requests to Amazon's own models and call Claude less, to cut cost.",
    "sources": [
     {
      "title": "Alexa+ comes to the web",
      "publisher": "Amazon",
      "url": "https://www.aboutamazon.com/news/devices/alexa-plus-web-ai-assistant",
      "date": "2026-01-05",
      "tier": "primary"
     },
     {
      "title": "Alexa+ is available free for Prime members in the US",
      "publisher": "Amazon",
      "url": "https://www.aboutamazon.com/news/devices/alexa-plus-available-free-prime-members-us",
      "date": "2026-02",
      "tier": "primary"
     },
     {
      "title": "Claude and Alexa+",
      "publisher": "Anthropic",
      "url": "https://anthropic.com/news/claude-and-alexa-plus",
      "date": "2025-02-26",
      "tier": "primary"
     },
     {
      "title": "Amazon pushes to lower Alexa AI costs and use Anthropic models less",
      "publisher": "Business Insider",
      "url": "https://www.businessinsider.com/amazon-push-lower-alexa-ai-costs-use-anthropic-models-less-2026-7",
      "date": "2026-07",
      "tier": "press"
     },
     {
      "title": "Amazon.com Announces Third Quarter Results",
      "publisher": "Amazon",
      "url": "https://ir.aboutamazon.com/news-release/news-release-details/2026/Amazon-com-Announces-Third-Quarter-Results/default.aspx",
      "date": "2026-10-29",
      "tier": "primary"
     }
    ]
   },
   {
    "id": "I012",
    "group": "work",
    "door": "Amazon Bedrock (cloud model catalogue)",
    "owner": {
     "name": "Amazon",
     "ids": [
      "amazon"
     ]
    },
    "models": [
     {
      "name": "GPT models",
      "ids": [
       "openai"
      ],
      "role": "rented"
     },
     {
      "name": "Claude",
      "ids": [
       "anthropic"
      ],
      "role": "rented"
     },
     {
      "name": "Amazon Nova",
      "ids": [
       "amazon"
      ],
      "role": "own"
     }
    ],
    "kind": "mixed",
    "last_record": "2026-10-29",
    "reach": "Usage, not users: total Bedrock token volume grew nearly 17 times year over year (company figure, October 2026). No customer count in the latest results.",
    "who_pays_whom": "Not disclosed",
    "terms": "OpenAI's models became generally available on Bedrock after Microsoft's exclusive rights ended.",
    "how_it_could_be_lost": "The model maker can sell the same models through every major cloud.",
    "sources": [
     {
      "title": "OpenAI models on Amazon Bedrock",
      "publisher": "Amazon",
      "url": "https://www.aboutamazon.com/news/aws/bedrock-openai-models",
      "date": "2026-09-08",
      "tier": "primary"
     },
     {
      "title": "Claude and Alexa+",
      "publisher": "Anthropic",
      "url": "https://anthropic.com/news/claude-and-alexa-plus",
      "date": "2025-02-26",
      "tier": "primary"
     },
     {
      "title": "Q3 Earnings: Andy Jassy on why AWS growth keeps accelerating",
      "publisher": "Amazon",
      "url": "https://www.aboutamazon.com/news/company-news/aws-growth-ai-demand-q3-2026-earnings",
      "date": "2026-10-29",
      "tier": "primary"
     }
    ]
   }
  ],
  "kinds": {
   "own": "Own model",
   "mixed": "Own and rented",
   "rented": "Rented model"
  },
  "groups": [
   {
    "id": "search",
    "name": "Search and the phone"
   },
   {
    "id": "apps",
    "name": "Chat and social apps"
   },
   {
    "id": "work",
    "name": "Work and coding tools"
   }
  ],
  "page": "https://ailattice.ai/interface/",
  "note": "Owned versus rented reach (Interface force): for each door to AI, who owns it, whose model answers behind it (role own or rented), its reach, who pays whom and how it could be lost. Reach uses each company's own user definition and is never summed. A selection, not a census. last_record is the date of the latest source."
 }
}